There are parameters to checked for to make sure pile is clean adequately. The following
figure indicates the limiting values. Those values will be changing from specification to
specification.
Once the bentonite in the excavation reaches the specified limits, flushing is stoped.
Then the tremie pipe is placed in the excavation.
Then slowly concrete is poured into the tremie. Once it is filled, the tremie is lifted by a
very little amount allowing the concrete to flow out.
This concrete will gradually move up with all the mud and impurities at the bottom of
the pile. Then again tremie is filled with concrete and allow concrete to flow out.
It shall make sure the end of the tremie pipe is always within the fresh concrete. It
enables always fresh concrete to mix with fresh concrete and top concrete layer moving
up gradually.
Further, it is very important to control the rate of pouring concrete to avoid lifting the
reinforcement cage. If the rate is higher, cage will be lifted.
Repeat this until the concreting is completed.
Nothing visible…
It is the responsibility of the contractor to carry out testing of piles in consultation with
project consultant and third-party testing agency.
https://www.structuralguide.com/pile-foundations/ 13/15
7/1/22, 1:14 AM Pile foundations - Design, Construction and Testing Guide - Structural Guide
This best method to identify the defective file but can not assess the pile capacities.
The pile integrity test is used to identify the piles to be testing by other methods such as pile
dynamic test and pile static load test.
In addition, this testing method is not costing much when compared with other tests.
Further, all the piles are tested with this method.
Not like a static load test, it provides results instantly. Plie capacity can be obtained at the
site just after the testing. However, further analysis will be done to provide accurate answers
after analysis with Softwares like CAPWAP.
We can obtain the pile skin friction and end bearing developed to the test load.
Initially, the pile testing will be simulated with software and the falling height of the
hammer is decided in such a manner that it will not generate tensile stresses than that can
be allowed or that can carry by the pile reinforcements.
This is called wave equation analysis (WEAP). With this method, it is not required to apply the
hammer load several times until we find the testing load.
WEAP provides the relationship between test load, compressive stress, and tensile stress
development.
We increase the load on the pile up the testing load specified in the pile design and it
reduces gradually.
Conduits are placed in the pile. Then the testing instrument is placed in the pile and check.
Transmitter and receiver is used to check the condition of the pile.
Privacy - Terms
https://www.structuralguide.com/pile-foundations/ 14/15
7/1/22, 1:14 AM Pile foundations - Design, Construction and Testing Guide - Structural Guide
Based on the wave speeds it predicts the condition of the pile. Further reading on the testing
method could be referred from Wikipedia article crosshole sonic logging .
Pile Raft Foundations Concrete Mix for Footings | Strap Footing types and
Facts to be aware design procedure
and Construction Design Loads Concrete Mix for Footings | Facts to be aware
Email*
Terms and Conditions
Structural Guide © 2022. All Rights Reserved. Privacy Policy Subscribe
Designed by KitS
Privacy - Terms
https://www.structuralguide.com/pile-foundations/ 15/15