1) Task -
CC To: New component development FMEA
Aruchamy -
(Prod G Plast)
Dhakshinamoorthi
2) Result - Critical characterstics
(QA - G Plast)
Ashok B (Ford) Sl.No Potential failure Mode
RPN
1 Blow Hole (Mounting Area) 120
2 Cone Angle 18° 55' - 0° 30' 96
3 Chemical composition - Not met 96
4 Diameter 7H7 96
3) Major Actions -
Location of Plant : Sl.No Actions By / Due
Simulation has done to avoid the blow holes in the critical zones (Gate provided
Coimbatore 1.1 in the critical zone)
Completed
FRECH Hot chamber with closed loop machine used to have process control and
1.2 Machine inbulid Poka Yoke
_
Tightening torque test to be implemted during set up approval and shift wise for
1.4 inprocess inspection
SOP
Spectro anlayis done at raw material stage and also at furnace during melting in
3 various zones ( Top and Bottom)
SOP
4 100% inspection wth Air Plug guage and Control chart to be implemted SOP
Working Group :
Mr.Nagamani (Eng)
Mr.Aruchamy (Prod)
Mr.Senthil (M/c)
Mr.Kumaravadivel
(Operations)
5 Sheets of PFMEA
Moderator Supplier
Name :Nagamani Name :Aruchamy Name : Dhakshinamoorthi Name : Senthil Name : Kumaravadivel
Dept : Engineering Dept : Production Dept : Quality Dept :M/c Dept : DGM - Operations