You are on page 1of 9

F432-005-3:2019

Competency Profile Chart (CPC)


SECTION (F) CONSTRUCTION

GROUP (432) ELECTRICAL, PLUMBING AND OTHER CONSTRUCTION INSTALLATION ACTIVITIES

AREA ELECTRICAL

NOSS TITLE THREE PHASE ELECTRICAL INSTALLATION AND MAINTENANCE

NOSS LEVEL THREE (3) NOSS CODE F432-005-3:2019

COMPETENCY UNIT

THREE PHASE THREE PHASE MOTOR


THREE PHASE THREE PHASE
CORE SYSTEM SYSTEM
DRAWING WIRING
COMPETENCY MAINTENANCE INSTALLATION

F432-005-3:2019-C01 F432-005-3:2019-C02 F432-005-3:2019-C03 F432-005-3:2019-C04

ELECTRICAL
ELECTRICAL
THREE PHASE BUILDING
INSTALLATION &
WIRING TESTING AND AUTOMATION
MAINTENANCE
COMMISSIONING SYSTEM
SUPERVISORY
INSTALLATION
F432-005-3:2019-C05 F432-005-3:2019-C06 F432-005-3:2019-C06

1
F432-005-3:2019
Hasil Pemurnian : Curriculum of Competency Unit
Three Phase Drawing
SECTION (F) Construction

GROUP (432) Electrical, Plumbing and Other Construction Installation Activities

AREA Electrical

NOSS TITLE Three Phase Electrical Installation and Maintenance

COMPETENCY UNIT TITLE Three Phase Drawing

LEARNING OUTCOMES The learning outcomes of this competency are trainees enable to produce a three phase drawing
consisting of layout plan that shows installation location and a three phase schematic diagram that
shows information regarding wiring installation that is required by wireman according to MS IEC
60364, MS 1979:2007, MS 1936:2006, Electricity Supply Act 1990 (Act 447), Electricity
Regulation 1994, The Electricity Ordinance- Chapter 50 (Revised 2003), Electricity Rules 1999,
Electricity (State Grid Code) Rules 2003 and relevant regulatory body.

Upon completion of this competency unit, trainees should be able to:


1. Prepare three phase drawing requirements.
2. Perform three phase drawing.
3. Propose three phase drawing paperwork.

TRAINING PREREQUISITE Not Available.


(SPECIFIC)

CU CODE F432-005-3:2019-C01 NOSS LEVEL Three (3)

2
F432-005-3:2019
WORK RELATED RELATED SKILLS ATTITUDE/ ASSESSMENT CRITERIA
ACTIVITIES KNOWLEDGE SAFETY/
ENVIRONMENT

1. Prepare three phase 1.1. Introduction to 1.1. Carry out site survey. ATTITUDE 1.1. Introduction to electric
drawing requirements. electric 1.2. Calculate Total 1.1. Attention to schematic diagram and layout
schematic Connected Load details when dealing plan explained.
diagram and (TCL). with specifications and 1.2. Site information requirement
layout plan: 1.3. Calculate current data. explained.
• Electrical diversity value. 1.3. Types of load explained.
symbols. 1.4. Determine maximum SAFETY 1.4. Diversity factor explained.
• Drawing demand. 2.1 Adhere to specific 1.5. MS IEC 60364 explained.
situational safety 1.6. Electricity Supply Act 1990
scale.
requirements. (Act 447) explained.
1.2. Site information
2.2 Apply safe working 1.7. Drawing method explained.
requirement 1.8. Drawing utensils explained.
which include: culture.
1.9. Drawing software
• Site location. explained.
• Logistic. ENVIRONMENT
• Site layout. Not Available.
1.3. Types of load:
• Lighting.
• Power.
• Electrical
appliances.

3
F432-005-3:2019
WORK RELATED RELATED SKILLS ATTITUDE/ ASSESSMENT CRITERIA
ACTIVITIES KNOWLEDGE SAFETY/
ENVIRONMENT

2. Perform three phase 2.1. Relevant 2.1. Draw layout ATTITUDE 2.1. Relevant drawing guideline
drawing. drawing plan. 2.1. Attention to details explained.
guideline. 2.2. Determine final when dealing with 2.2. Three phase blueprints
2.2. Three phase circuit distribution. specifications and explained.
blueprints. 2.3. Draw three line data. 2.3. Layout plan elements
2.3. Layout plan schematic diagram. explained.
elements which SAFETY 2.4. Three line schematic
include: 2.1. Adhere to diagram elements
specific explained.
• Symbols.
situational safety 2.5. Circuit connection
• Loads. technique explained.
requirements.
• Accessories. 2.2. Apply safe 2.6. Accessories fittings
• Legends. working culture. explained.
2.4. Three line 2.7. Building structure
schematic ENVIRONMENT explained.
diagram Not Available. 2.8. Layout drawing elements
such as standard symbol,
cable size, drawing scale,
current value, sensitivity.

4
F432-005-3:2019
WORK RELATED RELATED SKILLS ATTITUDE/ ASSESSMENT CRITERIA
ACTIVITIES KNOWLEDGE SAFETY/
ENVIRONMENT

3. Propose three phase 3.1. Presentation 3.1. Compile three phase ATTITUDE 3.1. Presentation technique
drawing paperwork. technique. drawing paperwork. 3.1. Attention to details explained.
3.2. Sample of three 3.2. Check drawing for when dealing with 3.2. Cover letter, draft
phase drawing error. specifications and drawing and checklist
paperwork. 3.3. Present drawing data. prepared.
for verification 3.3. Three phase drawings
(manual/CAD). SAFETY presented (manual/ CAD).
3.1. Attention to details
when dealing with
specifications and
data.
3.2. Adhere to specific
situational safety
requirements.
3.3. Apply safe
working culture.

ENVIRONMENT
Not Available.

Employability Skills

5
F432-005-3:2019
Core Abilities
• Please refer NCS- Core Abilities latest edition.

Social Values & Social Skills


• Please refer Handbook on Social Skills and Social Values in Technical Education and Vocational Training.

References for Learning Material Development


1. Shelton, Christopher. 2006. Electrical Installation. United Kingdom: Nelson Thornes Ltd. ISBN-0748796029 2. A Manan, MD Nasir.
2007. Panduan Pendawaian Elektrik Domestik I.E.E Edisi 16 BS7671:1992 (Edisi Ketiga). Selangor, Malaysia: ibs BUKU. ISBN-
9789679501810.
2. In Partnership with NJATC. 2007. Conduit Bending and Fabrication. USA: American Technical Publisher, Inc. ISBN-9780826912671
4. Hanif, Abd Samad. 2004. Pemasangan dan Penyelenggaraan Elektrik (Edisi Kedua). Kuala Lumpur, Malaysia: Dawama Sdn Bhd.
ISBN 9836240632.
3. Mullin, Ray C. 2005. Electrical Wiring Residential, Based on the 2005 National Electrical Code (15th Edition). USA: Thomson Delmar
Learning. ISBN-1401850197.

Competency Weightage

6
F432-005-3:2019
The following table shows the percentage of training priorities based on consensus made by the Standard Development Committee (SDC).

THREE PHASE ELECTRICAL INSTALLATION AND MAINTENANCE


LEVEL 3
COMPETEN WORK
CU CODE COMPETENCY UNIT CY UNIT WORK ACTIVITIES ACTIVITIE
TITLE WEIGHTAG S
E WEIGHTA
GE
1. Prepare three phase
15%
drawing requirements.
F432-
Three Phase Drawing 10% 2. Perform three phase drawing. 70%
005-
3:2019- 3. Propose three phase
15%
C01 drawing paperwork.
1. Prepare three phase
15%
wiring requirements.
F432- 2. Perform three phase
Three Phase Wiring 30% 70%
005- wiring activities.
3:2019- 3. Carry out three phase
15%
C02 distribution board installation.
1. Prepare maintenance
15%
F432- Three Phase work requirement.
10%
005- System 2. Perform maintenance work. 70%
3:2019- Maintenance 3. Prepare maintenance work report. 15%
C03

1. Prepare three phase motor


10%
system installation
requirements.

7
F432-005-3:2019
F432- Three Phase Motor 2. Carry out three phase
15% 15%
005- System motor installation and
3:2019- Installation termination.
C04 3. Carry out three phase motor
60%
control installation.

8
F432-005-3:2019

4. Test three phase motor and


15%
motor control functionalities.
1. Prepare three phase electrical
system testing and commissioning 10%
F432- requirements.
Three Phase Wiring
005- 10% 2. Perform three phase
Testing and 70%
3:2019- electrical system testing.
Commissioning
C05 3. Perform three phase
20%
electrical system
commissioning.
1. Prepare electrical BAS
10%
installation requirement.
2. Produce electrical BAS
10%
Electrical schematic drawing.
F432-
Building 15% 3. Install electrical BAS system. 30%
005-
Automation 4. Perform electrical BAS
3:2019- 40%
System device programming.
C06
Installation 5. Perform electrical BAS
10%
system testing and
commissioning.
1. Prepare project costing. 35%
F432- Electrical Installation
10% 2. Supervise safety and health 35%
005- & Maintenance
3:2019- Supervisory practice.
C07 3. Supervise work progress. 30%
TOTAL PERCENTAGE
100%
(CORE
COMPETENCY)

You might also like