BARANGAY

ROAD REPAIR

For Barangay Guintagbucan Real Street


Why a road repair?
Improved rural road infrastructure enables connectivity and
safe mobility. It also affects access to health, education and
economic opportunities. Almost a billion people globally have
limited access to road infrastructure.

Rural connectivity also provides for local employment, which is


a crucial aspect in the COVID-19 scenario that has seen large-
scale reverse migration to rural areas from cities. These local
employment opportunities provide a much-needed safety net to
reduce financial distress.
OBJECTIVES
Continue to provide Avoid detour, speed
1 safe and convenient 2 changes, etc. due to
travel facilities to the failures in roadway
road users. facilities and to
minimize the
increase in road
transportation cost.

Preserve the asset Avoid rapid


3 and investments 4 deterioration of the
made on the road pavement structure
infrastructure by leading to huge
taking appropriate maintenance cost by
maintenance carrying out timely
measures at the ‘preventive
right time. maintenance’ works.
SCOPE
This project
mainly focuses on
Barangay Guintagbucan -
Real Street
TIME FRAME
START OF CONSTRUCTION: APRIL 1, 2022
TARGET DATE OF FINISH: JUNE 1, 2022
BUDGET BREAKDOWN
PROJECT COST PHP 2,000,000

LABOR COST PHP 500,000

TOTAL COST PHP 2,500,000


DESCRIPTION OF THE
ONE-TIME COST IN
The estimated expenses of PHP 2.5 million is alloted
for both the construction materials and as well as
the workers. Since this will be a big project, many
workers should be hired and a lot of materials will be
needed.
PROJECT STAKEHOLDERS

Client: Brgy. Guintagbucan Real Street


Sponsor: Abegail B. Tamayo
Project Manager: Kim Maximus B. Tamayo
PROJECT MONITORING
AND EVALUATION
The Project Manager and his crew will be monitoring
the progress of the project and will ensure better
quality of work to be done.
Approved by the client

Approved by the sponsor

Approved by the project manager