Summary of Motor Greasing

SR No. Area Total no. of motor

1 HT Motor BOILER 12

2 HT Motor ESP&AHP 23

3 HT Motor TURBINE 24

4 LT motor AHP 31

5 LT motor BOILER 14

6 LT motor SILO 3

7 LT motor TURBINE 26

8 LT motor BOP 45

Total
Compliance %
Site: 3X660 MW, M/s Talwandi SABO Power Ltd, Mansa, Punjab.

HT Motors Greasing Progress Report Greasing Date

Sr. No Area Description of HT Motors Rating Grease Type Actual Remarks Scheduled
2 TURBINE OCCW PUMP - 1B 220KW LGHP-2
13 TURBINE CEP - 1A 2200KW LGHP-2 Pipe issue

15 TURBINE CEP - 2A 2200KW LGHP-2 Unit Shutdown

20 TURBINE CWP - 1B (only DE side) 5250KW EP3


21 TURBINE CWP - 2A 5250KW EP3 Unit Shutdown
22 TURBINE CWP - 2B 5250KW EP3 Unit Shutdown
55 ESP&AHP ASH AIR COMPRESSOR - 19 350KW Unirex
56 ESP&AHP HCSD PUMP - A 925KW Servo gem2 In off condition
57 ESP&AHP HCSD PUMP - B 925KW Servo gem2 In off condition
58 ESP&AHP HCSD PUMP - C 925KW Servo gem2 In off condition
59 ESP&AHP HCSD PUMP - D 925KW Servo gem2 In off condition
Site: 3X660 MW, M/s Talwandi SABO Power Ltd, Mansa, Punjab.
LT Motors Greasing Progress Report
Sr. No. Area Equipment Scheduled date Actual Scheduled date

TURBINE GEN STATOR COOLING WATER PUMP - 1B Greasing point not available
2 12/9/2020
18 TURBINE BARRING GEAR-TURBINE#3

BOILER DRN PMP OF STRT SPRTR DRN TNK - 2A Motor was in OFF condition
29 12/14/2020
BOILER DRN PMP OF STRT SPRTR DRN TNK - 2B Motor was in OFF condition
30 12/15/2020
BOILER DRN PMP OF STRT SPRTR DRN TNK - 3A Motor was in OFF condition
31 12/16/2020
BOILER DRN PMP OF STRT SPRTR DRN TNK - 3B Motor was in OFF condition
32 12/17/2020
36 BOILER MILL SEAL AIR FAN - 2B 12/21/2020 Unit shutdown
40 BOILER CONDENSATE WATER TRANSFER PUMP - 2B 12/24/2020 Unit shutdown