Professional Documents
Culture Documents
: 01 Date: J1 03 2014
SL
No. Description Remarks
All the meters are programmed with necessary settings and configuration was
carried out in ELNET software as per the requirement in PO Yes
ELNET communications with all the meters are checked and confimed that
2 ELNET is communicating with the meters
Yes
All the features/customized screens, SLD & reports along with SMS/email alerts
are completed and working fine as per design Yes
ELNET system as per the PO was handed over to Customer. Customer needs to
take over the Operations and Maintenance of ELNET
4 System. Any modification
required to be done in the system in future, will be on chargeable basis Yes
M/s. Elmeasure India Pvt. Ltd. Ms. Lemon Tree Premier, Mumbai
Sandeep Rajpure Mr. Manoranjan Panda
A
AMIER
VE3IN