You are on page 1of 1

LT REVISION DATE CHKD

100 9
PLT-1 21
DUMPING CONTROL VALVE
(SEE HYD. BRAKE)
101 10
P T
A B

10 S5 S6

11

2755 PSI

JOYSTICK VALVE 12
17 1 2

STEERING CYLINDERS 10

DUMPING CYLINDERS

20
20
24 22 20
BULKHEAD
M

23 21 19
23 BULKHEAD

2600 PSI
78 LS
PRIORITY FLOW
124 CONTROL VALVE S7
P T MB B LSC MA A D
ASSY

T P
STEERING CONTROL VALVE 22 22A 22B 15
7 13 17
LS-1
85
(SEE HYD. BRAKE)
85 16
PRH-1
14 18
5 1 2 8
(SEE HYD. BRAKE)

TRH-1
(SEE HYD. BRAKE) 6 3
3 121
78

122 123
4A 4
120
X
63 64 65 66

2
32
87 B
M2
6
0-3000 PSI TRANS. DRIVE 25-75 GPM

4 750-2200 RPM PC: 2600 PSI


LS: 400 PSI

C1
L2
S L1

62 1

60
177 177A

2B 61 TITLE: MAIN HYDRAULIC P1


1 PRESSURE LINE
TANK RETURN LINE
PILOT LINE MODEL: DT-24
HYDRAULIC TANK LOAD SENSING LINE
615 LAVOISIER
S/N: 1253, 1254, 1255, 1256
REPENTIGNY, QUEBEC
THIS DRAWING AND DATA EMBODY PROPRIETARY
INFORMATION WHICH IS CONFIDENTIAL PROPERTY DUX
DRAWN BY O.DELGADO 2012-03-12 REV. CANADA J6A 7N2
MACHINERY CORPORATION AND WICH SHALL NOT BE
COPIED, REPRODUCED, DISCLOSED TO OTHERS, OR VERIFIED BY DWG.N SIZE
USED IN WHOLE OR PART FOR ANY PURPOSE, WITHOUT SHEET
EXPRESS WRITTEN PERMISSION OF DUX MACHINERY
CORPORATION APPROVED BY 1 OF 1 6160 B

You might also like