GDC-KLIA

GT 6001A Components Preservation & Inspection


Field Report

Work Order: VMT01512020

Prepared By: Eur.Ing.Rashid Al Jaowad

Rev. 0 Page 1 of 34
GDC-KLIA

PRE-REQUISITES

• All works undertaken are to be executed with full compliance


with the GDC-KLIA,SEPANG Health, Safety and Environment
Directives.

• SOE-CTL personnel shall perform Risk Assessments when


necessary, for works not covered by existing SOE-CTL Health,
Safety and Environment Directives.

• Any irregularities or discrepancies that are found within this


checklist are to be brought to the attention of the SOE-CTL
Maintenance Engineer.

• All maintenance works are to be carried out only after


documented authorization, which includes certification of Lock
out & Tag out and de-pressurization, have been received by
SOE-CTL personnel.

• Areas around equipment under maintenance are to be cordoned


off and access allowed only to SOE-CTL and SOE-CTL approved
personnel.

• All process and instrument lines coming in and out of


equipment under maintenance are to be isolated and blinded off.

• A cool down time of at least 8 hours is to be observed before the


commencement of maintenance works.

Rev. 0 Page 2 of 34
GDC-KLIA

1. Combustion /Ventilation Air Intake

Activity Discipline Remarks

Visually inspect Air Inlet Rain Hood and Bird Screen. Mechanical DONE

Check seals around door and lubricate hinges. Mechanical DONE

Inspect Coalescer and clean if necessary. Mechanical DONE

Inspect and if necessary change Air Inlet Final Filter Mechanical DONE

Inspect and Clean all Compartments of Filter House Mechanical DONE

Inspect and clean filter housing and Intake Plenum Chamber. Look
for signs of corrosion and flanking paintwork. Look for any Mechanical DONE
“sunlight” in the plenum. Refer GEK 28156k

Lubricate ventilation fan motor bearing. Mechanical NA

2. LM2500 Gas Generator

Activity Discipline Remarks

Perform Crank Soak wash. Check if crank wash fluids are as per
Mechanical NA
GEK requirement.
Carry out Detailed Gas Generator External Inspection especially
Fuel Gas Pipes and Manifold; oil and hydraulic lines and for external
leakages.

Check condition of all interconnecting oil/hydraulic hoses. Inspect


installation of gas fuel manifold and burner feed pipes for cracks and DONE
damages as per GEK 28156k.
Mechanical
Use GEK 28156k to refit any of the pipes on GG mounted fuel supply
system.
NA
Pay special attention to clearance between engine mounted
pipes/components and other parts of skid. If clearance is not
enough, thermal growth of running engine may cause fretting of
closely installed parts. (GEK 28156k)

Check security of Gas Generator mountings.


Inspect the front suspension bolts and spherical bearing for Mechanical NA
lubrication.

Visually inspect Gas Generator Air vent and Bleed Ducting Mechanical NA

Rev. 0 Page 3 of 34
GDC-KLIA

Inspect the static oil level in the intake guide vanes ram and
Mechanical NA
replenish, if necessary as instructed in chapter 7 para 5.3

Activity Discipline Remarks

Perform Endoscopic Inspection of Gas Generator. Record all findings


Brief Rep on the specific
in the forms provided,if required.(To be carried out after FSNL, Mechanical
requirements.
Reliability Run)

Remove and clean any dirty fuel burners as per Para 11, chapter 7 of
Mechanical NA
GEK maintenance.
Inspect GG air intake (intake flare, extension rings, front bearing
housing, starter fairing,) as per para 10.2 chapter 6 of GEK
maintenance manual.
Pay special attention to checks mentioned at Para 14,chapter 7 of GEK
maintenance book. Mechanical NA
Check IGV linkage and bushing for freedom of movement –Remove
linkage pin and operate the IGV’s by hand.
Check for freedom of movement or excessive play in linkages and
bushings. Restricted or tight movement is not acceptable

Check condition of Fuel Regulator filter. Replace Filter Element if


necessary. Look for liquid contamination of the filter bowl of customer Mechanical NA
filter. (GEK 28156k)

Clean/replace filters on hydraulic supply/return to hydraulically


Mechanical NA
actuated valve (if applicable).

Remove, clean and refit P2 Air Filter as instructed in chapter 7 para


Mechanical NA
22.

Inspect GG compressor as detailed in para 14,chapter 6 of GEK


Mechanical NA
maintenance manual.

Remove and inspect the oil feed filter for cleanliness as instructed in
Mechanical NA
chapter 7,para 8.3.3 to 8.3.5

Visually inspect exhaust thermocouples cables and securing clamps for


Mechanical NA
evidence of frettage. (GEK 28156k)

DONE
Verify (note down) that operator is using correct lube oil brand. Mechanical
(ESSO TURBO OIL)

Inspect Lube Oil Magnetic Chip Detectors as per chapter 7 Para 8.3.6
Mechanical NA
to 8.3.8 of GEK maintenance book

Verify that lubricating oil analysis is done regularly at site (preferably


DONE
every three month). Refer SB-48, and para 12, chapter 6 of GEK Mechanical
maintenance book.

Rev. 0 Page 4 of 34
GDC-KLIA

• Lubricate Starter Motor Bearings. Lubrication interval is at


every 4k. Quantity of lubrication is 2 cubic inch per bearing.
DONE
• Lubricate flexible portion of the coupling between starter motor Mechanical
and shaft.

Check if starter motor space heaters are working. Measure insulation


Control NA
resistance of motor stator windings.

Activity Discipline Remarks

DONE
Visually inspect the structural integrity of the Acoustic Enclosure Mechanical

Check all lighting within acoustic enclosure Mechanical NA

3. GG Fuel forwarding system

Activity Discipline Remarks

Remove and clean the inlet filter (located on the side of the actuator NA
Control
housing under the solenoid)

Check Fuel Isolation Valves (if Located Outside Enclosure) as


applicable . NA
Remove metal cover plate and review condition of micro switch on
valve position indicator
Control
Photograph any evidence of corrosion
Check for ingress of water or moisture. Capture on photo if possible

Verify if fuel gas analysis is done at 4K intervals as per (GEK 28156k) Mechanical NA

4. Power turbine

Activity Discipline Remarks

Check unit foundation bolts/nuts and general condition. Mechanical DONE

Check PT clearances (GEK 28156k)


• Check second stage blade tip clearance. Mechanical NA
• Check aft inter-stage diaphragm axial position.

Inspect the PT exhaust hood for damage, burning, oil soaking


Mechanical DONE
and general overall condition.

Rev. 0 Page 5 of 34
GDC-KLIA

Check the fasteners at the exhaust volute split lines and at the
Mechanical DONE
interface with the transition duct for security (GEK 28156k)

Check oil leakages near PT bearing case as per GEK 28156k.) Mechanical DONE

Check the offset and gap between GG air extension and bell
Mechanical NA
mouth.

5. Gear Box

Activity Discipline Remarks

Check unit foundation bolts/nuts and general condition Mechanical NA

Check gearbox for signs of oil leakage. Mechanical NA

6. GG Lube Oil System

Activity Discipline Remarks

Check all systems hoses, fittings and pipe work for degradation
(visual check for chafing or frottage of piping/hoses/tubing) and
tightness (leakages) on following oil and hydraulic systems Mechanical NA
• Main lube oil systems
• GG oil systems
Attend filters on oil circuits as under.
1. Change (if required) on-line filter elements on filter located
on GG lube oil supply, hydraulic supply and PT Cool down
supply lines (wherever fitted)
2. Clean demister pads fitted on
a. Vent lines of GG lube oil tank
b. Vent line of PT bearing casing
c. Vent lines on compressor bearings. Mechanical
3. Clean breathers on NA
a. GG lube oil tank
b. Low and high speed couplings
c. Gear box
4. Clean strainer elements on
a. Strainers on GG LP/scavenge pump suction.
b. Strainer on wash tank skid.
Accumulator – check inert (N2) gas pressure in the bladder (should NA
be 500 psi), when the unit is not running. Charge the accumulator Mechanical
bladder if necessary.
NA
Verify that G.G lube analysis is carried out at regular intervals
Mechanical
(3 months)

Rev. 0 Page 6 of 34
GDC-KLIA

Carry out functional test on automatic transfer on stand by unit for


GG lube oil pumps. (ref also to notes in Corrective Maintenance Control NA
section)

7 Gas turbine combustion air and exhaust system

Activity Discipline Remarks

Check the air inlet systems for degradation and moisture buildup.
Visually inspect Air Inlet Rain Hood and Bird Screen. Replace filters
Mechanical DONE
in GG air intake and in ventilation system (if required). Check seals
around door and lubricate hinges.
Inspect all joint bolts on the air system for tightness. Visually
inspect system welds for failure and /or cracks. Inspect intake Mechanical DONE
flexible joint assembly.
Check the interior of the GG enclosure/Plenum. Look for signs of
corrosion and flanking paintwork in the plenum. Look for any
“sunlight” in the plenum. Refer GEK 28156k. Check all lights fixture.
Mechanical DONE
Check operation of the door proximity switches and adjust if
necessary. Inspect the GG enclosure/plenum access door
gasketing for wear and deterioration. Lubricate door hinges.
Carry out functional test on automatic transfer on stand by unit for
Ventilation fan. Check tension on fan belts (if used) in enclosure
ventilation system. Check operation of the back-draught dampers Mechanical NA
to ensure free movement of the damper blades. Lubricate
dampers.
Visually inspect the exhaust expansion joint assembly to ensure
the unit is in good working order. Check for leakages between the
Mechanical DONE
exhaust expansion joint flanges. If necessary tighten bolts and
check gaskets for wear or deterioration.

8. UCP, field devices and field wiring

Activity Discipline Remarks

Field devices: In general, pay special attention to terminal


connections of field devices and tighten them if necessary.
Clean terminal ends off all contaminations.
If corrosion is indicated in the terminal housing, check terminal box Control NA
gasket and replace if necessary.
Check conduit layout to correct conditions that allow corrosion to
enter the terminal housing.

Open all Skid junction boxes and inspect condition of connections, NA


Control
water ingress etc.

Clean and inspect panel air filters Control NA

Rev. 0 Page 7 of 34
GDC-KLIA

Check all indicator lights (lamp test) Control NA

9. Electrical motors

Activity Discipline Remarks

Inspect and lubricate all electric motors (those which are


provided with grease nipples). Use chart for motor frame size
v/s grease qty-interval needed. (Motors upto frame 200 are
normally fitted without grease nipples). Make entries in
greasing logbook. Take photograph/note down name plate
details of all the motors.
Control NA
2. GG lube oil pump motor
3. Motors for standby pump, rundown pump, cool down
pump –Main lube oil system.
4. Lube oil cooler fan motors
5. Ventilation fan motor.
6. Liquid fuel pump motor.
Electric motors-Inspect all electric motors in the unit for
following-
1. Clean the motor. Remove dust, dirt or any other
blanketing element from the motor enclosure. There
should be no constrictions or blockage of ventilation to the
motor.
2. Open motor terminal box cover, check gasket and internal
for integrity, loose termination, ingress moisture and signs
of overheating. Connections should be secure, tight,
insulated and corrosion free. Clean, retighten and
reinsulated (if found necessary) all electrical connections.
3. Check tightness of mounts. Control NA
4. Security and condition of all earth bonding.
5. Measure the continuity (resistance) between motor and
earth .It should be below 1 ohm
6. Check and record insulation resistance of the motor
windings (all the phases and phase to phase) to ground.
Note down the value of test voltage and output of megger.
7. Check integrity of glands for damages
8. . Test that anti –condensation heaters are working,
whenever motors are not in operations.
9. Starting or running capacitors and power factor correction
capacitors should be checked for leakage and swelling.

10. Others

Rev. 0 Page 8 of 34
GDC-KLIA

Activity Discipline Remarks

Lubricate stems of all hand-operated valves. Mechanical NA

1. General Comments:

NOT APPLICABLE

2. Corrective Maintenance

Activity Discipline Remarks

The hydraulic supply pressure, A63QGHS, is reading higher NA


Controls
than normal. Check and calibrate the transmitter
Main lube oil supply temperature A26QM (TT-100), reading NA
Controls
open. Replace sensor.
Customer has reported that Lub Oil Pump B does not
Controls/ NA
develop adequate pressure. Check and establish if problem
Mechanical
is with pump or motor.
NA
Replace Start Motor shaft with new Mechanical
Inspect Vent Fan Inlet Dampers, especially the damper that NA
Mechanical
was replaced in Jan, for any cracks and damages.
GG lube oil tank level transmitter is giving an erratic reading.
Check he level transmitter configuration, and if necessary NA
Controls
replace with spare transmitter.

Replace broken shims on Burner 5. Retain piece of existing NA


Mechanical
shim as reference for fitting new shim

INSPECTION PERFORMED BY: ________________________________________


Service Rep. / Date:

Rev. 0 Page 9 of 34
GDC-KLIA

Outstanding Work – Incomplete Due to Unavailability of parts.

Item Description Part Description Part Number Qty Priority

NOT APPLICABLE

Priority X Urgent (Do not use machine until complete) A As soon as possible (Next Service)
Code
B Within 6 months or 4000 Hours C Plan as appropriate to coincide with other
works

3. Unit Start-Up

Function Discipline Comments Readings

Clear all debris and foreign material from


Mechanical NA
Combustion Air System

Clear all debris and foreign material from Mechanical and


NA
Acoustic Enclosure Controls

Perform final walk-thru around package Mechanical and


NA
to eliminate discrepancies Controls

Start Up Unit. Monitor for alarms and Mechanical and


NA
abnormalities Controls

Rev. 0 Page 10 of 34
GDC-KLIA

INDUSTRIAL GE LM GAS GENERATOR


BORESCOPE PROCEDURE/ INSPECTION REPORT

SITE / BERTH INSPECTED :

DATE OF INSPECTION :

INSPECTED BY :

NOT APPLICABLE

SERIAL NO TSN TSR TSO STARTS

ENGINE

VIDEO TAKEN DIGITAL FILM TAKEN

Rev. 0 Page 11 of 34
GDC-KLIA

INSPECTION RECORD – AIR INTAKE / EARLY STAGES OF COMPRESSOR ROTOR AND


STATOR BLADES

NO OF
AREA / VIEWING Height/Width of DAMAGE
PORT STATORS / COMMENTS
DIRECTION blades (MM) FOUND
ROTORS

VIGVs S 23

R22
00 Stage
S31
NOT APPLICABLE
AIR INTAKE

R29
0 Stage
S47

01 Stage Leading R37


Edge S59

02 Stage Leading R53


Edge S59

INSPECTION REPORT: COMPRESSOR OUTLET GUIDE VANES AND OUTLET CASING

1 8

2 VIEW LOOKING 7
FORWARD

3 6
BOROSCOPE
PORTS
4 5

15th Stage Trailing R113


BURNER PORT Edge S139

Rev. 0 Page 12 of 34
GDC-KLIA

BURNER PORT DAMAGE FOUND COMMENTS

5
NOT APPLICABLE

INSPECTION REPORT: FLAME TUBES, SNOUT (BOSSES AND DOWELS), DISCHARGE


NOZZLES, SWIRLER, INNER FLARE, and BRIDGE PIECES & INTERCONNECTOR

1 8

2 VIEW LOOKING 7
FORWARD

3 6
BOROSCOPE
PORTS
4 5

Rev. 0 Page 13 of 34
GDC-KLIA

BURNER PORT DAMAGE FOUND COMMENTS

4 NOT APPLICABLE

INSPECTION REPORT: HP NOZLE GUIDE VANES AND HP TURBINE BLADES INSPECTION


RECORD –, IP, LP TURBINE ROTOR / STATOR BLADES

1 8

2 VIEW LOOKING 7
FORWARD

3 6
BOROSCOPE
PORTS
4 5

Rev. 0 Page 14 of 34
GDC-KLIA

AREA / NO OF LENGTH
DAMAGE
PORT VIEWING STATORS / (APPROX) COMMENTS
FOUND
DIRECTION ROTORS MM

HP Turbine
Blades Trailing
ENTRY DUCT/OR THRU T4
INSPECTION PORTS IN PT

Edges
NOT APPLICABLE

LP Turbine
Blades Trailing
Edges
PORT

Rev. 0 Page 15 of 34
GDC-KLIA

4. Turbine Mid Frame-Integrity Inspection-Refer below to Details TMF Replacement


Procedure

Function Discipline Comments Remarks

Clear all debris and foreign material from


HPT CMF,CRF,TRF. Bolts shall be
Mechanical NA
coated with an approved anti-seize
compound.
Clear all debris and foreign material from Mechanical and
NA
Acoustic Enclosure. Controls
Check and ensure all the all gas turbine
connections, including extraction and
secondary flow ports, pressure
Mechanical and
monitoring parts, bearing lube oil feed NA
Controls
and drain openings and etc. shall be
covered to protect the gas turbine from
contamination.
Inspect for connection identifiers on the
drawing that lists flange covers, refer to
Mechanical NA
MLI 0329 – view drawing for detailed
locations.
Check and ensure all covers shall be
painted or made of colored plastic to
indicate that they are temporary flange
covers. Bolts shall be coated with an
approved anti-seize compound. For
wrapping the journals use a heavy coat Mechanical NA
of Tectyl 506, then layer with a layer of
wax cloth, layer of fiber board and finally
with a layer of PVC tape. Then follow
with a second layer of cloth, fiberboard
and tape.

PS: During the rebuild period all parts will have their preservation and FME protection
systematically remove, be cleaned and fully blown down with plant air then closely
inspected prior to being considered acceptable to be re-installed and returned to
service.

PS: Due to relatively short duration of downtime (estimated 30 to 60 days) there is no


real requirement for additional anti-corrosion or anti-condensation protection required
at this time.

Rev. 0 Page 16 of 34
GDC-KLIA

5. Power Turbine (PT)-Integrity Inspection

Function Discipline Comments Remarks

Clear all debris and foreign material from


HPT CMF,CRF,TRF,TMF. Bolts shall be
Mechanical DONE
coated with an approved anti-seize
compound.
Clear all debris and foreign material from Mechanical and DONE
Acoustic Enclosure. Controls
Confirm all engine and package
disturbed pipes and fitting openings still
have their FME devises Mechanical DONE
fitted and secure.
Confirm there are no engine or disturbed
package pipe and fitting openings Mechanical DONE
previously missed.
Confirm original coverings of package
large area casing openings are still in Mechanical DONE
place and not compromised.
Add additional cling wrap to all large Mechanical DONE
opening area covers.
Using a large tarpaulin cover all large Mechanical
equipment and secure in place with duct DONE
tape or cling wrap
Cover and secure all removed Mechanical
equipment that will be re-installed into DONE
the unit.
Barrier off all lay down areas to prevent Mechanical
unauthorized personnel from tampering DONE
with preserved
equipment.

PS: During the rebuild period all parts will have their preservation and FME protection
systematically remove, be cleaned and fully blown down with plant air then closely
inspected prior to being considered acceptable to be re-installed and returned to
service.

PS: Due to relatively short duration of downtime (estimated 30 to 60 days) there


is no real requirement for additional anti-corrosion or anti-condensation
protection required at this time.

Rev. 0 Page 17 of 34
GDC-KLIA

6. Power Turbine (PT)-Integrity Inspection/Oil Wetting Procedure- Continue

Function Discipline Comments Remarks

Clear all debris and foreign material


Mechanical DONE
from Acoustic Enclosure.
Ensure attached power turbine and/or
accessories are PRELUBRICATED. Mechanical and DONE
Failure to comply may result in damage Controls
to power turbine and/or accessories.
Using moisture barrier paper, cover
inlet and exhaust openings. Ensure and Mechanical
Check on all cover or plug all engine DONE
openings and unattached fittings.
Inspect and re-ensure INSTALLED ENGINE PRESERVATION FOR INDEFINITE PERIOD. FOR
PRESERVATION PERIODS THAT EXTEND PAST
60 DAYS, USE OF RUST PREVENTATIVE CONCENTRATE IS MANDATORY.
a. Add 5 percent (by volume) of
rust preventative concentrate to
lubricating oil tank, if not previously Mechanical
DONE
added, per packager’s manual.
b. Perform paragraph 8, steps a.
through d.
c. Maintain and update engine
storage log as required, or at a
maximum interval of every 30 days. Mechanical DONE
Information shall include: recorded
humidity conditions, oil wetting dates,
and desiccant replacement.
d. Replace desiccant per WP 502 00. Mechanical
DONE
e. Oil wet bearings per paragraph 12. Mechanical DONE
f. Remove moisture barrier paper,
covers, and plugs installed on engine. Mechanical DONE

g. Check and confirm the Oil Wetting on


the bearing is PRESENT. Apply
LUBRICATING OIL, MIL-PRF-23699F Mechanical DONE
(C/I) onto Bearing No.6 & 7,Seal and
Plain nuts. Refer to GEK 112768
h. If connected, disconnect lube supply
hose from lube and scavenge pump Mechanical
DONE
inlet supply tube. Drain residual oil into
appropriate container.

Rev. 0 Page 18 of 34
GDC-KLIA

7. GE LM 2500 FIELD REPORT/FINDINGS (Located at GT6001A Enclosure)

Bellmouth/IGV inspection hatch found 10% GG/PT-Engine Removal Hatch door found in
corroded and Structurally found Acceptable Acceptable condition and need to check on
condition. the rubber seal condition prior to CSU.

Entry door(Hinges & slide handhold) found Enclosure grating,beams,gussets and related
in Acceptable condition. mechanism found in Acceptable condition.

Rev. 0 Page 19 of 34
GDC-KLIA

8. GE LM 2500 FIELD REPORT/FINDINGS -Continue

Lifting handling gears-chain blocks, web Best practices had been adopted during the
slings, shackles and trolleys found EXPIRED last GT6001A major overhaul in March
on 20/1/2022. 2021.No indicative of oil leakages, opening
manifolds, piping and connectors found at
site/enclosure.

All the cling wrapping,piping All the cling wrapping,piping


openings,manifolds and connectors were well openings,manifolds and connectors were
encapsulated and do a thorough inspection on well encapsulated and do a thorough
every each components within enclosure inspection on every each components
expanse. within enclosure expanse.

Rev. 0 Page 20 of 34
GDC-KLIA

9. GE LM 2500 FIELD REPORT/FINDINGS -Continue

PT-PRESERVATION was carried out as per PT-PRESERVATION, It is observed that


GEK compliance and found in Acceptable REMNANT of Lube Oil(OIL WETTING)
condition. PRESENT at the bottom of cling wrapping.

PT-PRESERVATION, It is observed that PT-PRESERVATION, It is observed that


REMNANT of Lube Oil(OIL WETTING) REMNANT of Lube Oil(OIL WETTING)
PRESENT at the bottom of cling wrapping. PRESENT at the bottom of cling wrapping.

Rev. 0 Page 21 of 34
GDC-KLIA

10. GE LM 2500 FIELD REPORT/FINDINGS -Continue

All the cling wrapping,piping All the cling wrapping,piping


openings,manifolds and connectors were openings,manifolds and connectors were well
well encapsulated and do a thorough encapsulated and do a thorough inspection
inspection on every each components within on every each components within enclosure
enclosure expanse. expanse.

PT-Lifting gears are installed as per GEK All the cling wrapping,piping
compliance. openings,manifolds and connectors were well
encapsulated and do a thorough inspection
on every each components within enclosure
expanse.

Rev. 0 Page 22 of 34
GDC-KLIA

11. GE LM 2500 FIELD REPORT/FINDINGS -Continue

PT-Lifting gears are installed as per GEK PT-Lifting gears are installed as per GEK
compliance. compliance.

PT-Lifting gears are installed as per GEK PT-Lifting gears are installed as per GEK
compliance. compliance.

Rev. 0 Page 23 of 34
GDC-KLIA

12. GE LM 2500 FIELD REPORT/FINDINGS -Continue

PT-Lifting gears are installed as per GEK PT-Lifting gears are installed as per GEK
compliance. compliance.

PT-Lifting gears are installed as per GEK PT-Lifting gears are installed as per GEK
compliance. compliance.

Rev. 0 Page 24 of 34
GDC-KLIA

13. GE LM 2500 FIELD REPORT/FINDINGS -Continue

PT-Lifting gears are installed as per GEK PT-Lifting gears are installed as per
compliance. GEK compliance.

PT-Lifting gears are installed as per GEK PT-Lifting gears are installed as per
compliance. GEK compliance.

Rev. 0 Page 25 of 34
GDC-KLIA

14. GE LM 2500 FIELD REPORT/FINDINGS -Continue

PT-Lifting gears are installed as per GEK PT-Lifting gears are installed as per GEK
compliance. compliance.

PT-Lifting gears are installed as per GEK All the cling wrapping,piping
compliance. openings,manifolds and connectors were well
encapsulated and do a thorough inspection
on every each components within enclosure
expanse.

Rev. 0 Page 26 of 34
GDC-KLIA

15. GE LM 2500 FIELD REPORT/FINDINGS -Continue

All the cling wrapping,piping PT-Observed the Oil Wetting PRESENT


openings,manifolds and connectors were during the inspection at site.
well encapsulated and do a thorough
inspection on every each components
within enclosure expanse.

PT-Observed the Oil Wetting PT-Observed the Oil Wetting PRESENT


PRESENT during the inspection at site during the inspection at site and found
and found Acceptable condition. Acceptable condition.

Rev. 0 Page 27 of 34
GDC-KLIA

16. GE LM 2500 FIELD REPORT/FINDINGS -Continue

PT-Observed the Oil Wetting PRESENT PT-Observed the Oil Wetting PRESENT
during the inspection at site and found during the inspection at site and found
Acceptable condition. Acceptable condition.

PT-Observed the Oil Wetting PRESENT PT-Observed the Oil Wetting PRESENT
during the inspection at site and found during the inspection at site and found
Acceptable condition. Performed manual Acceptable condition.
5% droplets on the PT for Oil Wetting.

Rev. 0 Page 28 of 34
GDC-KLIA

17. GE LM 2500 FIELD REPORT/FINDINGS -Continue

Performed manual 5% droplets on the PT Close up PT with cling wrapping after


for Oil Wetting. Oil wetting was done.

Close up PT with cling wrapping after Oil Performed manual 5% droplets on the
wetting was done. PT for Oil Wetting.

Rev. 0 Page 29 of 34
GDC-KLIA

18. GE LM 2500 FIELD REPORT/FINDINGS -Continue

Close up PT with cling wrapping after Oil PT-Lifting gears are installed as per
wetting was done. GEK compliance.

PT-Lifting gears are installed as per GEK PT-Lifting gears are installed as per
compliance. GEK compliance.

Rev. 0 Page 30 of 34
GDC-KLIA

19. GE LM 2500 FIELD REPORT/FINDINGS -Continue

LO tank-To acquire Lube Oil from the No water ingress & moisture found
tank prior to perform “Shake test”. from the LO tank.

Shake Test-5 minutes/30 seconds interval Resultant after “Shake test”

Rev. 0 Page 31 of 34
GDC-KLIA

20. GE LM 2500 FIELD REPORT/FINDINGS -Continue

LO tank found Acceptable condition. LO tank found Acceptable condition.

LO tank found Acceptable condition. LO tank found Acceptable condition.

Rev. 0 Page 32 of 34
GDC-KLIA

21. GE LM 2500 FIELD REPORT/FINDINGS -Continue

No water ingress & moisture found No water ingress & moisture found from
from the LO tank and LO drum the LO tank and LO drum

Rev. 0 Page 33 of 34
GDC-KLIA

22. GE LM 2500 FIELD REPORT/FINDINGS -Continue

Lifting Gear-Chain Block found expired Lifting Gear-Chain Block found


on 20/01/2022 expired on 20/01/2022

Lifting Gear-Shackle found expired on Lifting Gear-Web Sling found


18/02/2022 expired on 20/01/2022

Rev. 0 Page 34 of 34