You are on page 1of 1

PT LOBUNTA KENCANA RAYA

Project : BSL Muratara


DAILY STATUS UNIT
Date : 21-Apr-22
Shift : Malam
Department : PAL
(AA, AB & Support)
Ready For Use Status

No. Model Total No. Unit Outstanding RS Remarks


DT-168,170,172,173,174,216,218,219
1 Mercy Actross 12
220,221,222,223
2 Mercy Sitrack 4 DT-7201,7213,7214,7215 DT-7201 (Pipe AC leak/Operation)
DT-7203,7204,7205,7206,7207,7208,7209
3 Mercy Axor 10
DT-7210,7211,7212
ET-229,ET-230,ET-231,ET-40,ET187 RS-1920/1971 RS ET-230, RS ET-40 (unit operation)
4 Excavator 6
ET-232 RS-2001 RS ET-231,ET-232
5 Buldozer 3 BD-178,BD-89,BD-177 RS-1969 Fan radiator (RS BD-177)
6 Motor Grader 1 MG-101 RS-1970 Operation (Cutting worn out)
7 Water Tank 1 WT-09 BL Unit & Progres Replace Unit By
8 Fuel Truck 1 FT-001 Rental
9 Tower Lamp 5 TL-03,TL-04,TL-180,TL-205,TL-206
10 Genset 3 GE-212M,GE-01W,GE-03W
11 Welding Machine WM-01 Jumper up Voltage Ready For Use
12 Welding Machine WM-207 Jumper up Voltage Ready For Use
Break Down Status
No. Model No. Unit Problem Outstanding RS Remarks
1 DX-225 ET-188 Investigation Plan GOH
2 Exc DX-520 ET-189 Plan GOH,Eng,MP,Hyd System
3 SY215C ET-228 Kaca Cabin FR Hancur RS-2002 Investigation
4 S-500 ET-37 Plan Replace Unit
5 S-500 ET-38 Pengecekan kebocoran/Rembesan RS-1966 (RS-Feed Pump)
6 Exc DX-520 ET-227 Low Power (RS-Feed Pump) RS-1966-1918 Progress Investigation
7 Dozer (Rental) DZ-01 Over Heat
8 D6R (Rental) DZ-02 Over Heat Ground test
9 D-85E BD-46 Plan Replace Unit
10 D8R BD-100 Transmission problem RS-2003-04 Continue investigation
11 GD-511 MG-191 Engine Trouble (TOH) RS-1839 Waiting Parts Inner TOH dan Comp ATT
12 Actross DT-171 Plan combine Chassis To DT-224
13 Actross DT-215 Complecatet Part Cannibal
14 Actross DT-175 Transmission problem Repair booster clutch
15 Actross DT-169 Transmission problem RS-1972 Completed Component, (Alternator)
16 Sitrack DT-7202 Radiator leak RS-2006 Investigation
17 Actross DT-224 Gear Shifting Move To DT-172 RS-1973 (RS DT-172)
18 CLA 26.280 DT-128 RS-1883 Completed component To WT-128
19 CLA 26.280 DT-131 RS-1883 Completed component To FT-131
20 SV-512 CM-204 Engine Blowbay Waiting Investigasi Engine Blowbay Plan OH
21 MH-01 RS-1883 Completed Parts to FT 01
Operation (Waiting Parts Axle
22 MH-001
FR,Tangki)
23 FT-51 Not Recommended Unit Plan Lelang
24 TL-179 Engine trouble Waiting OH Engine (Bekasi)
25 GE-211M Over Voltage Plan Replace Genset 150 Kva
Note
1. Beberapa unit ready diatas masih memiliki kerusakan minor sehingga masuk workshop sewaktu-waktu.
Tapi unit-unit tsb masih direkomendasikan dapat beroperasi
2. Diharapkan Percepatan Lubcar sesuai Kelengkapan SMKP BSL
3. Diharapkan Percepatan Genset 150 Kva utk Area Mess krn Saat ini Genset hanya 1 Unit yg Operasi Shift 1 & 2

Preapared Acnowledge

Ferdin silaban Torkis Simanullang


Planner KA. PAL