Pre-Engineered Buildings

Standard Terms & Conditions of Sale


Standard Terms & Conditions of Sale Pre-Engineered Buildings
Standard Terms & Conditions of Sale
Index

1. Placing Orders
2. Acceptance of Orders
3. Standard Payment Terms
4. Approval of Zamil Steel Drawings
5. Design Calculations (Optional)
6. Design Certificates
7. Change Orders
8. Jobs on Hold
9. Material Dispatch
10. Erection Drawings
11. Specification Changes & Material Substitution
12. Design and Supply Exclusions
13. Permits and Fees
14. Inspection of Fabricated Materials
15. Material Dispatch Advice
16. Partial Shipments
17. Customer Pick-Up Shipments

18. Unloading of Material at the Job Site for Overland


Shipments (Supply Only Contracts)
19. Erection of Buildings (Supply Only Contracts)
20. Erection by Zamil Steel
21. Shortage of Materials
22. Field Modifications
23. Combined Shipments
24. Storage
25. Warranty
26. Force Majeure
27. Cancellation of Orders
28. Governing Law & Dispute Resolution

Pre-Engineered Buildings Standard Terms & Conditions of Sale


The following Terms and Conditions of Sale For example, if the deadline for ship-
are established by Zamil Steel Pre-Engi- ment is the 1st of January then the L/C
neered Buildings Co. Ltd., Saudi Arabia, will expire on the 22nd of January. (L/Cs
hereinafter referred to in this document as issued by Saudi & GCC Banks - confir-
Zamil Steel, to govern the sale and ship- mation not required.)
ment of Pre-Engineered Buildings that are
designed, manufactured and processed by 3.2 Correspondent Banks
Zamil Steel Pre-Engineered Buildings Co.
Ltd., Saudi Arabia. Customers opening a letter of credit
may choose from the following Saudi
correspondent banks. Addresses and
1. Placing Orders Zamil Steel account numbers are also
provided for customer convenience.
Orders are normally placed after Zamil
Steel submits a written proposal (also
known as quotation or offer) to its customers. SABB
Quotations may be revised until all techni- P.O. Box 1618
cal and commercial matters are agreed Dammam 31411, Saudi Arabia
upon by both the customer and Zamil Steel. Phone (966 13) 833 1553,
Fax (966 13) 832 1916
Once all matters are agreed upon and are Swift Code: SABBSARI
included in a final, revised Zamil Steel Account No. 042-884882-001
proposal, both the customer’s authorized IBAN No. SA7045000000042884882001
representative and Zamil Steel’s authorized
representative must sign a standard
contract. This standard document is pro-
vided with and attached to all Zamil Steel Arab National Bank
proposals. P.O. Box 18
Dammam 31411, Saudi Arabia
Phone (966 13) 832 3440,
2. Acceptance of Orders Fax (966 13) 834 7309
Swift Code: ARNBSARI
Only orders accompanied by signed and Account No. 0108095169880021
dated contracts are accepted by Zamil Steel. IBAN No. SA0230400108095169880021
Orders are reviewed and determined to be
complete with all required information. Ac-
cepted orders are entered in a sales register
maintained by the Order Management De- Saudi Hollandi Bank
partment while orders that are incomplete P.O. Box 70
are placed on hold until the appropriate Dammam 31411, Saudi Arabia
corrective action is taken. Customers are Phone (966 13) 894 8001,
informed of the “On Hold” status of their Fax (966 13) 894 8001 x 190
orders by the responsible Zamil Steel Area Swift Code: AAALSARI
Office. Account No. 0-10398472-00-8
IBAN No. SA9550000000010398472008

3. Standard Payment Terms


3.1 Letter of Credit Al Rajhi Bank
Br. No. 139
Payment of the full contract price will be P.O. Box 1362
made by an irrevocable letter of credit Al-Khobar 31952, Saudi Arabia
(L/C), confirmed by the negotiating bank Phone (966 13) 864 3525,
in Saudi Arabia. The period of validity Fax (966 13) 864 3525 x 225
for the L/C is established at the time of Swift Code: RJHISARI
contract signing. The minimum period Account No. 578608010025395
of validity of the L/C is 90 days for IBAN No. SA9680000578608010025395
shipment and 111 days for negotiation.

1 Standard Terms & Conditions of Sale Pre-Engineered Buildings


Riyadh Bank JPMorgan Chase Bank N. A.
P.O Box 274 Al Faisaliah Tower, Level 8, Area C
Dammam 31411, Saudi Arabia PO Box 51907, Floor 8
Phone (966 13) 833 5733, Riyadh, 11553, Saudi Arabia
Fax (966 13) 832 1056 Swift Code: CHASSARIXXX
Swift Code: RIBLSARI
Account No. 3540349239940
IBAN No. SA0520000003540349239940
Deutsche Bank AG
17th Floor, King Fahad Road
Nevertheless the following banks can Aloaya District
advise L/Cs issued in favor of Zamil Steel P.O. Box 301806, Riyadh 11372, KSA
Pre-Engineered Buildings Co. Ltd. Swift Code: DEUTSARIXXX

National Commercial Bank


P.O. Box 5558
Dammam 31432, Saudi Arabia
Phone (966 13) 834 0088
Fax (966 13) 834 7251
Swift Code: NCBKSASARI

Banque Saudi Fransi


P.O. Box 2792
Dammam 31411, Saudi Arabia
Phone (966 13) 825 1588
Fax (966 13) 898 5508
Swift Code: BSFSARIxxx

SAMBA Financial Group


P.O. Box 842
Al-Khobar 31952, Saudi Arabia
Phone (966 13) 865 8271
Fax (966 13) 865 8277
Swift Code: SAMBSARI

National Bank of Pakistan


P.O. Box 63020,
Riyadh 11516, Saudi Arabia
Phone (96611) 217 2631
Fax (966 11) 217 8869

Al Inma Bank
P.O. Box 66674
Riyadh 11586, Saudi Arabia

All L/C’s opened by banks located outside


Saudi Arabia must be confirmed by a Saudi
bank.

Pre-Engineered Buildings Standard Terms & Conditions of Sale 2


3.3 LC Opening Procedure (Within Ksa)

Zamil Steel Pre-Engineered Buildings Co. Ltd.


P.O. Box 877, Dammam 31421, Saudi Arabia
Phone (966 13) 847 1840 Fax (966 13) 847 1291

For the sum of SAR. _______________ (Saudi Riyals ________________________ only) being
____________% of the value of Zamil Steel’s contract proposal no._______________, rev.
no._______________, dated ___________. and advise Zamil Steel Pre-Engineered Build-
ings Co. Ltd., Dammam, through any Saudi Bank.
L/C should be payable against presentation of the following documents

1. Sight Draft drawn on issuing bank.


2. Invoice in one original and two copies.
3 Packing List.
4 Truck Consignment Note issued by the trucking company (confirming receipt of
material for delivery to opener’s job site) marked freight pre-paid (if shipment is on
DAP/CPT/CIP basis) and made out to the order of the opening bank and notify
openers.
5. Land Insurance Certificate covering ;Land Transit All Risks clauses for 110% of
shipment value.
This is applicable for Contracts with CIP Terms.
6. If Commercial Invoice requires Applicant’s authorized representative signature,
the following clause is to be added: “If Applicant fails to return the counter
signed Commercial Invoice within 10 days from the date of shipment, beneficiary
is allowed to present the documents for claim without the countersignature of
Applicant’s authorized representative signature on such documents.

Other Terms:
a. WAR RISK is not covered under land insurance
b. Partial shipment is allowed.
c. L/C must be valid for shipment for ninety (90) days from opening date.
d. L/C expiry date shall be twenty one (21) days after L/C shipment date.
e. All L/C opening and amendment charges are for opener’s account.

Please arrange to transmit the full text of the L/C by SWIFT, being the operative instru-
ment, to enable the beneficiary to ship the material at an early date and advise the ben-
eficiary through telephone/fax to collect the L/C from the advising bank.

Notes:
1) for deferred payment, the rate of 0.3% per month to be added to the contract value.
2) In case of approval for issuance of advance / performance bond there is a cost
involved which amounts to 1% per annum.

3 Standard Terms & Conditions of Sale Pre-Engineered Buildings


3.4 LC Opening Procedure (Within GCC)

Zamil Steel Pre-Engineered Buildings Co. Ltd.


P.O. Box 877, Dammam 31421, Saudi Arabia
Phone (966 13) 847 1840 Fax (966 13) 847 1291

For the sum of SAR/USD/AED/QAR/BHD/KWD/OMR _______________)


________________________ only) being ____________% of the value of Zamil Steel’s con-
tract proposal no._______________, rev. no._______________, dated ___________. and ad-
vise Zamil Steel Pre-Engineered Buildings Co. Ltd. Dammam, through any prime Saudi
Bank with the clear instructions to add their confirmation to the said L/C.
L/C should be payable against presentation of the following documents

1 Sight Draft drawn on negotiating bank.


2. Invoice in one original and two copies.
3. Packing List.
4. Certificate of Origin in Arabic issued by the Saudi Arabian Ministry of Commerce
and Industry as per GCC format.
5. Truck Consignment Note issued by the trucking company confirming receipt of
material for delivery to opener’s job site marked freight pre-paid (if shipment is on
DAP/CPT/CIP basis) and made out to the order of the opening bank and notify
openers.
6. Land Insurance Certificate covering Land Transit All Risks clauses for 110% of
shipment value.
This is applicable for Contracts with CIP Terms.

Other Terms:
a. Partial shipment is allowed.
b. L/C must be valid for shipment for ninety (90) days from opening date.
c. L/C expiry date shall be twenty one (21) days after L/C shipment date.
d. All L/C opening and amendment charges are for opener’s account.

Please arrange to transmit the full text of the L/C by SWIFT, being the operative instru-
ment, to enable the beneficiary to ship the material at an early date and advise the ben-
eficiary through telephone/fax to collect the L/C from the advising bank.

Notes:
1) for deferred payment, the rate of 0.3% per month to be added to the contract value.
2) In case of approval for issuance of advance / performance bond there is a cost
involved which amounts to 1% per annum.

Pre-Engineered Buildings Standard Terms & Conditions of Sale 4


3.5 LC Opening Procedure (Arab Countries Other Than GCC) (Over Land)

Zamil Steel Pre-Engineered Buildings Co. Ltd.


P.O. Box 877, Dammam 31421, Saudi Arabia
Phone (966 13) 847 1840 Fax (966 13) 847 1291

For the sum of SAR/USD/Euro _______________ (Saudi Riyals/ US Dollars/ Euros


________________________ only) being ____________% of the value of Zamil Steel’s con-
tract proposal no._______________, rev. no._______________, dated ___________. and ad-
vise Zamil Steel Pre-Engineered Buildings Co. Ltd. Dammam, through any prime Saudi
Bank with the clear instructions to add their confirmation to the said L/C.
L/C should be payable against presentation of the following documents (Please check ap-
plicable boxes)

1. Sight Draft drawn on negotiating bank.


2. Invoice in one original and two copies.
3. Packing List.
4. Certificate of Origin in Arabic issued by the Saudi Arabian Ministry of Commerce
and Industry.
5. Truck Consignment Note issued by the trucking company confirming receipt of
material for delivery to opener’s job site marked freight pre-paid and made out to
the order of the opening bank and notify openers.

Other Terms:
a. Partial shipment is allowed.
b. L/C must be valid for shipment for ninety (90) days from opening date.
c. L/C expiry date shall be twenty one (21) days after L/C shipment date.
d. All L/C opening and amendment charges are for opener’s account.

Please arrange to transmit the full text of the L/C by SWIFT, being the operative instru-
ment, to enable the beneficiary to ship the material at an early date and advise the ben-
eficiary through telephone/fax to collect the L/C from the advising bank.

Notes:
1) for deferred payment, the rate of 0.3% per month to be added to the contract value.
2) In case of approval for issuance of advance / performance bond there is a cost
involved which amounts to 1% per annum.

5 Standard Terms & Conditions of Sale Pre-Engineered Buildings


3.6 LC Opening Procedure Sea Shipment (All Countries):

Zamil Steel Pre-Engineered Buildings Co. Ltd.


P.O. Box 877, Dammam 31421, Saudi Arabia
Phone (966 13) 847 1840 Fax (966 13) 847 1291

For the sum of SAR/USD/Euro _______________ (Saudi Riyals/ US Dollars/ Euros


________________________ only) being ____________% of the value of Zamil Steel’s con-
tract proposal no._______________, rev. no._______________, dated ___________. and ad-
vise Zamil Steel Pre-Engineered Buildings Co. Ltd. Dammam, through any prime Saudi
Bank with the clear instructions to add their confirmation to the said L/C.
L/C should be payable against presentation of the following documents (Please check ap-
plicable boxes)

1. Sight Draft drawn on negotiating bank.


2. Invoice in one original and two copies.
3. Packing List.
4. Certificate of Origin in English issued by the Saudi Arabian Ministry of
Commerce and Industry.
5. Full Set of Shipped On Board Bill of Lading issued by the Carrier or their
authorized Agents made out to the Order of Opening Bank marked freight
pre-paid and notify openers.

Other Terms:
a. Partial shipment is allowed.
b. L/C must be valid for shipment for ninety (90) days from opening date.
c. L/C expiry date shall be twenty one (21) days after L/C shipping date.
d. All L/C opening and amendment charges are for opener’s account.

Please arrange to transmit the full text of the L/C by SWIFT, being the operative instru-
ment, to enable the beneficiary to ship the material at an early date and advise the ben-
eficiary through telephone/fax to collect the L/C from the advising bank.

Notes:
1) for deferred payment, the rate of 0.3% per month to be added to the contract value.
2) In case of approval for issuance of advance / performance bond there is a cost
involved which amounts to 1% per annum.

Pre-Engineered Buildings Standard Terms & Conditions of Sale 6


3.7 Supply Ex-Works Factory in Dammam c) The negotiating bank must add its
confirmation on LCs coming out
The value of the L/C will be payable side K.S.A.
according to the following terms: Down
payment of 10% of the value of the L/C d) Original documents (the most
will be paid upon the receipt of the L/C common of which are the commer
and against presentation of the ben- cial invoice, packing list, and
eficiary’s (Zamil Steel Pre-Engineered material dispatch note) are to be
Buildings Co. Ltd.) sight draft & commer- hand carried by the truck driver and
cial invoice to the negotiating bank. The duplicate copies of the same shall
balance of the value of the L/C will be be acceptable for negotiation.
paid against presentation of the:
This is applicable for LCs within
• Sight draft drawn on the negotiating GCC & Arab countries.
bank.
3.8 Supply CFR Destination Port,
• Commercial invoice. Sea Shipment (All Destinations)

• Packing list. The full value of the L/C will be payable


according to the following terms:
• Delivery note issued by the
beneficiary and countersigned by the Down payment of 10% of the L/C value
truck driver confirming receipt of will be paid upon the receipt of the L/C
materials. OR, and against presentation of the ben-
eficiary’s (Zamil Steel Pre-Engineered
Telex sent by beneficiary to openers of Buildings Co. Ltd.) sight draft & commer-
the L/C through the negotiating bank, cial invoice to the negotiating bank.
7 to 10 days prior to the shipment date,
informing the bank that the material is The balance of the value of the L/C will
ready for shipment and requesting the be paid against presentation of the:
bank to make arrangements for cus-
tomer pickup. • Sight draft drawn on negotiating
bank.
In the event that trucks do not arrive on
the specified shipping date, the • Commercial invoice.
beneficiary may submit copies of in-
voice, certificate of origin (if applicable), • Packing list.
and packing list to the negotiating bank
for processing, along with a letter stating • Bill of lading.
that:
• Certificate of origin, in either English
“The L/C openers have not provided and / or Arabic, issued by the Saudi
trucks to collect the material. Material Arabian Ministry of Commerce and
will remain in the beneficiary’s custody Industry.
to be transfered to the L/C openers on
the future date”. Additional Terms:

Additional Terms: a) Partial shipments must be


permitted.
a) Partial shipment must be permitted.
b) Trans shipment must be allowed.
b) The negotiating / advising bank’s
charges will be applied to the c) The negotiating / advising bank’s
beneficiary’s account, while the charges will be applied to the ben
opening / issuing bank’s charges eficiary’s account, while the
will be ap plied to the account of the opening / issuing bank’s charges
party opening the L/C will be applied to the account of
the party opening the L/C.

7 Standard Terms & Conditions of Sale Pre-Engineered Buildings


d) The negotiating bank must add its
confirmation. The L/C value will cover the total
amount of the supply and erection
3.9 Supply FOB Dammam Port, Sea prices.
Shipment (All Destinations)
Payment for Supply:
The value of the L/C will be payable
according to the following terms: The supply CPT job site amount is
Down payment of 10% of the L/C value payable as follows:
will be paid upon the receipt of the L/C
and against presentation of the ben- Down payment of 10% of the supply CPT
eficiary’s (Zamil Steel Pre-Engineered job site amount is to be paid upon the
Buildings Co. Ltd.) sight draft & commer- receipt of the L/C and against presen-
cial invoice to the negotiating bank. tation of the beneficiary’s (Zamil Steel
Pre-Engineered Buildings Co. Ltd.) sight
The balance of the value of the L/C will draft & commercial invoice to the negoti-
be paid against presentation of: ating bank.

• Sight draft drawn on th negotiating The balance of the supply price CPT job
bank. site will be paid upon presentation of
the following documents:
• Commercial invoice.
• Sight draft drawn on the negotiating
• Packing list. bank.

• Bill of lading specifying “freight • Commercial invoice.


collect”.
• Packing list.
• Certificate of origin, in either English
or Arabic, issued by the Saudi Ara- • Truck consignment note issued by the
bian Ministry of Commerce. TRUCKING COMPANY confirming
receipt of material for fur ther delivery
• Trade terms must read as FOB to any to job site.
Saudi Port.
Additional Terms:
Additional Terms:
a) Partial shipments must be
a) Partial shipments must be permitted.
permitted.
b) Trans shipment must be allowed.
b) The negotiating / advising bank’s
charges will be applied to the ben c) The negotiating / advising bank’s
eficiary’s account, while the opening / charges will be applied to the
issuing bank’s charges will be applied beneficiary’s account, while the
to the account of the party opening the opening / issuing bank’s charges
L/C. will be applied to the account of the
party opening the L/C.
c) Negotiating bank must add its confirma-
tion. Payment for Erection

d) Openers to arrange with the shipping The erection price will be paid against
lines to issue bill of lading time drafts (dates to be determined
showing “freight collect”. according to the erection period) all of
which are calculated based upon the
3.10 Supply & Erection Contracts shipment date.
(Saudi Arabian Contracts only)
4. Approval of Zamil Steel
The L/C will remain valid for a minimum
of 180 days. Drawings

Pre-Engineered Buildings Standard Terms & Conditions of Sale 8


customer will be responsible for
4.1 When requested by the customer or ordinary cancellation and engineering
considered necessary by Zamil Steel, costs) incurred up to that point in the
approval drawings will be prepared to process.
ensure that Zamil Steel accurately
interprets the requirements and 4.8 Comments noted on returned approval
specifications of the customer. drawings, that change the previously
agreed upon scope of work, must
4.2 If the building is attached to an existing appear in RED INK and be accompa-
building, Zamil Steel will not issue nied by a change order that is duly
approval drawings until a report pre- signed and accepted by the customer.
pared by a certified surveyor is sent
to the Zamil Steel Order Management 4.9 Approval drawings for standard build-
Department. ings are normally submitted within two
weeks of request. Approval drawings
4.3 When approval is required, two (2) sets for more complex buildings require a
of drawings are provided to the cus- longer period of preparation time.
tomer, free of charge. One set must be
signed by the customer and returned 4.10 Approval drawings should be returned
to the responsible Zamil Steel Area Of- to Zamil Steel’s Area Office / Head
fice bearing the notation - “Approved Office within two weeks of the
As Is” or “Approved As Noted”. The customer’s date of recipt. A delay in
second set may be retained by the cus- the return of approval drawings may
tomer for future reference.Additional affect the overall project cycle, includ-
sets are available for a fee of SR 300 ing delivery of the steel to the job site
(US$ 80) per set. (or port of entry).

4.4 The information presented in the 5. Design Calculations


approval drawings is preliminary in
nature and is not intended for uses (Optional)
such as setting anchor bolts, designing
foundations and other construction 5.1 For projects that require approval, the
activities. structural design calculations may be
included with the approval drawings,
4.5 The approval of these drawings by if requested.
Zamil Steel will be accepted only in the
form of the customer’s (or his autho- 5.2 Two (2) sets of structural design calcula-
rized representative’s) signature, tions are provided to the customer, free
appearing within the “Approval” of charge. Additional sets are avail-
stamp placed by Zamil Steel on its able for a fee of SR 150 (US$ 40) per set.
approval drawings. Approval by any
other means will not be accepted by 5.3 Standard structural design calculations
Zamil Steel. include:

4.6 Sets of drawings that are signed and a) Material specifications & design
approved in the designated manner assumptions.
will be considered final and binding.
b) Design of the primary & secondary
4.7 Jobs that have been designated as structural framing.
“Out For Approval” for a period of c) Wind bracing design.
more than 60 days will be subject to
the pricing schedule that is in effect at d) Column reactions.
the time the approval drawings are
returned to Zamil Steel Order Man- 5.4 Additional engineering fees may be
agement Department. Zamil Steel levied for the preparation of design
reserves the right to cancel orders that calculations, they require a greater level
have been designated as “Out For of analysis than the standard alcula-
Approval” for more than 90 days (The tions.

9 Standard Terms & Conditions of Sale Pre-Engineered Buildings


6. Design Certificates
• Acceptable letter of credit / final
A certificate attesting to the structural accepted amended L/C.
design integrity of a particular Zamil
Steel building, signed and stamped by • Final change order including any
a registered professional engineer, is amendments to L/C price.
available (at no extra cost) in lieu of the
design calculations. • Approval drawings, signed and
marked as “Approved As Is”or “Ap
7. Change Orders proved As Noted”, where applicable.

7.1 Once a contract is signed and 9.2 Production and dispatch schedules shall
accepted, any subsequent changes to be determined when all of the following
the order require a change order letter, are fulfilled:
prepared by Zamil Steel and signed by
the customer. This letter will, describes • Receipt of the final “Approved As Is”
the specific change(s) and indicate the or “Approved As Noted” approval
impact these changes may have on drawings at Zamil Steel offices, where
price and/or delivery of the project. No applicable (see item 4).
further action will be taken by Zamil
Steel until the change order has been • Receipt and acceptance of the final
signed as accepted by the customer. change order, where applicable (see
item 7).
7.2 The cost of any fabricated components
that are rendered useless by a change • Release to production by the Zamil
order initiated after the start of fabrica- Steel Finance Department, i.e. fi-
tion, will be charged to the customer’s nancial clearance. This will be done
account. when the customer fulfills all the
contract commercial terms.

8. Jobs on Hold 9.3 The Zamil Steel Order Management


Department regularly notifies all Zamil
8.1 All costs that are incurred by Zamil Steel Steel Area Offices of production and
when a job is placed “On Hold” by the dispatch schedules for the jobs entered
customer, after the start of manufactur- by each individual office.
ing, will be charged to the customer’s
account.
10. Erection Drawings
8.2 A job that is not released for production
within 90 days from the date of its entry 10.1 The standard erection drawings
in the sales register, for whatever reason package consists of one (1) set sent to
(including lack of technical clarification), the customer, via the responsible Zamil
will be put “On Hold”. Zamil Steel Steel Area Office, and one (1) set
reserves the right to adjust the price of dispatched with the materials.
such a job according to the price rates
that are valid at the time of release from 10.2 When erection is completed by Zamil
its “On Hold” status. Steel, the package will consist of one
(1) set of drawings sent to the customer,
via the responsible Zamil Steel Area
9. Material Dispatch Office, and one (1) set provided to the
Zamil Steel erection team.
9.1 The material dispatch commitment
period is measured, in weeks, from the 10.3 Additional sets of erection drawings
latest date of receipt and acceptance by are available upon request for SR 300
Zamil Steel offices of all of the following (US$ 80) per set.
job related documents:
10.4 By specific request only, one set of “As
• Signed contract. Built” drawings will be supplied to the

Pre-Engineered Buildings Standard Terms & Conditions of Sale 10


customer (free of charge) after 13. Permits and Fees
erection is completed. “As Built” draw-
ings will incorporate changes made 13.1 It is the customer’s sole responsibility to
during erection (if any), assuming that obtain and pay for all building permits,
those changes have been communi- licenses, public assessment, prorated
cated in writing to Zamil Steel after utilities, utility connections, occupancy
completion of erection. fees as well as any other fees required
by any government authority in connec-
11. Specification Changes tion with the work provided for in the
contract.
& Material Substitution
13.2 The customer will provide, at his ex-
11.1 Zamil Steel reserves the right to pense, all plans and specifications
substitute meterial equivalent to that required to obtain the building permit,
originally specified when a standard except those plans to be furnished by
inventory item is out of stock or when Zamil Steel.
product development improvements
make substitution necessary. 13.3 It is the customer’s responsibility to
ensure that all the plans and specifi-
11.2 When special paint supplier is speci- cations, including those produced by
fied by the consultant / client, and paint Zamil Steel, comply with the applicable
is found to have application problems requirements of all the governing build-
and (or) extended drying times, Zamil ing authorities.
Steel will recommend to substitute it
with an equivalent and suitable sup- 13.4 If erection is to be completed by the
plier, subject to final approval by the Zamil Steel erection team, a copy of the
consultant / client. Otherwise, delivery building permit must be provided to
period shall be extended to accommo- Zamil Steel by the customer, prior to the
date for the additional required drying commencement of work. If erection work
time. must be deferred due to building permit
problems, the cost of such stoppages,
12. Design and Supply standing time or demobilization will be
charged to the customer’s account.
Exclusions
14. Inspection of Fabricated
12.1 Zamil Steel supplies only materials that
are clearly described in its proposal Materials
under “Building Description” and
“Standard Supplied Items” or cov- 14.1 Zamil Steel, an ISO 9001 certified
ered by written, accepted and signed company, operates in accordance with
Change Orders. its standard Quality Plan, which specifi-
cally outlines the quality control proce-
12.2 Zamil Steel does not supply, nor does it dures that must be followed during the
accept responsibility for the design or production and shipment of its products.
construction of column footings, ground This plan describes the sampling tech-
slabs, tie beams, masonry walls and niques, types of tests conducted, control
other concrete works. procedures and reporting format used
in the production of all manufactured
12.3 Zamil Steel does not supply, nor does it components. The approved procedures
accept responsibility for plumbing described in this Quality Plan are main-
services, electrical services, air tained within the Zamil Steel Quality
conditioning services, or any other Control Department.
material or service not specified in the
final accepted proposal, contract or 14.2 Inspection of Zamil Steel products at
Change Order. the Zamil Steel plant by a customer,
or by his authorized representative, (if
required by a specific supply contract)
may be

11 Standard Terms & Conditions of Sale Pre-Engineered Buildings


arranged. Such inspection will be 17.3 The customer must obtain an assigned
scheduled upon receipt of a written loading date and time from the Zamil
request for such inspection by the Steel Order Management Department.
customer. Inspections will be arranged
in such a manner so as not to delay 17.4 The customer must provide suitable
production and/or shipment. In the trailers for loading by Zamil Steel.
event that the customer or his repre- Zamil Steel cannot load closed van
sentative fails to conduct inspections as trailers and trailers with sidings.
scheduled, the applicable goods will
be considered “Accepted and Re- 17.5 The customer’s driver must check and
leased By Concession”. sign a receipt for the Zamil Steel
materials.

15. Material Dispatch Advice 17.6 Customers who are not familiar with
Zamil Steel’s customer pick-up
15.1 Upon dispatch, Zamil Steel Shipping procedures should request complete
Department will advise the responsible information from the responsible Zamil
Zamil Steel Area Office of the actual Steel Area Office.
dispatch date.
18. Unloading of Material at
15.2 The customer will be notified of the
actual dispatch date by the responsible Job Site for Overland
Zamil Steel Area Office, immediately Shipments (Supply Only
upon the dispatch of material from Contacts)
Zamil Steel factory.
18.1 Unloading of trucks at the job site
is the sole responsibility of the
16. Partial Shipments customer. The customer is expected
to provide suitable equipment for
16.1 On large jobs, it is the standard policy unloading the material. If a site
of Zamil Steel standard practice to is inaccessible or not ready to accept
make partial shipments. the material, another site for unloading
must be provided by the customer.
16.2 When partial shipments are made,
Zamil Steel will endeavor to ship 18.2 The customer is solely responsible for
erectable steel on a schedule that en- the condition of the job site in terms of
ables the erection process to proceed as the safety of the trucking company
smoothly. driver and the Zamil Steel material.

16.3 When partial shipments are requested 18.3 The customer is responsible for
and accepted by Zamil Steel, each accurately checking the materials
shipment will be assigned a prorated upon arrival and unloading. Any
value of the dispatched materials discrepancies must be indicated on the
based upon the accepted terms of pay- material dispatch note.
ment covering the total job value.
18.4 A receiving representative of the
customer cannot refuse to accept an
17. Customer Pick-Up Shipments entire shipment because some
portion of that shipment is damaged or
17.1 Zamil Steel does not permit customer missing. Damaged materials must be
for overseas shipments. indicated on the material dispatch note
and reported to the responsible Zamil
17.2 Zamil Steel prefers to make all over- Steel Area Office immediately.
land shipments by contract carrier;
however, the customer may pick-up the
materia provided that the procedures 19. Erection of Buildings
noted in section 17.3 to 17.5 are ob-
served. (Supply Only Contracts)

Pre-Engineered Buildings Standard Terms & Conditions of Sale 12


19.1 The customer will be solely responsible responsibility for accuracy. Any
for the quality of a erection of Zamil addional work or rework required due
Steel building when the erection is not to misplacement of anchor bolts or
carried out by the Zamil Steel erection faulty concrete will be the responsibil-
team. Zamil Steel assumes no liability ity of the customer.
for, and the customer will hold Zamil
Steel harmless in connection with any 20.4 If erection is delayed due to the
defects in the erection of buildings or non-completion of civil works, or other
such defects as loose connections, causes, Zamil Steel will not be respon-
missing parts, roof leaks, damaged sible for the deterioration of the primer
sheets, omission of sealer, scratched paint, or the cleaning of the manufac-
surfaces, poor alignment, or inad- tured steel after delivery to site.
equate drainage that are the result of
the erection process. 20.5 Zamil Steel will not be responsible for
any cleaning of the steel columns or
19.2 The customer will permit Zamil Steel’s cladding after pouring of the concrete
personnel to inspect the erection work slab.
at any time during the erection pro-
cess. 20.6 Zamil Steel will not be responsible for
grouting under base plates after steel
19.3 Although Zamil Steel appoints only erection and alignment. The customer
competent contractors as Certified will be responsible for finalizing the
Builders, Zamil Steel is not responsible grouting prior to applying the design
for the quality of erection provided by loads including cladding.
these builders. Zamil Steel Certified
Builders are independent contractors 20.7 Zamil Steel shall not be responsible for
who are certified by Zamil Steel on the the repair of any damage to building
basis of knowledge and experience in components caused by others.
pre-engineered steel building erection
and contracting practices. 20.8 Any necessary repairs will be per-
formed only upon receipt by the Zamil
20. Erection by Zamil Steel Stee erection team of written notifica-
tion of acceptance of the charges, by
20.1 The Zamil Steel erection team will the customer in the form of a Change
undertake building erection only Order.
on a clear, leveled, compacted and
unobstructed building foot print, 20.9 Any deviation from these standard
with suitable uninterrupted access erection conditions will become sub-
for unloading trucks and erection ject to price review.
equipment. A 10 meter wide access
must be provided around each 20.10 Zamil Steel reserves the right to
building for cladding & accessories subcontract part or all of its erection
storage. The ground surface of all contract to qualified contractors who
working areas must be suitably will execute the job professionally and
compacted to accommodate the use of in accordance with Zamil Steel’s strict
forklifts or cranes. erection requirements.

20.2 Prior to the arrival of the Zamil Steel


erection team on site, the anchor bolts 21. Shortage of Materials
must be accurately set by other per-
sonnels. All anchor bolts set in place 21.1 Whenever a material consignment is
must have the appropriate nuts and received on site by anyone other than
washers installed on cleaned threads. the Zamil Steel erection team, the
dated signature of the customer or his
20.3 The Zamil Steel erection team may designated representative constitutes
check the position and level of the a formal acknowledgment of the
anchor bolts prior to the pouring of the correct receipt of the consignment as
concrete foundations. This does not related to both quality and quantity.
absolve the contractor from his

13 Standard Terms & Conditions of Sale Pre-Engineered Buildings


21.2 It is the sole responsibility of the in their open yards, any or all the ma-
customer or his representative respon- terials for a contract for a period not
sibility to check the materials before exceeding 10 days from the scheduled
signing and dating Zamil Steel’s mate- dispatch date.
rial dispatch note to indicate accep-
tance. 24.2 Should a customer delay dispatch of
goods for a period exceeding 10 days
21.3 Claims of shortages are only accepted after the originally scheduled dispatch
by Zamil Steel if received in writing date, STORAGE CHARGES will be
within seven (7) days of the date of the levied by Zamil Steel, at the rate of
acceptance signature. 0.1% of the ex-works selling price (of
the unshipped material) per day up to
21.4 If, after receipt of such claims, Zamil a maximum of 5%.
Steel bills of materials and shipping
lists are found to be correct, replace- 24.3 Zamil Steel shall not be held
ment material will be supplied only responsible for damage caused to the
upon receipt written acceptance of the exposed steel after it has been stored
additional ex-works costs and delivery longer than 10 days. Such damage
costs from the customer or his may include deterioration of the paint
representative. coating.

21.5 Zamil Steel is not responsible for any


consequential claims or liabilities al- 25. Warranty
leged to arise from losses or shortages.
25.1 Zamil Steel warrants the materials it
manufactures for a period of one year
22. Field Modifications from the date of material dispatch.
This warranty extends only to failure
22.1 Minor field modifications and adjust- due to defective materials or work-
ments, in any pre-engineered build- manship, and covers only products
ing, are to be anticipated. Minor field that are utilized in the intended man-
work does not constitute grounds for ner.
chargebacks or refunds. This field
work should be provided for within the 25.2 Zamil Steel warrants that the structure
contingency element of any construc- will support the loads described in
tion estimate. Zamil Steel’s drawings and contract
when properly erected, as part of a
22.2 Only repairs due to major fabrication complete structural system designed
errors may be cause for filing a claim. by Zamil Steel and made up only of
Such repairs will only be undertaken parts made by Zamil Steel, provided
with the consultation and consent of that the structure is used in the man-
Zamil Steel. ner and purpose for which it was
designed.

23. Combined Shipments 25.3 No warranties are expressed or im-


plied other than those described in
Zamil Steel is occasionally obliged to these Terms and Conditions of Sale.
include a small quantity of material
(perhaps a back-order or urgent 25.4 In the event of breach of warranty, the
material request) within a shipment limit of any claim shall be the cor-
destined for another customer in the rection or replacement of defective
same metropolitan area or territory. materials and correction of defective
All customers stand to benefit from this workmanship.Under no circumstances
mutual cooperation. will Zamil Steel be responsible for con-
sequential damages that are alleged
to arise from any such claim of breach
24. Storage of warranty.

24.1 Zamil Steel shall store, free of charge 25.5 In the event of erection by Zamil Steel,

Pre-Engineered Buildings Standard Terms & Conditions of Sale 14


the building maintenance is warrant-
ed for 12 months from the date of pro-
visional acceptance by the customer.

26. Force Majeure


Zamil Steel shall not be held account-
able for delays in material dispatch or
delivery (after dispatch) resulting from
circumstancesoutside its control, such
as strikes, acts of war, revolution, riot
or civil disturbance, trade sanctions or
restrictions, occurrences of meteoro-
logical or geophysical nature, etc., to
the extent that these affect transport,
communications, manufacturing and/
or erection by Zamil Steel, its suppliers
and its subcontractors.

27. Cancellation of Orders


27.1 In the event that a signed contract is
cancelled by a customer, the greater of
the following cancellation charges will
apply:

• 10% of the total contract amount.

• All actual charges incurred by Zamil


Steel (and its sub contrac tors / sup-
pliers) up to the time of receipt of
the notice of cancellation.

27.2 Cancellation charges are due


immediately upon the receipt by
Zamil Steel of the customer’s notice of
cancellation.

28. Governing Law & Dispute


Resolution

28.1 This Agreement shall be governed by,


and construed in accordance with the
Laws of the Kingdom of Saudi Arabia.

28.2 Any dispute arising hereunder or from


or in connection herewith shall be
resolved amicably by discussion be-
tween the parties hereto, failing which
the parties shall submit the matter in
dispute to be finally settled pursuant to
the Saudi Arbitration Regulations. The No changes in these terms and conditions shall be
arbitration shall take place in Dam- allowed unless agreed to, in writing, by the General
mam, Saudi Arabia. Manager of the Pre-Engineered Buildings Division at
Zamil Steel Head Office in Dammam, Saudi Arabia.

15 Standard Terms & Conditions of Sale Pre-Engineered Buildings


Pre-Engineered Buildings Standard Terms & Conditions of Sale
Head Office: PO Box 877 Dammam 31421 Saudi Arabia Phone (966 13) 847 1840 Fax (966 13) 847 1291
Factories: Saudi Arabia, Ras Al Khaimah, Egypt, India, Vietnam

Standard Terms & Conditions of Sale Pre-Engineered Buildings 11

November 2015