You are on page 1of 3

PEMERINTAH KABUPATEN TEMANGGUNG

DINAS PENDIDIKAN KEBUDAYAAN PEMUDA DAN OLAHRAGA


-

RENCANA ANGGARAN BIAYA

KEGIATAN : REHABILITASI RUANG PEMBELAJARAN /PENUNJANG RUSAK BERAT


PEKERJAAN : REHABILITASI RUANG BELAJAR SD TEMANGGUNG
LOKASI :
SUMBER DANA :
H.SATUAN H.KESATUAN JUMLAH
NO URAIAN PEKERJAAN ANALIS VOL/SAT.
[Rp.] [Rp.] [Rp.]
1 2 3 4 5.00 6 7
A. REHABILITASI RUANG PEMBELAJARAN /PENUNJANG RUSAK BERAT
I PEKERJAAN PERSIAPAN
1 Uitzet - 1.00 ls 250,000.00 250,000.00
2 Brak dan anjab kerja - 1.00 ls 227,000.00 227,000.00
3 Bongkaran - 1.00 ls 2,000,000.00 2,000,000.00 2,477,000.00

II PEKERJAAN PONDASI
1 Galian tanah biasa A.2.3.1.1. 17.28 m3 31,877.00 550,834.56
2 Urugan tanah kembali A.2.3.1.9.1. 22.06 m3 10,625.66 234,402.06
3 Beton sloof 20/25 (S1)
- Beton K 175 (menggunakan alat) A.4.1.1.5.2. 1.50 m3 1,141,284.56 1,711,926.84
- Pembesian A.4.1.1.17.1a. 222.43 Kg 15,674.53 3,486,485.71
- Bekisting A.4.1.1.21 15.00 m2 162,527.08 2,437,906.20
4 Beton sloof Selasar 20/20 (S2)
- Beton K 175 (menggunakan alat) A.4.1.1.5.2. 0.48 m3 1,141,284.56 547,816.59
- Pembesian A.4.1.1.17.1a. 59.18 Kg 15,674.53 927,618.69
- Bekisting A.4.1.1.21 4.80 m2 162,527.08 780,129.98
5 Beton FootPlat (FP1)
- Beton K 125 (menggunakan alat) A.4.1.1.2.2. 0.20 m
3 1,062,940.56 212,588.11
- Beton K 225 (menggunakan alat) A.4.1.1.7.2. 1.42 m
3 1,141,284.56 1,620,624.08
- Pembesian A.4.1.1.17.1a. 161.64 Kg 15,674.53 2,533,631.03
- Bekisting A.4.1.1.21 2.86 m
2 162,527.08 464,827.45
- Pasir Urug A.2.3.1.11. 0.20 m3 176,910.80 35,382.16
6 Beton FootPlat (FP2)
- Beton K 125 (menggunakan alat) A.4.1.1.2.2. 0.40 m
3 1,062,940.56 425,176.22
- Beton K 225 (menggunakan alat) A.4.1.1.7.2. 2.84 m
3 1,141,284.56 3,241,248.15
- Pembesian A.4.1.1.17.1a. 181.75 Kg 15,674.53 2,848,845.83
- Bekisting A.4.1.1.21 2.86 m
2 162,527.08 464,827.45
- Pasir Urug A.2.3.1.11. 0.40 m3 176,910.80 70,764.32
7 Beton FootPlat (FP3)
- Beton K 125 (menggunakan alat) A.4.1.1.2.2. 0.11 m
3 1,062,940.56 116,923.46
- Beton K 225 (menggunakan alat) A.4.1.1.7.2. 0.91 m
3 1,141,284.56 1,038,568.95
- Pembesian A.4.1.1.17.1a. 31.21 Kg 15,674.53 489,202.08
- Bekisting A.4.1.1.21 1.20 m
2 162,527.08 195,032.50
- Pasir Urug A.2.3.1.11. 0.11 m3 176,910.80 19,460.19 24,454,222.60
III PEKERJAAN LANTAI
1 Urugan Pasir Bawah Lantai A.2.3.1.11. 3.81 m3 176,910.80 674,030.15
2 Beton K 125 A.4.1.1.2.2. 3.81 m3 1,062,940.56 4,049,803.53
3 Lantai Kramik 40x40 kw 1 (4 Ruang ) A.4.4.3.7.1. 120.00 m2 156,954.29 18,834,514.80 23,558,348.48

IV PEKERJAAN DINDING
1 Beton Kolom 30/30 (KS)
- Beton K 225 (menggunakan alat) A.4.1.1.7.2. 1.12 m3 1,212,140.56 1,357,597.43
- Pembesian A.4.1.1.17.1a. 168.89 Kg 15,674.53 2,647,271.37
- Bekisting 2x pakai A.4.1.1.22.3. 8.40 m2 276,864.28 2,325,659.95
2 Beton Kolom 30/30 (K1) -
- Beton K 225 (menggunakan alat) A.4.1.1.7.2. 6.30 m3 1,212,140.56 7,636,485.53
- Pembesian A.4.1.1.17.1a. 1,307.98 Kg 15,674.53 20,501,971.75
- Bekisting 2x pakai A.4.1.1.22.3. 42.00 m2 276,864.28 11,628,299.76
3 Beton Kolom 30/30 (K2) -
- Beton K 225 (menggunakan alat) A.4.1.1.7.2. 1.26 m3 1,212,140.56 1,527,297.11
- Pembesian A.4.1.1.17.1a. 168.89 Kg 15,674.53 2,647,271.37
- Bekisting 2x pakai A.4.1.1.22.3. 8.40 m2 276,864.28 2,325,659.95
4 Beton Kolom teras 20/20 (K3) -
- Beton K 225 (menggunakan alat) A.4.1.1.7.2. 0.56 m3 1,212,140.56 678,798.71
- Pembesian A.4.1.1.17.1a. 118.94 Kg 15,674.53 1,864,328.60
- Bekisting 2x pakai A.4.1.1.22.3. 5.60 m2 276,864.28 1,550,439.97
5 Beton Balok Sunduk 8/25 (BS) -
- Beton K 175 (menggunakan alat) A.4.1.1.5.2. 0.17 m3 1,141,284.56 194,018.38
- Pembesian A.4.1.1.17.1a. 27.46 Kg 15,674.53 430,422.59
- Bekisting A.4.1.1.23. 4.93 m2 291,315.14 1,436,183.64 58,751,706.11

V PEKERJAAN KUSEN
1 Kusen Pintu, Jendela Kayu Kruing A.4.6.1.1.4. 0.16 m
3 10,768,040.50 1,722,886.48
3 Daun Jendela Kaca Kayu Kruing A.4.6.1.6.4. 0.84 m
2 416,908.20 350,202.89
4 Jalusi Kayu Kruing A.4.6.1.7.4. 1.29 m
2 758,749.00 978,786.21
5 Cat Kayu Baru A.4.7.1.5. 11.28 m
2 62,822.24 708,634.87
8 Engsel Jendela A.4.6.2.6. 8.00 bh 22,450.04 179,600.32
9 Kait Angin A.4.6.2.9. 4.00 bh 30,375.64 121,502.56
10 Grendel Jendela A.4.6.2.11.2 4.00 bh 25,650.08 102,600.32
11 Kaca Bening A.4.6.2.17.1. 1.48 m
2 104,625.06 154,845.09 4,319,058.73
VI PEKERJAAN PLAFOND
1 Pemasangan List A.4.5.1.9. 132.80 m1 21,178.74 2,812,536.67
2 Pengecatan Plafond + List A.4.7.1.10.1 78.64 m2 17,915.99 1,408,913.45 4,221,450.13

VII PEKERJAAN DAK


1 Beton Cor Lantai Atap
- Beton K 225 (menggunakan alat) A.4.1.1.7.2. 8.64 m3 1,212,140.56 10,472,894.44
- Pembesian A.4.1.1.17.1a. 363.60 Kg 15,674.53 5,699,259.11
- Bekisting 2x pakai A.4.1.1.24 36.00 m2 336,095.14 12,099,425.04
2 Beton Balok30/50 (B1)
- Beton K 225 (menggunakan alat) A.4.1.1.7.2. 2.10 m3 1,212,140.56 2,545,495.18
- Pembesian A.4.1.1.17.1a. 280.56 Kg 15,674.53 4,397,646.14
- Bekisting 2x pakai A.4.1.1.23. 7.42 m2 291,315.14 2,161,558.34
3 Beton Balok 20/50 (B2)
- Beton K 225 (menggunakan alat) A.4.1.1.7.2. 5.00 m3 1,212,140.56 6,060,702.80
- Pembesian A.4.1.1.17.1a. 668.71 Kg 15,674.53 10,481,714.96
- Bekisting 2x pakai A.4.1.1.23. 30.00 m2 291,315.14 8,739,454.20
4 Beton Balok 20/30 (B3)
- Beton K 225 (menggunakan alat) A.4.1.1.7.2. 0.96 m3 1,212,140.56 1,163,654.94
- Pembesian A.4.1.1.17.1a. 150.11 Kg 15,674.53 2,352,903.70
- Bekisting 2x pakai A.4.1.1.23. 6.40 m2 291,315.14 1,864,416.90
5 Beton Balok KONSOL 15/15 (bk)
- Beton K 175 (menggunakan alat) A.4.1.1.5.2. 0.81 m
3 1,141,284.56 924,440.49
- Pembesian A.4.1.1.17.1a. 116.98 Kg 15,674.53 1,833,606.52
- Bekisting 2x pakai A.4.1.1.23. 6.12 m
2 291,315.14 1,782,848.66
6 rangka atap balok Konsol A.4.6.1.13.10. 0.65 m3 9,611,597.00 6,247,538.05
7 pasang usuk reng Balok Konsol A.4.6.1.17.4. 38.08 m
2 163,519.65 6,226,828.27
8 Pasang genteng Balok Konsol A.4.5.2.30. 38.08 m
2 96,586.30 3,678,006.30
9 Listplank 3/30 A.4.6.1.22.4. 42.16 m
1 99,147.90 4,180,075.46 92,912,469.49
VIII PEKERJAAN ATAP
1 rangka atap A.4.6.1.13.10. 0.64 m
3 9,611,597.00 6,193,251.75
2 pasang usuk reng A.4.6.1.17.4. 189.61 m
2 163,519.65 31,004,797.32
3 Pasang genteng A.4.5.2.30. 189.61 m
2 96,586.30 18,313,631.76
4 bubungan A.4.5.2.34. 37.50 m
1 79,617.20 2,985,645.00
5 Listplank 3/30 A.4.6.1.22.4. 42.16 m
1 99,147.90 4,180,075.46
6 Kuda kuda A.4.6.1.13.4. 0.88 m
3 10,372,601.00 9,158,923.47
71,836,324.76
IX PEKERJAAN LISTRIK
1 Pas. Instalasi listrik - 5.00 Titik 151,300.00 756,500.00
2 Pas. Lampu TL 20 watt - 5.00 Bh 75,000.00 375,000.00
3 Lampu xl - - Bh 40,000.00 -
4 Saklar Dauble - 1.00 Bh 20,000.00 20,000.00
5 Stop Kontak - 1.00 unit 17,500.00 17,500.00 1,169,000.00
JUMLAH A. REHABILITASI RUANG PEMBELAJARAN /PENUNJANG RUSAK BERAT : 283,699,580.29
JUMLAH B. PENGADAAN MEBELAIR : -
JUMLAH 283,699,580.29
Dibulatkan 283,699,000.00