KILLIING SITE ALL VEHICLES &MACHINERY DAILY BREAK DOW

Name of Breakdown
Sr no equepments description/nature Cause of defects
of defect

chassis, cabin bend&axle


1 NL01N-8917 Accidental shaft& crown inter change
from tipper 6113

Piston,piston ring,liner wear


2 NL020-3992 Engine back compressor
out& E.head gas kit burned.

Brake liner,brake cam


CG12BC Brake liner,brake cam
bush ,hub oil seal & poor
3 9371(CHHATISG bush ,hub oil seal & poor
pick-up ,steering pump
HAR TIPPER) pick-up ,steering pump issue
issue

Track motor ,swash Track motor ,swash


4 EX-8 plate,hyd pump,engine& plate,hyd pump,engine&
idelar issue idelar issue

DG 600KVA Under voltage & under Altinator issue &engine back


5
(OLD) frequency issue compression.

Front cover-B, Front Excessive Vibration and


6 2000A Breaker
cover flange wear out frictional reason

Hyd hose leakage,radiator


Ignation system,cooling
chock,radiator hose
system,hydraulic
TH86(Old damage,front & rear wheel
7 system,transmission
backhoe loader) tube condition not good &
system proper note
need to loader & bucket
working.
hard facing work.
Self strater motor Self strater motor
Compressor no-
8 (armature,bush,lock& (armature,bush,lock&
2
carbon rocker) damage carbon rocker) damage
ES &MACHINERY DAILY BREAK DOWN REPRT

Break down start Material indent


present status time&date status(Pr.no& date

B/D(radiator & intercooler fitted PR NO.10&129 Pr date-


128days(14/08/23)
work done,under maintenance) 25/8/23&12/1023

B/D(engine head, piston & engine


accessories dismanteling
PR NO-244 PR DATE-25-
workdone ,piston liner dismantling 41DAYS (18/10/2023)
11-2023
work done & sleeve fitment work in
progress )

B/D( Brake liner,brake cam bush ,hub


oil seal ,steering pump,hub PR NO-245 PR DATE-25-11-
24-11-2023(4days)
bearing,slack adjuster,king pin assy & 2023
dual valve dismantleing work done)

B/D (waiting for spares) 163days (10/05/2023)

Altinetor sent to out side


workshop repiyaring
B/D 20days (07/11/2023) purpouson date (14-11-
23) ,PR NO-119 & PR DATE-
10/10/23

PR NO.- 205, PR DATE-


B/D 23days (06/11/2023)
07/11/2023,

PR NO-255, PR DATE-27-
B/D (under maintainance) 27-11-2023(8:00am)
11-2023
PR NO-241,PR DATE-24-11-
B/D 23-11-2023(5 days)
23
DATE- 27-11-2023

Remarks&excepted date
Speare status on road

Waiting for speares &


tinkring work

Spares recived on 26-


11-23(engine top Tipper ready will be next two
overhauling work in days (29-11-23)
progress)

Waiting for speares

Waiting for speares

Waiting for alternator &


Engine top overhauling
speares

(waiting for spares)

(waiting for spares)


Comp-2 ready will be tomorrow
(waiting for spares)
morning
KILLIING SITE ALL VEHICLES &MACHINERY DAILY BREAK DOWN

Name of Breakdown
Sr no equepments description/nature Cause of defects
of defect

chassis, cabin bend&axle


1 8917 Accidental shaft& crown inter change
from tipper 6113

Diffects will be clear after


2 3992 Engine back compressor
dismantle & inspection

Brake liner,brake cam


CG12BC Brake liner,brake cam
bush ,hub oil seal & poor
3 9371(CHHATISG bush ,hub oil seal & poor
pick-up ,steering pump
HAR TIPPER) pick-up ,steering pump issue
issue

Track motor ,swash Track motor ,swash


4 EX-8 plate,hyd pump,engine& plate,hyd pump,engine&
idelar issue idelar issue

DG 600KVA Under voltage & under Altinator issue &engine back


5
(OLD) frequency issue compression.

Front cover-B, Front Excessive Vibration and


6 2000A Breaker
cover flange wear out frictional reason

Self strater motor Self strater motor


Compressor no-
7 (armature,bush,lock& (armature,bush,lock&
2
carbon rocker) damage carbon rocker) damage
S &MACHINERY DAILY BREAK DOWN REPRT DATE- 26-11-2023

Break down start Material indent


present status time&date status(Pr.no& date Speare status

B/D(radiator & intercooler


PR NO.10&129 Pr date- Waiting for speares &
fitted work done,under 127days(14/08/23)
25/8/23&12/1023 tinkring work
maintenance)

B/D(engine head, piston &


engine accessories dismanteling PR NO-244 PR DATE-25-
40DAYS (18/10/2023) Waiting for speares
workdone & piston liner 11-2023
dismantling work done )

B/D( Brake liner,brake cam


bush ,hub oil seal ,steering
PR NO-245 PR DATE-25-11-
pump,hub bearing,slack 24-11-2023(3days) Waiting for speares
2023
adjuster,king pin assy & dual
valve dismantleing work done)

B/D (waiting for spares) 162days (10/05/2023) Waiting for speares

Altinetor sent to out side


workshop repiyaring Waiting for alternator &
B/D 19days (07/11/2023) purpouson date (14-11- Engine top overhauling
23) ,PR NO-119 & PR DATE- speares
10/10/23

PR NO. 205, PR DATE


B/D 22days (06/11/2023) (waiting for spares)
07/11/2023,

PR NO-241,PR DATE-24-11-
B/D 23-11-2023(4days) (waiting for spares)
23
DATE- 26-11-2023

Remarks&excepted date
on road
KILLIING SITE ALL VEHICLES &MACHINERY DAILY BREAK DOWN

Name of Breakdown
Sr no equepments description/nature Cause of defects
of defect

chassis, cabin bend&axle


1 8917 Accidental shaft& crown inter change
from tipper 6113

Diffects will be clear after


2 3992 Engine back compressor
dismantle & inspection

Brake liner,brake cam


CG12BC Brake liner,brake cam
bush ,hub oil seal & poor
3 9371(CHHATISG bush ,hub oil seal & poor
pick-up ,steering pump
HAR TIPPER) pick-up ,steering pump issue
issue

Track motor ,swash Track motor ,swash


4 EX-8 plate,hyd pump,engine& plate,hyd pump,engine&
idelar issue idelar issue

DG 600KVA Under voltage & under Altinator issue &engine back


5
(OLD) frequency issue compression.

Front cover-B, Front Excessive Vibration and


6 2000A Breaker
cover flange wear out frictional reason

Self strater motor Self strater motor


Compressor no-
7 (armature,bush,lock& (armature,bush,lock&
2
carbon rocker) damage carbon rocker) damage
S &MACHINERY DAILY BREAK DOWN REPRT DATE- 25-11-2023

Break down start Material indent


present status time&date status(Pr.no& date Speare status

B/D(radiator & intercooler


PR NO.10&129 Pr date- Waiting for speares &
fitted work done,under 126days(14/08/23)
25/8/23&12/1023 tinkring work
maintenance)

B/D(engine head, piston &


engine accessories dismanteling PR NO-244 PR DATE-25-
39DAYS (18/10/2023) Waiting for speares
workdone & piston liner 11-2023
dismantling work done )

B/D( Brake liner,brake cam


bush ,hub oil seal ,steering
PR NO-245 PR DATE-25-11-
pump,hub bearing,slack 24-11-2023(2days) Waiting for speares
2023
adjuster,king pin assy & dual
valve dismantleing work done)

B/D (waiting for spares) 161days (10/05/2023) Waiting for speares

Altinetor sent to out side


workshop repiyaring Waiting for alternator &
B/D 18days (07/11/2023) purpouson date (14-11- Engine top overhauling
23) ,PR NO-119 & PR DATE- speares
10/10/23

PR NO. 205, PR DATE


B/D 21days (06/11/2023) (waiting for spares)
07/11/2023,

PR NO-241,PR DATE-24-11-
B/D 23-11-2023(3 days) (waiting for spares)
23
DATE- 25-11-2023

Remarks&excepted date
on road
KILLIING SITE ALL VEHICLES &MACHINERY DAILY BREAK DOW

Name of Breakdown
Sr no equepments description/nature Cause of defects
of defect

chassis, cabin bend&axle


1 8917 Accidental shaft& crown inter change
from tipper 6113

Diffects will be clear after


2 3992 Engine back compressor
dismantle & inspection

Brake liner,brake cam


CG12BC Brake liner,brake cam
bush ,hub oil seal & poor
3 9371(CHHATISG bush ,hub oil seal & poor
pick-up ,steering pump
HAR TIPPER) pick-up ,steering pump issue
issue

Track motor ,swash Track motor ,swash


4 EX-8 plate,hyd pump,engine& plate,hyd pump,engine&
idelar issue idelar issue

DG 600KVA Under voltage & under Altinator issue &engine back


5
(OLD) frequency issue compression.

Front cover-B, Front Excessive Vibration and


6 2000A Breaker
cover flange wear out frictional reason

Self strater motor Self strater motor


Compressor no-
7 (armature,bush,lock& (armature,bush,lock&
2
carbon rocker) damage carbon rocker) damage
S &MACHINERY DAILY BREAK DOWN REPRT DATE- 24-11-20

Break down start Material indent


present status time&date status(Pr.no& date Speare status

B/D(radiator & intercooler


PR NO.10&129 Pr date- Waiting for speares &
fitted work done,under 125days(14/08/23)
25/8/23&12/1023 tinkring work
maintenance)

B/D(engine head, piston &


engine accessories dismanteling PR NO-239 PR DATE-23-
38DAYS (18/10/2023) Waiting for speares
workdone & piston liner 11-23
dismantling work in progress )

B/D 11/24/2023

B/D (waiting for spares) 160days (10/05/2023) Waiting for speares

Altinetor sent to out side


workshop repiyaring Waiting for alternator &
B/D 17days (07/11/2023) purpouson date (14-11- Engine top overhauling
23) ,PR NO-119 & PR DATE- speares
10/10/23

PR NO. 205, PR DATE


B/D 20days (06/11/2023) (waiting for spares)
07/11/2023,

PR NO-241,PR DATE-24-11-
B/D 23-11-2023(2 days) (waiting for spares)
23
DATE- 24-11-2023

Remarks&excepted date
on road

Front & rear hub dismantling


work in progress
KILLIING SITE ALL VEHICLES &MACHINERY DAILY BREAK DOWN REP
Breakdown
Sr no Name of equepments description/nature of Cause of defects present status
defect
B/D(radiator &
chassis, cabin bend&axle
intercooler fitted
1 8917 Accidental shaft& crown inter
work done,under
change from tipper 6113
maintenance)

B/D(engine head,
piston & engine
Diffects will be clear after
2 3992 Engine back compressor accessories
dismantle & inspection
dismanteling
workdone )

Front axle spindle rhs Front axle spindle rhs ready for
3 P-4
broken broken operational

Track motor ,swash Track motor ,swash


B/D (waiting for
4 EX-8 plate,hyd pump,engine& plate,hyd pump,engine&
spares)
idelar issue idelar issue

Under voltage & under Altinator issue &engine


5 DG 600KVA (OLD) B/D
frequency issue back compression.

B/D(Hyd hose
dismantle and
pilot lever valve hyd hose pilot lever valve hyd hose
6 Ex-9 send form
pipe leakage pipe leakage
maikhuli for
remaking )

Front cover-B, Front cover Excessive Vibration and


7 2000A Breaker B/D
flange wear out frictional reason
REAK DOWN REPRT DATE- 23-11-2023
Break down Material indent Remarks&except
start status(Pr.no& date Speare status ed date on road
time&date

124days(14/08/2 PR NO.10&129 Pr date- Waiting for speares &


3) 25/8/23&12/1023 tinkring work

37DAYS PR NO-239 PR DATE-23-


Waiting for speares
(18/10/2023) 11-23

21-11-
PR NO-226,PR DATE-21-
23(6:30am) ready (12pm)
11-23
2days

159days
Waiting for speares
(10/05/2023)

Altinetor sent to out side


workshop repiyaring Waiting for alternator
16days
purpouson date (14-11- & Engine top
(07/11/2023)
23) ,PR NO-119 & PR overhauling speares
DATE-10/10/23

23-11- Ex-9 ready will be


Waiting for hyd. Hose
23(6:30pm) tomorrow morning

19days PR NO. 205, PR DATE


(waiting for spares)
(06/11/2023) 07/11/2023,
KILLIING SITE ALL VEHICLES &MACHINERY DAILY BREAK DOWN REP
Breakdown
Sr no Name of equepments description/nature of Cause of defects present status
defect
B/D(radiator &
chassis, cabin bend&axle
intercooler fitted
1 8917 Accidental shaft& crown inter
work done,
change from tipper 6113
maintenance

Diffects will be clear after


2 3992 Engine back compressor B/D
dismantle & inspection

Front axle spindle rhs Front axle spindle rhs


3 P-4 B/D
broken broken

Track motor ,swash Track motor ,swash


B/D (waiting for
4 EX-8 plate,hyd pump,engine& plate,hyd pump,engine&
spares)
idelar issue idelar issue

Under voltage & under


5 DG 600KVA (OLD) Altinator issue B/D
frequency issue

6 ex-9 pilot lever valve issue pilot lever valve issue B/D

Front cover-B, Front cover Excessive Vibration and


7 2000A Breaker B/D
flange wear out frictional reason
REAK DOWN REPRT DATE- 22-11-2023
Break down Material indent Remarks&except
start status(Pr.no& date Speare status ed date on road
time&date

123days(14/08/2 PR NO.10&129 Pr date- Waiting for speares&


3) 25/8/23&12/1023 denting work

36DAYS Engine dismantling


(18/10/2023) work in progress

PR NO-226,PR DATE-21-
2days Waiting for speares
11-23

158days
Waiting for speares
(10/05/2023)

Altinetor sent to out side


15days workshop repiyaring
Waiting for alternator
(07/11/2023) purpouson date (14-11-
23)

PR NO-228,PR Date-22-
22-11-23(8am) Waiting for spare
11-23
18days PR NO. 205, PR DATE
(waiting for spares)
(06/11/2023) 07/11/2023,
KILLIING SITE ALL VEHICLES &MACHINERY DAILY BREAK DOWN REP
Breakdown
Sr no Name of equepments description/nature of Cause of defects present status
defect
chassis, cabin bend&axle
1 8917 Accidental shaft& crown inter B/D
change from tipper 6113

Diffects will be clear after


2 3992 Engine back compressor B/D
dismantle & inspection

Front axle spindle rhs Front axle spindle rhs


3 P-4 B/D
broken broken

Track motor ,swash Track motor ,swash


B/D (waiting for
4 EX-8 plate,hyd pump,engine& plate,hyd pump,engine&
spares)
idelar issue idelar issue

Under voltage & under


5 DG 600KVA (OLD) Altinator issue B/D
frequency issue

Front cover-B, Front cover Excessive Vibration and


6 2000A Breaker B/D
flange wear out frictional reason
REAK DOWN REPRT DATE- 21-11-2023
Break down Material indent Remarks&except
start status(Pr.no& date Speare status ed date on road
time&date

122days(14/08/2 PR NO.10&129 Pr date- Waiting for speares&


3) 25/8/23&12/1023 denting work

35DAYS Engine dismantling


(18/10/2023) work in progress

21-11- PR NO-226,PR DATE-21-


Waiting for speares
23(6:30am) 11-23

157days
Waiting for speares
(10/05/2023)

Altinetor sent to out side


14days workshop repiyaring
Waiting for alternator
(07/11/2023) purpouson date (14-11-
23)
17days PR NO. 205, PR DATE
(waiting for spares)
(06/11/2023) 07/11/2023,
KILLIING SITE ALL VEHICLES &MACHINERY DAILY BREAK DOWN REP
Breakdown
Sr no Name of equepments description/nature of Cause of defects present status
defect
chassis, cabin bend&axle
1 8917 Accidental shaft& crown inter B/D
change from tipper 6113

Diffects will be clear after


2 3992 Engine back compressor B/D
dismantle & inspection

Track motor ,swash Track motor ,swash


B/D (waiting for
3 EX-8 plate,hyd pump,engine& plate,hyd pump,engine&
spares)
idelar issue idelar issue

Under voltage & under


4 DG 600KVA (OLD) Altinator issue B/D
frequency issue

Front cover-B, Front cover Excessive Vibration and


5 2000A Breaker B/D
flange wear out frictional reason
REAK DOWN REPRT DATE- 20-11-2023
Break down Material indent Remarks&except
start status(Pr.no& date Speare status ed date on road
time&date

121days(14/08/2 PR NO.10&129 Pr date- Waiting for speares&


3) 25/8/23&12/1023 denting work

34DAYS
(18/10/2023)

156days
Waiting for speares
(10/05/2023)

Altinetor sent to out side


13days workshop repiyaring
(07/11/2023) purpouson date (14-11-
23)
16days PR NO. 205, PR DATE
(waiting for spares)
(06/11/2023) 07/11/2023,
KILLIING SITE ALL VEHICLES &MACHINERY DAILY BREAK DOWN REP
Breakdown
Sr no Name of equepments description/nature of Cause of defects present status
defect
chassis, cabin bend&axle
1 8917 Accidental shaft& crown inter B/D
change from tipper 6113

Diffects will be clear after


2 3992 Engine back compressor B/D
dismantle & inspection

ideal(clutch plate,
Axle& tyre fitting
Pick-up droping issue & clutch disc wornout &
3 P-07 work done& dala
body floor damage speed sensor issue
floor repiyaring
work Done)

Track motor ,swash Track motor ,swash


B/D (waiting for
4 EX-8 plate,hyd pump,engine& plate,hyd pump,engine&
spares)
idelar issue idelar issue

Under voltage & under


5 DG 600KVA (OLD) Altinator issue B/D
frequency issue

Front cover-B, Front cover Excessive Vibration and


6 2000A Breaker B/D
flange wear out frictional reason
REAK DOWN REPRT DATE- 19-11-2023
Break down Material indent Remarks&except
start status(Pr.no& date Speare status ed date on road
time&date

120days(14/08/2 PR NO.10&129 Pr date- Waiting for speares&


3) 25/8/23&12/1023 denting work

33DAYS
(18/10/2023)

11days tipper ready for


(09/11/2023) operational

155 days
Waiting for speares
(10/05/2023)

Altinetor sent to out side


12days workshop repiyaring
(07/11/2023) purpouson date (14-11-
23)
15days PR NO. 205, PR DATE
(waiting for spares)
(06/11/2023) 07/11/2023,
KILLIING SITE ALL VEHICLES &MACHINERY DAILY BREAK DOWN REP
Breakdown
Sr no Name of equepments description/nature of Cause of defects present status
defect
chassis, cabin bend&axle
1 8917 Accidental shaft& crown inter B/D
change from tipper 6113

Diffects will be clear after


2 3992 Engine back compressor B/D
dismantle & inspection

ideal(clutch plate,
Axle& tyre fitting
Pick-up droping issue & clutch disc wornout &
3 P-07 work done& dala
body floor damage speed sensor issue
floor repiyaring
work in progress)

Track motor ,swash Track motor ,swash


B/D (waiting for
4 EX-8 plate,hyd pump,engine& plate,hyd pump,engine&
spares)
idelar issue idelar issue
Absence of hyd pump,
5 EX-11 travelling pilot valve & Running
main relife valve

Under voltage & under


6 DG 600KVA (OLD) Altinator issue B/D
frequency issue

Front cover-B, Front cover Excessive Vibration and


7 2000A Breaker B/D
flange wear out frictional reason
REAK DOWN REPRT DATE- 18-11-2023
Break down Material indent Remarks&except
start status(Pr.no& date Speare status ed date on road
time&date

119days(14/08/2 PR NO.10&129 Pr date- Waiting for speares&


3) 25/8/23&12/1023 denting work

32DAYS
(18/10/2023)

10days tipper ready will be


(09/11/2023) Monday

154 days
Waiting for speares
(10/05/2023)

13days PR NO. 114, hyd.pump repiyaring machine ready at


(06/11/2023) (11/11/2023) work done 12.35pm

Altinetor sent to out side


11days workshop repiyaring
(07/11/2023) purpouson date (14-11-
23)

14days PR NO. 205, PR DATE


(waiting for spares)
(06/11/2023) 07/11/2023,
KILLIING SITE ALL VEHICLES &MACHINERY DAILY BREAK DOWN REP
Breakdown
Sr no Name of equepments description/nature of Cause of defects present status
defect
chassis, cabin bend&axle
1 8917 Accidental shaft& crown inter B/D
change from tipper 6113

Diffects will be clear after


2 3992 Engine back compressor B/D
dismantle & inspection

B/D (clutch
platefitting work
Pick-up droping issue & clutch disc wornout &
3 P-07 done Axle& tyre
body floor damage speed sensor issue
fitting work
pending,)

Track motor ,swash Track motor ,swash


B/D (waiting for
4 EX-8 plate,hyd pump,engine& plate,hyd pump,engine&
spares)
idelar issue idelar issue

B/D (hyd pump,


travelling pilot
valve & main relife
Absence of hyd pump,
valve are fitted in
5 EX-11 travelling pilot valve &
ex-9, hyd pump
main relife valve
02nos. Send to
maikhuli site
repairing purpose)

Under voltage & under


6 DG 600KVA (OLD) Altinator issue B/D
frequency issue

Front cover-B, Front cover Excessive Vibration and


7 2000A Breaker B/D
flange wear out frictional reason
REAK DOWN REPRT DATE- 17-11-2023
Break down Material indent Remarks&except
start status(Pr.no& date Speare status ed date on road
time&date

118days(14/08/2 PR NO.10&129 Pr date- Waiting for speares&


3) 25/8/23&12/1023 denting work

31DAYS
(18/10/2023)

9days tipper ready will be


(09/11/2023) tomorrow

153 days
Waiting for speares
(10/05/2023)

12days PR NO. 114, hyd.pump repiyaring Ex-11 Ready will be


(06/11/2023) (11/11/2023) work done tommorow

Altinetor sent to out side


10days workshop repiyaring
(waiting for altinetor)
(07/11/2023) purpouson date (14-11-
23)

13days PR NO. 205, PR DATE


(waiting for spares) Waiting for spare
(06/11/2023) 07/11/2023,
KILLIING SITE ALL VEHICLES &MACHINERY DAILY BREAK DOWN REP
Breakdown
Sr no Name of equepments description/nature of Cause of defects present status
defect
chassis, cabin bend&axle
1 8917 Accidental shaft& crown inter B/D
change from tipper 6113

Diffects will be clear after


2 3992 Engine back compressor B/D
dismantle & inspection

B/D (clutch
platefitting work
Pick-up droping issue & clutch disc wornout &
3 P-07 done Axle& tyre
body floor damage speed sensor issue
fitting work
pending,)

Track motor ,swash Track motor ,swash


B/D (waiting for
4 EX-8 plate,hyd pump,engine& plate,hyd pump,engine&
spares)
idelar issue idelar issue

B/D (hyd pump,


travelling pilot
valve & main relife
Absence of hyd pump,
valve are fitted in
5 EX-11 travelling pilot valve &
ex-9, hyd pump
main relife valve
02nos. Send to
maikhuli site
repairing purpose)

Under voltage & under


6 DG 600KVA (OLD) Altinator issue B/D
frequency issue

Front cover-B, Front cover Excessive Vibration and


7 2000A Breaker B/D
flange wear out frictional reason
REAK DOWN REPRT DATE- 16-11-2023
Break down Material indent Remarks&except
start status(Pr.no& date Speare status ed date on road
time&date

117days(14/08/2 PR NO.10&129 Pr date- Waiting for speares&


3) 25/8/23&12/1023 denting work

30DAYS
(18/10/2023)

8days tipper ready will be


(09/11/2023) tomorrow

152 days
Waiting for speares
(10/05/2023)

11 days PR NO. 114, hyd.pump repiyaring Ex-11 Ready will be


(06/11/2023) (11/11/2023) work done tommorow

Altinetor sent to out side


09days workshop repiyaring
(waiting for altinetor)
(07/11/2023) purpouson date (14-11-
23)

12days PR NO. 205, PR DATE


(waiting for spares) Waiting for spare
(06/11/2023) 07/11/2023,
KILLIING SITE ALL VEHICLES &MACHINERY DAILY BREAK DOWN REP
Breakdown
Sr no Name of equepments description/nature of Cause of defects present status
defect
chassis, cabin bend&axle
1 8917 Accidental shaft& crown inter B/D
change from tipper 6113

Diffects will be clear after


2 3992 Engine back compressor B/D
dismantle & inspection

B/D (clutch
platefitting work
Pick-up droping issue & clutch disc wornout &
3 P-07 done Axle& tyre
body floor damage speed sensor issue
fitting work
pending,)

Track motor ,swash Track motor ,swash


B/D (waiting for
4 EX-8 plate,hyd pump,engine& plate,hyd pump,engine&
spares)
idelar issue idelar issue

B/D (hyd pump,


travelling pilot
valve & main relife
Absence of hyd pump,
valve are fitted in
5 EX-11 travelling pilot valve &
ex-9, hyd pump
main relife valve
02nos. Send to
maikhuli site
repairing purpose)

Under voltage & under


6 DG 600KVA (OLD) Altinator issue B/D
frequency issue

Front cover-B, Front cover Excessive Vibration and


7 2000A Breaker B/D
flange wear out frictional reason
REAK DOWN REPRT DATE- 15-11-2023
Break down Material indent Remarks&except
start status(Pr.no& date Speare status ed date on road
time&date

116days(14/08/2 PR NO.10&129 Pr date- Waiting for speares&


3) 25/8/23&12/1023 denting work

29DAYS
(18/10/2023)

7days tipper ready will be


(09/11/2023) tomorrow

151 days
Waiting for speares
(10/05/2023)

10 days PR NO. 114, hyd.pump repiyaring Ex-11 Ready will be


(06/11/2023) (11/11/2023) work done tommorow

Altinetor sent to out side


08days workshop repiyaring
(waiting for altinetor)
(07/11/2023) purpouson date (14-11-
23)

11days PR NO. 205, PR DATE


(waiting for spares) Waiting for spare
(06/11/2023) 07/11/2023,
Killing site break down report
DA

Breakdown Report
Equipment Make/ Equip. REQUISITI
Sr. No. Descriptio REG.NO BD / Maint. Details Cause of WARRANT ON NO -
Model Code Defect Y PERIOD
n DATE
Lifting
Tipper A/L KA16-D2563 E0101564 tipping cylinder problem no
1

27/05/202
Tipper A/L KA16C-9330 E0101539 engine back pistion ring 2 ( 2036 )
compression wearout PR
100013876
2 no 6
eak down report
DATE:-11.06.2022

own Report 2/7/2024


REMARK &
AWAITING PRESENT READING EXPECTED
Type of
FOR STATUS Maint.
No. of Days Breakdown Date
DATE ON
SPARES HMR KMR
ROAD
BD 637.00 5/11/2022
127855

dismentali
ng work
done, BD 621.00 5/27/2022
waiting for
spares
110908