You are on page 1of 71

RZ POWER LIMITED

(50 MW HSD RPP)


Thakurgaon Road, Thakurgaon
Engine Status

G/N 1:11:10 A Shift B Shift C Shift G/N


1G-1 Grease leakage from NON drive end of ALT 2G-1
1G-2 Grease leakage from NON drive end of ALT 2G-2
1G-3 2G-3
1G-4 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 2G-6
1G-7 2G-7
1G-8 1:24 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 Grease leakage from NON drive end of ALT 2G-10
1G-11 1:24 17:20 2G-11
1G-12 1:24 17:20 2G-12
1G-13 1:24 17:20 2G-13
1G-14 Grease leakage from NON drive end of ALT 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 1:24 18:30 2G-16
1G-17 Grease leakage from NON drive end of ALT 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 Grease leakage from NON drive end of ALT 2G-19
1G-20 Grease leakage from NON drive end of ALT 2G-20
1G-21 1:24 21:25

Engines View
Engine Running Gensets Load Sta
Buiding
nos.
Engine S/D B-01
B-02
Engine under maintenance Total
=
Engine out of order
WER LIMITED Date: 1.11.10
W HSD RPP)
Road, Thakurgaon
gine Status

1:11:10 A Shift B Shift C Shift


Excitor rotor problem
1:24 16:48
1:24 16:48
1:24 16:48
1:24 16:48
1:24 16:48
1:24 16:48
1:24 16:48
Lube Oil leakage from Turbocharger
1:24 16:48
1:24 16:48
1:24 16:48
1:24 16:48
1:24 16:48
Security NUT-BOLTs removed from exhaust manifold
1:24 16:48
1:24 16:48
1:24 16:48
1:24 16:48
S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Running Set Load % load of Load
Gensets (KW) engines (MW)
5 900 80.94 4.5 A Shift Md.Shahriar kabir
16 1350 87.21 21.6
21 26.1 B Shift Md.Hasanuzzaman

C Shift Md.Moniruzzaman
31177.69 16174.01
#REF! #REF!
RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon
Engine Status

G/N 1.11.10 G/N


1G-1 17:50 2G-1
1G-2 17:50 2G-2
1G-3 Dipon work is going on 2G-3
1G-4 Dipon work is going on 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 16:45 2G-6
1G-7 16:45 2G-7
1G-8 16:45 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 16:45 2G-10
1G-11 23:32 16:45 2G-11
1G-12 23:32 16:45 2G-12
1G-13 23:32 16:45 2G-13
1G-14 16:45 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 23:32 16:45 2G-16
1G-17 16:45 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 16:45 2G-19
1G-20 16:45 2G-20
1G-21 23:32 16:45

Engines View
Engine Running Gensets Load Sta
Buiding
nos.
Engine S/D B-01
B-02
Engine under maintenance Total
=
Engine out of order
ER LIMITED Date: 02.11.10
W HSD RPP)
Road, Thakurgaon
ne Status

1.11.10
Excitor rotor problem
23:32 16:45 17:50
23:32 16:45
23:32 16:45
23:32 16:45
23:32 16:45
23:32 16:45
23:32 16:45
Lube Oil leakage from Turbocharger
23:32 16:45 19:45
23:32 16:45
23:32 16:45
23:32 16:45 17:30 19:30
23:32
Security NUT-BOLTs removed from exhaust manifold
23:32
23:32
23:32
23:32
S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Running Set Load % load of Load
Gensets (KW) engines (MW)
15 1000 89.93 15 A Shift Md.Hasanuzzaman
9 1350 87.21 12.15
27.15 B Shift Md.Moniruzzaman

C Shift Md.Shahriar kabir


RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon
Engine Status

G/N 2.11.10 3.11.10


1G-1 23:50 16:45 0:22
1G-2 23:50 16:45 0:22
1G-3 16:45 0:22
1G-4 16:45 0:22
1G-5 Fire introduced in ALT
1G-6 23:50 16:45 0:22
1G-7 23:50 16:45 0:22
1G-8 23:50 16:45 0:22
1G-9 Fire introduced in ALT
1G-10 23:50 16:45 0:22
1G-11 23:50 16:45 0:22
1G-12 23:50 16:45 0:22
1G-13 23:50 16:45 0:22
1G-14 23:50 16:45 0:22
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT
1G-16 23:50 16:45 0:22
1G-17 23:50 16:45 0:22
1G-18 Grease leakage from NON drive end of ALT
1G-19 23:50 16:45 0:22
1G-20 23:50 16:45 0:22
1G-21 23:50 16:45 0:22

Engines View
Engine Running

Engine S/D
Engine under maintenance

Engine out of order


RZ POWER LIMITED Date: 03.11.10
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon
Engine Status

G/N 2.11.10 3.11.10


2G-1 Excitor rotor problem
2G-2 17:50
2G-3 23:50
2G-4 23:50
ed in ALT 2G-5 23:50 Water leaking from Radiator
2G-6 23:50
2G-7 23:50
2G-8 23:50
ed in ALT 2G-9 Lube Oil leakage from Turbocharger
2G-10 19:45
2G-11 23:50
2G-12 23:50 16:45 0:22
2G-13 23:50 16:45 0:22
2G-14 16:45 0:22
eaking from NON drive end of ALT 2G-15 Security NUT-BOLTs removed from exhaust manifold
2G-16 16:45 0:22
2G-17 16:45 0:22
ON drive end of ALT 2G-18 16:45 0:22
2G-19 16:45 0:22
2G-20 S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Buiding Running Set Load % load of Load
nos. Gensets (KW) engines (MW)
B-01 17 1000 89.93 17 A Shift Md.Hasanuzzaman
B-02 7 1350 87.21 9.45
Total 26.45 B Shift Md.Moniruzzaman
=
C Shift Md. Anisur Rahman
Date: 03.11.10

adiator

harger

xhaust manifold

rating

Shift In-Charge

Md.Hasanuzzaman
Md.Moniruzzaman

Md. Anisur Rahman


RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon
Engine Status

G/N 3.11.10 G/N


1G-1 0:22 16:45 2G-1
1G-2 0:22 16:45 2G-2
1G-3 0:22 16:45 2G-3
1G-4 0:22 16:45 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 0:22 16:45 2G-6
1G-7 0:22 16:45 2G-7
1G-8 0:22 16:45 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 0:22 16:45 17:46 Grease leakage from NON drive end of ALT 2G-10
1G-11 0:22 16:45 2G-11
1G-12 0:22 16:45 2G-12
1G-13 0:22 16:45 2G-13
1G-14 0:22 16:45 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 0:22 16:45 2G-16
1G-17 0:22 16:45 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 0:22 16:45 2G-19
1G-20 0:22 16:45 2G-20
1G-21 0:22 16:45

Engines View
Engine Running Gensets Load Sta
Buiding
nos.
Engine S/D B-01
B-02
Engine under maintenance Total
=
Engine out of order
ER LIMITED Date: 04.11.10
W HSD RPP)
Road, Thakurgaon
ine Status

3.11.10
Excitor rotor problem
16:45 17:15 17:25
16:45
16:45
Water leaking from Radiator
16:45 17:25 17:35
16:45 17:35 17:45
16:45
Lube Oil leakage from Turbocharger
2G-10 16:45
2G-11 17:55
0:22
0:22
0:22
Security NUT-BOLTs removed from exhaust manifold
0:22
0:22
0:22
0:22
S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Running Set Load % load of Load
Gensets (KW) engines (MW)
15 1000 89.93 15 A Shift Md.Moniruzzaman
8 1400 90.44 11.2
26.2 B Shift Md. Anisur Rahman

C Shift Md.Shahriar kabir


RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon
Engine Status

G/N 4.11.10 C G/N


1G-1 2:42 17:02 2G-1
1G-2 2:42 17:02 2G-2
1G-3 2:42 17:02 2G-3
1G-4 2:42 9:50 10:10 10:48 13:05 17:02 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 2:42 9:50 10:10 10:48 13:05 17:02 2G-6
1G-7 2:42 9:50 10:10 10:48 13:05 17:02 2G-7
1G-8 2:42 9:50 10:10 10:48 13:05 17:02 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 Grease leakage from NON drive end of ALT 2G-10
1G-11 2:42 9:50 10:10 10:48 13:05 17:02 2G-11
1G-12 2:42 9:50 10:10 10:48 13:05 17:02 2G-12
1G-13 2:42 9:50 10:10 10:48 13:05 17:02 2G-13
1G-14 2:42 9:50 10:10 10:48 13:05 17:02 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 Fire introduced in ALT 2G-16
1G-17 2:42 17:02 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 2:42 17:02 2G-19
1G-20 2:42 17:02 2G-20
1G-21 2:42 17:02

Engines View
Engine Running Gensets Load
Buiding
nos.
Engine S/D B-01
B-02
Engine under maintenance Total
=
Engine out of order
WER LIMITED Date: 05.11.10
W HSD RPP)
n Road, Thakurgaon
gine Status

4.11.10 C
Excitor rotor problem
2:42
2:42 17:02
2:42 17:02
17:02
2:42 17:02
2:42 9:50 10:10 10:48 13:05 17:02
2:42 9:50 10:10 10:48 13:05 17:02
Lube Oil leakage from Turbocharger
2:42 9:50 10:10 10:48 13:05
2:42 9:50 10:10 10:48 13:05 17:02
0:22 9:50 10:10 10:48 13:05 17:02
0:22 9:50 10:10 10:48 13:05
0:22 9:50 10:10 10:48 13:05
Security NUT-BOLTs removed from exhaust manifold
0:22 9:50 10:10 10:48 13:05
0:22 9:50 10:10 10:48 13:05
0:22 9:50 10:10 10:48 13:05
0:22 9:50 10:10 10:48 13:05
S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Running Set Load % load of Load
Gensets (KW) engines (MW)
10 1000 89.93 10 A Shift Md.Moniruzzaman
12 1400 90.44 16.8
26.8 B Shift Md. Anisur Rahman

C Shift Md.Shahriar kabir


#VALUE!
0:20
2:17
7:30
10:07
RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon
Engine Status

G/N 5.11.10 C A shift B shift C shift G/N


1G-1 0:32 2G-1
1G-2 0:32 2G-2
1G-3 0:32 2G-3
1G-4 0:32 16:50 2:02 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 0:32 8:02 8:25 16:50 2:02 2G-6
1G-7 0:32 8:02 13:03 16:50 2:02 2G-7
1G-8 0:32 8:02 13:03 16:50 2:02 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 Grease leakage from NON drive end of ALT 2G-10
1G-11 0:32 8:02 13:03 2G-11
1G-12 0:32 8:02 13:03 2G-12
1G-13 0:32 8:02 13:03 2G-13
1G-14 0:32 8:02 13:03 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 Fire introduced in ALT 2G-16
1G-17 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 0:32 8:02 13:03 2G-19
1G-20 0:32 8:02 13:03 2G-20
1G-21 0:32 8:02 13:03

Engines View
Engine Running Gensets Load
Buiding
nos.
Engine S/D B-01
B-02
Engine under maintenance Total
=
Engine out of order

Dipon working
WER LIMITED Date: 06.11.10
W HSD RPP)
Road, Thakurgaon
gine Status

5.11.10 C A shift B shift C shift


Excitor rotor problem
8:02 13:03 16:50 2:02
0:32 8:02 13:03 16:50 2:02
0:32 8:02 13:03 16:50 2:02
0:32 8:02 13:03 16:50 2:02
0:32 8:02 13:03 16:50 2:02
0:32 8:02 13:03 16:50 2:02
0:32 8:02 13:03 16:50 2:02
Lube Oil leakage from Turbocharger
2G-10 8:02 13:03 16:50 2:02
0:32 8:02 13:03 16:50 2:02
0:32 8:02 13:03 16:50 2:02
2G-13 8:02 13:03 16:50 2:02
2G-14 8:02 13:03 16:50 2:02
Security NUT-BOLTs removed from exhaust manifold
2G-16 16:50 2:02
2G-17 16:50 2:02
2G-18 16:50 2:02
2G-19 16:50 2:02
S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Running Set Load % load of Load
Gensets (KW) engines (MW)
7 1000 89.93 7 A Shift Md. Anisur Rahman
14 1350 87.21 18.9
25.9 B Shift Md.Shahriar kabir

C Shift Md.Hasanuzzaman
RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon
Engine Status

G/N 6.11.10 A shift B shift C shift G/N


1G-1 20:15 0:48 2G-1
1G-2 20:15 0:48 2G-2
1G-3 20:15 0:48 2G-3
1G-4 2:02 20:15 0:48 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 2:02 20:15 0:48 2G-6
1G-7 2:02 20:15 0:48 2G-7
1G-8 2:02 20:15 0:48 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 Grease leakage from NON drive end of ALT 2G-10
1G-11 9:04 20:15 23:00 0:48 2G-11
1G-12 9:04 20:15 2G-12
1G-13 9:04 20:15 2G-13
1G-14 9:04 20:15 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 Fire introduced in ALT 2G-16
1G-17 13:00 13:00 0:48 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 9:04 20:15 2G-19
1G-20 9:04 20:15 2G-20
1G-21 9:04 20:15

Engines View
Engine Running Gensets Load
Buiding
nos.
Engine S/D B-01
B-02
Engine under maintenance Total
=
Engine out of order

Dipon working
WER LIMITED Date: 07.11.10
W HSD RPP)
Road, Thakurgaon
gine Status

6.11.10 A shift B shift C shift


Excitor rotor problem
2:02 9:04 0:48
2:02 9:04 12:25 15:50 22:47
2:02 9:04 0:48
2:02 Water leakage from radiator
2:02 9:04 0:48
2:02 9:04 0:48
2:02 9:04 0:48
Lube Oil leakage from Turbocharger
2:02 9:04 0:48
2:02 Lube oil was mixed with Coolant water
2:02 9:04 0:48
2:02 9:04 0:48
2:02 9:04 0:48
Security NUT-BOLTs removed from exhaust manifold
2:02 9:04 0:48
2:02 9:04 0:48
2:02 9:04 0:48
2:02 9:04 0:48
S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Running Set Load % load of Load
Gensets (KW) engines (MW)
1000 89.93 0 A Shift Md. Anisur Rahman
1300 83.98 0
0 B Shift Md.Shahriar kabir

C Shift Md.Hasanuzzaman
RZ POWER LIMITED Date: 08.11.10
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon
Engine Status

G/N 7.11.10(C Shift) A shift B shift C shift G/N 7.11.10(C Shift) A shift B shift C
1G-1 0:48 17:15 17:34 2G-1 Excitor rotor problem
1G-2 0:48 16:48 21:45 2G-2 0:48 16:48
1G-3 0:48 16:48 21:45 2G-3 22:47 16:48
1G-4 0:48 16:48 2G-4 0:48 16:48
1G-5 Fire introduced in ALT 2G-5 2:02 16:48
1G-6 0:48 16:48 2G-6 0:48 16:48
1G-7 0:48 16:48 2G-7 0:48 16:48
1G-8 0:48 16:48 2G-8 0:48 16:48
1G-9 Fire introduced in ALT 2G-9 Lube Oil leakage from Turbocharger
1G-10 Grease leakage from NON drive end of ALT 2G-10 0:48 16:48
1G-11 0:48 21:45 2G-11 2:02 Lube oil was mixed with Coolant water
1G-12 21:45 2G-12 0:48 16:48
1G-13 2G-13 0:48 16:48
1G-14 2G-14 0:48 16:48
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15 Security NUT-BOLTs removed from exhaust manifold
1G-16 Fire introduced in ALT 2G-16 0:48 16:48
1G-17 0:48 2G-17 0:48 16:48
1G-18 Grease leakage from NON drive end of ALT 2G-18 0:48 16:48
1G-19 2G-19 0:48 17:34
1G-20 2G-20 S/D by MHI for excessive vibrating
1G-21

Engines View
Engine Running Gensets Load Status Toal Shift In-Cha
% load
Set Load
Buiding of
Running Gensets Load
nos.
(KW)
engine (MW)
s
Engine S/D B-01 6 1000 89.93 6 A Shift Md.Shahriar
B-02 15 1350 87.21 20.25
Engine under maintenance Total 26.25 B Shift Md.Hasanuz
21
=
Engine out of order C Shift Md.Moniruzz

Dipon working
.10

C shift

ter

ld

-Charge

riar kabir

nuzzaman

ruzzaman
RZ POWER LIM
(50 MW HSD RPP
Thakurgaon Road, Thak
Engine Status
G/N 09.10.10 A shift B shift C shift
1G-1 1:27 8:01 8:25 8:42 13:30
1G-2 1:27 8:01 8:25 8:42 13:30
1G-3 1:27 8:01 8:25 8:42 13:30
1G-4 1:27 8:01 8:25 8:42 13:30
1G-5 Fire introduced in ALT
1G-6 1:27 9:50 13:30
1G-7 1:27 9:50 13:30 16:50
1G-8 1:27 9:50 13:30 16:50
1G-9 Fire introduced in ALT
1G-10 Grease leakage from NON drive end of ALT
1G-11 1:27 8:01 8:25 8:42 13:30 16:50
1G-12 1:27 8:01 8:25 8:42 13:30 16:50
1G-13 16:50
1G-14 16:50
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT
1G-16 Fire introduced in ALT
1G-17
1G-18 Grease leakage from NON drive end of ALT
1G-19
1G-20
1G-21

Engines View
Engine Running

Engine S/D

Engine under maintenance

Engine out of order

Dipon working
RZ POWER LIMITED Date: 09.11.10
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon
Engine Status
G/N 09.10.10 A shift B shift C shift
2G-1 Excitor rotor problem
2G-2 1:27 8:01 8:25 8:42 13:30 16:50
2G-3 1:27 8:01 8:25 8:42 13:30 16:50
2G-4 1:27 8:01 8:25 8:42 13:30 16:50
2G-5 1:27 8:01 8:25 8:42 13:30 16:50
2G-6 1:27 8:01 8:25 8:42 13:30 16:50
2G-7 1:27 8:01 8:25 8:42 13:30 16:50
2G-8 1:27 8:01 8:25 8:42 13:30 16:50
2G-9 Lube Oil leakage from Turbocharger
2G-10 1:27 8:01 8:25 8:42 13:30 16:50
2G-11 Lube oil was mixed with Coolant water
2G-12 1:27 8:01 8:25 8:42 13:30 16:50
2G-13 1:27 8:01 8:25 8:42 9:50 16:50
2G-14 1:27 8:01 8:25 8:42 9:50 16:50
2G-15 Security NUT-BOLTs removed from exhaust manifold
2G-16 1:27 8:01 8:25 8:42 13:30 16:50
2G-17 1:27 8:01 8:25 8:42 13:30 16:50
2G-18 1:27 8:01 8:25 8:42 13:30 16:50
2G-19 1:27 8:01 8:25 8:42 13:30 16:50
2G-20 S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Buiding Running Set Load % load of Load
nos. Gensets (KW) engines (MW)
B-01 6 1000 89.93 6 A Shift Md.Shahriar kabir
B-02 15 1350 87.21 20.25
Total 26.25 B Shift Md.Hasanuzzaman
=
C Shift Md.Moniruzzaman
C shift

ahriar kabir

sanuzzaman

oniruzzaman
RZ POWER LIMITE
(50 MW HSD RPP)
Thakurgaon Road, Thakurg
Engine Status
G/N 09.10.10
1G-1 0:30 23:20
1G-2 0:30 Water Leakage from radiator
1G-3 23:39 0:38
1G-4 23:15 0:38
1G-5 Fire introduced in ALT
1G-6 Water Leakage from radiator
1G-7 0:30 8:08 12:25 16:45 17:40 21:00 0:38
1G-8 0:30 8:08 12:25 16:45 0:38
1G-9 Fire introduced in ALT
1G-10 Grease leakage from NON drive end of ALT 2G-10
1G-11 0:30 21:00 0:38 2G-11
1G-12 0:30 21:00 0:38 2G-12
1G-13 0:30 8:08 12:25 16:45 0:38 2G-13
1G-14 0:30 8:08 12:25 16:45 23:35
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT
1G-16 Fire introduced in ALT 2G-16
1G-17 16:45 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 8:08 12:25 16:45 21:00 2G-19
1G-20 8:08 12:25 16:45 21:00 2G-20
1G-21 8:08 8:20 11:27 12:25 16:45 21:00

Engines View
Engine Running

Engine S/D

Engine under maintenance

Engine out of order


RZ POWER LIMITED Date: 10.11.10

(50 MW HSD RPP)


hakurgaon Road, Thakurgaon
Engine Status
G/N 09.10.10
2G-1 Excitor rotor problem
2G-2 0:30 8:08 12:25 16:45 0:38
2G-3 0:30 8:08 12:25 16:45 0:38
2G-4 23:10 8:08 12:25 16:45 0:38
2G-5 0:30 8:08 12:25 16:45 0:38
2G-6 0:30 8:08 12:25 16:45 23:55
2G-7 0:30 8:08 12:25 16:45 0:38
2G-8 0:30 8:08 12:25 16:45 0:38
2G-9 Lube Oil leakage from Turbocharger
2G-10 0:30 8:08 12:25 16:45 0:38
2G-11 Lube oil was mixed with Coolant water
2G-12 0:30 8:08 12:25 16:45 0:38
2G-13 0:30 8:08 12:25 17:10 0:38
2G-14 0:30 8:08 12:25 16:45 0:38
2G-15 Security NUT-BOLTs removed from exhaust manifold
2G-16 0:30 8:08 12:25 16:45 0:38
2G-17 0:30 8:08 12:25 17:15 0:38
2G-18 0:30 8:08 12:25 17:35 22:50 0:00 0:02 Water Leakage from radiator
2G-19 0:30 8:08 12:25 16:45 0:38
2G-20 S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Buiding Running Set Load % load of Load
nos. Gensets (KW) engines (MW)
B-01 5 1000 89.93 5 A Shift Md.Hasanuzzaman
B-02 12 1300 83.98 15.6
Total 20.6 B Shift Md.Moniruzzaman
=
C Shift Md. Anisur Rahman
8:08
12:25 4:17
7:40
16:50
0:00:00
RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon
Engine Status
G/N 11.11.10
1G-1 8:35 13:22
1G-2 Water Leakage from radiator
1G-3 0:38 8:35 13:22
1G-4 0:38 8:35 13:22 19:20 0:23
1G-5 Fire introduced in ALT
1G-6 Water Leakage from radiator
1G-7 0:38 8:35 13:22 16:50 0:23
1G-8 0:38 10:15 13:22 16:50 0:23
1G-9 Fire introduced in ALT
1G-10 16:50 0:23 2G-10
1G-11 0:38 10:15 13:22 16:50 0:23 2G-11
1G-12 0:38 8:35 13:22 16:50 0:23 2G-12
1G-13 0:38 10:55 13:22 16:50 0:23 2G-13
1G-14 10:55 13:22 16:50 0:23
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT
1G-16 Fire introduced in ALT 2G-16
1G-17 16:50 0:23 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 23:55 0:23 2G-19
1G-20 23:55 0:23 2G-20
1G-21

Engines View
Engine Running

Engine S/D

Engine under maintenance

Engine out of order


POWER LIMITED Date: 11.11.10

50 MW HSD RPP)
urgaon Road, Thakurgaon
Engine Status
G/N
2G-1 Excitor rotor problem
2G-2 0:38 9:42 13:22 16:50 0:23
2G-3 0:38 8:35 13:22 16:50 0:23
2G-4 0:38 8:35 10:40 Fire introduce in turbo lube oil line
2G-5 0:38 8:35 13:22 16:50 0:23
2G-6 10:42 13:22 16:50 23:50
2G-7 0:38 8:35 13:22 16:50 0:23
2G-8 0:38 8:35 13:22 16:50 0:23
2G-9 Lube Oil leakage from Turbocharger
2G-10 0:38 8:35 13:22 16:50 0:23
2G-11 Lube oil was mixed with Coolant water
2G-12 0:38 8:35 13:22 16:50 0:23
2G-13 0:38 8:35 13:22 16:50 0:23
2G-14 0:38 8:35 13:22 16:50 0:23
2G-15 Security NUT-BOLTs removed from exhaust manifold
2G-16 0:38 8:35 13:22 16:50 0:23
2G-17 0:38 8:35 13:22 16:50 0:23
2G-18 0:02 16:50 0:23
2G-19 0:38 8:35 10:40 16:50 0:23
2G-20 S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Buiding Running Set Load % load of Load
nos. Gensets (KW) engines (MW)
B-01 10 1000 89.93 10 A Shift Shahriar Kabir
B-02 13 1250 80.75 16.25
Total 26.25 B Shift Md.Moniruzzaman
=
C Shift Md. Anisur Rahman
8:08
12:25 4:17
7:40
16:50
0:00:00
RZ POWER LIMITED Date: 12.1
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon

Engine Status
G/N 11.11.10 G/N
1G-1 2G-1 Excitor Rotor cable has been
1G-2 Water Leakage from radiator 2G-2 0:38 15:20
1G-3 0:38 2G-3 0:38 15:20
1G-4 0:38 2G-4 Fire introduce in turbo lube oil line
1G-5 Fire introduced in ALT 2G-5 0:38 15:20
1G-6 Water Leakage from radiator 2G-6 15:20
1G-7 0:38 22:01 2G-7 0:38 15:20
1G-8 0:38 22:01 2G-8 0:38 15:20
1G-9 Fire introduced in ALT 2G-9 Lube Oil leakage from Turbocharger
1G-10 22:50 2G-10 0:38 15:20
1G-11 0:38 15:20 2G-11 Lube oil was mixed with Coolant water
1G-12 0:38 15:20 2G-12 0:38 15:20
1G-13 0:38 15:20 2G-13 0:38 15:20
1G-14 15:20 2G-14 0:38 15:20
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15 Security NUT-BOLTs removed from exhaust manifold
1G-16 Fire introduced in ALT 2G-16 0:38 15:20
1G-17 15:20 22:50 2G-17 0:38 15:20
1G-18 Grease leakage from NON drive end of ALT 2G-18 0:02 15:20
1G-19 15:20 2G-19 0:38 15:20 21:55
1G-20 15:20 2G-20 S/D by MHI for excessive vibrating
1G-21 15:20

Engines View
Engine Running Gensets Load Status Toal Shift In-Charge
Buiding Running Set Load % load of Load
nos. Gensets (KW) engines (MW)
Engine S/D B-01 8 1000 89.93 8 A Shift Md.Moniruzzaman
B-02 14 1300 83.98 18.2
Engine under maintenance Total 26.2 B Shift Md. Anisur Rahman
=
Engine out of order C Shift Shahriar Kabir
: 12.11.10

harge

an

man
RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon

Engine Status
G/N 11.11.10 G/N
1G-1 2G-1
1G-2 Water Leakage from radiator 2G-2
1G-3 2G-3
1G-4 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 Water Leakage from radiator 2G-6
1G-7 10:20 13:40 23:55 2G-7
1G-8 10:20 13:40 23:55 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 10:20 13:40 23:55 2G-10
1G-11 10:20 13:40 16:50 2G-11
1G-12 10:20 13:40 16:50 2G-12
1G-13 10:20 13:40 16:50 2G-13
1G-14 10:20 13:40 16:50 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15 Secur
1G-16 Fire introduced in ALT 2G-16
1G-17 16:50 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 10:20 13:40 16:50 2G-19
1G-20 16:50 2G-20
1G-21 10:20 13:40 16:50

Engines View
Engine Running Gensets Load Status
Buiding Running
nos. Gensets
Engine S/D B-01 9
B-02 13
Engine under maintenance Total
=
Engine out of order
ER LIMITED Date: 13.11.10
W HSD RPP)
Road, Thakurgaon

ne Status

Excitor Rotor cable has been


10:20 13:40 16:50
10:20 13:40 16:50
Fire introduce in turbo lube oil line
10:20 13:40 16:50
10:20 13:40 16:50
16:50
10:20 13:40 16:50
Lube Oil leakage from Turbocharger
10:20 13:40 16:50
Lube oil was mixed with Coolant water
10:20 13:40 16:50
10:20 13:40 16:50 23:54
10:20 13:40 16:50 23:54
Security NUT-BOLTs removed from exhaust manifold
10:20 13:40 16:50
10:20 13:40 16:50
10:20 13:40 16:50
10:20 13:40 16:50
S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Set Load % load of Load
(KW) engines (MW)
1000 89.93 9 A Shift Md.Moniruzzaman
1300 83.98 16.9
25.9 B Shift Md. Anisur Rahman

C Shift Shahriar Kabir


RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon

Engine Status
G/N 11.11.10 G/N
1G-1 2G-1
1G-2 Water Leakage from radiator 2G-2 0:14
1G-3 2G-3 0:14
1G-4 2G-4
1G-5 Fire introduced in ALT 2G-5 0:14
1G-6 Water Leakage from radiator 2G-6 0:14
1G-7 0:14 2G-7 0:14
1G-8 0:14 2G-8 0:14
1G-9 Fire introduced in ALT 2G-9
1G-10 0:14 20:33 2G-10 0:14
1G-11 0:14 17:10 2G-11
1G-12 0:14 17:10 2G-12 0:14
1G-13 0:14 17:10 2G-13 23:54
1G-14 0:14 17:10 2G-14 23:54
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15 Secur
1G-16 Fire introduced in ALT 2G-16 0:14
1G-17 0:14 2G-17 0:14
1G-18 Grease leakage from NON drive end of ALT 2G-18 0:14
1G-19 0:14 17:10 2G-19 0:14
1G-20 0:14 17:10 2G-20
1G-21 0:14 17:10

Engines View
Engine Running Gensets Load Status
Buiding Running
nos. Gensets
Engine S/D B-01 8
B-02 13
Engine under maintenance Total
=
Engine out of order
ER LIMITED Date: 14.11.10
W HSD RPP)
Road, Thakurgaon

ne Status

Excitor Rotor cable has been


17:10 20:25
17:10
Fire introduce in turbo lube oil line
17:10
17:10
17:10 radiator leckage
17:10
Lube Oil leakage from Turbocharger
17:10
Lube oil was mixed with Coolant water
17:10
17:10
17:10
Security NUT-BOLTs removed from exhaust manifold
17:10 t/c nutbolts are removed
17:10
17:10
17:10
S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Set Load % load of Load
(KW) engines (MW)
1000 89.93 8 A Shift
1400 90.44 18.2
26.2 B Shift Md. Anisur Rahman

C Shift Shahriar Kabir


RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon

Engine Status
G/N 14.11.10 G/N
1G-1 10:45 13:30 21:35 22:39 2G-1
1G-2 Water Leakage from radiator 2G-2
1G-3 10:45 13:30 21:35 22:39 2G-3
1G-4 21:35 22:39 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 Water Leakage from radiator 2G-6
1G-7 17:16 22:39 2G-7
1G-8 17:16 22:39 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 23:27 10:45 13:30 17:16 22:39 2G-10
1G-11 23:27 10:45 13:30 17:16 22:39 2G-11
1G-12 23:27 11:20 13:30 17:16 22:39 2G-12
1G-13 23:27 10:45 13:30 17:16 22:25 2G-13
1G-14 23:27 10:45 13:30 17:16 22:39 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 Fire introduced in ALT 2G-16
1G-17 22:25 22:39 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 23:27 10:45 13:30 2G-19
1G-20 23:27 10:45 13:30 2G-20
1G-21 23:27 10:45 13:30

Engines View
Engine Running Gensets Load Status
Buiding
nos.
Engine S/D B-01
B-02
Engine under maintenance Total
=
Engine out of order
OWER LIMITED Date: 15.11.10
0 MW HSD RPP)
gaon Road, Thakurgaon

Engine Status
14.11.10
Excitor Rotor cable has been
20:25 17:16 22:39
23:27 10:45 13:30 17:16 22:39
Fire introduce in turbo lube oil line
23:27 10:45 13:30 17:16 22:39
23:27 10:45 13:30 17:16 22:39
23:27 10:45 13:30 17:16 22:39
23:27 10:45 13:30 17:16 22:39
Lube Oil leakage from Turbocharger
23:27 10:45 13:30 17:16 21:35
Lube oil was mixed with Coolant water
23:27 10:45 13:30 17:16 22:39
23:27 10:45 13:30 17:16 22:39
23:27 10:45 13:30 17:16 22:39
Security NUT-BOLTs removed from exhaust manifold
23:27 10:45 13:30 17:16 21:26
23:27 10:45 13:30 17:16 22:39
23:27 10:45 13:30 17:16 22:39
23:27 10:45 13:30 17:16 22:39
S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Running Set Load % load of Load
Gensets (KW) engines (MW)
10 1000 89.93 10 A Shift Rubayet Imteaz (ME)
12 1350 87.21 16.2
26.2 B Shift Shahriar Kabir

C Shift Md. Anisur Rahman


RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon

Engine Status
G/N 15.11.10 G/N 15.11.10
1G-1 22:39 2G-1
1G-2 Water Leakage from radiator 2G-2 22:39
1G-3 22:39 2G-3 22:39
1G-4 22:39 2G-4
1G-5 Fire introduced in ALT 2G-5 22:39
1G-6 Water Leakage from radiator 2G-6 22:39
1G-7 22:39 2G-7 22:39
1G-8 22:39 2G-8 22:39
1G-9 Fire introduced in ALT 2G-9
1G-10 22:39 17:30 2G-10 21:35
1G-11 22:39 17:30 2G-11
1G-12 22:39 17:30 2G-12 22:39
1G-13 22:25 17:30 2G-13 22:39
1G-14 22:39 17:30 2G-14 22:39
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 Fire introduced in ALT 2G-16 21:26
1G-17 22:39 17:30 2G-17 22:39
1G-18 Grease leakage from NON drive end of ALT 2G-18 22:39
1G-19 13:30 17:30 2G-19 22:39
1G-20 13:30 17:30 2G-20
1G-21 13:30 17:30

Engines View
Engine Running Gensets Load Status
Buiding Running
nos. Gensets
Engine S/D B-01 9
B-02 13
Engine under maintenance Total
=
Engine out of order
R LIMITED Date: 15.11.10
HSD RPP)
oad, Thakurgaon

e Status

Excitor Rotor cable has been


17:30
17:30
Fire introduce in turbo lube oil line
17:30
17:30

17:30
Lube Oil leakage from Turbocharger
17:30 lllkjkjkj
Lube oil was mixed with Coolant water
17:30
17:30
17:30
Security NUT-BOLTs removed from exhaust manifold
17:30
17:30
17:30
17:30
S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Set Load % load of Load
(KW) engines (MW)
1000 89.93 9 A Shift Rubayet Imteaz (ME)
1350 87.21 17.55
26.55 B Shift Shahriar Kabir

C Shift Md. Anisur Rahman


RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon

Engine Status
G/N 18.11.10 G/N 18.11.10
1G-1 2G-1
1G-2 Water Leakage from radiator 2G-2 22:15
1G-3 2G-3 22:15
1G-4 2G-4
1G-5 Fire introduced in ALT 2G-5 22:15
1G-6 Water Leakage from radiator 2G-6 22:15
1G-7 2G-7 22:15
1G-8 2G-8 22:15
1G-9 Fire introduced in ALT 2G-9
1G-10 22:15 16:20 2G-10
1G-11 22:15 16:20 2G-11
1G-12 22:15 16:20 2G-12 22:15
1G-13 22:15 16:20 2G-13 22:15
1G-14 22:15 16:20 2G-14 22:15
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15 Secu
1G-16 Fire introduced in ALT 2G-16 22:15
1G-17 22:15 16:20 2G-17 22:15
1G-18 Grease leakage from NON drive end of ALT 2G-18 22:15
1G-19 22:15 16:20 2G-19 22:15
1G-20 22:15 16:20 2G-20
1G-21 22:15 16:20

Engines View
Engine Running Gensets Load Status
Buiding Running
nos. Gensets
Engine S/D B-01 9
B-02 13
Engine under maintenance Total
=
Engine out of order
LIMITED Date: 19.11.10
D RPP)
Thakurgaon

atus

Excitor Rotor cable has been


16:20
16:20
Fire introduce in turbo lube oil line
16:20
16:20
16:20
16:20
Lube Oil leakage from Turbo oil return line
Lube oil was mixed with Coolant water
Lube oil was mixed with Coolant water
16:20
16:20
16:20
Security NUT-BOLTs removed from exhaust manifold
16:20
16:20
16:20
16:20
S/D by MHI for excessive vibrating

Gensets Load Status Toal Shift In-Charge


Set Load % load of Load
(KW) engines (MW)
1000 89.93 9 A Shift Banabir Kanti
1350 87.21 17.55
26.55 B Shift Shahriar Kabir

C Shift Md. Anisur Rahman


RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon

Engine Status
G/N A Shift B Shift C Shift G/N
1G-1 16:48 22:59 2G-1
1G-2 16:48 22:59 2G-2
1G-3 16:48 22:59 2G-3
1G-4 16:48 22:59 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 16:48 22:59 2G-6
1G-7 16:48 22:59 2G-7
1G-8 16:48 22:59 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 16:48 22:59 2G-10
1G-11 16:48 22:59 2G-11
1G-12 16:48 22:59 2G-12
1G-13 16:48 22:59 2G-13
1G-14 16:48 22:59 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 Fire introduced in ALT 2G-16
1G-17 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 2G-19
1G-20 2G-20
1G-21 Tx-07(4.5MVA) are in maintenance condition

Engines View
Engine Running Gensets Load
Buiding
nos.

Engine S/D B-01


B-02
Engine under maintenance Total
=
Engine out of order
ER LIMITED Date: 24.11.10
HSD RPP)
oad, Thakurgaon

e Status
A Shift B Shift C Shift
Excitor Rotor cable has been damage
16:48 22:59
Lube oil was mixed with Coolant water
Fire introduce in turbo lube oil line
16:48 22:59
16:48 22:59
Water leakage from radiator
16:48 22:59
Lube Oil leakage from Turbo oil return line
Lube oil was mixed with Coolant water
Lube oil was mixed with Coolant water
2G-12 16:48 22:59
2G-13 16:48 22:59
2G-14 16:48 22:59
Security NUT-BOLTs removed from exhaust manifold
2G-16 16:48 22:59
2G-17 16:48 22:59
2G-18 16:48 22:59
2G-19 16:48 22:59
S/D by MHI for excessive vibrating

Gensets Load Status Shift In-Charge


Toal
Running Load
Set Load % load of
Gensets
no.
(KW) engines (MW)
12 1000 89.93 12 A Shift
11 1300 83.98 14.3
23 26.3 B Shift Md.Hasanuzzaman

C Shift Md.Hasanuzzaman
RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon

Engine Status
G/N A Shift B Shift C Shift G/N
1G-1 10:50 22:43 2G-1
1G-2 10:50 22:43 2G-2
1G-3 10:50 22:43 2G-3
1G-4 10:50 12:00 14:35 14:50 14:35 22:43 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 10:50 22:43 2G-6
1G-7 10:50 22:43 2G-7
1G-8 10:50 22:43 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 10:50 22:43 2G-10
1G-11 10:50 22:43 2G-11
1G-12 10:50 22:43 2G-12
1G-13 10:50 22:43 2G-13
1G-14 10:50 22:43 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 Fire introduced in ALT 2G-16
1G-17 15:00 15:20 15:30 22:43 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 2G-19
1G-20 2G-20
1G-21 Tx-07(4.5MVA) are in maintenance condition

Engines View
Engine Running Gensets Load
Buiding
nos.

Engine S/D B-01


B-02
Engine under maintenance Total
=
Engine out of order
ER LIMITED Date: 25.11.10
HSD RPP)
oad, Thakurgaon

e Status
A Shift B Shift C Shift
Excitor Rotor cable has been damage
10:50 22:43
Lube oil was mixed with Coolant water
Fire introduce in turbo lube oil line
10:50 22:43
10:50 22:43
12:00 22:43
10:50 22:43
Lube Oil leakage from Turbo oil return line
Lube oil was mixed with Coolant water
Lube oil was mixed with Coolant water
2G-12 10:50 22:43
2G-13 10:50 22:43
2G-14 10:50 22:43
Security NUT-BOLTs removed from exhaust manifold
2G-16 10:50 22:43
2G-17 10:50 22:43
2G-18 10:50 14:30 14:30 15:22 15:30
2G-19 10:50 22:43
S/D by MHI for excessive vibrating

Gensets Load Status Shift In-Charge


Toal
Running Load
Set Load % load of
Gensets (MW)
(KW) engines
no.
13 1000 89.93 13 A Shift
11 1300 83.98 14.3
24 27.3 B Shift Md.Hasanuzzaman

C Shift Md.Moniruzzaman
RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon

Engine Status
G/N
1G-1 22:43 16:52 2G-1
1G-2 22:43 16:52 2G-2
1G-3 22:43 16:52 2G-3
1G-4 22:43 16:52 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 22:43 16:52 2G-6
1G-7 22:43 16:52 2G-7
1G-8 22:43 16:52 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 22:43 16:52 2G-10
1G-11 22:43 16:52 2G-11
1G-12 22:43 16:52 2G-12
1G-13 22:43 16:52 2G-13
1G-14 22:43 16:52 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 Fire introduced in ALT 2G-16
1G-17 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 2G-19
1G-20 2G-20
1G-21 Tx-07(4.5MVA) are in maintenance condition

Engines View
Engine Running Gensets Load
Buiding
nos.

Engine S/D B-01


B-02
Engine under maintenance Total
=
Engine out of order
ER LIMITED Date: 26.11.10
HSD RPP)
oad, Thakurgaon

e Status

Excitor Rotor cable has been damage


22:43 16:52
Lube oil was mixed with Coolant water
Fire introduce in turbo lube oil line
22:43 16:52
22:43 16:52
22:43 16:52
22:43 16:52
Lube Oil leakage from Turbo oil return line
Lube oil was mixed with Coolant water
Lube oil was mixed with Coolant water
2G-12 22:43 16:52
2G-13 22:43 16:52
2G-14 22:43 16:52
Security NUT-BOLTs removed from exhaust manifold
2G-16 22:43 16:52
2G-17 22:43 16:52
2G-18 14:30 16:52
2G-19 22:43
S/D by MHI for excessive vibrating

Gensets Load Status Shift In-Charge


Toal
Running Load
Set Load % load of
Gensets (MW)
(KW) engines
no.
12 1000 89.93 12 A Shift Md.Hasanuzzaman
11 1300 83.98 14.3
23 26.3 B Shift Md.Moniruzzaman

C Shift Md. Anisur Rahman


RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon

Engine Status
G/N
1G-1 11:18 23:27 2G-1
1G-2 11:18 23:27 2G-2
1G-3 11:18 23:27 2G-3
1G-4 11:18 23:27 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 11:18 23:27 2G-6
1G-7 11:18 23:27 2G-7
1G-8 11:18 23:27 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 11:18 23:27 2G-10
1G-11 11:18 23:27 2G-11
1G-12 11:18 23:27 2G-12
1G-13 11:18 23:27 2G-13
1G-14 11:18 23:27 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 Fire introduced in ALT 2G-16
1G-17 17:27 23:27 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 2G-19
1G-20 2G-20
1G-21 Tx-07(4.5MVA) are in maintenance condition

Engines View
Engine Running Gensets Load
Buiding
nos.

Engine S/D B-01


B-02
Engine under maintenance Total
=
Engine out of order
ER LIMITED Date: 27.11.10
HSD RPP)
oad, Thakurgaon

e Status

Excitor Rotor cable has been damage


11:18 17:27 19:45 23:27
Lube oil was mixed with Coolant water
Fire introduce in turbo lube oil line
11:18 23:27
11:18 23:27
11:18 20:30
11:18 19:45
Lube Oil leakage from Turbo oil return line
Lube oil was mixed with Coolant water
Lube oil was mixed with Coolant water
11:18 17:50 19:20 22:20
11:18 23:27
11:18 19:45
Security NUT-BOLTs removed from exhaust manifold
11:18 23:27
11:18 23:27
11:18 23:27
11:18 23:27
S/D by MHI for excessive vibrating

Gensets Load Status Shift In-Charge


Toal
Running Load
Set Load % load of
Gensets (MW)
(KW) engines
no.
12 1000 89.93 12 A Shift Md.Hasanuzzaman
12 1234 79.72 14.808
24 26.808 B Shift Md.Moniruzzaman

C Shift Md. Anisur Rahman


RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon

Engine Status
G/N
1G-1 23:27 9:40 13:48 16:14 23:52 2G-1
1G-2 23:27 9:40 13:48 16:14 23:52 2G-2
1G-3 23:27 9:40 13:48 16:14 23:52 2G-3
1G-4 23:27 9:40 13:48 16:14 23:52 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 23:27 9:40 13:48 16:14 23:52 2G-6
1G-7 23:27 9:40 13:48 16:14 23:52 2G-7
1G-8 23:27 9:40 13:48 16:14 23:52 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 23:27 9:40 13:48 16:14 16:23 17:45 23:52 2G-10
1G-11 23:27 9:40 13:48 16:14 23:52 2G-11
1G-12 23:27 9:40 13:48 16:14 23:52 2G-12
1G-13 23:27 9:40 13:48 16:14 23:52 2G-13
1G-14 23:27 9:40 13:48 16:14 23:52 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 Fire introduced in ALT 2G-16
1G-17 23:27 9:40 13:48 18:15 23:52 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 2G-19
1G-20 Tx-07(4.5MVA) are in maintenance condition 2G-20
1G-21

Engines View
Engine Running Gensets Load Sta
Buiding
nos.

Engine S/D B-01


B-02
Engine under maintenance Total
=
Engine out of order
ER LIMITED Date: 28.11.10
W HSD RPP)
Road, Thakurgaon

ine Status

Excitor Rotor cable has been damage


23:27 9:40 13:48 16:14 18:28 20:50 23:52
Lube oil was mixed with Coolant water
Fire introduce in turbo lube oil line
23:27 9:40 13:48 16:14 23:52
23:27 9:40 13:48 16:14 23:52
23:27 9:40 13:48 16:14 23:52
23:27 9:40 13:48 16:14 18:22 19:55 21:45
Lube Oil leakage from Turbo oil return line
Lube oil was mixed with Coolant water
Lube oil was mixed with Coolant water
23:27 9:40 13:48 16:14 19:55 21:35 23:52
23:27 9:40 13:48 16:14 23:52
23:27 9:40 13:48 16:14 18:15 19:15 21:35
Security NUT-BOLTs removed from exhaust manifold
23:27 9:40 13:48 16:14 23:52
23:27 9:40 13:48 16:14 19:10 21:50 23:52
23:27 9:40 13:48 16:14 23:52
23:27 9:40 13:48 16:14 23:52
:

Gensets Load Status Shift In-Charge


Toal
Running Load
Set Load % load of
Gensets (MW)
(KW) engines
no.
13 1000 89.93 13 A Shift Md.Moniruzzaman
9 1200 77.52 10.8
22 23.8 B Shift Md. Anisur Rahman

C Shift Asaduzzaman
RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon

Engine Status
G/N
1G-1 23:52 8:45 11:50 16:47 23:42 2G-1
1G-2 23:52 8:45 13:35 16:47 23:42 2G-2
1G-3 23:52 8:45 13:35 16:47 23:42 2G-3
1G-4 23:52 8:45 13:35 16:47 23:42 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 23:52 8:45 11:50 16:47 23:42 2G-6
1G-7 23:52 8:45 13:35 16:47 23:42 2G-7
1G-8 23:52 8:45 13:35 16:47 23:42 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 23:52 8:45 13:35 16:47 23:42 2G-10
1G-11 23:52 8:45 13:35 16:47 23:42 2G-11
1G-12 23:52 8:45 13:35 2G-12
1G-13 23:52 8:45 13:35 16:47 23:42 2G-13
1G-14 23:52 16:47 23:42 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 Fire introduced in ALT 2G-16
1G-17 23:52 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 2G-19
1G-20 Tx-07(4.5MVA) are in maintenance condition 2G-20
1G-21

Engines View
Engine Running Gensets Load Sta
Buiding
nos.

Engine S/D B-01


B-02
Engine under maintenance Total
=
Engine out of order
ER LIMITED Date: 29.11.10
W HSD RPP)
Road, Thakurgaon

ine Status

Excitor Rotor cable has been damaged


23:52 8:45 13:35 16:47 23:42
Lube oil was mixed with Coolant water
Fire introduce in turbo lube oil line
23:52 8:45 13:35 16:47 23:42
23:52 8:45 13:35 16:47 23:42
23:52 8:45 13:35 16:47 23:42
21:45 8:45 13:35 16:47 23:42
Lube Oil leakage from Turbo oil return line
Lube oil was mixed with Coolant water
Lube oil was mixed with Coolant water
23:52 8:45 13:35 16:47 23:42
23:52 8:45 13:35 16:47 23:42
21:35 8:45 13:35 16:47 23:42
Security NUT-BOLTs removed from exhaust manifold
23:52 8:45 13:35 16:47 23:42
23:52 8:45 13:35
23:52 8:45 13:35 16:47 23:42
23:52 8:45 13:35 16:47 23:42
:

Gensets Load Status Shift In-Charge


Toal
Running Load
Set Load % load of
Gensets (MW)
(KW) engines
no.
11 1000 89.93 11 A Shift Md.Moniruzzaman
11 1400 90.44 15.4
22 26.4 B Shift Md. Anisur Rahman

C Shift Asaduzzaman
RZ POWER LIMITED
(50 MW HSD RPP)
Thakurgaon Road, Thakurgaon

Engine Status
G/N
1G-1 23:42 14:50 23:16 2G-1
1G-2 23:42 14:50 23:16 2G-2
1G-3 23:42 14:50 23:16 2G-3
1G-4 23:42 14:50 23:16 2G-4
1G-5 Fire introduced in ALT 2G-5
1G-6 23:42 14:50 23:16 2G-6
1G-7 23:42 14:50 23:16 2G-7
1G-8 23:42 14:50 23:16 2G-8
1G-9 Fire introduced in ALT 2G-9
1G-10 23:42 14:50 23:16 2G-10
1G-11 23:42 14:50 23:16 2G-11
1G-12 23:42 18:25 23:16 2G-12
1G-13 23:42 14:50 23:16 2G-13
1G-14 23:42 14:50 23:16 2G-14
1G-15 Actuator haunting problem+ Grease leaking from NON drive end of ALT 2G-15
1G-16 Fire introduced in ALT 2G-16
1G-17 23:42 23:00 23:16 2G-17
1G-18 Grease leakage from NON drive end of ALT 2G-18
1G-19 2G-19
1G-20 Tx-07(4.5MVA) are in maintenance condition 2G-20
1G-21

Engines View
Engine Running Gensets Load Sta
Buiding
nos.

Engine S/D B-01


B-02
Engine under maintenance Total
=
Engine out of order
ER LIMITED Date: 30.11.10
W HSD RPP)
Road, Thakurgaon

ine Status

Excitor Rotor cable has been damaged


23:42 14:50 23:16
Lube oil was mixed with Coolant water
Fire introduce in turbo lube oil line
23:42 14:50 23:16
23:42 14:50 18:20
23:42 14:50 23:16
23:42 14:50 22:43
Lube Oil leakage from Turbo oil return line
Lube oil was mixed with Coolant water
Lube oil was mixed with Coolant water
23:42 14:50 23:16
23:42 14:50 23:16
23:42 14:50 23:16
Security NUT-BOLTs removed from exhaust manifold
23:42 14:50 23:16
23:42
23:42 14:50 23:16
23:42 14:50 23:16
:

Gensets Load Status Shift In-Charge


Total
Running Load
Set Load % load of
Gensets (MW)
(KW) engines
no.
12 1000 89.93 12 A-Shift Md. Anisur Rahman
9 1400 90.44 12.6
21 24.6 B-Shift Asaduzzaman

C-Shift Md.Hasanuzzaman