Professional Documents
Culture Documents
Pertemuan 12 Dinas Jaga
Pertemuan 12 Dinas Jaga
A. Tujuan
a. The Importance Of Engine Room Rounds Before Taking Over The Watch And Periodic
Rounds During The Watch.
b. Communication With Bridge And Chief Engineer Is Always Available Except Engine
Room Rounds Or Carrying Communication Means
a.) The Importance Of Engine Room Rounds Before Taking Over The Watch And
anding over of the watch should be carried out according to the
instructions provided by the chief engineer and company’s standing
orders. It should be done in such a way that the watch keeping
becomes smoother and continuation of any kind of work is not affected
on the ship.
Practically, it is impossible for any relieving engineer officer to check all the valves,
pipelines, machinery, and controller in the engine room while taking over the watch. It is
therefore necessary that the right information is passed to the relieving engineer officer
by the relieved officer so that there are no surprises during the watch and one can
concentrate on more demanding and important jobs.
Level of important tanks such as bilges, ballast tank, sewage tank, reserve
tank, slop tank, fuel tank, or any other tank which requires attention
In case there is any kind of maintenance work being carried out in the
engine room by other engineer officer and crew members, then their work
location, details of machinery under maintenance, and information of
Pertemuan 12
SAFETY PRECAUTIONS TO BE OBSERVED DURING A
WATCH AND IMMEDIATE ACTION TO BE TAKEN
All the checks already made when the ship leaves the port should be noted .
In case any check is pending, it should be conveyed to the reliving officer
All the checks that are made when the ship enters the port should be noted
and informed in case any is missing.
The condition and modes of automatic boiler controls and details of other
equipment related to the operation of the steam boiler should be provided
It is to note that if the engineer officer feels that the reliving officer is not in a condition to
carry out the watch duties efficiently, the former should not hand over the watch and
inform the same to the chief engineer.
a.
Pertemuan 12
SAFETY PRECAUTIONS TO BE OBSERVED DURING A
WATCH AND IMMEDIATE ACTION TO BE TAKEN