You are on page 1of 6

QC-FRM-ITF-05B (REV.

6)

Client : PT. Wilmar Nabati Indonesia - Gresik

Contractor : PT. Srikaya Putra Mas

Area / Plant : SOYA


WILMAR PROJECT GRESIK

Date : April 2022

PAINTING INSPECTION REPORT

FORM NUMBER * ITF - 030 / SPM – SOYA / 22 / 04 * NomerdiisiolehKontraktorsesuaiarahan QC

Location Piping √ Cone Structure Other:

Painting Brand JOTUN-FUTURA CLASSIC Blasting Inspection


Report Number
Painting Type L PRIMER L INTERMEDIATE L FINISH
1 2 3
Thickness (micron)

Caution:Form iniharapdiserahkansetiapharikepada QC-Wilmarbeserta photo dan Painting map /isometric.

Items of Inspection :

DFT
S/N Material Layer Defects Remarks
(micron)

1 SHELL 2PL-Cone 1 250 - ACC

2 SHELL 3PL-Cone 1 250 - ACC

3 SHELL 4PL-Cone 1 250 - ACC

4 SHELL 5PL-Cone 1 250 - ACC

5 SHELL 6PL-Cone 1 250 - ACC

6 SHELL 7PL-Cone 1 250 - ACC

Comments

CONTRACTOR WILMAR
Requested by : Approved by :

Signature

Name YUSUF LUNAJI BERRY A AGUNG P


QC-FRM-ITF-05B (REV.6)

Client : PT. Wilmar Nabati Indonesia - Gresik

Contractor : PT. Srikaya Putra Mas

Area / Plant : SOYA


WILMAR PROJECT GRESIK

Date : April 2022

PAINTING INSPECTION REPORT

Position QC Site Manager Project Construction QC Inspector

Telp. 

FORM NUMBER * ITF - 031 / SPM – SOYA / 22 / 04 * NomerdiisiolehKontraktorsesuaiarahan QC

Location Piping √ Cone Structure Other:

Painting Brand JOTUN-FUTURA CLASSIC Blasting Inspection


Report Number
Painting Type L PRIMER L INTERMEDIATE L FINISH
1 2 3
Thickness (micron)

Caution:Form iniharapdiserahkansetiapharikepada QC-Wilmarbeserta photo dan Painting map /isometric.

Items of Inspection :

DFT
S/N Material Layer Defects Remarks
(micron)

1 SHELL 2PL-Cone 2 250 - ACC

2 SHELL 3PL-Cone 2 250 - ACC

3 SHELL 4PL-Cone 2 250 - ACC

4 SHELL 5PL-Cone 2 250 - ACC

5 SHELL 6PL-Cone 2 250 - ACC

6 SHELL 7PL-Cone 2 250 - ACC

Comments

Signature CONTRACTOR WILMAR


Requested by : Approved by :
QC-FRM-ITF-05B (REV.6)

Client : PT. Wilmar Nabati Indonesia - Gresik

Contractor : PT. Srikaya Putra Mas

Area / Plant : SOYA


WILMAR PROJECT GRESIK

Date : April 2022

PAINTING INSPECTION REPORT

Name YUSUF LUNAJI BERRY A AGUNG P

Position QC Site Manager Project Construction QC Inspector

Telp. 

FORM NUMBER * ITF - 032 / SPM – SOYA / 22 / 04 * NomerdiisiolehKontraktorsesuaiarahan QC

Location Piping √ Cone Structure Other:

Painting Brand JOTUN-FUTURA CLASSIC Blasting Inspection


Report Number
Painting Type L PRIMER L INTERMEDIATE L FINISH
1 2 3
Thickness (micron)

Caution:Form iniharapdiserahkansetiapharikepada QC-Wilmarbeserta photo dan Painting map /isometric.

Items of Inspection :

DFT
S/N Material Layer Defects Remarks
(micron)

1 SHELL 2PL-Cone 3 250 - ACC

2 SHELL 3PL-Cone 3 250 - ACC

3 SHELL 4PL-Cone 3 250 - ACC

4 SHELL 5PL-Cone 3 250 - ACC

5 SHELL 6PL-Cone 3 250 - ACC

6 SHELL 7PL-Cone 3 250 - ACC


QC-FRM-ITF-05B (REV.6)

Client : PT. Wilmar Nabati Indonesia - Gresik

Contractor : PT. Srikaya Putra Mas

Area / Plant : SOYA


WILMAR PROJECT GRESIK

Date : April 2022

PAINTING INSPECTION REPORT

Comments

CONTRACTOR WILMAR
Requested by : Approved by :

Signature

Name YUSUF LUNAJI BERRY A AGUNG P

Position QC Site Manager Project Construction QC Inspector

Telp. 

FORM NUMBER * ITF - 033 / SPM – SOYA / 22 / 04 * NomerdiisiolehKontraktorsesuaiarahan QC

Location Piping √ Cone Structure Other:

Painting Brand JOTUN-FUTURA CLASSIC Blasting Inspection


Report Number
Painting Type L PRIMER L INTERMEDIATE L FINISH
1 2 3
Thickness (micron)

Caution:Form iniharapdiserahkansetiapharikepada QC-Wilmarbeserta photo dan Painting map /isometric.

Items of Inspection :

DFT
S/N Material Layer Defects Remarks
(micron)

1 SHELL 2PL-Cone 4 250 - ACC

2 SHELL 3PL-Cone 4 250 - ACC

3 SHELL 4PL-Cone 4 250 - ACC

4 SHELL 5PL-Cone 4 250 - ACC

5 SHELL 6PL-Cone 4 250 - ACC

6 SHELL 7PL-Cone 4 250 - ACC


QC-FRM-ITF-05B (REV.6)

Client : PT. Wilmar Nabati Indonesia - Gresik

Contractor : PT. Srikaya Putra Mas

Area / Plant : SOYA


WILMAR PROJECT GRESIK

Date : April 2022

PAINTING INSPECTION REPORT

Comments

CONTRACTOR WILMAR
Requested by : Approved by :

Signature

Name YUSUF LUNAJI BERRY A AGUNG P

Position QC Site Manager Project Construction QC Inspector

Telp. 

FORM NUMBER * ITF - 034 / SPM – SOYA / 22 / 04 * NomerdiisiolehKontraktorsesuaiarahan QC

Location Piping √ Cone Structure Other:

Painting Brand JOTUN-FUTURA CLASSIC Blasting Inspection


Report Number
Painting Type L PRIMER L INTERMEDIATE L FINISH
1 2 3
Thickness (micron)

Caution:Form iniharapdiserahkansetiapharikepada QC-Wilmarbeserta photo dan Painting map /isometric.

Items of Inspection :

DFT
S/N Material Layer Defects Remarks
(micron)

1 SHELL 2PL-Cone 5 250 - ACC

2 SHELL 3PL-Cone 5 250 - ACC


QC-FRM-ITF-05B (REV.6)

Client : PT. Wilmar Nabati Indonesia - Gresik

Contractor : PT. Srikaya Putra Mas

Area / Plant : SOYA


WILMAR PROJECT GRESIK

Date : April 2022

PAINTING INSPECTION REPORT

3 SHELL 4PL-Cone 5 250 - ACC

4 SHELL 5PL-Cone 5 250 - ACC

5 SHELL 6PL-Cone 5 250 - ACC

6 SHELL 7PL-Cone 5 250 - ACC

Comments

CONTRACTOR WILMAR
Requested by : Approved by :

Signature

Name YUSUF LUNAJI BERRY A AGUNG P

Position QC Site Manager Project Construction QC Inspector

Telp. 