You are on page 1of 168

Power Transmission and Distribution Group Electrotechnical documents

Drawing For Review


COPYRIGHT (C) SIEMENS LIMITED VIETNAM 2008
ALL RIGHT RESERVED

THIS COVER PAGE IS A RECORD FOR ALL REVISIONS OF THE DRAWINGS IDENTIFIED BY NUMBER AND Customer: NPT/CPPMB
TITLE. ALL PREVIOUS PAGES ARE HEREBY SUPERSEDED AND ARE TO BE DESTROYED

Project name: Supply of Primary Equipment, Conductor


,Grouding wire, Insulator, Optical cable and Accessories.

Substation: 500kV PLEIKU-2 SUBSTATION


PROJECT NO. 0

Title: Circuit Breaker 500kV 3AP2FI & 3AP3FI


B Revised as Customer comments (by email) Items A.1 ; A.2
REV REMARKS DATE NAME

Date 18/8/2015 NPT/CPPMB NPT/CPPMB Substation REV


500kV PLEIKU-2 SUBSTATION
B Second issued 18/8/2015 Design SAG Supply of Primary Equipment, Conductor Circuit Breaker 500kV 3AP2FI & B
A First issued 18/8/2015 Check N.K.PHONG ,Grouding wire, Insulator, Optical cable and Accessories. 3AP3FI Scale
(3)-500E05-S1507-U0500-B
Sh 1+
Rev Remarks Date Name Issued N.K.PHONG Customer/Project Name NPT/CPPMB SIEMENS LIMITED VIETNAM Cover sheet 168 Sheets
No. Document / Drawing Title Document/Drawing No Revision Date Sheets Issue by Remark

1 - Cover sheet (3)-500E05-S1507-U0500-B B 18/8/2015 1 SLV


2 - List of drawing (3)-500E05-S1507-L0500-B B 18/8/2015 1 SLV
550kV - 4000A - 63kA/3s - SF6 Circuit Breaker – type 1, TRV: Acc. IEC 62271-100, without
A.1.1 Resistor, single pole operation type (with PSD D50 controller) Without Resistor, with PSD

Layout drawings -3AP2FI 3HM427-06717-060 B 17.08.2015 1 SAG


Guidline for support of CB 433-01810-029-B02 A 10.02.2009 1 SAG
Circuit - Breaker drawings 3HS458 00042307 B 11/8/2015 83 SAG
Name plate 627-30004-876 B - 1 SAG
Information provided from Customer (submited for confirmation) B05-R2 ;B06-R2 ;B06-R1; SLD 7 Customer provided
550kV - 4000A - 63kA/3s - SF6 Circuit Breaker – type 2, TRV: 2.78 pu, with Resistor
A.1.2 (400<R<500) , single pole operation type With Resistor

Layout drawings -3AP3FI - with 450 3HM427-067115-023 B 17/8/2015 1 SAG


Guidline for support of CB 433-01810-029-B02 A 10/2/2009 1 SAG
COPYRIGHT (C) SIEMENS LIMITED VIETNAM 2008

Circuit - Breaker drawings 3HS458 00042305 B 4/8/2015 70 SAG


Name plate 627-30004-903 B - 1 SAG
ALL RIGHT RESERVED
PROJECT NO. 0

Date 18/8/2015 NPT/CPPMB Substation REV


Circuit Breaker 500kV 3AP2FI & 500kV PLEIKU-2 SUBSTATION
Design SAG Supply of Primary Equipment, Conductor B
18/8/2015
3AP3FI Scale
A First issued Check N.K.PHONG ,Grouding wire, Insulator, Optical cable and Accessories. Sh 2+
(3)-500E05-S1507-L0500-B
Rev Remarks Date Name Issued N.K.PHONG Customer/Project Name NPT/CPPMB SIEMENS LIMITED VIETNAM List of drawing 168 Sheets
Type 3AP2FI Year of manufacturing / No. xx/xxxxxxxx

Rated voltage Ur 550 kV

Rated lightning impulse withstand voltage Up 1550 kV

Rated switching impulse withstand voltage Us 1175 kV

Rated frequency fr 50 Hz

Rated normal current Ir 4000 A

Rated short-circuit breaking current Isc 63 kA

Rated duration of short-circuit tk 3s

DC component of the rated short-circuit breaking current 53 %

First pole-to-clear factor kpp 1,3

Rated line-charging breaking current Il 500 A

Rated cable-charging breaking current Ic 500 A

Rated operating sequence O-0.3s-CO-3min-CO

Creepage distance to earth 14.450 mm

Creepage distance across open CB 15.126 mm

SF6 nominal filling gauge pressure at +20°C 6,0 bar

Mass of SF6-filling / pole m 21,5 kg

Mass / pole M 2340 kg

Temperature class -25...+50°C

IEC 62271 - 100

627-30004-876
cắt từng pha riêng
cắt cả 3pha

xác nhận

khí sf6 tot


khóa liên động

mạch khóa
thường đóng mở chậm

tiếp điểm hành trình động cơ

chống dính tiếp điểm


công tắc cửa
khóa đóng truyền đoongj
Type 3AP3FI Year of manufacturing / No. xx/xxxxxxxx

Rated voltage Ur 550 kV

Rated lightning impulse withstand voltage Up 1550 kV

Rated switching impulse withstand voltage Us 1175 kV

Rated frequency fr 50 Hz

Rated normal current Ir 4000 A

Rated short-circuit breaking current Isc 63 kA

Rated duration of short-circuit tk 3s

DC component of the rated short-circuit breaking current 53 %

First pole-to-clear factor kpp 1,3

Rated line-charging breaking current Il 500 A

Rated cable-charging breaking current Ic 500 A

Rated operating sequence O-0.3s-CO-3min-CO

Creepage distance to earth 14.450 mm

Creepage distance across open CB 15.126 mm

SF6 nominal filling gauge pressure at +20°C 6,0 bar

Mass of SF6-filling / pole m 32,2 kg

Mass / pole M 3130 kg

Temperature class -25...+50°C

IEC 62271 - 100

627-30004-903
Power Transmission and Distribution

PSD Identification Sheet page 1/2


Siemens E T HP CB B TS PE Fax No. (030) 386-22832
Customer CPPMB Date
Reference B05-R2 Fax

1 Controlled Circuit Breaker (CB)


Type of CB 3AP2FI Number of CB B05-R2

2 General Information
2.1 DC supply, controls and outputs
Aux. Supply CB coil supply and Alarm supply
Command
110 [V DC]
125 [V DC]
220 [V DC]
250 [V DC]
Other
Separate battery systems for control and trip Yes No

2.2 Others
Cable for sensors Yes No length [m]
(1P x AWG22 C, screened, twisted pair (distance CB<->PSD) 100m
2
2x0,34mm )

3 Synchronous switching case


3.1 Network parameters
Neutral point solidly Yes No
Rated voltage [kV] 500 Frequency [Hz] 50
earthed (s.e.)

3.2 Overhead line or cable


OPEN CLOSE Uncompensated Line lenght [km] Charge cur. [A]
Compensated Degree [%]
Yes No
Auto-reclosing Auto-reclosing time [s]
Line discharged at Yes No
reclosing time
Kind of voltage transformers at the line inductive capacitive other

3.3 Capacitor bank


OPEN CLOS Reactive power 3ph [MVAr] Reactive power 1ph [MVAr]
E
Neutral Yes No Phase impedance Zc [Ohm] Rated current [A]
point s.e. Neutral impedance Zn [Ohm]

3.4 Shunt reactor


OPEN CLOSE Reactive power 3ph [MVAr] Reactive power 1ph [MVAr] 63.3
Neutral Yes No Phase impedance Zr [Ohm] Rated current [A] 199.45
point s.e. Neutral impedance Zn [Ohm] 800-
1200-
2000

3.5 Unloaded transformer (please attach saturation curve)


To reduce the influence of remanence OPEN and CLOSE operation should be performed controlled
OPEN CLOS Power 3ph [MVA] Power 1ph [MVA]
E
D:\Data\My work\Projects\500kV Play Cu 2\F.DRAWING\Final\Pleiku drawings\CB 500kV\PSD\PSD_Ident_Sheet_En for B05-R2 - .doc
16.04.2009
Power Transmission and Distribution

PSD Identification Sheet page 2/2


Magnetising current [A]
Numerical index of vector group
Transformer bank with 3 single phase units yes no
Rated voltage [kV] primary secondary tertiary

4 Network monitoring signals


Voltage and current transformers
For closing operations only a voltage signal (source side) can be used as reference for synchronous
switching. The current signals are used for supervision (e.g. supervision of inrush current and start of
current flow). If a current signal is not available a voltage signal (switched side) can be used for
analysing the closing operation. For synchronous switching a transformer a voltage signal (switched
side) is required.

For trip operations a voltage signal (source side) or a current signal can be used as reference for
synchronous switching. The voltage signal as reference is used in particular, with unloaded
transformers, were only a very small magnetizing current is flowing into the transformer.
The current signals are used for supervision (e.g. detecting a chopping process or a re-ignition)

For controlled auto-reclosing of lines at least one voltage signal from source side and all 3 voltage
signals from switched side must be provided. If the line voltage contains a DC component, the VT
must transform this.

For commissioning following signals are required additional to the reference for synchronous
switching.
a) Capacitive loads or reactors: current signals or voltage signals (switched side)
b) Transformer: voltage signals (switched side)

Voltage and current transformers available:


Cap. Ind. Bushing Ratio Class Phase Phase Phase
PT PT tap A B C
Voltage (Source side) (500/ 3)/(0.11/ 3) 3P / 0.5

Voltage (Switched
side)
Current 100-200-400/1/1/1 0.5 /
5P20
Please add the single line diagram to this identification sheet

5 Operating Demands
(Definition of the maximum permissible overvoltage factors and inrush current)

D:\Data\My work\Projects\500kV Play Cu 2\F.DRAWING\Final\Pleiku drawings\CB 500kV\PSD\PSD_Ident_Sheet_En for B05-R2 - .doc


16.04.2009
Power Transmission and Distribution

PSD Identification Sheet page 1/2


Siemens E T HP CB B TS PE Fax No. (030) 386-22832
Customer CPPMB Date
Reference B06-R2 Fax

1 Controlled Circuit Breaker (CB)


Type of CB 3AP2FI Number of CB B06-R2

2 General Information
2.1 DC supply, controls and outputs
Aux. Supply CB coil supply and Alarm supply
Command
110 [V DC]
125 [V DC]
220 [V DC]
250 [V DC]
Other
Separate battery systems for control and trip Yes No

2.2 Others
Cable for sensors Yes No length [m]
(1P x AWG22 C, screened, twisted pair (distance CB<->PSD) 100m
2
2x0,34mm )

3 Synchronous switching case


3.1 Network parameters
Neutral point solidly Yes No
Rated voltage [kV] 500 Frequency [Hz] 50
earthed (s.e.)

3.2 Overhead line or cable


OPEN CLOSE Uncompensated Line lenght [km] Charge cur. [A]
Compensated Degree [%]
Yes No
Auto-reclosing Auto-reclosing time [s]
Line discharged at Yes No
reclosing time
Kind of voltage transformers at the line inductive capacitive other

3.3 Capacitor bank


OPEN CLOS Reactive power 3ph [MVAr] Reactive power 1ph [MVAr]
E
Neutral Yes No Phase impedance Zc [Ohm] Rated current [A]
point s.e. Neutral impedance Zn [Ohm]

3.4 Shunt reactor


OPEN CLOSE Reactive power 3ph [MVAr] Reactive power 1ph [MVAr] 63.3
Neutral Yes No Phase impedance Zr [Ohm] Rated current [A] 199.45
point s.e. Neutral impedance Zn [Ohm] 800-
1200-
2000

3.5 Unloaded transformer (please attach saturation curve)


To reduce the influence of remanence OPEN and CLOSE operation should be performed controlled
OPEN CLOS Power 3ph [MVA] Power 1ph [MVA]
E
D:\Data\My work\Projects\500kV Play Cu 2\F.DRAWING\Final\Pleiku drawings\CB 500kV\PSD\PSD_Ident_Sheet_En for B06-R2 - .doc
16.04.2009
Power Transmission and Distribution

PSD Identification Sheet page 2/2


Magnetising current [A]
Numerical index of vector group
Transformer bank with 3 single phase units yes no
Rated voltage [kV] primary secondary tertiary

4 Network monitoring signals


Voltage and current transformers
For closing operations only a voltage signal (source side) can be used as reference for synchronous
switching. The current signals are used for supervision (e.g. supervision of inrush current and start of
current flow). If a current signal is not available a voltage signal (switched side) can be used for
analysing the closing operation. For synchronous switching a transformer a voltage signal (switched
side) is required.

For trip operations a voltage signal (source side) or a current signal can be used as reference for
synchronous switching. The voltage signal as reference is used in particular, with unloaded
transformers, were only a very small magnetizing current is flowing into the transformer.
The current signals are used for supervision (e.g. detecting a chopping process or a re-ignition)

For controlled auto-reclosing of lines at least one voltage signal from source side and all 3 voltage
signals from switched side must be provided. If the line voltage contains a DC component, the VT
must transform this.

For commissioning following signals are required additional to the reference for synchronous
switching.
a) Capacitive loads or reactors: current signals or voltage signals (switched side)
b) Transformer: voltage signals (switched side)

Voltage and current transformers available:


Cap. Ind. Bushing Ratio Class Phase Phase Phase
PT PT tap A B C
Voltage (Source side) (500/ 3)/(0.11/ 3) 3P / 0.5

Voltage (Switched
side)
Current 100-200-400/1/1/1 0.5 /
5P20
Please add the single line diagram to this identification sheet

5 Operating Demands
(Definition of the maximum permissible overvoltage factors and inrush current)

D:\Data\My work\Projects\500kV Play Cu 2\F.DRAWING\Final\Pleiku drawings\CB 500kV\PSD\PSD_Ident_Sheet_En for B06-R2 - .doc


16.04.2009
Power Transmission and Distribution

PSD Identification Sheet page 1/2


Siemens E T HP CB B TS PE Fax No. (030) 386-22832
Customer CPPMB Date
Reference B06-R1 Fax

1 Controlled Circuit Breaker (CB)


Type of CB 3AP2FI Number of CB B06-R1

2 General Information
2.1 DC supply, controls and outputs
Aux. Supply CB coil supply and Alarm supply
Command
110 [V DC]
125 [V DC]
220 [V DC]
250 [V DC]
Other
Separate battery systems for control and trip Yes No

2.2 Others
Cable for sensors Yes No length [m]
(1P x AWG22 C, screened, twisted pair (distance CB<->PSD) 100m
2
2x0,34mm )

3 Synchronous switching case


3.1 Network parameters
Neutral point solidly Yes No
Rated voltage [kV] 500 Frequency [Hz] 50
earthed (s.e.)

3.2 Overhead line or cable


OPEN CLOSE Uncompensated Line lenght [km] Charge cur. [A]
Compensated Degree [%]
Yes No
Auto-reclosing Auto-reclosing time [s]
Line discharged at Yes No
reclosing time
Kind of voltage transformers at the line inductive capacitive other

3.3 Capacitor bank


OPEN CLOS Reactive power 3ph [MVAr] Reactive power 1ph [MVAr]
E
Neutral Yes No Phase impedance Zc [Ohm] Rated current [A]
point s.e. Neutral impedance Zn [Ohm]

3.4 Shunt reactor


OPEN CLOSE Reactive power 3ph [MVAr] 91 Reactive power 1ph [MVAr]
Neutral Yes No Phase impedance Zr [Ohm] Rated current [A] 105
point s.e. Neutral impedance Zn [Ohm] 550-
650-800

3.5 Unloaded transformer (please attach saturation curve)


To reduce the influence of remanence OPEN and CLOSE operation should be performed controlled
OPEN CLOS Power 3ph [MVA] Power 1ph [MVA]
E
Magnetising current [A]
D:\Data\My work\Projects\500kV Play Cu 2\F.DRAWING\Final\Pleiku drawings\CB 500kV\PSD\PSD_Ident_Sheet_En for B06-R1.doc
16.04.2009
Power Transmission and Distribution

PSD Identification Sheet page 2/2


Numerical index of vector group
Transformer bank with 3 single phase units yes no
Rated voltage [kV] primary secondary tertiary

4 Network monitoring signals


Voltage and current transformers
For closing operations only a voltage signal (source side) can be used as reference for synchronous
switching. The current signals are used for supervision (e.g. supervision of inrush current and start of
current flow). If a current signal is not available a voltage signal (switched side) can be used for
analysing the closing operation. For synchronous switching a transformer a voltage signal (switched
side) is required.

For trip operations a voltage signal (source side) or a current signal can be used as reference for
synchronous switching. The voltage signal as reference is used in particular, with unloaded
transformers, were only a very small magnetizing current is flowing into the transformer.
The current signals are used for supervision (e.g. detecting a chopping process or a re-ignition)

For controlled auto-reclosing of lines at least one voltage signal from source side and all 3 voltage
signals from switched side must be provided. If the line voltage contains a DC component, the VT
must transform this.

For commissioning following signals are required additional to the reference for synchronous
switching.
a) Capacitive loads or reactors: current signals or voltage signals (switched side)
b) Transformer: voltage signals (switched side)

Voltage and current transformers available:


Cap. Ind. Bushing Ratio Class Phase Phase Phase
PT PT tap A B C
Voltage (Source side) (500/ 3)/(0.11/ 3) 3P / 0.5

Voltage (Switched
side)
Current 150-300/1/1/1 0.5 /
5P20
Please add the single line diagram to this identification sheet

5 Operating Demands
(Definition of the maximum permissible overvoltage factors and inrush current)

D:\Data\My work\Projects\500kV Play Cu 2\F.DRAWING\Final\Pleiku drawings\CB 500kV\PSD\PSD_Ident_Sheet_En for B06-R1.doc


16.04.2009
B05-R2
B06-R2

3AP2- FI -550 with PSD

B06-R1
3AP2 -FI-550 with PSD

Other supplier

You might also like