Professional Documents
Culture Documents
E/N SMR 2.
Control Check
Sub Component To Be Check Critical of Failure Remarks
Mech. QA / GL
QA/GL
Mechanic Inspected by QA / GL
(…………………………………………….….) (…………………………………………….….)
( Name ) ( Name )
INM/2014/QA4-HD785-7 1
PT PAMAPERSADA NUSANTARA
PLANT DIVISION QA4 : COMPONENT INSTALLATION SHEET
PAMA DUMP TRUCK – HD785-7
C/N Date Job Site 1.
E/N SMR 2.
Control Check
Sub Component To Be Check Critical of Failure Remarks
Mech. QA / GL
QA/GL
Mechanic Inspected by QA / GL
(…………………………………………….….) (…………………………………………….….)
( Name ) ( Name )
INM/2014/QA4-HD785-7 2
PT PAMAPERSADA NUSANTARA
PLANT DIVISION QA4 : COMPONENT INSTALLATION SHEET
PAMA DUMP TRUCK – HD785-7
C/N Date Ob site 1.
E/N SMR 2.
Control Check
Sub Component To Be Check Critical of Failure Remarks
Mech. QA / GL
QA/GL
Mechanic Inspected by QA / GL
(…………………………………………….….) (…………………………………………….….)
( Name ) ( Name )
INM/2014/QA4-HD785-7 3
PT PAMAPERSADA NUSANTARA
PLANT DIVISION QA4 : COMPONENT INSTALLATION SHEET
PAMA DUMP TRUCK – HD785-7
C/N Date Job Site 1.
E/N SMR 2.
Control Check
Sub Component To Be Check Critical of Failure Remarks
Mech. QA / GL
QA/GL
1. Take care when Install the rear axle 1. Take care when
assembly, approx. 12 Ton, end then reinstall rear Axle
put 2 stands to support the axle ass’y