Standard Terms & Conditions of Sale

A pleasure to do business with

ZAMIL STEEL BUILDINGS CO. - EGYPT (S.A.E)


INDEX
1. PLACING ORDERS
2. ACCEPTANCE OF ORDERS
3. STANDARD PAYMENT TERMS
4. APPROVAL OF ZAMIL STEEL
DRAWINGS
5. DESIGN CALCULATIONS (Optional)
6. DESIGN CERTIFICATES
7. CHANGE ORDERS
8. JOB ON HOLD
9. MATERIAL DISPATCH
10. ERECTION DRAWINGS
11. SPECIFICATION CHANGES & MATERIAL
SUBSTITUTION
12. DESIGN AND SUPPLY EXCLUSIONS
13. PERMITS AND FEES
14. INSPECTION OF FABRICATED
MATERIALS
15. MATERIAL DISPATCH ADVICE
16. PARTIAL SHIPMENTS
17. CUSTOMER PICK-UP SHIPMENTS
18. UNLOADING OF MATERIAL AT JOB SITE
FOR OVERLAND SHIPMENTS (Supply
Only Contracts)
19. ERECTION OF BUILDINGS (Supply Only
Contracts)
20. ERECTION BY ZAMIL STEEL
21. SHORTAGE OF MATERIALS
22. FIELD MODIFICATIONS
23. COMBINED SHIPMENTS
24. STORAGE
25. WARRANTY
26. FORCE MAJEURE
27. CANCELLATION OF ORDERS
The following Terms and Conditions of sale are established by 3.3 Supply C&F Job Site, Overland Shipment
Zamil Steel Buildings Co. - Egypt (S.A.E.), hereinafter referred
to in this document as Zamil Steel, to govern the sale of pre- The L/C value should be payable according to, and against
Engineered Buildings that are processed through Zamil Steel presentation of, the documents specified hereinafter:
Buildings Co. - Egypt (S.A.E.)
Down payment of 25% of the L/C value is to be paid upon
1. PLACING ORDERS the receipt of the L/C and against presentation of the
beneficiary’s [Zamil Steel Buildings Co.-Egypt (S.A.E.)]
Orders are normally placed after Zamil Steel submits a written commercial invoice to the negotiating bank.
proposal (also known as quotation or offer) to its customer.
Quotations may be revised until all technical and commercial Balance of the L/C to be paid against presentation of:
matters are agreed upon by both the customer and Zamil Steel.
• Commercial invoice.
Once all matters are agreed upon and are included in a final • Packing list.
revised Zamil Steel proposal, the client’s authorized • Truck consignment note issued by the TRUCKING
representative and Zamil Steel’s authorized representative COMPANY or any services entity confirming the receipt
must sign a standard contract. A blank from of this contract of material for further delivery to the job site.
is attached to all Zamil Steel proposals.
Other Terms:
2. ACCEPTANCE OF ORDERS a) Partial shipment must be allowed.
b) Negotiating / Advising bank’s charges are to the
Only signed and dated contracts are accepted at Zamil Steel. beneficiary’s account while the Opening / Issuing bank’s
Accepted orders are entered in a sales register maintained by charges are to the opener’s account.
the Order Management Department.

The Order Management Department will put orders that are 3.4 Supply C&F Job Site, Overland Shipment (Export)
incomplete on hold until corrective action is taken. Customers
are informed of “On Hold” status through the Zamil Steel The L/C value should be payable according to and against
Sales Offices. presentation of the documents specified hereinafter:

Down payment of 25% of the L/C value is to be paid upon


3. STANDARD PAYMENT TERMS
the receipt of the L/C and against presentation of the
3.1 Letter of Credit beneficiary’s [Zamil Steel Buildings Co.-Egypt (S.A.E.)]
sight draft & commercial invoice to the negotiating bank.
Payment of the full contract price shall be by an irrevocable
letter of credit (L/C) issued by a first class Egyptian Bank, Balance of the L/C to be paid against presentation of:
confirmed by the negotiating bank in Egypt. The validity
period for the L/C is to be established at the time of signing
the contract. The minimum validity period of the L/C shall • Sight draft drawn on confirming bank.
be 90 days for shipment and 111 days for negotiation. For • Commercial invoice.
example, if the latest date for shipment is the 1 st of January • Packing list.
then the L/C expiry date should be the 22nd of January. • Truck consignment note issued by the TRUCKING
COMPANY or any services entity confirming the receipt of
3.2 Correspondent Banks material for further delivery to the job site.
Below is the address and account number of Zamil Steel’s • Certificate of origin (in Arabic)
correspondent bank in Egypt.
Other Terms:
Commercial International Bank (Egypt) S.A.E
6th of October City, Egypt a) Partial shipment must be allowed.
Phone: (20 2) 3833 06 20 - 21
Fax: (20 2) 3833 16 58 b) Negotiating / Advising bank’s charges are to the
Telex:21235 94348 CNBCA UN beneficiary’s account while the Opening / Issuing bank’s
E.G. P Account No. 1755010392 charges are to the opener’s account.
U.S.D Account No. 1755380290 c) Negotiating bank in Egypt to be requested to add its
SWIFT No. CIBEEGCX017 confirmation.
d) The original documents (the most common of which are
Other Egyptian banks can be used for advising L/Cs provided the commercial invoice, packing list, truck consignment
that advising correspondent bank should be located in Cairo note and certificate of origin) are to be hand carried by
or 6th of October City. All L/C’s opened by banks outside the truck driver for border customs clearance. Duplicate
Egypt must be confirmed by an Egyptian bank. copies of the same shall be acceptable for negotiation.
3.5 Supply Ex-Works Factory in 6th October City, Cairo • Bill of lading.
• Certificate of origin, in either English or Arabic.
The L/C value should be payable according to, and against
presentation of the documents specified hereinafter: Other Terms:
Down payment of 25% of the L/C value is to be paid upon a) Partial shipment must be allowed.
the receipt of the L/C and against presentation of the b) Transshipment must be allowed.
beneficiary’s [Zamil Steel Buildings Co.-Egypt (S.A.E.)] c) Negotiating / Advising bank’s charges are to the
commercial invoice to the negotiating bank. beneficiary’s account while the Opening / Issuing bank’s
charges are to the opener’s account.
Balance of the L/C to be paid against presentation of: d) Negotiating bank in Egypt must be requested to add its
confirmation.
• Commercial invoice.
• Packing list. 3.7 Supply FOB Egyptian Port, Sea Shipment (All Destinations)
• Material dispatch note issued by the beneficiary and
countersigned by the truck driver confirming receipt of The L/C value should be payable according to and against
materials. OR, presentation of the documents specified hereinafter:
Telex sent by beneficiary to openers through the negotiating Down payment of 25% of the L/C value is to be paid upon
bank, 7 to 10 days prior to shipment date, informing the bank the receipt of the L/C and against presentation of the
that the material is ready for shipment and requesting the bank beneficiary’s [Zamil Steel Buildings Co.-Egypt (S.A.E.)]
to make arrangements for customer pickup. sight draft & commercial invoice to the negotiating bank.
In the event that trucks are not made available on the due
shipping date, beneficiary is allowed to submit copies of Balance of the L/C to be paid against presentation of:
invoice, certificate of origin (if applicable), and packing list
to the negotiating bank for negotiation, adding a letter stating • Sight draft drawn on negotiating bank.
that: • Commercial invoice.
• Packing list.
“Openers have not provided trucks to collect the materials. • Bill of lading showing “freight collected”.
Materials will remain in the beneficiary’s custody for further • Certificate of origin, in either English or Arabic.
handing over to L/C openers”. • Trade terms to read as FOB any Egyptian Port.

Other Terms: Other Terms:

a) Partial shipment must be allowed. a) Partial shipment must be allowed.


b) Negotiating / Advising bank’s charges are to the b) Negotiating / Advising bank’s charges are to the
beneficiary’s account while the Opening / Issuing bank’s beneficiary’s account while the Opening / Issuing bank’s
charges are to the opener’s account. charges are to the opener’s account.
c) Negotiating bank must add its confirmation. c) Negotiating bank must add its confirmation.
d) Original documents (the most common of which are d) Openers to arrange with the shipping lines to issue Bill
the commercial invoice, packing list, and material dispatch of lading showing “freight collect”.
note) are to be hand carried by the truck driver and
duplicate copies of the same shall be acceptable for 3.8 Supply & Erection Contracts (Egypt Contracts only)
negotiation.
e) Items c & d applies only for overland export. Minimum validity of L/C shall be 180 days.

3.6 Supply C&F Destination Port, Sea Shipment (All The L/C value should be for the total amount of the supply
Destinations) and erection prices.
Payment for Supply:
The L/C value should be payable according to, and against
presentation of the documents specified hereinafter:
The supply C&F job site value should be payable as follows:
Down payment of 25% of the L/C value is to be paid upon
the receipt of the L/C and against presentation of the Down payment of 25% of the supply C&F job site value is
beneficiary’s [Zamil Steel Buildings Co.-Egypt (S.A.E.)] to be paid upon the receipt of the L/C and against presentation
commercial invoice to the negotiating bank. of the beneficiary’s [Zamil Steel Buildings Co.-Egypt (S.A.E.)]
commercial invoice to the negotiating bank.
Balance of the L/C to be paid against presentation of:
Balance of supply price C&F job site to be paid against
• Sight draft drawn on negotiating bank. presentation of documents specified hereinafter:
• Commercial invoice.
• Packing list. • Commercial invoice.
• Packing list. 4.9 Approval drawings for standard buildings are normally
• Truck consignment note issued by the TRUCKING submitted within 2 weeks. More complex buildings require
COMPANY or any services entity confirming receipt of longer submittal time for approval drawings.
material for further delivery to the job site.
4.10 Approval drawings should be returned to Zamil Steel’s
Other Terms: Sales Office / Head Office within 2 weeks after receipt by
the customer. Delay in returning approval drawings may
a) Partial shipment must be allowed. affect the overall project cycle including delivery of the
b) Transshipment must be allowed. steel to the job site (or port of entry).
c) Negotiating / Advising bank’s charges are to the
beneficiary’s account while the Opening / Issuing bank’s
charges are to the opener’s account. 5. DESIGN CALCULATIONS (Optional)
d) Negotiating bank must add its confirmation (export
jobs). 5.1 For jobs requiring approval, the structural design
calculations may be included with the approval drawings,
Payment for Erection: if requested.

Erection value to be paid against time drafts (dates to be 5.2 Three (3) sets of-structural design calculations are provided
determined according to the erection period) all of which free of charge. Additional sets are available for a fee of
are payable with respect to the shipment date. EP 150 (US$ 40) per set.

5.3 Standard structural design calculations include:


4. APPROVAL OF ZAMIL STEEL DRAWINGS
4.1 When requested by the customer or considered necessary a) Material specifications & design assumptions.
b) Design of the primary & secondary structural framing.
by Zamil Steel, approval drawings shall be prepared to c) Wind bracing design.
ensure that the Zamil Steel interpretation of all the d) Column reactions.
customer’s requirements is accurate.
5.4 Additional engineering fees may be levied for design
4.2 If the building is tied up to an existing building, Zamil calculations, which require more analysis than what is
Steel will not issue approval drawings until a report from included in the standard calculations.
a certified surveyor is received at Zamil Steel Order
Management Department.
6. DESIGN CERTIFICATES
4.3 When approval is required, three (3) sets of drawings are
provided free of charge to the customer of which one set A design certificate attesting to the structural design
must be signed by the customer and returned to Zamil integrity of a Zamil Steel building may be furnished (at
Steel’s responsible Sales Office “Approved As Is” or no cost) in lieu of the design calculations.
“Approved As Noted”. Additional sets are available for a
fee of EP 300 (US$ 80) per set.
7. CHANGE ORDERS
4.4 The information presented in the approval drawings is
preliminary in nature and is not to be used for the purpose
of setting anchor bolts, design of foundations and other 7.1 Changes in the requirements, after a contract is signed and
construction activities. accepted, requires the client to sign a change order letter,
prepared by Zamil Steel, which describes the change(s)
4.5 The approval of these drawings shall be accepted by Zamil and the impact the changes may have on price and/or
Steel only in the form of the customer’s (or his authorized delivery. No further action will be taken by Zamil Steel
representative’s) signature within the “Approval” stamp until a change order has been signed as accepted by the
placed by Zamil Steel on its approval drawings. Approval customer.
by any other means shall not be accepted by Zamil Steel.
7.2 The price of fabricated components, made obsolete due
4.6 Signed approval drawings shall be final and binding. to a change order that is initiated after the start of fabrication,
will be changed to the customer’s account.
4.7 Jobs that have been “Out For Approval” for more than 60
days will be subject to the pricing schedule that is in effect 8. JOB ON HOLD
at the time the approval drawings are returned to Zamil
Steel Order Management Department. Zamil Steel reserves 8.1 All costs incurred when a job is placed “On Hold” by the
the right to cancel orders that have been “Out For Approval” customer, after the start of manufacturing, will be to the
for more than 90 days (the customer shall be responsible customer’s account.
for ordinary cancellation and engineering costs).
8.2 A job that is not released for production within 90 days
4.8 Comments on returned approval drawings, which change from the date of its entry in the sales register, for whatever
the previously agreed upon scope of work, must be in reason (including lack of technical clarification), will be
RED INK and covered by a change order that is duly put “On Hold”. Zamil Steel reserves the right to re-price
signed and accepted by the customer. such a job from its “On Hold” status.
9. MATERIAL DISPATCH 12.2 Zamil Steel does not supply, nor does it accept responsibility
for the design or construction of column footings, ground
9.1 The material dispatch commitments is measured, in weeks, slabs, tie beams, masonry walls and other concrete works.
from the date of the latest receipt and acceptance, at Zamil
Steel Head Office, of all the following job related 12.3 Zamil Steel does not supply, nor does it accept responsibility
documents: for plumbing services, electrical services, air conditioning
services, or any other material or service not specified in
• Signed contract. the final accepted proposal, contract or change order.
• Acceptable letter of credit / final accepted amended L/C.
• Final change order including any amendments to L/C 13. PERMITS AND FEES
price.
• Approval drawings signed as “Approved As Is” or 13.1 It is the customer’s responsibility to obtain and pay for all
“Approved As Noted”, where applicable. building permits, licenses, public assessment, prorated
utilities, utility connections, occupancy fees and any other
9.2 Production and dispatch schedules shall be determined fees required by any government authority in connection
when all of the following is fulfilled: with the work provided for in the contract.
• Receipt of the final “Approved As Is” or “Approved As 13.2 The customer shall provide, at his expense, all plans and
Noted” approval drawings at Zamil Steel head office or specifications required to obtain the building permit, except
sales offices, where applicable (see item 4). those plans to be furnished by Zamil Steel.
• Receipt and acceptance of the final change order, where
applicable (see item 7). 13.3 It is the customer’s responsibility to ensure that all the
• Release to production by Zamil Steel Finance Department, plans and specifications, including those produced by
i.e., financial clearance. Zamil Steel, comply with the applicable requirements of
all the governing building authorities.
9.3 Zamil Steel Order Management Department regularly
notifies Zamil Steel Sales Offices of all production and 13.4 If erection is to be by Zamil Steel Site Engineers, a copy
dispatch schedules for jobs entered by their offices. of the building permit must be provided to Zamil Steel,
by the customer, prior to the commencement of work. If
10. ERECTION DRAWINGS erection work has to be deferred due to building permit
problems, the cost of such stoppages, standing time or
10.1 The standard erection drawings package shall consist of demobilization charged to the customer.
one (1) set sent to the customer, via the Zamil Steel
responsible Sales Office, and one (1) set dispatched with 14. INSPECTION OF FABRICATED MATERIALS
the materials.
14.1 Zamil Steel has a standard Quality Plan, which outlines
10.2 When erection is by Zamil Steel the package shall consist the quality control procedures that are followed during the
of one (1) set sent to the customer via the Zamil Steel production and shipment of its products. This plan describes
responsible Sales Office and one (1) set provided to Zamil the sampling techniques, types of tests conducted, control
Steel Site Engineers. procedures and reporting format used in the production
of all manufactured components.
10.3 Additional sets of erection drawings may be supplied on The approved procedures described in this Quality Plan
request for EP 300 (US$80) per set. are maintained within Zamil Steel Quality Control
Department.
10.4 If specifically requested, one set of “As Built” drawings
will be supplied to the customer (free of charge) after 14.2 Inspection of Zamil Steel’s products at Zamil Steel plant
erection is completed. “As Built” drawings shall incorporate by a customer, or by his authorized representative, (if
changes made during erection (if any) provided that such required by a specific supply contract) maybe arranged.
changes are notified in writing to Zamil Steel before Such inspection will be scheduled after receipt of a written
completion of erection. request for such inspection by the customer, Inspections
will be arranged in such a manner so as not to delay
11. SPECIFICATION CHANGES & MATERIAL production and/ or shipment. In the event that the customer
SUBSTITUTION or his representative fails to conduct inspections as
scheduled, the goods shall be considered “Released By
When a standard inventory item is out of stock or when Concession”.
product development improvements necessitate it, Zamil
Steel reserves the right to substitute material equivalent 15. MATERIAL DISPATCH ADVICE
to that originally specified.
15.1 Upon dispatch, Zamil Steel Shipping Department advises
12. DESIGN AND SUPPLY EXCLUSIONS Zamil Steel responsible Sales Office of the actual dispatch
date.
12.1 Zamil Steel’s supply includes only materials, which are
clearly described in its proposal under “Building 15.2 The customer will be notified of the actual dispatch by
Description” and “Standard Supplied Material” or covered Zamil Steel responsible Sales Office immediately upon
by written, accepted and signed change orders. the dispatch of material from Zamil Steel factory.
16. PARTIAL SHIPMENTS 19. ERECTION OF BUILDINGS
(Supply Only Contracts)
16.1 On large jobs, it is Zamil Steel standard practice to make
partial shipments. 19.1 The customer shall be fully responsible for the quality of
erection of Zamil Steel buildings when the erection is not
16.2 When partial shipments are made, Zamil Steel shall carried out by Zamil Steel.
endeavor to ship erectable steel to enable erection to
proceed smoothly. Zamil Steel assumes no liability for, and the customer
shall hold Zamil Steel harmless on account of, any defects
16.3 When partial shipments are requested and accepted by in the erection of buildings or such defects as loose
Zamil Steel, each shipment will be assigned a prorated connections, missing parts, roof leaks, damaged sheets,
value of the dispatched materials that is claimed according omission of sealer, scratched surfaces, poor alignment,
to the accepted terms of payment covering the total job inadequate drainage and defects caused by others. The
value. customer shall permit Zamil Steel’s personnel to inspect
the erection work at any time during the erection process.
17. CUSTOMER PICK-UP SHIPMENTS
17.1 Zamil Steel does not accept Customer Pick-Up shipment 19.2 Although Zamil Steel appoints only competent contractors
for sea shipments. as Certified Builders, Zamil Steel is not responsible for
the quality of erection made by these builders. Zamil Steel
17.2 Zamil Steel prefers to make all overland shipments by Certified Builders are independent contractors who are
contract carrier, the customer may pick-up the material certified by Zamil Steel due to their knowledge and
provided that the procedures noted in section 17.3 to 17.5 experience in pre-engineered steel buildings, erection and
are observed. contracting practices.

17.3 The customer must obtain an assigned loading date and 20. ERECTION BY ZAMIL STEEL
time from Zamil Steel Order Management Department.
20.1 Zamil Steel Site Engineers shall undertake building erection
17.4 The customer must provide suitable trailers for loading only on a clear, levelled and unobstructed concrete slab,
by Zamil Steel. Zamil Steel cannot load closed van trailers with suitable access for trucks and erection equipment. A
and trailers with sidings. 6 m wide access shall be provided around each building
17.5 The customer’s driver must check and sign a receipt for for storage, setting out and erection of the building. The
the Zamil Steel materials. ground of all working areas shall be suitably compacted,
for the use of forklifts or cranes.
17.6 Customers who are not familiar with Zamil Steel’s customer
pick-up procedures should request this information from 20.2 Prior to the arrival of Zamil Steel Site Engineers on site,
the responsible Zamil Steel Sales Office.
the anchor bolts are to be accurately set by others. Anchor
18. UNLOADING OF MATERIAL AT JOB SITE bolts, set in place shall have appropriate nuts and washers
FOR OVERLAND SHIPMENTS (Supply Only installed on cleaned threads.
Contracts)
20.3 Zamil Steel Site Engineers may check the position and
18.1 Unloading of trucks at job site is the responsibility of the level of the anchor bolts prior to the pouring of the concrete
customer. The customer is expected to provide suitable foundations. This does not absolve the contractor from his
equipment for unloading the material. If a site is inaccessible
responsibility for accuracy. Any rework required due to
or not ready to accept the material, another site for unloading
must be provided by the customer. misplacement of anchor bolts or faulty concrete shall be
the responsibility of the customer.
18.2 The customer is solely responsible for the condition of the
job site as far as the safety of the trucking company driver 20.4 If erection is delayed due to the non-completion of civil
and Zamil Steel material is concerned. works, or other causes, Zamil Steel shall not be responsible
for the deterioration of the primer paint, or the cleaning
18.3 The customer is responsible for accurately checking the of the manufactured steel after delivery to site.
materials upon arrival and unloading. Any discrepancies
must be noted on the material dispatch note. 20.5 If at the sole discretion of Zamil Steel Site Engineers,
erection takes place on footings and beams prior to pouring
18.4 A receiving representative of the customer cannot refuse
of the concrete slab, Zamil Steel shall not be responsible
to accept an entire shipment because some portion of that
shipment is damaged or missing. for any cleaning of the steel columns or cladding after
pouring of the concrete slab.
Damaged materials must be noted on the material dispatch
note and reported to the responsible Zamil Steel Sales 20.6 Zamil Steel shall not be responsible for the repair of
Office immediately. damage to building components caused by others.
20.7 Any repairs necessary shall be undertaken only after the 24.2 Should a customer delay dispatch of goods for a period
receipt by Zamil Steel Site Engineers of written acceptance exceeding 10 days after the originally scheduled dispatch
of the charges, in the from of a change order, from the date, STORAGE CHARGES shall be levied by Zamil
customer. Steel, at the rate of 0.1% of the ex-works selling price (of
the unshipped material) per day up to a maximum of 5%.
20.8 Any deviation from these standard erection conditions
shall be subject to price review. 24.3 Zamil Steel shall not be held responsible for damage
caused to the exposed steel after it has been stored longer
20.9 Zamil Steel reserves the right to subcontract part or all of than 10 days. Such damage may include deterioration of
its erection contract to qualified contractors who will the paint coating.
execute the job professionally and in accordance with
Zamil Steel’s strict erection requirements. 25. WARRANTY
21. SHORTAGE OF MATERIALS 25.1 Zamil Steel warrants materials for one year from the date
of material dispatch. This warranty extends only to materials
21.1 On contracts where a material consignment is received on manufactured by Zamil Steel in that such material shall
site by anyone other than Zamil Steel Site Engineers, the not fail due to defective materials or workmanship, when
customer’s (or his representative’s) dated signature utilized in the intended manner.
constitutes a formal acknowledgment of the correct receipt
of the consignment for both quality and quantity. 25.2 Zamil Steel warrants that the structure shall support the
loads described in Zamil Steel’s drawings and contract, if
21.2 It is the customer’s (or his representative’s) responsibility properly erected, as part of complete structural system
to check the materials before signing and dating acceptance designed by Zamil Steel and comprising only of parts
on Zamil Steel’s material dispatch note. made by Zamil Steel, and the structure is used in the
manner and the purpose for which it was designed.
21.3 Claims of shortages shall only be accepted by Zamil Steel
if received in writing within seven (7) days of the date of 25.3 No warranties are expressed or implied other than those
the acceptance signature. described in these Terms and Conditions of Sale.

21.4 If, after receipt of such claims, Zamil Steel’s bills of 25.4 In the event of breach of warranty, the limit of any claim
materials and shipping lists are found to be correct, shall be the correction or replacement of defective materials
replacement material shall be supplied only after receipt and correction of defective workmanship.
of the customer’s (or his representative’s) written acceptance
of the additional ex-works costs and delivery costs for Under no circumstances shall Zamil Steel be responsible
such replacement material. for consequential damages that are alleged to or arisen
from any such claim of breach of warranty.
21.5 Zamil Steel shall not accept any consequential claims or
liabilities that are alleged to, or arisen from, losses or 26. FORCE MAJEURE
shortages.
Zamil Steel shall not be held accountable for delays in
22. FIELD MODIFICATIONS material dispatch or delivery (after dispatch) resulting
from circumstances outside its control, such as strikes,
22.1 Minor field modifications and adjustments, in any pre- acts of war, revolution, riot or civil disturbance, trade
engineered building, are to be anticipated, Minor field sanctions or restrictions, occurrences of meteorological
work dose not constitute grounds for backcharges, This or geophysical nature, etc., to the extent that these affect
field work should be provided for within the contingency transport, communications, manufacturing and/or erection
element of any construction estimate. by Zamil Steel, its suppliers and its subcontractors.
22.2 Only repairs due to major fabrication errors may be cause
for filing a claim. Such repairs shall only be undertaken 27. CANCELLATION OF ORDERS
after consultation and consent of Zamil Steel.
27.1 In the event a signed contract is cancelled by a customer,
23. COMBINED SHIPMENTS the higher of the following cancellation charges will apply:

Zamil Steel is occasionally obliged to include a small • 10% of the total contract amount.
quantity of material (back-order or urgent material request) • All actual charges incurred by Zamil Steel (and its
consigned to a customer within a shipment destined to subcontractors / suppliers) up to the time of receipt of
another customer in the same metropolitan area or territory. the notice of cancellation.
All customers benefit from this mutual cooperation.
27.2 Cancellation charges are due immediately upon the receipt
24. STORAGE by Zamil Steel of the customer’s notice of cancellation.

24.1 Zamil Steel shall store, free of charge in their open yards, No changes in these terms and conditions shall be allowed unless agreed to, in
any or all the materials, for a contract, for a period not writing, by the General Manager of the Pre-Engineered Buildings Division at
exceeding 10 days from the scheduled dispatch date. Zamil Steel Head Office in 6th of October, Egypt.
A pleasure to do business with

HEAD OFFICE
P.O. Box 11
Main Post Office
6th October City-Egypt
Phone:(20 2) 3828 3333
Fax :(20 2) 3834 1247 - 3828 3399

E-mail: egyptmarketing@zamilsteel.com.eg

www.zamilsteel.com

AREA OFFICES
Egypt (Cairo, Alexandria), Sudan (Khartoum),
Ethiopia (Addis Ababa), Ghana (Accra),
South Africa (Johannesburg),
CÔte d’Ivoire (Abidjan), Tanzania (Dar ES Salam),
Senegal (Dakar), Morocco (Casablanca), Algeria
(Algiers), Nigeria (Lagos), Libya (Tripoli)

Saudi Arabia (Dammam, Riyadh and Jeddah),

Kuwait (Kuwait City), Bahrain (Manama), Qatar


(Doha), UAE (Dubai and Abu Dhabi), Oman
(Muscat), Yemen (Sana’a)

Jordan (Amman), Lebanon (Beirut), India


(Chennai), Pakistan (Lahore), Sri Lanka
(Colombo), Bangladesh (Dhaka), Czech Republic
(Prague), Romania (Bucharest). Greece (Athens),
Spain (Madrid), Poland (Warsaw)

Thailand (Bangkok), Myanmar (Yangon),


Vietnam (Ho Chi Mich, Hanoi and Haiphong),
China (Shanghai), Philippines (Manila), South
Korea (Seoul)

You might also like