W/O No Asset No Asset Description Duration Department Planned date/time


20403 CTA03 Compaction Table 3 (infront of mixer 7) 8.00 Mould B 04/05/2021 8:00
20277 SSC01 spiral sand cooler 6.00 Reclaimer A 05/05/2021 9:00
20278 OSC01 Omega sand cooler 1 6.00 Reclaimer A 06/05/2021 9:00
PM Dashboard Reclaimer PM WK 18 8.00 Reclaimer B 08/05/2021 8:00
20405 CSOXY Oxygen reticulation system 6.00 site 11/05/2021 8:30
PM Dashboard CM10,000 PM WK22 8.00 Mould B 12/05/2021 8:00
20404 CSLPG LPG reticulation system 6.00 site 12/05/2021 8:30
20408 HCG03 High Cycle Generator 3 3.00 Grind B 12/05/2021 14:00
PM Dashboard Reclaimer PM WK 20 8.00 Reclaimer B 15/05/2021 8:00
20402 A5SRS Plant A Sand Reclaim System 6.00 Reclaimer A 17/05/2021 9:00
20417 CNC02 CNC Machine Centre 2 6.00 Mc Shop 18/05/2021 9:00
20400 SD05 Drill Stand 5 2.00 Mc Shop 19/05/2021 8:00
20401 HL14 Horizontal Lathe No 14 5.00 Mc Shop 19/05/2021 10:00
20415 HB05 Horizontal Borer No 5 5.00 Mc Shop 20/05/2021 8:00
20414 HB06 Horizontal Borer No 6 5.00 Mc Shop 20/05/2021 13:30
PM Dashboard Dust Collector Mixer 8 WK20 4.00 Mould B 21/05/2021 8:00
PM Dashboard Quenching crane F10 PM WK20 4.00 HT B 21/05/2021 13:30
PM Dashboard Reclaimer PM WK 22 8.00 Reclaimer B 22/05/2021 8:00
PM Dashboard Axial blower 1-14 PM WK20 4.00 HT B 24/05/2021 8:00
PM Dashboard Axial blower 7-12 PM WK22 4.00 HT B 24/05/2021 13:30
PM Dashboard Zero Harm Ladle 02 4.00 Melt B 25/05/2021 8:00
PM Dashboard Ladle G1(8Ton) PM WK22 4.00 Melt B 25/05/2021 13:00
PM Dashboard Panel cooling system 4.00 Melt B 26/05/2021 8:30