Pump Testing Requirement

ISO 9906:2012
Rotodynamic pumps -- Hydraulic
performance acceptance tests -- Grades
1, 2 and 3
Pump Testing Requirement
• ISO 9906:2012 specifies hydraulic performance tests for customers'
acceptance of rotodynamic pumps (centrifugal, mixed flow and
axial pumps). It is intended to be used for pump acceptance testing
at pump test facilities, such as manufacturers' pump test facilities or
laboratories. ISO 9906:2012 can be applied to pumps of any size
and to any pumped liquids which behave as clean, cold water.
• It specifies three levels of acceptance:
• grades 1B, 1E and 1U with tighter tolerance;
• grades 2B and 2U with broader tolerance;
• grade 3B with even broader tolerance.
• It applies either to a pump itself without any fittings or to a
combination of a pump associated with all or part of its upstream
and/or downstream fittings.
Pump Testing Requirement
Main Objective
Confirm pump performance parameters:
• Capacity
• Head
• Power
• Efficiency
• NPSH
Pump Testing Requirement
Others
Confirm pump performance parameters:
• Temperature rise
• Noise
• Dimension
• Material
• Protection coating
Pump Testing Requirement
Consideration
Confirm pump performance parameters:
• Water Temperature
• Speed
• Power
• Efficiency
• NPSH
Pump Testing Requirement
Arrangement
Pump Testing Requirement
Item Particulars Unit 1 2 3
No.
1. Quantity of water delivered against m3/hr
Total Head by each pump
2. Total Dynamic Head m
3. Water Power (base on item 1 & 2) kW
4. Maximum Power input for Motor kW
5. Overall Efficiency of Pump and Motor %
6. Pump Speed rpm

7. NPSH m
Pump Testing Requirement
Computation

Flow meter 1
Pump Testing Requirement
Item Particulars Unit 1 2 3
No.
1. Quantity of water delivered against m3/hr
1
Total Head by each pump
2. Total Dynamic Head m
3. Water Power (base on item 1 & 2) kW
4. Maximum Power input for Motor kW
5. Overall Efficiency of Pump and Motor %
6. Pump Speed rpm

7. NPSH m
Pump Testing Requirement
Computation
Pressure
gauge P1

Pressure
gauge P2

2 = P2 – P1 + (V22 – V12/2g)
Pump Testing Requirement
Item Particulars Unit 1 2 3
No.
1. Quantity of water delivered against m3/hr
1
Total Head by each pump
2. Total Dynamic Head m 2
3. Water Power (base on item 1 & 2) kW
4. Maximum Power input for Motor kW
5. Overall Efficiency of Pump and Motor %
6. Pump Speed rpm

7. NPSH m
Pump Testing Requirement
Computation

kW, (after power


factor) 4

Speed 5

3 Water Power = 1 x 2 x 9.81


Pump Testing Requirement
4
X 100
Item Particulars Unit 1 2 3 3
No.
1. Quantity of water delivered against m3/hr
1
Total Head by each pump
2
2. Total Dynamic Head m
3
3. Water Power (base on item 1 & 2) kW
4. Maximum Power input for Motor kW 4
5. Overall Efficiency of Pump and Motor %
6. Pump Speed rpm 5

7. NPSH m