ROS :
Exist‐Tote‐Tank/Pour Point D‐1‐E Installed :
ROS :
Installed :
YYA‐BAR‐001(BATTERY_RACK 1&2)‐N
ROS :
Exist‐Tote‐Tank/Pour Point D‐2‐E Installed :
YYA‐Z‐003(N2 Package)‐E ROS :
ROS : Installed : YYA‐Z‐010(O2_SCAVANGER)‐N
YYA‐Z‐007(Pour Point Depresant
Installed : ROS :
Tank)‐E
ROS : Installed :
YYA‐L‐001(Pig Launcher)‐N Installed :
ROS :
Installed : YYA‐Z‐009(Crane)‐N
ROS :
Installed :
YYA‐T‐012 (Diesel Storage Tk)‐N
ROS :
Installed : YYA‐Z‐011 (BIOCIDE PACKAGE)‐N
ROS :
Installed :
TEST SEPARATOR TANK‐E
ROS : YYA‐Z‐012 (EMULSIFIER INJECTION PACKAGE)‐N
Installed : ROS :
Installed :
STUDY‐TOTE‐TANK/OXYGEN_SI
ROS :
Installed : YYA‐Z‐002 (CO2 SSNUFFING UNIT)‐N
ROS :
STUDY‐TOTE‐TANK/EMULSIFIER_INJ Installed :
ROS :
Installed : YYA‐Z‐005 (SCALE INHIB. INJEC. PACKAGE)‐E
ROS :
STUDY‐TOTE‐TANK/BIOCIDE_INJ Installed :
ROS :
Installed : YYA‐Z‐006 (CORROSION INHIB. INJEC. PACKAGE)‐E
ROS :
Installed :
YYA‐P‐003‐01 (SCALE INHIBITOR TRANSFER PUMP)‐E
ROS :
Installed :
YYA‐P‐003‐02 (CORROSION INHIBITOR TRANSFER PUMP)‐E
ROS :
Installed :
TOTE TANK SCALE INHIB‐E YYA‐P‐003‐01 (BIOCIDE TRANSFER PUMP)‐E
ROS : ROS :
Installed : Installed :
TOTE TANK COR INHIB‐E YYA‐P‐003‐02 (EMULSIFIER TRANSFER PUMP)‐E
ROS : ABOVE MAIN DECK ROS :
Installed : Installed :
YYA‐F‐006A (Diesel Filter)‐N
ROS :
Installed :
Exist‐Tote‐Tank/Pour Point D‐2‐E
ROS :
Installed :
Exist‐Tote‐Tank/Pour Point D‐1‐E
ROS :
Installed :
ABOVE DIESEL STORAGE TANK SKID
YYA‐F‐004D (Vendor‐Existing)
ROS :
Installed :
YYA‐F‐004C (Vendor‐Existing)
ROS :
Installed :
YYA‐F‐004B (Vendor‐Existing)
ROS :
Installed : YYA‐V‐004B (Vendor‐Existing)
ROS :
Installed :
YYA‐F‐004A (Vendor‐Existing)
ROS : YYA‐V‐004A (Vendor‐Existing)
ROS :
Installed :
YYA‐V‐005 (Instrument Gas
Separator‐Vendor‐Existing)‐Need
YYA‐V‐003 (Vendor‐Existing)
ROS :
Installed :
YYA‐V‐013A Fuel Gas Dryer (N) (Vendor)
ROS :
Installed :
ABOVE MEZZANINE DECK
YYA‐Z‐008(CO2_SNUFFING) (N)
ROS :
Installed :
CD‐PG‐(Pig Launcher) Modif
YYA‐GBR‐001(GBR) (N) ROS : YYA‐F‐004D (Vendor‐Existing)
ROS : Installed : ROS :
Installed : Installed :
YYA‐V‐004A (Vendor‐Existing)
Switch Gear Room (N) (Inst‐Elect) ROS :
ROS : Installed :
Installed :
YYA‐V‐005A (Vendor‐Existing)
ROS :
YYA‐ELECJB‐001L/S(Modif) Installed :
ROS :
Installed :
YYA‐V‐003 (Vendor‐Existing)
ROS :
YYA‐WH‐001L/S (Well Head)‐N
Installed :
ROS :
Installed :
Fuel Gas Dryer‐N (Vendor)
New Equipment (Future) ROS :
ROS : Installed :
Installed :
YYA‐V‐002 (Gas Lift Separator) (Future) YYA‐G‐002(Back up Generator‐Diesel
ROS : Engine Generator)‐N
Installed : ROS :
Installed :
YYA‐G‐001(Main Power Generator)(N)
ROS :
Installed :
ABOVE CELLAR DECK
YYA‐V‐009(Closed Drain Vessel/Vent KO Drum)
ROS :
YYA‐P‐009( Closed Drain Pump)
Installed :
ROS :
Installed :
YYA‐P‐012A(SEA_WATER_PUMP‐A)
ROS :
Installed :
YYA‐P‐012B(SEA_WATER_PUMP‐B)
ROS :
Installed :
YYA‐P‐013( Diesel Fire Water Pump)
ROS :
Installed :
YYA‐P‐013‐Day Tank (Daily Tank)
ROS :
Installed :
SUB CELLAR DECK
Caisson (Sea Water Pump‐A) New Raiser guard
ROS : Fab :
Raiser Pipeline to KLB Platform Installed : Installed :
ROS :
Caisson (Sea Water Pump‐B) NEW
A ROS :
Installed :
B1
YYA‐WH‐001 L/S (Welhead)
ROS :
Installed :
Caisson (Fire Water Pump)
ROS :
Installed :
Conductor guard
Fab :
Boat Landing B2 Installed :
Fab :
Installed :
BOAT LANDING