You are on page 1of 1

INSTRUCTIONS FOR ENGINE ROOM OFFICERS

Based on IMO STCW-95 ch.VIII with 2010 Manila Amendments, COLREG and SOLAS ch. V and its supplementary requirements for INS (Integrated Navigation System)
on route planning and on MRM (Maritime Resource Management) recommendations.
In order to ensure safe and effective operations in the control and engine rooms, the personnel must be well acquainted with applicable regulations, codes and standards.
The crew shall follow the instructions in the ship’s operation manual and standing rules, taking into consideration prevalent conditions and available resources.
The procedures explained here are only indicative, not exhaustive in nature and one must always be guided by practices of good seamanship.
Reference is also made to IMO STCW-95 ch.VIII with 2010 Manila Amendments, MARPOL with SOPEP and SOLAS regulation II-2/14.2.2.1 and ISM code clauses 7 and 10.

THE CHIEF ENGINEER • ensure that the engine room is in good order, • Verify that red signal flag is hoisted and/or SAFETY
that bilges are empty and that equipment is bunker light is switched on.
is directly subordinate to the Master and running normally • Start bunkering cautiously and increase the The engine room personnel shall be well
responsible for technical operations on board. • make a check round on a regular basis flow slowly until the desired flow has been acquainted with the Safety Management
The chief engineer shall make sure that • make sure that alarms are switched “on” to reached. System (SMS) onboard).
• the vessel is technically approved and in order duty engineer. • Test the communication between the bunker • Assess and minimize risks!
• s/he has been informed by the Master The engine room officers of the watch shall station and the engine control room now and • Recognize and prevent error situations!
regarding the itinerary of the intended voyage before arrival in port then. • Maintain and test safety systems!
• the supply of fuel, lubricating oils, spare • man the engine room well before the pilot’s • Hot works are prohibited when fuel or other • Secure sufficient resources for each work!
parts, water and other supplies are sufficient arrival or before an estimated manoeuvre inflammable liquids are bunkered. • Uphold safety during maintenance and
• the engine room officers and the personnel of command • Bunkering to be registered in the oil record repairs as well!
the watch are well acquainted with the ves- • take the action included in the section “during book. Leakage in the engine room
sel’s machinery, the engine manufacturers’ manoeuvring” • Test the bunker before use. • Treat small leakages as big risks!
instructions and the safe working routines
when stopping the engines • In the case of heavy leakage
applied on board
• stop the engines in accordance with manu- ENVIRONMENTAL PROTECTION • Block the leakage
• the vessel’s fire-extinguishing systems are facturers’ instructions • Take prompt protective action to reduce
in order International conventions shall be followed
• standing orders are observed so that prompt • keep such engines on stand-by that the in accordance with applicable law, such as damage to engines and equipment.
safety of the vessel or the harbour author- MARPOL including SOPEP, BWM etc. Test the function of emergency bilge suction
action can be taken in emergencies and the
ities demand valves!
bridge personnel can be informed The shipping company’s environmental policy
• the engineering watch is appropriately • register the need for service or repairs. shall be observed. Fuel and oil leakage
organised with watch rotation allowing Make sure that the bilge water separator and • Fire risk – look out!
necessary rest periods for all, including him/ TAKING OVER THE WATCH • Slippery – be careful!
the exhaust gas cleaning system work opti-
herself. The departing watch shall inform the relieving mally. Gas leakage
It is of utmost importance that coope-
watch in full of all matters that may affect the Primarily use chemicals which • Evacuate – stop the gas from spreading –
ration in the engine room works and that
vessel’s safe navigation and seaworthines. • are environmentally friendly danger of explosion!
any disturbances that may threaten the Before taking over the watch, the relieving • repel oils At discharge or risk of discharge
safe operation of the ship or cause danger watch shall be fully acquainted with the pre- • do not interrupt the biological process in the • Stop further discharges
are promptly reported to the Master. vailing circumstances. waste water system. • Inform the Master and the Chief Engineer
The relieving watch shall pay particular atten- Sewage management log, oil record- and BWM • Follow the SOPEP manual and use SOPEP
tion to record books must be kept. equipment
COMPOSITION OF Safety at work
restrictions that may affect normal operations
ENGINE WATCH • the updating of the engine room log FIRE PROTECTION • Follow the safety at work instructions!
To ensure reliable operation of all machinery • work in progress Updated vessel drawings and fire control plan
• Cleanliness reduces risks!
vital for safe operation of the vessel, the com- • hot work in progress to be kept available.
• Use protective equipment (PPE)!
position of the watch shall be appropriate to • any special requirements relating to sanitary • Always be prepared for heavy weather – lash,
Emergency fire response plan to be considered. fasten and secure properly!
the prevailing circumstances and conditions. system disposals
In planning the composition of the watch the • appliances and equipment that must not be Guidelines for the maintenance and inspection • Keep the hot surface insulation in good
following shall be observed started while work is in progress of fire protection systems and appliances to be condition!
• international, national and local rules and • availability of fire-fighting appliances considered. Cargo-related risks
regulations • standing orders and special instructions Special attention to: Locate and identify the hazardous cargo.
• special operating conditions: weather, ice, The watch must not be handed over to anyone • Cleanliness in machinery spaces
polluted water, shallow water, narrow fair- presumed to be incapable of performing watch • Fire pumps and pipes tested Inform crew about risks and measures in case
of emergency.
ways, emergency situations, departures and duties. • Automatic fire alarms, emergency quick-
arrivals closing valves and shutdowns regular tests
• safety of life, vessel, cargo and port and pre-
Winter operation
• Piping system for high pressure fuel lines and AT ANCHOR
vention of damage and pollution. In conditions with a risk of temperature drop oil leakage alarm At an unsheltered anchorage the chief engineer
below zero °C and risk of freezing: • Hot surfaces adequat insulation and protec- shall consult with the master whether or not
OPERATION - water piping exposed to cold air to be parti- tion to maintain the same engine watch as when
cularly well monitored • Emergency escapes to be free from obstruc- under way.
The officer in charge of the engine watch is the - fire lines to be drained tions
chief engineer’s representative and is primarily - fresh water lines with outlets to outside to Hot Work
At anchor the engineer officer in charge shall
responsible, at all times, for the safe and effi- be drained ensure that
cient operation of the machinery. - air inlets to the engine room and in particular • Hot Work instructions to be followed - an efficient engineering watch is kept;
to the main engine shall be under supervision
• Hot work permit shall be issued - periodic inspection is made of all operating
The engine room officers of the watch shall
- radiators in the air conditioning system shall • Ensure adequate fire protection before, and stand-by machinery;
ensure that established watch keeping routines
are maintained and be under supervision
during and after hot works - main and auxiliary machinery is maintained
- hydraulic oil in mooring winches, hatch cover • Fire watch to be appointed in a state of readiness in accordance with or
before departure orders from the bridge;
systems, stern ramp systems and cargo
• prepare engines for start in accordance with handling systems shall be circulated where
Fire drills shall be held in accordance with
- measures are taken to protect the environ-
the manufacturers’ instructions international rules and the ship’s manual.
applicable. ment from pollution by the vessel, and that
• ensure that the engine room is ready and fit applicable pollution-prevention regulations
for departure before giving up the manoeuv- When navigating in ice cooling water intakes
shall be frequently and carefully inspected. BLACK-OUT are complied with;
ring to the bridge - all damage-control and fire-fighting systems
during manoeuvring Black-out may be prevented by regular service are in readiness.
• ensure that the power resources required for BUNKERING and testing of overload protection systems,
safe manoeuvring is monitored and main- Bunkering is a cooperation process involving stand-by systems or spare and emergency DRY DOCKING
tained many parties. systems.
• continually monitor the operation values of • The bunkering operation to be performed in Further preventive measures:
Follow the dry-docking manual!
the engines
accordance with bunkering instructions and • Pay attention to the quality of fuel and lubri- Dry-docking is a situation when your vessel is
in open waters cating oils and ensure that separators and exposed to increased risk.
international rules.
• make sure that the daily duties assigned by • Before and after bunkering, make sure that filters etc. work optimally. Plan your dry-docking carefully.
the Chief Engineer and the shipping company the quantity and quality of the supplier’s fuel • Make sure that the day tank is full and regu- Agree on safety measures with vessel and
are performed, i.e. that the operation values conform to the order placed. larly drained from water. shipyard
of the engines and the quantities of fuel, oils • Take fuel samples in accordance with valid • Do not overload the generator. Hot work needs special attention.
and water are recorded international rules and store the sample bot- • Drain the fuel tank of the emergency diesel
• make sure that normal and periodical main- tles (min. 2 bottles) in accordance with the unit in connection with test runs. Safety first. Communicate and coordinate.
tenance work is carried out, provided that it company’s instructions. • Make sure that electric appliances, electricity The crew is always responsible for the safety
does not interfere with operations. • Proper communication to be established lockers and boxes are adequately enclosed of the vessel!
When transferring to unmanned engine room between the vessel and the fuel supplier. and/or protected.
operation, the engineer on duty shall • Engine room and bunker station to be manned.
• check that fuel and lube oils are available and • Do not mix new and old fuel unless their com- In the event of Black-out, follow the vessel
01/11/2021

day tank drained from water patibility has been verified. specific routines and check-list.

Alandia Försäkring Abp, Pb 121, AX-22101 MARIEHAMN, Tel. +358 18 29 000, lossprevention@alandia.com, www. alandia.com
Disclaimer: These instructions are provided for general information only. Alandia accepts no responsibility for loss which may result from reliance on these instructions.

You might also like