Professional Documents
Culture Documents
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
Customer
Address:
Phone:
Fax:
Table of contents
Location box Order Number Page Page description Job number Remarks
=COM +SD
SD00.1 SD01.1
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Table of contents : =COM+SD/SD00 - = COM
Ed. BINH AN =COM+SD/SD14 + SD
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page SD01
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Table of contents
Location box Order Number Page Page description Job number Remarks
=COM +SD
=COM +AC
SD01 SD01.2
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Table of contents : =COM+SD/SD15 - = COM
Ed. BINH AN =COM+AC/AC17 + SD
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page SD01.1
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Table of contents
Location box Order Number Page Page description Job number Remarks
=COM +DC
=E01 +COM
71 CO2 LAYOUT OF TWO LINES & BUS COUPLER CONTROL PANEL CT - 12102016
72 CO3 LAYOUT OF TWO LINES & BUS COUPLER CONTROL PANEL CT - 12102016
73 CO4 LAYOUT OF TWO LINES & BUS COUPLER RELAY PANEL CT - 12102016
74 CO5 LAYOUT OF TWO LINES & BUS COUPLER RELAY PANEL CT - 12102016
SD01.1 SD01.3
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Table of contents : =COM+DC/DC00 - = COM
Ed. BINH AN =E01+COM/CO12 + SD
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page SD01.2
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Table of contents
Location box Order Number Page Page description Job number Remarks
=E01 +CP1
=E01 +RP1
SD01.2 SD01.4
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Table of contents : =E01+CP1/C100 - = COM
Ed. BINH AN =E01+RP1/R113 + SD
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page SD01.3
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Table of contents
Location box Order Number Page Page description Job number Remarks
=E01 +RP1
=E01 +MK1
=E02 +CP2
SD01.3 SD01.5
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Table of contents : =E01+RP1/R114 - = COM
Ed. BINH AN =E02+CP2/C206 + SD
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page SD01.4
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Table of contents
Location box Order Number Page Page description Job number Remarks
=E02 +CP2
=E03 +COM
=E03 +CP3
=E03 +RP3
SD01.4 SD01.6
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Table of contents : =E02+CP2/C207 - = COM
Ed. BINH AN =E03+RP3/R305 + SD
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page SD01.5
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Table of contents
Location box Order Number Page Page description Job number Remarks
=E03 +RP3
=E03 +MK3
=CABLE
SD01.5 SD01.7
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Table of contents : =E03+RP3/R306 - = COM
Ed. BINH AN =CABLE/CA1 + SD
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page SD01.6
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Table of contents
Location box Order Number Page Page description Job number Remarks
=CABLE
194 CA10 Cable diagram =COM+AC-PALCT1 =COM+AC-PAOLT1 =COM+AC-PARCT1 =COM+AC-PATR1 =COM+DC-PDA1 CT - 12102016
195 CA11 Cable diagram =COM+DC-PDA1 =COM+DC-PDBAT =COM+DC-PDCH =COM+DC-PDJ1 =COM+DC-PDLCT1 =COM+DC-PDRCT1 CT - 12102016
207 CA23 Cable diagram =E01+COM-P2102 =E01+COM-P2103 =E01+COM-P2104 =E01+COM-P2201 =E01+COM-P2202 CT - 12102016
208 CA24 Cable diagram =E01+COM-P2203 =E01+COM-P2204 =E01+COM-P2301 =E01+COM-P2302 =E01+COM-P2303 CT - 12102016
209 CA25 Cable diagram =E01+COM-P2304 =E01+COM-P2305 =E01+COM-P2306 =E01+COM-P2307 =E01+COM-P2308 CT - 12102016
210 CA26 Cable diagram =E01+COM-P2309 =E01+COM-P2310 =E01+COM-P2311 =E01+COM-P2312 =E01+COM-P2313 CT - 12102016
SD01.6 SD01.8
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Table of contents : =CABLE/CA2 - =CABLE/CA29 = COM
Ed. BINH AN + SD
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page SD01.7
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Table of contents
Location box Order Number Page Page description Job number Remarks
=CABLE
226 CA42 Cable diagram =E03+COM-I4304 =E03+COM-I4305 =E03+COM-I4306 =E03+COM-P4101 =E03+COM-P4102 CT - 12102016
227 CA43 Cable diagram =E03+COM-P4102 =E03+COM-P4201 =E03+COM-P4202 =E03+COM-P4301 =E03+COM-P4302 CT - 12102016
228 CA44 Cable diagram =E03+COM-P4303 =E03+COM-P4304 =E03+COM-P4305 =E03+COM-P4306 =E03+COM-P4307 CT - 12102016
229 CA45 Cable diagram =E03+COM-P4308 =E03+COM-P4309 =E03+COM-P4310 =E03+COM-P4311 =E03+COM-S4101 CT - 12102016
241 CA57 Cable diagram =E05+COM-C1306 =E05+COM-I1101 =E05+COM-I1102 =E05+COM-I1201 =E05+COM-I1202 CT - 12102016
SD01.7 SD01.9
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Table of contents : =CABLE/CA30 - = COM
Ed. BINH AN =CABLE/CA57 + SD
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page SD01.8
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Table of contents
Location box Order Number Page Page description Job number Remarks
=CABLE
242 CA58 Cable diagram =E05+COM-I1202 =E05+COM-I1203 =E05+COM-I1204 =E05+COM-I1205 =E05+COM-I1301 CT - 12102016
244 CA60 Cable diagram =E05+COM-I1305 =E05+COM-I1306 =E05+COM-P1301 =E05+COM-P1302 =E05+COM-P1303 CT - 12102016
245 CA61 Cable diagram =E05+COM-P1304 =E05+COM-P1305 =E05+COM-P1306 =E05+COM-P1307 =E05+COM-P1308 CT - 12102016
=E05 +COM
=E05 +CP5
SD01.8 SD01.10
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Table of contents : =CABLE/CA58 - = COM
Ed. BINH AN =E05+CP5/C506 + SD
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page SD01.9
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Table of contents
Location box Order Number Page Page description Job number Remarks
=E05 +CP5
=E05 +RP5
=E05 +MK5
SD01.9 SD01.11
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Table of contents : =E05+CP5/C507 - = COM
Ed. BINH AN =E05+MK5/M503 + SD
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page SD01.10
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Table of contents
Location box Order Number Page Page description Job number Remarks
=E05 +MK5
SD01.10 SD02
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Table of contents : =E05+MK5/M504 - = COM
Ed. BINH AN =E05+MK5/M514 + SD
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page SD01.11
Modification Date Name Original Replacement of Replaced by Page 304
1 2 3 4 5 6 7 8
A A
SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION
~ ALTERNATING CURRENT
CONDUCTOR
TRANSFORMER WITH THREE
SEPARATE WINDINGS
AUTOTRANSFORMER
FUSE SWITCH
LIGHTNING ARRESTER
ELECTROMAGNETIC EFFECT
RELAY COIL
FLAG INDICATOR
ELECTROMECHANICAL
POSITION INDICATOR
SYNCHRONISM CHECK
OPERATED BY LEVER CURRENT TRANSFORMER EARTH NORMAL OPEN CONTACT SYN
DEVICE [F25]
D DIRECTIONAL OVERCURRENT D
OPERATED BY HANDWHEEL CIRCUIT BREAKER WINDING CHANGE OVER CONTACT I >
PROTECTION [F67]
OVERVOLTAGE RELAY
PRESET ADJUSTEMENT DIFFERENTIAL SWITCH BATTERY PASSING CONTACT U>
[F59]
SD01.11 SD02.a
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company SYMBOL SYMBOL BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD02
1 2 3 4 5 6 7 8
Q7
M
A
Q8 Q8 A
M
VTL1 VTL2 M
Q52 Q9 Q9 Q52
P1 P1
CT CT
B
E01 Q0
P2
M
E02 M
P2
Q0
E03 B
Q51 Q1 Q1 Q0 Q2 Q1 Q51
M M M M M
P1 P2
TC11 TC12
VTB1 VTB2
C Q15 Q25 C
M M
Q1 Q51 Q52 Q1
Q51 Q51
P1 P1
CT CT
P2 P2
D
E04 Q0 M M Q0 E05 D
T1 T2
E E
Q8-22 Q8-22
J1.1 J2.1
F
TC41 TC42 F
SD02 SD03
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company SINGLE LINE & TRIPPING MATRIX SINGLE LINE DIAGARM BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD02.a
1 2 3 4 5 6 7 8
+110kV MARSHALLING KIOSK +110kV OHL CONTROL PANEL +110kV TRANSFORMER +110kV TRANSFORMER
=E01+MK1 =E01+CP1 CONTROL PANEL MARSHALLING KIOSK PANEL
=E05+CP5 =E05+MK5
METERING PROTECTION
FROM FROM
A 3xCVT BUS 3xCVT BUS A
TC11
Q1
M
TO VOLTAGE CIRCUIT OF E02
B B
Q51
-M2 -TRANS
Q0
TRANSDUCER
VOLT METER
M VOLT LINE
T1
--/1A
P2 -M1 -M3
C C
15VA - CL0,5 MULTI-TARIFF
MULTIMETER
ENERGY METER
CORE 1
15VA - CL5P20 Modbus
CORE 2 System
Q52 Q9 -F67
IEC 61850
M 67/67N 50BF
METER -F74
741
PROTECT 742
-F86
110 0,11 0,11
86
√3 √3 √3
50VA, CL0,5 - 50VA, CL3P
F F
E01 TO INTERLOCKING OF ES Q8
110kV OHL BAY
SD02.a SD04
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company SINGLE LINE & TRIPPING MATRIX SINGLE LINE DIAGARM E01 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD03
1 2 3 4 5 6 7 8
A A
F67 67/67N
F86 TRIP
741
F74
742
F67 50BF
C C
F21 21Z1
TELE
PROTN. FROM F21 67N
REMOTE END
F67 50BF
D D
E E
F F
SD03 SD05
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company SINGLE LINE & TRIPPING MATRIX TRIPPING LOGIC MATRIX E01 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD04
1 2 3 4 5 6 7 8
+110kV MARSHALLING KIOSK +110kV BUS COUPLER CONTROL PANEL +110kV CONTROL PANEL
=E02+MK2 =E02+CP2 =E01+CP1
VOLTAGE CIRCUIT
A OF E01 A
TC11
Q1
M
B B
Q51
T1 P1
--/1A
-M1
C C
15VA - CL0,5
MULTIMETER
CORE 1
15VA - CL5P20 Modbus
CORE 2 System
D CORE 4 D
-F51
50/51 50BF
Q0 50/51N 85/FR/FL
M IEC 61850
P2
E
Q52 Q2 E
M
-F74
741
742
TC12
-F86
86
E02
F F
110kV BUS COUPLER BAY
SD04 SD06
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company SINGLE LINE & TRIPPING MATRIX SINGLE LINE DIAGARM E02 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD05
1 2 3 4 5 6 7 8
A A
E02 - Q0 INITATE
TRIP F86 OF TRIP F86 OF TRIP F861 OF TRIP F861 OF
PANEL PROTECTION DEVICE 86 50BF
TRIP COIL 1 TRIP COIL 2 BLOCK CLOSE E01 E03 E04 E05
OF F51
C C
D D
E E
F F
SD05 SD07
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company SINGLE LINE & TRIPPING MATRIX TRIPPING LOGIC MATRIX E02 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD06
1 2 3 4 5 6 7 8
+110kV MARSHALLING KIOSK +110kV OHL CONTROL PANEL +110kV +110kV TRANSFORMER
=E03+MK3 =E03+CP3 CONTROL PANEL RELAY PANEL
=E02+CP2 =E01+RP1
METERING PROTECTION
FROM FROM
A 3xCVT BUS 3xCVT BUS A
TC12
Q1
M
B B
Q51
-M2 -TRANS
Q0
TRANSDUCER
VOLT METER
M VOLT LINE
T1
--/1A
P2 -M1 -M3
C C
15VA - CL0,5 MULTI-TARIFF
MULTIMETER
ENERGY METER
CORE 1
15VA - CL5P20 Modbus
CORE 2 System
D CORE 4 D
-F21
P1
21/21N 67N 25/79
Q52 Q9 -F67
IEC 61850
M 67/67N 50BF
METER -F74
741
PROTECT 742
-F86
110 0,11 0,11
86
√3 √3 √3
50VA, CL0,5 - 50VA, CL3P
F F
E03 TO INTERLOCKING OF ES Q8
110kV OHL BAY
SD06 SD08
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company SINGLE LINE & TRIPPING MATRIX SINGLE LINE DIAGARM E03 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD07
1 2 3 4 5 6 7 8
A A
F67 67/67N
F86 TRIP
741
F74
742
F67 50BF
C C
F21 21Z1
TELE
PROTN. FROM F21 67N
REMOTE END
F67 50BF
D D
E E
F F
SD07 SD09
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company SINGLE LINE & TRIPPING MATRIX TRIPPING LOGIC MATRIX E03 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD08
1 2 3 4 5 6 7 8
+110kV MARSHALLING KIOSK +110kV TRANSFORMER CONTROL PANEL +22kV VOLTAGE +22kV INCOMING
=E05+MK5 =E05+CP5 TRANSFORMER J2.1
J2.2
METERING METERING PROTECTING
FROM FROM FROM
A 3xCVT BUS 3xCT 3xCT A
TC12
VTB2 METER
M PROTECT
T1
--/1A
P1 -M11 -M21
CORE 4
D Q0 P2
-F87T
D
M 87 50REF
85/FR/FL
IEC 61850
-F51P
50/51 50BF
50/51N 85/FR/FL
E E
Q8
-F50G
50/51 50BF
J2.1 50/51N 85/FR/FL
-F74
741
F TC42 742 F
E05 -F86
110kV TRANSFORMER 2 BAY 861 862
SD08 SD10
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company SINGLE LINE & TRIPPING MATRIX SINGLE LINE DIAGARM E05 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD09
1 2 3 4 5 6 7 8
A A
E05 - Q0
TRIP F86 OF TRIP F86 OF TRIP F86 OF TRIP F861 OF
PANEL PROTECTION DEVICE 861 862
TRIP COIL 1 TRIP COIL 2 BLOCK CLOSE E01 E03 E02 E04
F862 TRIP
741
F74
742
F51P 50BF
C C
D D
E E
F F
SD09 SD11
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company SINGLE LINE & TRIPPING MATRIX TRIPPING LOGIC MATRIX E05 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD10
1 2 3 4 5 6 7 8
A CONTROL & RELAY PANEL OF E01 MARSHALLING KIOSK PANEL E01 CIRCUIT BREAKER OF E01 A
&
B LỆNH ĐÓNG TỪ TỦ ĐIỀU KHIỂN B
ĐIỀU KIỆN BÌNH THƯỜNG
D D
&
DCL Q9 NGĂN E01 MỞ HOÀN TOÀN
F F
SD10 SD12
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company CONTROL LOGIC LOGIC FOR CB-E01 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD11
1 2 3 4 5 6 7 8
A CONTROL & RELAY PANEL OF E01 MARSHALLING KIOSK PANEL E01 CIRCUIT BREAKER OF E01 A
E E
F F
SD11 SD13
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company CONTROL LOGIC LOGIC FOR CB-E01 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD12
1 2 3 4 5 6 7 8
A CONTROL & RELAY PANEL OF E01 MARSHALLING KIOSK PANEL E01 DISCONNECTOR & EARTHING SWITCH OF E01 A
DAO CÁCH LY
&
Ở CHẾ ĐỘ "GIÁM SÁT" (SUPERVISOR) CHẾ ĐỘ ĐIỀU KHIỂN TỪ XA
&
B B
LỆNH ĐÓNG/MỞ TỪ HỆ THỐNG SCADA
&
CHẾ ĐỘ ĐIỀU KHIỂN BẰNG TAY
D D
DCL Q9 NGĂN E01 MỞ HOÀN TOÀN & THAO TÁC DAO ĐẤT Q8
NGĂN E01
&
TRÊN ĐƯỜNG DÂY KHÔNG CÓ ÁP LỆNH ĐÓNG/MỞ TẠI CHỖ
F F
SD12 SD14
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company CONTROL LOGIC LOGIC FOR DS&ES-E01 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD13
1 2 3 4 5 6 7 8
A CONTROL & RELAY PANEL OF E01 MARSHALLING KIOSK PANEL E01 DISCONNECTOR & EARTHING SWITCH OF E01 A
DAO CÁCH LY
B & & B
LỆNH ĐÓNG/MỞ TỪ HỆ THỐNG SACDA CHẾ ĐỘ ĐIỀU KHIỂN TỪ XA
>1
&
Ở CHẾ ĐỘ ĐIỀU KHIỂN TỪ XA
LỆNH ĐÓNG/MỞ TẠI CHỖ
&
LỆNH ĐÓNG/MỞ TỪ TỦ ĐIỀU KHIỂN CHẾ ĐỘ ĐIỀU KHIỂN TẠI CHỖ
MC Q0 110kV NGĂN E01 Ở VỊ TRÍ MỞ &
DAO ĐẤT Q15 110kV NGĂN E04 MỞ LỆNH ĐÓNG/MỞ BẰNG TAY
&
CHẾ ĐỘ ĐIỀU KHIỂN BẰNG TAY
D D
CHỐT THAO TÁC BẰNG TAY MỞ
DAO ĐẤT
DCL Q9 NGĂN E01 MỞ HOÀN TOÀN
F F
SD13 SD15
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company CONTROL LOGIC LOGIC FOR DS&ES-E01 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD14
1 2 3 4 5 6 7 8
A CONTROL & RELAY PANEL OF E03 MARSHALLING KIOSK PANEL E03 CIRCUIT BREAKER OF E03 A
Ở CHẾ ĐỘ "GIÁM SÁT" (SUPERVISOR) DCL Q1 NGĂN E03 ĐÓNG HOÀN TOÀN
LÒ XO ĐÃ CĂNG
& &
LỆNH ĐÓNG TỪ HỆ THỐNG SCADA DCL Q9 NGĂN E03 ĐÓNG HOÀN TOÀN
KHÍ SF6 Ở MỨC THẤP CẤP 2
>1
DCL Q1 NGĂN E03 MỞ HOÀN TOÀN
C CHẾ ĐỘ ĐIỀU KHIỂN TỪ XA C
&
&
DCL Q9 NGĂN E03 MỞ HOÀN TOÀN
&
KHÓA AUTO/MAN Ở VỊ TRÍ "MAN"
D >1 D
RELAY GIÁM SÁT CUỘN CẮT SỐ 1 OK & LỆNH ĐÓNG TẠI CHỖ
ĐIỀU KIỆN BẢO TRÌ
RELAY GIÁM SÁT CUỘN CẮT SỐ 2 OK CHẾ ĐỘ ĐIỀU KHIỂN TẠI CHỖ &
F F
SD14 SD16
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company CONTROL LOGIC LOGIC FOR CB-E03 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD15
1 2 3 4 5 6 7 8
A CONTROL & RELAY PANEL OF E03 MARSHALLING KIOSK PANEL E03 CIRCUIT BREAKER OF E03 A
&
B Ở CHẾ ĐỘ ĐIỀU KHIỂN TỪ XA B
CHẾ ĐỘ ĐIỀU KHIỂN TẠI CHỖ
&
LỆNH MỞ TỪ TỦ ĐIỀU KHIỂN
>1
Ở CHẾ ĐỘ "GIÁM SÁT"(SUPERVISOR) &
MỞ MC Q0 NGĂN E03
CHẾ ĐỘ ĐIỀU KHIỂN TỪ XA
& (CUỘN CẮT 1)
&
LỆNH MỞ TỪ HỆ THỐNG SCADA >1
C C
D D
F F
SD15 SD17
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company CONTROL LOGIC LOGIC FOR CB-E03 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD16
1 2 3 4 5 6 7 8
A CONTROL & RELAY PANEL OF E03 MARSHALLING KIOSK PANEL E03 DISCONNECTOR & EARTHING SWITCH OF E03 A
DAO CÁCH LY
& &
LỆNH ĐÓNG/MỞ TỪ HỆ THỐNG SCADA CHẾ ĐỘ ĐIỀU KHIỂN TỪ XA
B B
>1
&
Ở CHẾ ĐỘ ĐIỀU KHIỂN TỪ XA
LỆNH ĐÓNG/MỞ TẠI CHỖ
&
LỆNH ĐONG/MỞ TỪ TỦ BẢO VỆ CHẾ ĐỘ ĐIỀU KHIỂN TẠI CHỖ &
MC Q0 NGĂN E03 Ở VỊ TRÍ MỞ
&
C DAO ĐẤT Q51 110kV NGĂN E03 MỞ C
&
CHẾ ĐỘ ĐIỀU KHIỂN BẰNG TAY
D D
DAO ĐẤT
DCL Q9 NGĂN E03 MỞ HOÀN TOÀN
& THAO TÁC DAO ĐẤT Q52
NGĂN E03
DCL Q1 NGĂN E03 MỞ HOÀN TOÀN &
LỆNH ĐÓNG/MỞ TẠI CHỖ
E E
DCL Q7 NGĂN E02 MỞ HOÀN TOÀN DAO ĐẤT
DCL Q9 NGĂN E03 MỞ HOÀN TOÀN & THAO TÁC DAO ĐẤT Q8
NGĂN E03
&
KHÔNG CÓ ÁP TRÊN ĐƯỜNG DÂY LỆNH ĐÓNG/MỞ TẠI CHỖ
F F
SD16 SD18
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company CONTROL LOGIC LOGIC FOR DS&ES-E03 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD17
1 2 3 4 5 6 7 8
A CONTROL & RELAY PANEL OF E03 MARSHALLING KIOSK PANEL E03 DISCONNECTOR & EARTHING SWITCH OF E03 A
DAO CÁCH LY
& &
B B
LỆNH ĐÓNG/MỞ TỪ HỆ THỐNG SCADA CHẾ ĐỘ ĐIỀU KHIỂN TỪ XA
>1
&
Ở CHẾ ĐỘ ĐIỀU KHIỂN TỪ XA
LỆNH ĐÓNG/MỞ TẠI CHỖ
&
LỆNH ĐÓNG/MỞ TỪ TỦ BẢO VỆ CHẾ ĐỘ ĐIỀU KHIỂN TẠI CHỖ
MC Q0 NGĂN E03 Ở VỊ TRÍ MỞ
&
DAO ĐẤT Q15 110kV NGĂN E04 MỞ LỆNH ĐÓNG/MỞ BẰNG TAY
&
CHẾ ĐỘ ĐIỀU KHIỂN BẰNG TAY
DAO ĐẤT
DCL Q9 NGĂN E03 MỞ HOÀN TOÀN
F F
SD17 SD19
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company CONTROL LOGIC LOGIC FOR DS&ES-E03 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD18
1 2 3 4 5 6 7 8
A CONTROL & RELAY PANEL OF E05 MARSHALLING KIOSK PANEL E05 CIRCUIT BREAKER OF E05 A
&
D >1 D
RELAY GIÁM SÁT CUỘN CẮT SỐ 2 OK
DCL Q1 NGĂN E05 MỞ HOÀN TOÀN CHẾ ĐỘ ĐIỀU KHIỂN TẠI CHỖ &
E E
&
F F
SD18 SD20
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company CONTROL LOGIC LOGIC FOR CB-E05 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD19
1 2 3 4 5 6 7 8
A CONTROL & RELAY PANEL OF E05 MARSHALLING KIOSK PANEL E05 CIRCUIT BREAKER OF E05 A
B B
ÁP SUẤT KHÍ SF6 ĐẠT
D D
ÁP SUẤT KHÍ SF6 ĐẠT
MỞ MC Q0 NGĂN E05
(CUỘN CẮT 2)
&
E E
F F
SD19 SD21
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company CONTROL LOGIC LOGIC FOR CB-E05 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD20
1 2 3 4 5 6 7 8
A CONTROL & RELAY PANEL OF E05 MARSHALLING KIOSK PANEL E04 DISCONNECTOR & EARTHING SWITCH OF E05 A
DAO CÁCH LY
& &
LỆNH ĐÓNG/MỞ TỪ HỆ THỐNG SCADA CHẾ ĐỘ ĐIỀU KHIỂN TỪ XA
B >1 B
&
Ở CHẾ ĐỘ ĐIỀU KHIỂN TỪ XA
LỆNH ĐÓNG/MỞ TẠI CHỖ
&
LỆNH ĐÓNG/MỞ TỪ TỦ ĐIỀU KHIỂN
CHẾ ĐỘ ĐIỀU KHIỂN TẠI CHỖ &
MC Q0 NGĂN E05 Ở VỊ TRÍ MỞ
&
CHẾ ĐỘ ĐIỀU KHIỂN BẰNG TAY
D D
E E
DCL Q1 NGĂN E01 MỞ HOÀN TOÀN
DCL Q1 NGĂN E03 MỞ HOÀN TOÀN & THAO TÁC DAO ĐẤT Q25
NGĂN E05
&
DCL Q1 NGĂN E05 MỞ HOÀN TOÀN LỆNH ĐÓNG/MỞ TẠI CHỖ
F F
SD20 SD22
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company CONTROL LOGIC LOGIC FOR DS&ES-E05 BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD21
1 2 3 4 5 6 7 8
A CONTROL & RELAY PANEL OF E05 MARSHALLING KIOSK PANEL E05 J2.1 INCOMING OF 22kV PANEL A
>1
& &
&
C MC Q0 110kV NGĂN E05 ĐÓNG C
LỆNH ĐÓNG TỪ TỬ ĐIỀU KHIỂN
>1
CHẾ ĐỘ "GIÁM SÁT" (SUPERVISOR)
MC Q0 22kV Ở VỊ TRÍ "SERVICE"
& ĐÓNG MC Q0 22kV NGĂN E05
&
LỆNH ĐÓNG TỪ HỆ THỐNG SCADA
LÒ XO ĐÃ CĂNG
D D
F F
SD21 SD23
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company CONTROL LOGIC LOGIC FOR J2.1 INCOMING BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD22
1 2 3 4 5 6 7 8
A CONTROL & RELAY PANEL OF E05 MARSHALLING KIOSK PANEL E05 J2.1 INCOMING OF 22kV PANEL A
B B
C >1 C
MỞ MC Q0 22kV
Ở CHẾ ĐỘ "GIÁM SÁT" (SUPERVISOR) & >1 &
& CHẾ ĐỘ ĐIỀU KHIỂN TỪ XA
LỆNH MỞ TỪ HỆ THỐNG SCADA
&
RELAY KHÓA MÁY CẮT SỐ 2 TÁC ĐỘNG
D LỆNH CẮT TỪ RELAY BẢO VỆ 22kV D
E E
F F
SD22 +AC/AC00
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company CONTROL LOGIC LOGIC FOR J2.1 INCOMING BAY = COM
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL + SD
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 37 Page SD23
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
A 22+2x2,5%/0,4kV 22+2x2,5%/0,4kV A
100kVA 100kVA
TD1 TD2
V 0-500V
VS
AS AS
200/5A 200/5A
kWh kWh
CL0.5 - 10VA CL0.5 - 10VA
F101 F103 F202 F204 F206 F301 F303 F305 F307 F402 F404 F406 F408 F410 F501 F503 F505 F507 F509 F411
4P - 80A 4P - 80A 4P - 32A 4P - 32A 4P - 16A 4P - 10A 4P - 10A 4P - 10A 4P - 10A 2P - 32A 2P - 32A 2P - 32A 2P - 25A 2P - 25A 2P - 20A 2P - 20A 2P - 16A 2P - 16A 2P - 10A 2P - 10A
10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA
C C
F102 F201 F203 F205 F207 F302 F304 F306 F401 F403 F405 F407 F409 F411 F502 F504 F506 F508 F510
4P - 80A 4P - 32A 4P - 32A 4P - 16A 4P - 16A 4P - 10A 4P - 10A 4P - 10A 4P - 10A 2P - 32A 2P - 32A 2P - 32A 2P - 25A 2P - 25A 2P - 20A 2P - 20A 2P - 16A 2P - 16A 2P - 10A
10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA
AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
D D
ALARM
LOCAL CONTROL PANEL TRANSFORMER 2
INDOOR LIGHTING
OUTDOOR LIGHTING
PUMP WATER
CHARGER 110VDC
SPARE
SPARE
SPARE
OLTC TRANSFORMER 1
OLTC TRANSFORMER 2
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
CHARGER 48VDC
SPARE
SPARE
E E
F F
AC00 AC02
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION SINGLE LINE DIAGRAM BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC01
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
SỐ
KÝ HIỆU MÔ TẢ ĐVT
LƯỢNG
TỦ NGUỒN PHÂN PHỐI AC AC DIST. Tủ nguồn phân phối AC Tủ 1
500
800
500
800
A A
0
0
A1, A2 Đồng hồ đo lường đơn chức năng (Ampere Meter) Bộ 2
2000
A B C A B C
F27/59 Rơ-le bảo vệ quá áp và thấp áp (Voltage Relay) Bộ 2
B B
V3
1500
C C
500
800
0
1000
D D
500
E E
AC01 AC03
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION LAYOUT OF PANEL BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC02
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
500
800
A A
0
2200
AC DIST.
2000
RT18-32
32A
RT18-32
32A
RT18-32
32A
RT18-32
32A
RT18-32
32A
RT18-32
32A
RT18-32
32A
RT18-32
32A
RT18-32
32A
RT18-32
32A
RT18-32
32A
RT18-32
32A
ABB ABB ABB ABB
500V ~ 500V ~ 500V ~ 500V ~ 500V ~ 500V ~ 500V ~ 500V ~ 500V ~ 500V ~ 500V ~ 500V ~
B B
Q01 Q02
1500
C C
F101 F102 F103
1000
D D
F401 F402 F403 F404 F405 F406 F407 F408 F409 F410 F411
500
F501 F502 F503 F504 F505 F506 F507 F508 F509 F510 F511
E E
AC02 AC04
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION LAYOUT OF PANEL BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC03
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
500
800
500
800
500
800
A A
0
2200
2000
L1 L1
L2 L2
L3 L3
N N
A B C N
1500
C C
LK 65x65
LK 65x65
LK 65x65
LK 65x65
M11 M21
1000
D D
TVmeC
www.trivietmec.com
500
XC
20
E E
SOCKET
E
F MẶT SAU TRONG TỦ MẶT TRONG BÊN HÔNG TRÁI TỦ MẶT TRONG BÊN HÔNG PHẢI TỦ F
AC03 AC05
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION LAYOUT OF PANEL BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC04
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+TD2 -TD2
1L1 -1F1
R1 U1 PATR1 1 1 2
2A
1L2 -1F2
S1 V1 2 1 2
A A
2A
1L3 -1F3
T1 W1 3 1 2
2A
N1 4 1N
L1 L2 L3 N
FROM AUX. TRANSFORMER 2
L1 L2 L3
x1 x1 x1 -VS1
1 3 5 7 -1FOUV
22 24 -1H1 -1H2 -1H3 F27-59 K&N
220VAC 220VAC 220VAC RM4 TR32 V1 V2
-Q1 Red
x2
Yellow
x2
Green
x2 Schneider
4P-200A 25kA 21
B ABB x1 x2 B
18 15 /AC14-1:B V
/AC14-5:B
I> I> I> I>
16
2 4 6 8
-VM1
0-500VAC
-1F4 CCX:1.5
U1
1 2
/AC06-4:B
2A
-1F5 U2
1 2
/AC06-4:C
2A
-1F6 U3
1 2
/AC06-4:C
2A
UN
C /AC06-4:C C
-M1
ELSTER A1700
3x5(3x6)A
2 5 8 10
TARIFF
METER
1 3 4 6 7 9
1
D D
x1 -XCT1
2
2
x1 3
CT1 x2
-3F1 200/5A
2A
2 x1 4
1
CT2 x2
-3F2
2A L1 L2 L3 N CT3 x2 L1 L2 L3 N
1 2
x1 x2 x1 x2
V A
-VM3 -AM1
0-500VAC 200/5A
CCX:1.5 CCX:1.5
BL1
BL1
BL2
F BL2 F
L1/L2/L3/N / AC06-1:F
BL3
BL3
BN
BN
AC04 AC06
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION AC INCOMING 1 BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC05
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
2L1 -2F1
1 2
2A
2L2 -2F2
1 2
A A
2A
2L3 -2F3
1 2
2A
2N
L1 L2 L3 N
L1 L2 L3
x1 x1 x1 -VS2
1 3 5 7 -2FOUV
22 24 -2H1 -2H2 -2H3 F27-59 K&N
220VAC 220VAC 220VAC RM4 TR32 V1 V2
-Q2 Red
x2
Yellow
x2
Green
x2 Schneider
4P-200A 25kA 21
B ABB x1 x2 B
18 15 /AC14-2:B V
/AC14-6:B
I> I> I> I>
16
2 4 6 8
-VM2
0-500VAC
CCX:1.5
U1
AC05-8:B/
U2
AC05-8:C/
U3
AC05-8:C/
UN
C AC05-8:C/ C
-M2
ELSTER A1700
3x5(3x6)A
2 5 8 10
TARIFF
METER
1 3 4 6 7 9
1
D D
x1 -XCT2
2
x1 3
CT4 x2
200/5A
x1 4
CT5 x2
CT6 x2 L1 L2 L3 N
-AS2
K&N
E A1 A2
E
x1 x2
A
-AM2
200/5A
CCX:1.5
BL1 BL1
BL2 BL2
F AC05-8:F / L1/L2/L3/N L1/L2/L3/N / AC07-1:A F
BL3 BL3
BN BN
AC05 AC07
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION AC INCOMING 2 BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC06
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
BL1 BL1
A A
BL2 BL2
AC06-8:F / L1/L2/L3/N L1/L2/L3/N / AC08-1:A
BL3 BL3
BN BN
B B
C C
1 3 5 7 1 3 5 7 1 3 5 7 1 3 5 7 1 3 5 7
2 4 6 8 2 4 6 8 2 4 6 8
D D
E E
PACH 1 2 3 4
+CHG
R S T N
F F
AC06 AC08
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION CIRCUIT BREAKERS SUPPLY BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC07
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
FAN FOR TRANSFORMER 1 FAN FOR TRANSFORMER 2 PUMP FOR OIL LEAKAGE TANK SPARE SPARE
BL1 BL1
A A
BL2 BL2
AC07-8:A / L1/L2/L3/N L1/L2/L3/N / AC09-1:A
BL3 BL3
BN BN
B B
C C
1 3 5 7 1 3 5 7 1 3 5 7 1 3 5 7 1 3 5 7
D D
E E
F F
AC07 AC09
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION CIRCUIT BREAKERS SUPPLY BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC08
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
LOCAL CONTROL PANEL OLTC PANEL LOCAL CONTROL PANEL OLTC PANEL SPARE
TRANSFORMER 2 TRANSFORMER 2 TRANSFORMER 1 TRANSFORMER 1
BL1 BL1
A A
BL2 BL2
AC08-8:A / L1/L2/L3/N L1/L2/L3/N / AC10-1:A
BL3 BL3
BN BN
B B
C C
1 3 5 7 1 3 5 7 1 3 5 7 1 3 5 7 1 3 5 7
D D
E E
PALCT1 1 2 3 4 PAOLT1 1 2 3 4
=E05+LCTC2 =E05+OLTC2
-X x x x x -X x x x x
F F
AC08 AC10
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION CIRCUIT BREAKERS SUPPLY BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC09
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
BL1 BL1
A A
BL2 BL2
AC09-8:A / L1/L2/L3/N L1/L2/L3/N / AC11-1:A
BL3 BL3
BN BN
B B
C C
1 3 5 7 1 3 5 7 1 3 5 7
D D
E E
F F
AC09 AC11
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION CIRCUIT BREAKERS SUPPLY BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC10
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
BL1 BL1
A A
BL2 BL2
AC10-8:A / L1/L2/L3/N L1/L2/L3/N / AC12-1:A
BL3 BL3
BN BN
B B
C C
1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3
D D
AC1-
AC2+
AC2-
ACM1+
ACM1-
ACM3+
ACM3-
ACM4+
ACM4-
-XAC 1 3
/ =E01+CP1/C101-1:A
/ =E01+CP1/C101-1:A
/ =E01+RP1/R101-1:A
/ =E01+RP1/R101-1:A
/ =E01+MK1/M101-1:A
/ =E01+MK1/M101-1:A
/ =E03+MK3/M301-1:A
/ =E03+MK3/M301-1:A
/ =E05+MK5/M501-1:A
/ =E05+MK5/M501-1:A
-XAC 2 4
F F
AC10 AC12
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION CIRCUIT BREAKERS SUPPLY BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC11
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
BL1 BL1
A A
BL2 BL2
AC11-8:A / L1/L2/L3/N L1/L2/L3/N / AC13-1:A
BL3 BL3
BN BN
B B
C C
1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3
D D
E E
PARCT1 1 2
=E05+RCTC2
-X x x
F F
AC11 AC13
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION CIRCUIT BREAKERS SUPPLY BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC12
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
BL1 BL1
A A
BL2 BL2
AC12-8:A / L1/L2/L3/N
BL3 BL3
BN BN
+DC
B B
1 PDA1 1 DC+
/+DC/DC09-8:D
-XC
2 2 DC-
/+DC/DC09-8:E
C C
1 3 1 3 1 3 1 3 1 3 1 3
D D
DC-
/AC14-1:E
DC+
/AC14-1:A
N
/AC16-2:A
L
/AC16-2:A
F F
AC12 AC14
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION CIRCUIT BREAKERS SUPPLY BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC13
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
B 16 18 16 18 1 1 21 21 13 B
-1FOUV -2FOUV -1K1 -2K1 -Q1 -Q2 -LT
/AC05-6:B 15 /AC06-6:B 15 /AC14-1:E 2 /AC14-2:E 2 /AC05-3:B 24 22 /AC06-3:B 24 22 14
C C
D D
A1 A1 x1 1 x1 1 x1 1 x1 1 A1 x1 1 x1 1 A1
-1K1 -2K1 -H1 -D1 -H2 -D2 -H3 -D3 -H4 -D4 -1K2 -H5 -D5 -H6 -D6 -2K2
110 VDC A2 110 VDC A2 110VDC x2 2 110VDC x2 2 110VDC x2 2 110VDC x2 2 110 VDC A2 110VDC x2 2 110VDC x2 2 110 VDC A2
Yellow Yellow Red Green Red Green
E E
DC-
AC13-7:D/
1 2 /AC14-3:B 1 2 /AC14-4:B 1 2 1 2
3 4 /AC15-2:E 3 4 /AC15-2:E 3 4 3 4 /AC15-3:E
F 5 6 /AC15-4:E 5 6 /AC15-4:F 5 6 /AC15-2:E 5 6 F
13 14 13 14 13 14 13 14
AC13 AC15
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION INDICATOR BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC14
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-MCB-DC -F101 -F102 -F103 -F201 -F202 -F203 -F204 -F205 -F206 -F207 -F301 -F302 -F303
/AC13-6:C 11/AC07-2:C 11/AC07-3:C 11/AC07-4:C 11/AC07-6:C 11/AC07-7:C 11/AC08-2:C 11/AC08-3:C 11/AC08-4:C 11/AC08-6:C 11/AC08-7:C 11/AC09-2:C 11/AC09-3:C 11/AC09-4:C 11
B B
12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-F304 -F305 -F306 -F307 -F401 -F402 -F403 -F404 -F405 -F406 -F407 -F408 -F409 -F410
/AC09-6:C 11/AC09-7:C 11/AC10-3:C 11/AC10-4:C 11/AC10-6:C 11/AC11-2:C 11/AC11-3:C 11/AC11-3:C 11/AC11-4:C 11/AC11-5:C 11/AC11-6:C 11/AC11-6:C 11/AC11-7:C 11/AC12-2:C 11
=E04+CP4
5 S1104 1 SC4
/=E05+CP5/C510-7:B
-XC
C 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 C
-F411 -F501 -F502 -F503 -F504 -F505 -F506 -F507 -F508 -F509 -F510 -F511
/AC12-3:C 11/AC12-3:C 11/AC12-4:C 11/AC12-5:C 11/AC12-6:C 11/AC12-6:C 11/AC12-7:C 11/AC13-2:C 11/AC13-3:C 11/AC13-3:C 11/AC13-4:C 11/AC13-5:C 11
7 S1104 2 AC
/=E05+CP5/C510-6:B
+DC
SIGNALING FOR SCADA
DC 2 8 3 DC
+DC/DC11-8:C/ /=E05+CP5/C510-6:B
3 3 5 3
-1K1 -2K1 -1K2 -2K2
/AC14-1:E 4 /AC14-2:E 4 /AC14-6:E 6 /AC14-8:E 4
-1K1
5 6 3 CAD1 3 EM+
/+DC/DC10-5:C
/AC14-1:E
-XC
E E
-XC 11 12 13 14 15
-2K1
=RTU+MAIN 5 6 4 4 EM-
/+DC/DC10-5:D
/AC14-2:E
F F
AC14 AC16
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION SIGNALING BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC15
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A L A
AC13-7:E/
N
AC13-7:E/
B B
C C
1 HT FAN
D -DS TS D
2 0 °C~50 °C COM
-SOCKET
E 1 E
x1
x1
PE
-LIGHT -HEATER
Flourescent Light with Contact
x2 2
x2
F F
AC15 AC17
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION HEATING &LIGHTING BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC16
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
B B
C C
D D
F F
AC16 +DC/DC00
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 220/380VAC DISTRIBUTION CABLE DIAGRAM BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + AC
Checked LUONG NGOC THACH AC DISTRIBUTION BOARD CT - 12102016 Pages 18 Page AC17
Approval VO CONG CHIEN Replacement of Replaced by
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
A A
FROM 380/220VAC DISTRIBUTION BOARD
V 51
VS
I>
110V DC RECTIFIER
220/380VAC 50Hz 110V DC BATTERY
AS
110VDC
50A
A
50A
V
59
U> 110V DC BATTERY FUSE
B A -50/0/50A B
27
U< A
64
ALARM
RECTIFIER FAIL
Q1
64
110 DC BUSBAR - In=50A - Icc=10kA 0-50A A Rs
220V AC
MCBDC F101 F102 F104 F105 F106 F107 F108 F201 F202 F203 F204 F205 F206 F207 F208 F301 F302 F303 F304 F305 F306 F307 F308 F401 F402 F403 F404 F405 F406 F407 F408 F103 AUTO
2P-10A 2P-40A 2P-40A 2P-40A 2P-40A 2P-40A 2P-32A 2P-32A 2P-32A 2P-32A 2P-32A 2P-32A 2P-25A 2P-25A 2P-25A 2P-25A 2P-20A 2P-20A 2P-16A 2P-16A 2P-16A 2P-16A 2P-16A 2P-16A 2P-10A 2P-10A 2P-10A 2P-10A 2P-10A 2P-10A 2P-10A 2P-10A 2P-40A
CHANGEOVER
10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA 10kA
Emergency lighting
D D
DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC DC
01 02 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 03
Alarming
fault
110V DC circuit
DC SUPPLY FOR MARSHALLING KIOSK E01
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
EMERGENCE LIGHTING
E E
F F
DC00 DC02
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110VDC DISTRIBUTION SINGLE LINE DIAGRAM BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + DC
Checked LUONG NGOC THACH DC DISTRIBUTION BOARD CT - 12102016 Pages 14 Page DC01
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
SỐ
KÝ HIỆU MÔ TẢ ĐVT
LƯỢNG
TỦ NGUỒN PHÂN PHỐI DC DC DIST. Tủ nguồn phân phối DC Tủ 1
500
800
500
800
A A
0
0
A Đồng hồ đo lường đơn chức năng (Ampere Meter) Bộ 1
2000
F64 Rơ-le bảo vệ chạm đất (Earth Leaking Relay) Bộ 2
V A
B B
FAULT FAULT LT
1500
ON OFF
C C
500
800
0
1000
D D
500
E E
DC01 DC03
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110VDC DISTRIBUTION LAYOUT OF PANEL BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + DC
Checked LUONG NGOC THACH DC DISTRIBUTION BOARD CT - 12102016 Pages 14 Page DC02
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
500
800
A A
0
2200
DC DIST.
2000
B B
1500 F401
C C
F101 F102 F103 F104 F105 F106 F107 F108
1000
D D
500
E E
DC02 DC04
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110VDC DISTRIBUTION LAYOUT OF PANEL BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + DC
Checked LUONG NGOC THACH DC DISTRIBUTION BOARD CT - 12102016 Pages 14 Page DC03
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
500
800
500
800
A A
0
2200
2000
LK 65x65
B B
L+
B+ B-
L-
1500
C C
LK 65x65
LK 65x65
1000
D D
TVmeC
www.trivietmec.com
XC
500 10
E E
SOCKET
E
DC03 DC05
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110VDC DISTRIBUTION LAYOUT OF PANEL BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + DC
Checked LUONG NGOC THACH DC DISTRIBUTION BOARD CT - 12102016 Pages 14 Page DC04
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+CHG
-REC
R + PDCH 1 L+ L+
3
A S
A
L+/L- / DC10-1:A
T - 2 L- L-
1 1
FROM CHARGER 110VDC -F1 -F2
2A 2A
2 2
LF+
/DC10-8:A
B B
LF-
/DC10-8:B
1 3 12 14
x1 x2
-Q0 I> I> 11 V
2P-50A 50kA
/DC10-4:C
ABB 2 4
-VM
0-150VDC
CCX:1.5
C C
+
-RS
50A-60mV
-
D D
x1 x2
A
-AM
50A-60mV
CCX:1.5
E E
B+
B+
B+/B- / DC06-1:A
B-
F B- F
DC04 DC06
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110VDC DISTRIBUTION DC INCOMING BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + DC
Checked LUONG NGOC THACH DC DISTRIBUTION BOARD CT - 12102016 Pages 14 Page DC05
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
DC SUPPLY FOR DC SUPPLY FOR EMERGENCY DC SUPPLY FOR DC SUPPLY FOR DC SUPPLY FOR DC SUPPLY FOR DC SUPPLY FOR
MARSHALLING KIOSK 1 MARSHALLING KIOSK 2 LIGHTING MARSHALLING KIOSK 3 MARSHALLING KIOSK 5 MARSHALLING KIOSK 4 RCTC 2 LCTC 2
B+ B+
A A
DC05-7:F / B+/B- B+/B- / DC07-1:A
B- B-
B B
C C
1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3
D 1 3 D
-K1
/DC10-5:E 2 4
DCM1-
DCM3+
DCM3-
DCM4+
DCM4-
-X x x -X x x
/ =E01+MK1/M102-1:A
/ =E01+MK1/M102-1:A
/ =E03+MK3/M302-1:A
/ =E03+MK3/M302-1:A
/ =E05+MK5/M502-1:A
/ =E05+MK5/M502-1:A
F F
DC05 DC07
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110VDC DISTRIBUTION CIRCUIT BREAKERS SUPPLY BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + DC
Checked LUONG NGOC THACH DC DISTRIBUTION BOARD CT - 12102016 Pages 14 Page DC06
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
DC SUPPLY FOR DC SUPPLY FOR DC SUPPLY 1 FOR DC SUPPLY 2 FOR DC SUPPLY 1 FOR DC SUPPLY 2 FOR DC SUPPLY FOR DC SUPPLY FOR
INCOMING J2.1 INCOMING J1.1 CONTROL PANEL CONTROL PANEL RELAY PANEL RELAY PANEL RCCT 1 LCCT 1
B+ B+
A A
DC06-8:A / B+/B- B+/B- / DC08-1:A
B- B-
B B
C C
1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3
D D
E =E01+CP1 =E01+RP1 E
PDJ1 1 2
P2103 1 2 P2104 1 2 P2203 1 2 P2204 1 2
=22kV+J2.1
DC11+
DC11-
DC12+
DC12-
DC21+
DC21-
DC22+
DC22-
-XDC 1 3
/ =E01+CP1/C102-1:A
/ =E01+CP1/C102-1:A
/ =E01+CP1/C102-1:A
/ =E01+CP1/C102-1:B
/ =E01+RP1/R102-1:A
/ =E01+RP1/R102-1:A
/ =E01+RP1/R102-1:A
/ =E01+RP1/R102-1:B
-XDC 2 4
F F
DC06 DC08
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110VDC DISTRIBUTION CIRCUIT BREAKERS SUPPLY BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + DC
Checked LUONG NGOC THACH DC DISTRIBUTION BOARD CT - 12102016 Pages 14 Page DC07
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
SPARE DC SUPPLY FOR SPARE DC SUPPLY FOR SPARE SPARE SPARE SPARE
RTU PANEL COMMUNICATION PANEL
B+ B+
A A
DC07-8:A / B+/B- B+/B- / DC09-1:A
B- B-
B B
C C
1 3 1 3 1 3 1 3 1 3 1 3 1 3 1 3
D D
E E
F F
DC07 DC09
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110VDC DISTRIBUTION CIRCUIT BREAKERS SUPPLY BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + DC
Checked LUONG NGOC THACH DC DISTRIBUTION BOARD CT - 12102016 Pages 14 Page DC08
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
B+ B+
A A
DC08-8:A / B+/B-
B- B-
B B
C C
1 3 1 3 1 3 1 3 1 3 1 3 1 3
+AC
D D
1 PDA1 1 DC+
/+AC/AC13-8:B
-XC
2 2 DC-
/+AC/AC13-8:C
E E
F F
DC08 DC10
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110VDC DISTRIBUTION CIRCUIT BREAKERS SUPPLY BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + DC
Checked LUONG NGOC THACH DC DISTRIBUTION BOARD CT - 12102016 Pages 14 Page DC09
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
L+ L+
A A
DC05-7:A / L+/L-
L- L-
LF+
/DC05-7:B
LF-
/DC05-7:B
1 3 1 3
-F408 -MCBDC
B 2P-10A 10kA 2P-10A 10kA B
ABB 2 4 ABB 2 4
CAD1 3
13
EM+
C 16 18 12 14 11 -LT C
-FOUV -FELG -Q0 14
/+AC/AC15-6:F
/DC10-7:D 15 /DC10-8:D 11 /DC05-4:B 14 12
/+AC/AC15-6:E
EM-
-XQ 8 9
4
D D
A1 A2 B C A1 A2 L+ L-
-XC 6 -FOUV -FELG
F27-59 U>/U< F64
ABB ABB
N KE
x1 1 x1 1 x1 1 x1 1 A1
-H1 -D1 -H2 -D2 -H3 -D3 -H4 -D4 -K1
110VDC x2 2 110VDC x2 2 110VDC x2 2 110VDC x2 2 110 VDC A2
Yellow Yellow Red Green
E E
DC09 DC11
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110VDC DISTRIBUTION INDICATOR BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + DC
Checked LUONG NGOC THACH DC DISTRIBUTION BOARD CT - 12102016 Pages 14 Page DC10
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-F101 -F102 -F103 -F104 -F105 -F106 -F107 -F108 -F201 -F202 -F203
/DC06-2:C 11/DC06-3:C 11/DC06-3:C 11/DC06-4:C 11/DC06-5:C 11/DC06-6:C 11/DC06-6:C 11/DC06-7:C 11/DC07-2:C 11/DC07-3:C 11/DC07-3:C 11
B B
12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-F204 -F205 -F206 -F207 -F208 -F301 -F302 -F303 -F304 -F305 -F306
/DC07-4:C 11/DC07-5:C 11/DC07-6:C 11/DC07-6:C 11/DC07-7:C 11/DC08-2:C 11/DC08-3:C 11/DC08-3:C 11/DC08-4:C 11/DC08-5:C 11/DC08-6:C 11
+AC
7 CAD1 1 SC+
/+AC/AC15-6:D
-XC
C 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 C
-F307 -F308 -F401 -F402 -F403 -F404 -F405 -F406 -F407 -F408 -MCBDC -MCBAC
/DC08-6:C 11/DC08-7:C 11/DC09-2:C 11/DC09-3:C 11/DC09-3:C 11/DC09-4:C 11/DC09-5:C 11/DC09-6:C 11/DC09-6:C 11/DC10-2:B 11/DC10-7:B 11/DC12-4:B 11
8 2 DC
/+AC/AC15-6:D
DC
FAULT
D D
26 28
-FOUV
/DC10-7:D 25
E E
-XC 9 10 11
=RTU+MAIN
F F
DC10 DC12
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110VDC DISTRIBUTION SIGNALING BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + DC
Checked LUONG NGOC THACH DC DISTRIBUTION BOARD CT - 12102016 Pages 14 Page DC11
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+AC
HEATING & LIGHTING
A AC-L PAD1 1 3 A
+AC/AC13-8:E/
-XC
AC-N 2 4
+AC/AC13-8:E/
1 3
-MCBAC
B 2P-10A 10kA B
ABB 2 4
C C
1 HT FAN
D -DS TS D
2 0 °C~50 °C COM
-SOCKET
E 1 E
x1
x1
PE
-LIGHT -HEATER
x2 2
x2
F F
DC11 DC13
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110VDC DISTRIBUTION HEATING &LIGHTING BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + DC
Checked LUONG NGOC THACH DC DISTRIBUTION BOARD CT - 12102016 Pages 14 Page DC12
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
B B
C C
=22kV+J2.1 +AC
D D
-PDJ1 -PDA1
18 m 7m
2G2,5 2G2,5
= DC DIST = AC DIST
= INC 22kV J2.1 = DC DIST
E E
F F
DC12 =E01+COM/CO1
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110VDC DISTRIBUTION CABLE DIAGRAM BAY = COM
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + DC
Checked LUONG NGOC THACH DC DISTRIBUTION BOARD CT - 12102016 Pages 14 Page DC13
Approval VO CONG CHIEN Replacement of Replaced by
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
Q- 7
1000
DS Discrepancy Switch K&N
800
500
500
0
0
SW Mimic Selector Switch K&N 7
A A
Q0 CB Discrepancy Switch K&N 3
2200
M Multimeter Schneider 3
CP-2DZ&PD
MK Tariff Meter Elster A1700 2
C C
Q11 Q0 Q12
110KV
Q51 L Q52
Q1 Q1
Q51 Q51
1000
1000
Q0 L Q0 L 50
Q52 Q52
D D
Q9 Q9
Q8 Q8
Q7
50
TU TU
LỖ OVAL 14 x 30
GO TO 1 GO TO 2 500
800
E E
PTL1 PTT2 PTL3
SIDE VIEW FRONT VIEW BOTTOM VIEW Dimension (mm) : H2200 x W800 x D800 x T2.0
Protection Degree : IP41
Painted : M9697W Light Grey
F F
CO1 CO3
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 LAYOUT OF TWO LINES & BUS COUPLER BAY = E01
Drawn DO VINH CONTROL PANEL
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH LAYOUT OF PANEL CT - 12102016 Pages 12 Page CO2
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
500
800
500
800
A A
0
2200
2000 LK 40x60
SCT DB1 DB TRAN1 TRAN3
DB2 DB3
VOLTAGE TRANSDUCER VOLTAGE TRANSDUCER
B LK 40x60 B
SCT
SCT
LK 65x65
LK 60x60
MCB KT2 KT3 KL2 KC3 KL3 TR KT1KL1KC1 MCB
FINDER FINDER
1500
FINDER FINDER FINDER
LK 80x60 LK 60x60
C XAC
C
XC2 XC1
XC3 4
XDC1
30 MK1 MK2 8
40 XDC2
40
8
XS2 XDC3
8
LK 65x65
LK 65x65
LK 65x65
LK 80x60
LK 80x60
XS1 XCT1
XS3 4
30 XVB1
1000 30 8
30 XVL1
XA2 4
XCT2
XA1 4
XA3 XVB2
D 30 4 D
XCT3
30 4
30 XVB3
XSCA2 8
TVmeC
www.trivietmec.com
XVL3
XSCA3 XSCA1 4
60 50
50
500
E E
E
SOCKET
F MẶT TRONG BÊN HÔNG TRÁI TỦ CỬA SAU TỦ MẶT TRONG BÊN HÔNG PHẢI TỦ MẶT ĐÁY TỦ F
CO2 CO4
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 LAYOUT OF TWO LINES & BUS COUPLER BAY = E01
Drawn DO VINH CONTROL PANEL
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH LAYOUT OF PANEL CT - 12102016 Pages 12 Page CO3
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
TYPE
DESCRIPTION MANUFACTURER QUANTITY
ORDERING CODE
800
500
800
500
0
0
F51 Overcurrent relay Toshiba 0
A Hand and Electrical Reset Master
A
F86 Arteche 2
Trip&Lockout Relay (8M+2B)
2200
TB Test Block Alstom 4
RP-E01&E02&E03
F74 Trip Circuit Supervision Relay Arteche 4
F211 F671
B B
F741 F742
F861
1 1
RT1 1500
F213 F673
C C
F741 F742
F863
3 3
RT3 1000
800
50
D D
50
OVAL HOLE 14 x 30
500
800
E E
SIDE VIEW FRONT VIEW BOTTOM VIEW Dimension (mm) : H2200 x W800 x D800 x T2.0
Protection Degree : IP41
Painted : M9697W Light Grey
F F
CO3 CO5
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 LAYOUT OF TWO LINES & BUS COUPLER BAY = E01
Drawn DO VINH RELAY PANEL
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH LAYOUT OF PANEL CT - 12102016 Pages 12 Page CO4
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
500
800
500
800
A A
0
2200
2000 LK 60x60
LK 60x60
B B
FINDER FINDER FINDER
LK 60x60 LK 60x60
XDC XAC
8 XDC
XDC3
XCT211
8
4 XCT213
XCT671
4 4
1500 XVB1 XCT673
4 4
XVL1 2 XVB3
XC1 4
XVL3 2
10 XC3
XI1 10
C C
15 XI3
XT1 15
XT3
LK 80x60
LK 80x60
LK 80x60
LK 80x60
LK 80x60
LK 80x60
30
30
XA1
XA3
1000 20
XDC2 20
10
XCT512
4
D XC2 D
10
XT2
30
XA2
10
500
E E
SOCKET E SOCKET
R R
F MẶT TRONG BÊN HÔNG TRÁI TỦ CỬA SAU TỦ MẶT TRONG BÊN HÔNG PHẢI TỦ MẶT ĐÁY TỦ F
CO4 CO6
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 LAYOUT OF TWO LINES & BUS COUPLER BAY = E01
Drawn DO VINH RELAY PANEL
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH LAYOUT OF PANEL CT - 12102016 Pages 12 Page CO5
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
SỐ
KÝ HIỆU MÔ TẢ ĐVT
LƯỢNG
TỦ ĐẤU DÂY NGOÀI TRỜI CHO ĐƯỜNG DÂY MK.E01 Tủ đấu dây ngoài trời cho đường dây Tủ 1
B B
500
800
500
600
0
0
1500
MK.E01.D
C C
1000
D D
500
E E
CO5 CO7
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 LAYOUT OF LINE 1 MARSHALLING KIOSK BAY = E01
Drawn DO VINH PANEL
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH LAYOUT OF PANEL CT - 12102016 Pages 12 Page CO6
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
B B
500
800
500
800
0
0
1500
C LK 80x60 C
MCB MCBVTL
LK 80x60 LK 80x60
XC XQ0 XQ8 XAC XCT XVT
15 12 8
20
1000 XQ9 24
XR
LK 80x60
LK 80x60
LK 80x60
LK 80x60
LK 80x60
LK 80x60
LK 80x60
LK 80x60
XDC
50 10
20
40
D XS D
XQ1
20
XQ51
XSCA 15
30 40
XQ52
15
500
15
E E
CO6 CO8
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 LAYOUT OF LINE 1 MARSHALLING KIOSK BAY = E01
Drawn DO VINH PANEL
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH LAYOUT OF PANEL CT - 12102016 Pages 12 Page CO7
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
SỐ
KÝ HIỆU MÔ TẢ ĐVT
LƯỢNG
TỦ ĐẤU DÂY NGOÀI TRỜI CHO ĐƯỜNG DÂY MK.E03 Tủ đấu dây ngoài trời cho đường dây Tủ 1
B B
500
800
500
600
0
0
1500
MK.E03.D
C C
1000
D D
500
E E
CO7 CO9
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 LAYOUT OF LINE 2 MARSHALLING KIOSK BAY = E01
Drawn DO VINH PANEL
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH LAYOUT OF PANEL CT - 12102016 Pages 12 Page CO8
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
B B
500
800
500
800
0
0
1500
C LK 80x60 C
MCB MCBVTL
LK 80x60 LK 80x60
XC XQ0 XQ8 XAC XCT XVT
15 12 8
20
1000 XQ9 24
XR
LK 80x60
LK 80x60
LK 80x60
LK 80x60
LK 80x60
LK 80x60
LK 80x60
LK 80x60
XDC
50 10
20
40
D XS D
XQ1
20
XQ51
XSCA 15
30 40
XQ52
15
500
15
E E
CO8 CO10
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 LAYOUT OF LINE 2 MARSHALLING KIOSK BAY = E01
Drawn DO VINH PANEL
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH LAYOUT OF PANEL CT - 12102016 Pages 12 Page CO9
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=COM+TELE =E05+MK5
A -C2203 -P2202 A
10 m 10 m -C2202 -V2104
7G1,5 2G2,5 22 m 55 m
= RP E01 = RP E01 7G1,5 4G4,0
= RP E05 = RP E05
= TELE PANEL = RP E01
= RP E01 = MK E05
=E05+RP5 +RP1
B B
D D
-P2102 -I2101 -V2102 -C2102 -S2101 -S2103 -S2104 -P2302 -P2101 -P2301 -I2201 -I2202 -C2201 -C2204 -V2103
12 m 48 m 48 m 48 m 48 m 48 m 48 m 48 m 12 m 50 m 48 m 48 m 48 m 48 m 48 m
2G2,5 4G4,0 4G4,0 12G1,5 19G1,5 12G1,5 19G1,5 2G2,5 2G2,5 2G2,5 4G4,0 4G4,0 7G1,5 12G1,5 4G4,0
E = CP E01 = CP E01 = CP E01 = CP E01 = CP E01 = CP E01 = CP E01 = DC DIST = AC DIST = AC DIST = RP E01 = RP E01 = RP E01 = RP E01 = RP E01 E
= CP E05 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = CP E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01
+MK1
F F
CO9 CO11
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 CABLE DIAGRAM BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH CABLE DIAGRAM CT - 12102016 Pages 12 Page CO10
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
B B
-P2310 -C2307 -S2302 -P2307 -P2308 -C2304 -S2303 -P2309 -C2306 -S2304
20 m 20 m 20 m 20 m 20 m 20 m 20 m 20 m 20 m 20 m
2G2,5 12G1,5 7G1,5 2G2,5 2G2,5 19G1,5 12G1,5 2G2,5 12G1,5 7G1,5
= ES Q8 E01 = ES Q8 E01 = ES Q8 E01 = DS Q9 E01 = DS Q9 E01 = DS Q9 E01 = DS Q9 E01 = ES Q52 E01 = ES Q52 E01 = ES Q52 E01
= MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01
C C
+MK1
D D
-P2303 -P2304 -C2301 -C2302 -S2301 -P2305 -P2306 -C2303 -S2306 -P2311 -C2305 -S2305
14 m 14 m 14 m 14 m 14 m 18 m 18 m 18 m 18 m 18 m 18 m 18 m
2G2,5 2G2,5 19G1,5 19G1,5 7G1,5 2G2,5 2G2,5 19G1,5 12G1,5 2G2,5 12G1,5 7G1,5
= CB Q0 E01 = CB Q0 E01 = CB Q0 E01 = CB Q0 E01 = CB Q0 E01 = DS Q1 E01 = DS Q1 E01 = DS Q1 E01 = DS Q1 E01 = ES Q51 E01 = ES Q51 E01 = ES Q51 E01
= MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01 = MK E01
F F
CO10 CO12
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 CABLE DIAGRAM BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH CABLE DIAGRAM CT - 12102016 Pages 12 Page CO11
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
B B
C C
+MK1
D D
E E
F F
CO11 +CP1/C100
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 CABLE DIAGRAM BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH CABLE DIAGRAM CT - 12102016 Pages 12 Page CO12
Approval VO CONG CHIEN Replacement of Replaced by
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
=COM+AC =E05+CP5
HEATING & LIGHTING
B B
1 3
12 14
-MCBAC
2P-10 A 11
2 4
/C109-6:A
C C
1 HT FAN
D -DS TS D
2 0 °C~50 °C COM
-SOCKET
E 1 E
x1
x1
PE
-LIGHT -HEATER
220VAC
Flourescent Light with Contact x2 2
x2
F F
C100 C102
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 AC POWER SUPPLY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP1
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 13 Page C101
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=COM+DC =E02+CP2
SIGNALING CONTROL AUX. DEVICE
POWER SUPPLY POWER SUPPLY POWER SUPPLY
B B
1 3 1 3 1 3
12 14 12 14
-MCB11 -MCB21 -MCB31
2P-10A 11 2P-10A 11 2P-10A
2 4 2 4 2 4
/C109-5:A
/C109-6:A
C C
D D
-XC1 1 4 2 5 3 6 -XC1 7 8 9 10 11 12
C2101 1 2
+RP1
E E
-S11+
-S11-
-C11+
-C11-
-M21+
-M21-
-SCT1+
-SCT1-
-TR1+
-TR1-
C11+
C11-
/ C107-1:A
/ C107-1:F
/ +RP1/R106-1:B
/ +RP1/R106-1:B
/ C104-1:A
/ C104-1:E
/ C103-7:C
/ C103-7:C
/ C108-2:C
/ C108-3:C
/ C103-6:E
/ C103-6:E
F F
C101 C103
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 DC POWER SUPPLY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP1
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 13 Page C102
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=E05+CP5
METERING FOR 110kV TARIFF METERING FOR 110kV MULTI-METER
A UA11 V2101 1 1 2 A
=E05+CP5/C503-8:A/
-XVB1 -XVB1
UB11 2 3 4
=E05+CP5/C503-8:A/
UC11 3 5 6
=E05+CP5/C503-8:A/
UN11 4 7 8
=E05+CP5/C503-8:B/
=E02+CP2
-PTT1
B UA11 1 2 B
=E02+CP2/C202-1:A/
UB11 3 4
=E02+CP2/C202-1:A/
UC11 5 6
=E02+CP2/C202-1:A/
UN11 7 8
=E02+CP2/C202-1:B/
M21+
/C102-6:E
-M11 -M31 M21-
ELSTER A1700 Diris A41
/C102-6:E
3x1(3x1,2)A Socomec
C 2 5 8 11 V1 V2 V3 VN A X C
POWER SUPPLY
TARIFF MULTI
METER METER
RS485
-CTT1
D IA11 I2101 1 1 1 2 D
+MK1/M104-1:F/
-XCT1
IB11 2 2 3 4
+MK1/M104-2:F/
IC11 3 3 5 6
+MK1/M104-2:F/
C102-7:E /
C102-7:E /
IN11 4 4 7 8
+MK1/M104-2:F/
-PTL1
-TR1+
-TR1-
1 2
E E
UL11 V2102 1 1 3 4
+MK1/M103-3:E/ 10 12 49
-XVL1 x1 1 13
4-20mA
5 6 -XSCA1
-M21 V 3 15 50
110kV/110V 63.5V
ULN11 2 3 7 8 x2
+MK1/M103-4:E/
-TRAN1
2
-XVL1
F F
4
C102 C104
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 METERING BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP1
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 13 Page C103
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A C11+ A
C102-5:E/
=COM+RTU
1 2
2 6
-SW11
/C112-2:B 1 5
REM/SUP
1
-XSCA1
+RP1 5 7 9
B B
-Q01
/C112-6:C 6 8 22 24 10
ON-P/OFF-P
-KC1
/C104-6:D 21
251 C2101 3 13
+RP1/R106-2:B/ 2
-XC1
7 5 3
-SW21
/C112-2:C 8 6
AUTO/OFF/MAN
C 791 4 14 C
+RP1/R106-3:B/
CL1+ 5 15
+RP1/R111-6:F/
CL1 6 16
+RP1/R111-7:F/
-XC1 17
D A1 D
-KC1
Spare Interlock 110 VDC A2
Jump if no use
-XC1 18
C11-
C102-5:E/
E E
-XC1 19 -XC1 20
C2102 1 2
14
12 11
+MK1
24
21 /C104-5:B
22
CLOSE
OPEN
34
31 /C106-5:B
32
44
42 41
/ +MK1/M105-3:A
/ +MK1/M105-4:A
F F
C103 C105
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 CIRCUIT BREAKER CONTROL BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP1
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 13 Page C104
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
/ +MK1/M107-6:B
/ +MK1/M107-7:B
/ +MK1/M107-8:B
/ +MK1/M106-6:B
/ +MK1/M106-7:B
/ +MK1/M106-8:B
COM9
Q9ON
Q9OFF
COM1
Q1ON
Q1OFF
B B
C2102 3 4 5 C2102 6 7 8
-XC1 21 22 23 24 25 26
C C
1 2
4 8 5 7 1 2
10 14 5 7 1 2
12 16
-SW11 -Q91 -SW11 -Q11 -SW11
/C112-2:B 3 7 /C112-6:B 6 8 /C112-2:B 9 13 /C112-5:D 6 8 /C112-2:B 11 15
REM/SUP ON-P/OFF-P REM/SUP ON-P/OFF-P REM/SUP
D D
REMOTE
SUPERVISION
E E
-XSCA1 4 5 6 7 8 9 10 14 15
=COM+RTU
F F
C104 C106
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 DISCONNECTOR SWITCH CONTROL BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP1
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 13 Page C105
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
79 SWITCH AUTO MANUAL
ON/OFF CLOSE CLOSE
32 34
B B
-KC1
/C104-6:D 31
1 2
1 4 2
C -SW31 -SW21 C
/C112-1:D 2 /C112-2:C 3 1
ON/OFF AUTO/OFF/MAN
D D
AUTO RECLOSE ON
MANUAL CLOSE
AUTO CLOSE
R11+
-XC1 27 28 29 30
E C2101 7 8 9 10 E
+RP1
R11+
BI6
BI7
BI8
/ +RP1/R105-5:B
/ +RP1/R105-5:B
/ +RP1/R105-5:B
/ +RP1/R105-6:B
F F
C105 C107
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 INPUT FOR MAIN RELAY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP1
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 13 Page C106
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
Q8 INDICATOR Q9 INDICATOR Q52 INDICATOR Q0 INDICATOR Q51 INDICATOR Q1 INDICATOR LAMP DISCREPANCY
TEST SWITCH
A S11+ A
C102-3:E/
-XS1 1 -XS1 2
S2101 1
+MK1
S11+
/ +MK1/M112-2:F
/ +MK1/M112-2:F
/ +MK1/M112-3:F
/ +MK1/M112-3:F
/ +MK1/M112-4:F
/ +MK1/M112-4:F
/ +MK1/M112-5:F
/ +MK1/M112-5:F
/ +MK1/M112-6:F
/ +MK1/M112-7:F
/ +MK1/M112-7:F
/ +MK1/M112-8:F
/ +MK1/M112-8:F
/ +MK1/M112-1:F
B B
CQ8
OQ8
CQ9
OQ9
CQ52
OQ52
CQ0
OQ0
LQ0
CQ51
OQ51
CQ1
OQ1
S2101 2 3 4 5 6 7 8 9 10 11 12 13 14
-XS1 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
C 23 C
Q0 LOCAL MODE
-LT1
24
Q52 CLOSE
Q51 CLOSE
Q52 OPEN
Q51 OPEN
Q8 CLOSE
Q9 CLOSE
Q0 CLOSE
Q1 CLOSE
Q8 OPEN
Q9 OPEN
Q0 OPEN
Q1 OPEN
3 1 3 1 3 1
1 3
-Q91 -Q01 -Q11 6 8 /C109-5:B
/C112-6:B 4 2 /C112-6:C 4 2 /C112-5:D 4 2 5
D OFF/ON OFF/ON OFF/ON D
14
12 11
24 7
31 29 25 23 19 21 /C111-2:C 15 13
22
-DB1 -DB1 -DB1 -DB1 -DB1 34 -DB1 -DB1 -KT1
/C112-1:E 32 /C112-1:E 30 /C112-1:E 26 /C112-1:E 24 /C112-1:E 20 /C112-1:E 16 /C112-1:E 14 110VDC 2
32 31
44
42 41
E E
1 2 1 2 1 2
x1 28 x1 22 x1 18 A1 x1 12
-Q91 -DB1 -Q01 -DB1 -LO1 -DB1 -Q11 -DB1
-Q81 /C112-6:B x2 /C112-1:E 27 -Q521 /C112-6:C x2 /C112-1:E 21 110VDC x2 /C112-1:E 17 -KL1 A2 -Q511 /C112-5:D x2 /C112-1:E 11
110VDC 4 110VDC 110VDC 4 110VDC Red 110 VDC 110VDC 4 110VDC
C106 C108
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 INDICATOR BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP1
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 13 Page C107
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
-XA1 1
S2102 1
+RP1
SC1
/ +RP1/R106-4:B
/ +RP1/R106-4:B
/ +RP1/R106-5:B
/ +RP1/R106-5:B
/ +RP1/R106-6:B
/ +RP1/R106-6:B
/ +RP1/R106-6:B
/ +RP1/R106-7:B
/ +RP1/R108-6:B
/ +RP1/R108-7:B
/ +RP1/R108-7:B
/ +RP1/R111-2:F
/ +RP1/R111-2:F
/ +RP1/R111-3:F
/ +RP1/R111-4:F
/ +RP1/R106-4:B
B 13 B
-RS1 14
AL1
AL2
AL3
AL4
AL5
AL6
AL7
AL8
AL9
AL10
AL11
AL12
AL13
AL14
AL15
13
-ACK1 14
13
S2102 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
-LT1 14
/C107-8:C -XA1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
C102-7:E /
RELAY FAILURE
F67 50BF TRIP
F741-1 ALARM
F741-2 ALARM
MCB RP OFF
LAMP TEST
-SCT1+
-SCT1-
F861 TRIP
F67 TRIP
RESET
SC1
37 38 33 35 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50
E BELL1 BELL2 -24V +24V DO DO DO DO DO DO DO DO DO DO DO DO DO DO DO E
+ x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2
-HORN1 -L1 -L2 -L3 -L4 -L5 -L6 -L7 -L8 -L9 -L10 -L11 -L12 -L13 -L14 -L15
- x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1
SC241+
F /C109-1:F F
C107 C109
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 ANNUNCIATION FOR PANEL BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP1
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 13 Page C108
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
-XA1 2 3 4
12 14 12 14 12 14
S2103 1
+MK1
-MCB11 11 -MCB21 11 -MCBAC 11
/C102-3:B /C102-4:B /C101-3:B
SC1
/ +MK1/M110-2:F
/ +MK1/M110-2:F
/ +MK1/M110-2:F
/ +MK1/M110-3:F
/ +MK1/M110-3:F
/ +MK1/M110-5:F
2P-10A 2P-10A 2P-10A
6 5
/ +MK1/M110-1:F
-KT1
B /C107-8:E 8 B
AL16
AL17
AL18
AL19
AL20
AL21
S2103 2 3 4 5 6 7
-XA1 20 21 22 23 24 25 26
C C
DISCREPANCY SWITCH
SPRING DISCHARGED
GAS SF6 ALARM
VT LINE 1 OFF
GAS SF6 TRIP
MCB MK OFF
MCB Q0 OFF
MCB CP OFF
SPARE
D -SCT1 DI DI DI DI DI DI DI DI DI
D
/C108-1:D 16 17 18 19 20 21 22 23 24
24DI-48DO
49 48 47 46 45 44 43 42 41
E DO DO DO DO DO DO DO DO DO E
x2 x2 x2 x2 x2 x2 x2 x2 x2
-L16 -L17 -L18 -L19 -L20 -L21 -L22 -L23 -L24
x1 x1 x1 x1 x1 x1 x1 x1 x1
SC241+
F C108-8:F/ F
C108 C110
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 ANNUNCIATION FOR PANEL BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP1
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 13 Page C109
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
=COM+RTU
B B
-XSCA1 11 16 17 18 19 20 21 22 23 24 25 26 27 28 29
C C
DISCREPANCY SWITCH
SPRING DISCHARGED
GAS SF6 ALARM
RELAY FAILURE
VT LINE 1 OFF
F741-1 ALARM
F741-2 ALARM
MCB MK OFF
MCB Q0 OFF
MCB RP OFF
MCB CP OFF
F861 TRIP
COMMON
SPARE
D -SCT1 COM DO DO DO DO DO DO DO DO DO DO DO DO DO DO
D
/C108-1:D S S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24
24DI-48DO
E E
F F
C109 C111
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 ANNUNCIATION FOR SCADA BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP1
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 13 Page C110
Approval VO CONG CHIEN Replacement of Replaced by
F
E
B
C
A
Revision
C
C110
1
1
-XSCA1
=COM+RTU
12
Date
Drawn
Checked
Approval
DO VINH
12/10/2016
30
+MK1
VO CONG CHIEN
LUONG NGOC THACH
/C107-5:E
-KL1
2
2
22
LOCAL MODE OF Q0
21
31
24
-XSCA1
COM+ SCOM
Replacement of
/ +MK1/M113-1:F
S2104 1
13
Q8 CLOSE SCQ8
/ +MK1/M113-1:F
2
32
3
3
Q8 OPEN SOQ8
33
Replaced by
Electrical Testing Company
Q9 CLOSE SCQ9
/ +MK1/M113-2:F
4
34
Q9 OPEN SOQ9
/ +MK1/M113-3:F
5
35
4
4
Q9 MCB OFF SMQ9
/ +MK1/M113-3:F
6
36
37
SCQ52
ANNUNCIATION FOR SCADA
Q52 CLOSE
/ +MK1/M113-4:F
8
38
5
5
Q52 OPEN SOQ52
/ +MK1/M113-4:F
9
39
Q0 CLOSE SCQ0
/ +MK1/M113-5:F
10
40
CONTROL PANEL
Q0 OPEN SOQ0
/ +MK1/M113-5:F
11
6
6
42
43
Q1 CLOSE SCQ1
/ +MK1/M113-7:F
14
44
CT - 12102016
SOQ1
7
7
Q1 OPEN
ANNUNCIATION FOR SCADA
/ +MK1/M113-7:F
15
45
Pages
46
13
47
BAY
Page
PANEL
8
8
= E01
+ CP1
C111
C112
F
E
B
C
A
D
1 2 3 4 5 6 7 8
A A
B B
1 2
2 4 6 8 10 12 14 16 17 19 1 2
x1 1 3 5 7 9 11
-SW11 -Q91
1 3 5 7 9 11 13 15 18 20 x2 2 4 6 8 10 12
SWITCH 2 POS SWITCH DS
/C104-4:A /C105-2:D /C104-5:A /C105-2:D /C105-4:D /C105-7:D /C105-4:D /C105-7:D /C107-2:E /C107-3:D /C107-2:D /C105-3:D /C105-3:D
K&N K&N
5NO & 5NC 3NO & 3NC
C C
1 2 3
2 4 5 7 1 2
x1 1 3 5 7 9 11
-SW21 -Q01
1 3 6 8 x2 2 4 6 8 10 12
SWITCH 3 POS SWITCH CB
/C106-6:C /C106-5:C /C104-4:C /C104-4:C /C107-4:E /C107-4:D /C107-4:D /C104-4:B /C104-5:B /C104-6:B
K&N K&N
2NO & 2NC 3NO & 3NC
D 1 3 x1 1 3 5 7 9 11 D
1 2 1 2
-SW31 -Q11
2 4 x2 2 4 6 8 10 12
SWITCH 2 POS SWITCH DS
/C106-4:C /C107-6:E /C107-7:D /C107-6:D /C105-5:D /C105-5:D
K&N K&N
1NO & 1NC 3NO & 3NC
E E
31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1
-DB1
32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2
/C107-2:E /C107-3:E /C107-2:E /C107-4:E /C107-4:E /C107-4:E /C107-5:E /C107-5:E /C107-6:E /C107-7:E /C107-7:E
DIODE BOARD
CONNECTWELL
16D-1A
F F
C111 +RP1/R100
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 REFERENCE FOR DEVICE BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP1
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 13 Page C112
Approval VO CONG CHIEN Replacement of Replaced by
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
=COM+AC =E05+RP5
HEATING & LIGHTING
B B
1 3
12 14
-MCBAC
2P-10A 11
2 4
/R111-5:B
C C
1 HT FAN
D -DS TS D
2 0 °C~50 °C COM
-SOCKET
E 1 E
x1
x1
PE
-LIGHT -HEATER
220VAC
Flourescent Light with Contact x2 2
x2
F F
R100 R102
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 AC POWER SUPPLY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP1
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R101
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=COM+DC =E03+RP3
MAIN RELAY INPUT MAIN RELAY BACKUP RELAY INPUT BACKUP RELAY TRIP 2
POWER SUPPLY POWER SUPPLY POWER SUPPLY POWER SUPPLY POWER SUPPLY
B B
1 3 1 3 1 3
12 14 12 14 12 14
-MCB11 -MCB21 -MCB31
2P-10A 11 2P-10A 11 2P-10A 11
2 4 2 4 2 4
/R111-4:B
/R111-4:B
/R111-4:B
C C
D D
E E
F211+
F211-
R11+
R11-
F671+
F671-
R21+
R21-
T11+
T11-
/ R103-3:C
/ R103-3:C
/ R105-1:A
/ R105-1:F
/ R104-3:C
/ R104-3:C
/ R107-1:A
/ R108-1:F
/ R108-1:A
/ R110-5:D
F F
R101 R103
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 DC POWER SUPPLY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP1
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R102
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=E05+MK5
B B
-TB211 -F211
/R113-1:A VA
/R112-2:B 1 2 VC1-1 VC1-2
VB
3 4 VC1-3 VC1-4
VC
5 6 VC1-5 VC1-6
7 8
C C
+
F211+ 13 14 T4-29
R102-2:E/
-
+MK1 F211- 15 16 T4-31
R102-3:E/ U
VS
UL12 V2103 1 1 9 10 VC1-7 VC1-8
+MK1/M103-5:E/
-XVL1
ULN12 2 2 11 12
+MK1/M103-6:E/
D D
IA
IA21 I2201 1 1 21 22 VC1-11 VC1-12
+MK1/M104-3:F/
-XCT211 IB
IB21 2 2 23 24 VC1-13 VC1-14
+MK1/M104-4:F/
IC
IC21 3 3 25 26 VC1-15 VC1-16
+MK1/M104-4:F/
IE
IN21 4 4 27 28 VC1-18 VC1-17
E +MK1/M104-4:F/ E
F F
R102 R104
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 ANALOGUE INPUT FOR MAIN RELAY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP1
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R103
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=E03+RP3
A UA12 2 UA12 A
R103-7:A/ /=E03+RP3/R302-1:A
-XVB1
UB12 4 UB12
R103-7:A/ /=E03+RP3/R302-1:A
UC12 6 UC12
R103-7:A/ /=E03+RP3/R302-1:A
UN12 8 UN12
R103-7:B/ /=E03+RP3/R302-1:B
B B
-TB671 -F671
/R114-1:A VA
/R112-2:C 1 2 VC1-1 VC1-2
VB
3 4 VC1-3 VC1-4
VC
5 6 VC1-5 VC1-6
7 8
C C
+
F671+ 13 14 T4-29
R102-4:E/
-
F671- 15 16 T4-31
R102-4:E/ U
+MK1
D IA D
IA31 I2202 1 1 21 22 VC1-17 VC1-18
+MK1/M104-5:F/
-XCT671 IB
IB31 2 2 23 24 VC1-19 VC1-20
+MK1/M104-6:F/
IC
IC31 3 3 25 26 VC1-21 VC1-22
+MK1/M104-6:F/
IE1
VC1-24 VC1-23
IE2
VC1-25 VC1-26
IN31 4 4 27 28
E +MK1/M104-6:F/ E
F F
R103 R105
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 ANALOGUE INPUT FOR BACKUP RELAY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP1
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R104
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
R11+ R11+
A R102-3:E/ /R108-1:B A
R11+
R11+
-XX x
/ +MK1/M110-5:F
/ +CP1/C106-3:F
/ +MK1/M110-6:F
/ +MK1/M110-6:F
/ +MK1/M110-7:F
/ +MK1/M110-7:F
/ +MK1/M110-8:F
/ +CP1/C106-4:F
/ +CP1/C106-5:F
/ +CP1/C106-6:F
B B
-XX x
BI1
BI2
BI3
BI4
BI5
BI6
BI7
BI8
C2201 2 3 4 5 6 C2101 8 9 10 C2202 2
C C
-XI1 4 5 6 7 8 9 10 11 12 13
671
/R108-1:B
D D
CIRCUIT BREAKER OFF
CIRCUIT BREAKER ON
AUTO RECLOSE ON
SPRING CHARGED
TELE RECEIVED
MANUAL CLOSE
VT LINE 1 OFF
VT BUS 1 OFF
F67/67N TRIP
AUTO CLOSE
SPARE
-F211
/R113-1:A
E T1-1 T1-3 T1-5 T1-7 T1-9 T1-11 T1-13 T1-15 T1-17 T1-21 T1-23
E
BI1 BI2 BI3 BI4 BI5 BI6 BI7 BI8 BI9 BI10 BI11
T1-2 T1-4 T1-6 T1-8 T1-10 T1-12 T1-14 T1-16 T1-18 T1-22 T1-24
R11-
F R102-3:E/ F
R104 R106
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 DIGITAL INPUT OF MAIN RELAY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP1
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R105
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
/ +CP1/C102-5:E
/ +CP1/C102-5:E
/ +CP1/C104-1:B
/ +CP1/C104-1:C
/ +CP1/C108-3:B
/ +CP1/C108-3:B
/ +CP1/C108-3:B
/ +CP1/C108-4:B
/ +CP1/C108-4:B
/ +CP1/C108-4:B
/ +CP1/C108-5:B
/ +CP1/C108-5:B
/ +CP1/C108-5:B
C11+
C11-
251
791
SC1
AL1
AL2
AL3
AL4
AL5
AL6
AL7
AL8
B B
C2101 1 2 3 4 S2102 1 2 3 4 5 6 7 8 9
-XC1 1 3 5 6 -XA1 1 3 4 5 6 7 8 9 10
-XC1 2 4 -XA1 2
C C
C11- SC1
/R110-1:D /R108-1:A
C11+ WD1
/R107-1:A /R108-8:D
RELAY FAILURE
251
791
-F211
/R113-1:A
E E
T2-9 T2-11 T2-13 T2-15 T2-17 T2-21 T2-23 T2-25 T2-27 T2-29 T4-1
BO5 BO6 BO7 BO8 BO9 BO10 BO11 BO12 BO13 BO14 FAIL1
T2-10 T2-12 T2-14 T2-16 T2-18 T2-22 T2-24 T2-26 T2-28 T2-30 T4-2
F F
R105 R107
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 DIGITAL OUTPUT OF MAIN RELAY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP1
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R106
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
C11+ C11+
A R106-3:D/ /R110-1:A A
R21+ R21+
R102-5:E/ /R108-1:B
=COM+TELE
B B
-XX x x
C2202 3 4
/ R109-1:A
/ R108-1:B
/ R110-1:A
-XT1 27 28
C C
TR861
SBF1
TC11
D D
-F211
/R113-1:A
E E
F F
R106 R108
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 DIGITAL OUTPUT OF MAIN RELAY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP1
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R107
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
START 50BF FOR START 79 FROM TRIP COIL 2 FROM TRIP 50BF FROM ANUNCIATION FROM BACKUP RELAY
BACKUP RELAY BACKUP RELAY BACKUP RELAY BACKUP RELAY
SC1 SC1
A R106-8:C/ /R111-1:A A
T11+ T11+
R102-6:E/ /R110-5:A
R21+ R21+
R107-8:A/ /R109-1:A
+CP1
671
R105-8:D/
/ +CP1/C108-6:B
/ +CP1/C108-6:B
/ +CP1/C108-6:B
B R11+ B
R105-8:A/
SBF1
R107-4:C/
AL9
AL10
AL11
/ R110-5:A
/ R109-1:D
S2102 10 11 12
-XA1 11 12 13
C C
TC21
BF1
11
-TB671
/R112-2:C 12
WD1
/R106-8:D
D D
BREAKER FAILURE 1
RELAY FAILURE
F67 50BF TRIP
TRIP COIL 2-1
67/67N TRIP
START BF1
F67 TRIP
SPARE
-F671
/R114-1:A
E T3-1 T3-3
E
T3-2 T3-4
F F
R21- R21-
R102-5:E/ /R109-1:F
R107 R109
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 DIGITAL INPUT & OUTPUT OF BACKUP BAY = E01
Drawn DO VINH RELAY
110kV CHAU THANH SUBSTATION
PANEL + RP1
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R108
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
TRIP FROM 50BF INTERNAL 50BF TRIP 50BF TRIP RESET RESET
MAIN RELAY TRIP FROM E03 FROM E05 REMOTE LOCKOUT
R21+
A R108-8:B/ =E03+RP3 A
TR861 BF13+
R107-3:C/ /=E03+RP3/R308-4:B
-XT1 11 12 13 14 15 -XT1 21
C2203 1
=E03+RP3 =E05+RP5 22 24
-KBF1
BF31+
BF41+
/R109-2:E 21
=E05+RP5/R509-8:C /
=E03+RP3/R308-8:B /
BF13
20 12 14 13 /=E03+RP3/R308-3:B
/ =E03+RP3/R308-8:A
/ =E05+RP5/R509-8:C
B 22 B
-TB211 -KBF1
/R112-2:B 19 /R109-2:E 11 -RE1 14
=E05+RP5
C2203 3 BF14+
BF31
BF41
/=E05+RP5/R508-4:B
-XT1 23
2
32 34
-KBF1
C /R109-2:E 31 C
-XT1 16 17 18 19 20
4 BF14
/=E05+RP5/R508-3:B
24
BF1
R108-5:C/
-XT1 25
D D
42 44
-KBF1
20 /R109-2:E 41
-TB671
/R112-2:C 19
26
E E
A1 b d
-KBF1 -F861
110 VDC A2 /R112-2:D a /R112-2:D c
Trip Coil Reset Coil
R21-
R108-8:F/
14
11 /R109-2:B
12
F 24 F
21 /R109-7:B
22
34
31 /R109-7:C
32
44
41 /R109-7:D
42
R108 R110
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 BREAKER FAILURE & TRIP LOCKOUT BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP1
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R109
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
TRIP FROM TRIP FROM TRIP CIRCUIT SUPERVISION 1 TRIP FROM TRIP FROM TRIP CIRCUIT SUPERVISION 2
MAIN RELAY RELAY F861 BACKUP RELAY RELAY F861
C11+ T11+
A R107-8:A/ R108-8:A/ A
TC11 TC21
R107-5:C/ R108-4:C/
B B
-F741-1 -F741-2
18 80 81 110VDC 1 4 13 9 14 10 18 70 71 110VDC 1 4 13 9 14 10
-TB211 -F861 -TB671 -F861
/R112-2:B 17 /R112-2:D 8 12 8 2 5 6 /R112-2:C 17 /R112-2:D 7 12 8 2 5 6
/R111-2:B
/R111-6:B
/R111-3:B
/R111-6:B
C C
C11- T11-
R106-3:C/ R102-6:E/
D D
TRIPPING COIL 1
TRIPPING COIL 2
TCS1 CLOSE
TCS2 CLOSE
TCS1 OPEN
TCS2 OPEN
C11+
T11+
C11-
T11-
E E
-XT1 1 2 3 4 5 -XT1 6 7 8 9 10
C2204 1 2 3 4 5 C2204 6 7 8 9 10
+MK1
TRIP1
TCSC1
TCSO1
C11-
C11+
TRIP2
TCSC2
TCSO2
T11-
T11+
/ +MK1/M105-5:A
/ +MK1/M105-5:A
/ +MK1/M105-6:A
/ +MK1/M105-6:A
/ +MK1/M105-6:A
/ +MK1/M105-7:A
/ +MK1/M105-7:A
/ +MK1/M105-7:A
/ +MK1/M105-8:A
/ +MK1/M105-8:A
F F
R109 R111
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 TRIP CIRCUIT SUPERVISION BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP1
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R110
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
SC1
A R108-8:A/ A
14 10
-F741-1
/R110-3:B 6
B B
40 41 13 9 13 9 12 14 12 14 12 14 12 14 14 10
-F861 -F741-1 -F741-2 -F741-2
/R112-2:D 4 /R110-3:B 5 /R110-7:B 5 -MCB11 11 -MCB21 11 -MCB31 11 -MCBAC 11 /R110-7:B 6
/R102-2:B /R102-4:B /R102-6:B /R101-3:B
C 10 11 C
-F861
/R112-2:D 1
D D
F741-1 ALARM
F741-2 ALARM
MCB RP OFF
F861 TRIP
CL1+
CL1
-XA1 14 15 16 17 -XC1 7 8
E E
+CP1
S2102 13 14 15 16 C2101 5 6
AL12
AL13
AL14
AL15
CL1+
CL1
/ +CP1/C108-7:B
/ +CP1/C108-7:B
/ +CP1/C108-7:B
/ +CP1/C108-8:B
/ +CP1/C104-1:C
/ +CP1/C104-1:D
F F
R110 R112
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 SIGNALING & INTERLOCK BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP1
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R111
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
1 3 5 7 9 11 13 15 18 20 21 23 25 27
-TB211
2 4 6 8 10 12 14 16 17 19 22 24 26 28
B TEST BLOCK B
/R103-4:B /R103-4:B /R103-4:C /R103-4:C /R103-4:D /R103-4:D /R103-4:C /R103-4:C /R110-2:B /R109-2:B /R103-4:D /R103-4:E /R103-4:E /R103-4:E
ALSTOM
28 PINS
1 3 5 7 9 11 13 15 18 20 21 23 25 27
C -TB671 C
2 4 6 8 10 12 14 16 17 19 22 24 26 28
TEST BLOCK
/R104-4:B /R104-4:B /R104-4:C /R104-4:C /R108-2:C /R104-4:C /R104-4:C /R110-6:B /R109-2:D /R104-4:D /R104-4:D /R104-4:D /R104-4:E
ALSTOM
28 PINS
10 11 20 21 30 31 40 41 50 51 60 61 70 71 80 81 b d
D -F861 D
1 2 3 4 5 6 7 8 a c
LOCKOUT RELAY /R111-6:C /R111-2:B /R110-6:B /R110-2:B /R109-5:E /R109-6:E
ARTECHE
8 NO/NC
TWO COILS
E E
F F
R111 R113
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 REFERENCE FOR DEVICE BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP1
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R112
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
DEVICE ANALOGUE INPUT BINARY INPUT 01 BINARY OUTPUT 02 BINARY INPUT & OUTPUT 03
+
A CIRCUIT A
/R105-2:E BO1 /R107-3:E
BREAKER TRIP 86
-F211 /R103-6:B VA ON
BI1
-
T1-2
T2-1 T2-2
BI1
-
T3-2
T1-3 T3-3
Toshiba
+
VC1-2 CIRCUIT START
GRZ200-11-237-00-13-10-110 BREAKER BI2 /R105-2:E BREAKER
BO2 /R107-4:E BI2
T1-4 T3-4
OFF - FAILURE T2-3 T2-4 -
T1-5 T3-5
VC1-3
+
SPRING BI3 /R105-3:E TRIP BO3 /R107-5:E BI3
VB CHARGED T1-6 COIL 1 T3-6
/R103-6:B -
T2-5 T2-6 -
FAIL1
T1-7 T3-7
+
T4-3 VC1-4 VT LINE 1 BI4 /R105-4:E F21 BO4 /R107-6:E BI4
B OFF T1-8 TELE SEND T3-8 B
/R106-7:E T2-7 T2-8
- -
T4-1 T4-2 T1-9 T3-9
VC1-5
+
CLOSING
VT BUS 1 /R105-4:E BO5 /R106-2:E
BI5 WITH BI5
VC OFF T1-10 T3-10
/R103-6:C - SYN. CHECK T2-9 T2-10 -
T1-11 T3-11
+
FAIL2 VC1-6 AUTO AUTO
/R105-5:E BO6 /R106-3:E
RECLOSE BI6 RECLOSE BI6
T4-9 T1-12 T3-12
ON - OPERATED T2-11 T2-12 -
T1-13 T3-13
VC1-7
+
F21 ZONE 1
AUTO /R105-5:E BO7 /R106-4:E
T4-7 T4-8 BI7 TRIP BI7
VS CLOSE T1-14 T3-14
/R103-6:D (ALARM) T2-13 T2-14
C - - C
T1-15
+
VC1-8 F21 ZONE 2
MANUAL /R105-6:E BO8 /R106-4:E BO1
BI8 TRIP
CLOSE T1-16
- (ALARM) T2-15 T2-16 T3-15 T3-16
T1-17
VC1-9
+
AC OR DC F21 ZONE 3
AUX. SUPPLY F67/67N /R105-6:E BO9 /R106-5:E BO2
+ BI9 TRIP
T4-29 VS2 TRIP T1-18
(ALARM) T2-17 T2-18 T3-17 T3-18
/R103-6:C -
- T1-21
+
T4-31 VC1-10 F21 ZONE 4
U TELE /R105-7:E BO10 /R106-5:E BO3
BI10 TRIP
RECEIVED T1-22
- (ALARM) T2-21 T2-22 T3-21 T3-22
VC1-11 T1-23
D D
+
F21
SPARE /R105-8:E BO11 /R106-6:E BO4
/R103-6:D IA BI11
T1-24
67/50/51 TRIP
- (ALARM) T2-23 T2-24 T3-23 T3-24
T1-25
VC1-12
+
+
F21
BO12 /R106-6:E BO5
BI12 25/79 CLOSE
T1-26
VC1-13 - (ALARM) T2-25 T2-26 T3-25 T3-26
T1-27
+
/R103-6:E IB F21
BO13 /R106-6:E BO6
BI13 SWITCH-ON
T1-28
TO FAULT T2-27 T2-28 T3-27 T3-28
VC1-14 -
T1-29
+
F21
VC1-15 BO14 /R106-7:E BO7
E BI14 TELE PROTECTION E
T1-30
- (ALARM) T2-29 T2-30 T3-29 T3-30
/R103-6:E IC T1-31
+
BI 16 BO16 BO9
IE T1-34
/R103-6:E -
T2-33 T2-34 T3-33 T3-34
T1-35 BO10 T3-36
+
VC1-18 BO17
BI 17
T1-36
F VC1-27 -
T2-35 T2-36 F
T3-38 T3-37
T1-37
+
IEm BO18
BI 18
T1-38
T2-37 T2-38
VC1-28 -
R112 R114
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 REFERENCE FOR MAIN RELAY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP1
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R113
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
DEVICE ANALOGUE INPUT BINARY INPUT & OUTPUT 01 BINARY INPUT & OUTPUT 01
+
A START A
/R108-2:E TRIP BO1 /R108-4:E
BREAKER
-F671 /R104-6:B VA FAILURE
BI1
-
T3-2 COIL 2 T3-21 T3-22
T3-3
Toshiba
+
VC1-2 BREAKER
GRD200-41-213-00-13-10-110 SPARE BI2 /R108-3:E BO2 /R108-5:E
T3-4 FAILURE
-
T3-23 T3-24
T3-5
VC1-3
+
BI3
67/67N BO3 /R108-4:E
VB T3-6 TRIP
/R104-6:B -
T3-25 T3-26
FAIL1
T3-7
+
T4-3 VC1-4 F67
BO4 /R108-6:E
B
BI4 TRIP B
/R108-7:E T3-8
- (ALARM) T3-27 T3-28
T4-1 T4-2 T3-9
VC1-5
+
BI5 BO5
VC T3-10
/R104-6:C -
T3-29 T3-30
T3-11
+
FAIL2 VC1-6 F67
BO6 /R108-7:E
BI6 50BF TRIP
T4-9 T3-12
- (ALARM) T3-31 T3-32
T3-13
VC1-7
+
BI7 BO7
T4-7 T4-8
VE T3-14
T3-33 T3-34
C - C
T3-15 BO8 T3-36
+
VC1-8
BI8
T3-16
-
T3-38 T3-37
AC OR DC VC1-9
AUX. SUPPLY
+
T4-29
/R104-6:C
VS
-
U T4-31 VC1-10
VC1-17
D D
/R104-6:D IA
VC1-18
VC1-19
/R104-6:D IB
VC1-20
E VC1-21 E
/R104-6:D IC
VC1-22
VC1-23
/R104-6:E IE1
VC1-24
F VC1-25 F
/R104-6:E IE2
VC1-26
R113 +MK1/M100
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 REFERENCE FOR BACKUP RELAY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP1
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R114
Approval VO CONG CHIEN Replacement of Replaced by
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
=COM+AC
HEATING & LIGHTING HEATING & LIGHTING FOR DEVICE
A ACM1+ P2301 1 1 A
220VAC-L
=COM+AC/AC11-5:F/
-XAC
ACM1- 2 2 220VAC-N
=COM+AC/AC11-5:F/
B B
1 3 1 3
12 14 12 14
-MCB1 -MCB2
2P-10A 11 2P-10A 11
2 4 2 4
/M110-3:C
/M110-4:C
C C
-XAC 3 10 4 11 5 12 6 13 7 14 8 15 9 16
1 1 HT FAN
D -DS1 -DS2 TS D
P2310 1 2 P2307 1 2 P2309 1 2 P2303 1 2 P2311 1 2 P2305 1 2 P2312 1 2
2 2 0 °C~50 °C COM
AC+
AC-
-TB 401 403 -TB 401 403 -TB 401 403 -TB 401 403 -TB 401 403 -TB 401 403
M117-2:A /
M117-2:A /
-SOCKET
E 1 E
x1 x1
x1
PE
-LIGHT2 -LIGHT1 -HEATER +Q8 +Q9 +Q52 +Q0 +Q51 +Q1 +Q7
220VAC 220VAC EARTHING SWITCH DISCONNECTOR EARTHING SWITCH CIRCUIT BREAKER EARTHING SWITCH DISCONNECTOR DISCONNECTOR
x2 2
x2 x2
F F
M100 M102
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 AC POWER SUPPLY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M101
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=COM+DC
POWER SUPPLY TO POWER SUPPLY TO
MOTOR DEVICE 1 MOTOR DEVICE 2
A DCM1+ P2302 1 1 A
110VDC +
=COM+DC/DC06-2:F/
-XDC
DCM1- 2 2 110VDC -
=COM+DC/DC06-2:F/
B B
1 3 1 3
12 14 12 14
-MCB3 -MCB4
2P-10A 11 2P-10A 11
2 4 2 4
/M110-4:C
/M110-4:C
C C
-XDC 3 5 4 6 -XDC 7 9 8 10
D D
P2304 1 2 P2313 1 2 P2308 1 2 P2306 1 2
M2+
M2-
DC+
DC-
M117-1:A /
/ M109-1:A
/ M109-1:F
-TB 439 420 -TB 439 420 -TB 439 420
E E
-TB 441 442 -TB 441 442 -TB 441 442
F F
M101 M103
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 DC POWER SUPPLY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M102
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
VT LINE CIRCUIT
+VTLINE
A A
-TB a1 n1 a2 n2
B B
V2301 1 2 V2301 3 4
-XVT 1 2 -XVT 5 6
C C
1 3 1 3
12 14 A1 12 14 22 24
-MCBVTL1 -SUV -MCBVTL2
2P-2A 11 63.5VAC A2 2P-2A 11 21
2 4 2 4
/M110-5:C
/M110-5:C
/M110-7:C
14
12 11
D D
24 21 /M109-7:D
22
34
32 31
44
42 41
-XVT 3 4 -XVT 7 8
+CP1 +RP1
V2102 1 2 V2103 1 2
E E
UL11
ULN11
UL12
ULN12
+CP1/C103-1:E /
+CP1/C103-1:F /
+RP1/R103-1:D /
F +RP1/R103-1:D / F
M102 M104
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 VT LINE CIRCUIT BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M103
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+CTB_A +CTB_B +CTB_C +CTB_A +CTB_B +CTB_C +CTB_A +CTB_B +CTB_C +CTB_A +CTB_B +CTB_C
B B
1S1
1S2
1S1
1S2
1S1
1S2
2S1
2S2
2S1
2S2
2S1
2S2
3S1
3S2
3S1
3S2
3S1
3S2
4S1
4S2
4S1
4S2
4S1
4S2
-TB -TB -TB -TB -TB -TB -TB -TB -TB -TB -TB -TB
I2301 1 2 I2303 1 2 I2305 1 2 I2301 3 4 I2303 3 4 I2305 3 4 I2302 1 2 I2304 1 2 I2306 1 2 I2302 3 4 I2304 3 4 I2306 3 4
C C
-XCT 1 4 2 5 3 6 -XCT 7 10 8 11 9 12 -XCT 13 16 14 17 15 18 -XCT 19 22 20 23 21 24
D D
+CP1 +RP1
IB11
IC11
IN11
IA21
IB21
IN21
IC21
IA31
IB31
IN31
IC31
+CP1/C103-1:D /
+CP1/C103-1:D /
+CP1/C103-1:D /
+CP1/C103-1:E /
+RP1/R103-1:D /
+RP1/R103-1:E /
+RP1/R103-1:E /
+RP1/R103-1:E /
+RP1/R104-1:D /
+RP1/R104-1:D /
+RP1/R104-1:E /
+RP1/R104-1:D /
F F
M103 M105
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 CT CIRCUIT BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M104
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
/ +CP1/C104-4:F
/ +CP1/C104-5:F
/ +RP1/R110-2:F
/ +RP1/R110-3:F
/ +RP1/R110-3:F
/ +RP1/R110-4:F
/ +RP1/R110-4:F
/ +RP1/R110-6:F
/ +RP1/R110-7:F
/ +RP1/R110-7:F
/ +RP1/R110-8:F
/ +RP1/R110-8:F
A A
CLOSE
OPEN
TRIP1
TCSC1
TCSO1
C11-
C11+
TRIP2
TCSC2
TCSO2
T11-
T11+
C2102 1 2 C2204 1 2 3 4 5 6 7 8 9 10
B -XC 1 2 B
C2304 6 8 9
+Q9 23 25 27
DISCONNECTOR
-Q9
24 26 28
C C
C2304 7 10 11
C2303 6 8 9
D +Q1 23 25 27 D
DISCONNECTOR
-Q1
24 26 28
TRIPPING COIL 1
TRIPPING COIL 2
TCS 1 CLOSE
TCS 2 CLOSE
TCS 1 OPEN
TCS 2 OPEN
C2303 7 10 11
C11+
T11+
-XQ1 7 -XQ1 10 -XQ1 11
C11-
T11-
E E
-XQ0 1 -XQ0 2 -XQ0 3 -XQ0 4 -XQ0 5 6 7 8 9 10 11 12 13 14
C2301 1 2 3 4 5 6 7 8 9 10 11 12 13 14
+Q0
INL+
INL-
CLOSE
OPEN
TRIP1
TCSC1
TCSO1
C11-
C11+
TRIP2
TCSC2
TCSO2
T11-
T11+
CIRCUIT BREAKER
M116-2:A /
M116-3:A /
M116-2:A /
M116-4:A /
M116-4:A /
M116-5:A /
M116-5:A /
M116-1:A /
M116-1:A /
M116-7:A /
M116-7:A /
M116-8:A /
M116-6:A /
M116-6:A /
F F
M104 M106
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 CIRCUIT BREAKER INTERLOCKING BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M105
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+CP1
A Q15 BAY E04 A
/ +CP1/C105-4:B
/ +CP1/C105-5:B
/ +CP1/C105-5:B
FULLY OPENED
COM1
Q1ON
Q1OFF
B C2102 6 7 8 B
C C
=E05+MK5/M509-1:F /
/ =E05+MK5/M509-2:F
X3:101 23 23
-Q0 -Q51 -Q52
X3:102 24 24
Q11
D D
E E
C2303 1 2 3 4 5
+Q1
DISCONNECTOR
F F
M105 M107
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 Q1 DISCONNECT SWITCH INTERLOCKING BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M106
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+CP1
A A
/ +CP1/C105-2:B
/ +CP1/C105-3:B
/ +CP1/C105-3:B
COM9
Q9ON
Q9OFF
B C2102 3 4 5 B
C C
27 X3:105 27 27
-Q8 -Q0 -Q51 -Q52
28 X3:106 28 28
D D
E E
C2304 1 2 3 4 5
+Q9
DISCONNECTOR
F F
M106 M108
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 Q9 DISCONNECT SWITCH INTERLOCKING BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M107
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
/ =E02+CP2/C204-5:B
/ =E02+CP2/C204-6:B
/ =E02+CP2/C204-7:B
A Q1 BAY E02 Q1 BAY E03 A
Q0 BAY E02 Q0 BAY E03
Q9 BAY E02 Q9 BAY E03
FULLY CLOSED FULLY CLOSED
COM7
Q7ON
Q7OFF
B C2312 1 2 3 B
C C
=E03+MK3/M310-4:F /
-X X
/ =E03+MK3/M310-7:F
X3:103 29 29
-Q0 -Q1 -Q9
X3:104 30 30
-X X
Q72
D D
-XQ7 1
E E
C2311 1 2 3 4 5
+Q7
DISCONNECTOR
F F
M107 M109
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 Q7 DISCONNECT SWITCH INTERLOCKING BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M108
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
C 31 31 35 35 55 55 C
-Q1 -Q9 -Q1 -Q9 -Q7 -Q9
32 32 36 36 56 56
22 24
-SUV 21
/M103-5:C
D D
C2311 7 C2304 19
C2303 15 C2304 15 C2303 17 C2304 17
-XQ8 1
E E
+Q51 +Q52 +Q8
EARTHING SWITCH EARTHING SWITCH EARTHING SWITCH
2 2 2
M108 M110
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 EARTHING SWITCH INTERLOCKING BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M109
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
C2308 5
-XQ0 20 -XQ0 26
=E05+MK5
VTB+
B C2302 7 C2302 12 B
=E05+MK5/M508-6:F /
/ =E05+MK5/M508-7:F
+Q0 +Q0
SC1
12 14 12 14 12 14 12 14 12 14 12 14 22 24
M117-7:A /
/ M117-6:A
/ M117-7:A
/ M117-5:A
/ M117-2:A
X3:107 X3:109 X1:33
-MCB1 11 -MCB2 11 -MCB3 11 -MCB4 11 -MCBVTL1 11 -MCBVTL2 11 -Q0 -MCBVTL2 21
/M101-4:B /M101-5:B /M102-3:B /M102-6:B /M103-3:C /M103-5:C X3:108 X3:110 X1:34 /M103-5:C
VTB
AL1
AL2
AL3
C AL4 C
C2302 8 9 10 11 C2302 13 14 15 C2308 6
SPRING CHARGED
GAS SF6 ALARM
VT LINE 1 OFF
VT LINE 1 OFF
VT BUS 1 OFF
GAS SF6 TRIP
MCB MK OFF
MCB Q0 OFF
R11+
SC1
-XC 9 10 11 12 13 14 15 -XR 11 13 14 15 16 17
E E
C2201 1 2 3 4 5 6
+CP1 +RP1
S2103 1 2 3 4 5 6 7
SC1
AL16
AL17
AL18
AL19
AL20
AL21
R11+
BI1
BI2
BI3
BI4
BI5
/ +CP1/C109-2:B
/ +CP1/C109-3:B
/ +CP1/C109-3:B
/ +CP1/C109-3:B
/ +CP1/C109-4:B
/ +CP1/C109-4:B
/ +CP1/C109-4:B
/ +RP1/R105-2:B
/ +RP1/R105-2:B
/ +RP1/R105-2:B
/ +RP1/R105-3:B
/ +RP1/R105-4:B
/ +RP1/R105-4:B
F F
M109 M111
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 SIGNALING FROM MARSHALLING KIOSK BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M110
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
INTERLOCK FOR BUSBAR EARTHING SWITCH Q15 E05 INTERLOCK FOR EARTHING SWITCH Q8 E03
B B
-XQ1 28 -XQ7 14
C2303 18 C2311 8
+Q1 +Q7
DISCONNECTOR DISCONNECTOR
C C
55 35
-Q1 -Q7
56 36
D D
C2303 19
C2311 9
-XQ1 30 -XQ7 15
-XQ1 29 31 -XQ7 13 16
E C2310 3 4 E
C2308 1 2
=E05+MK5 =E03+MK3
Q151+
Q151
Q83+
Q83
/ =E05+MK5/M507-6:C
/ =E05+MK5/M507-5:D
/ =E03+MK3/M308-7:C
/ =E03+MK3/M308-7:D
F F
M110 M112
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 INTERLOCK FOR THE OTHERS BAY BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M111
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
C 2 3 2 3 2 3 2 3 7 2 3 2 3 C
D D
Q0 LOCAL MODE
Q52 CLOSE
Q51 CLOSE
Q52 OPEN
Q51 OPEN
Q8 CLOSE
Q9 CLOSE
Q0 CLOSE
Q1 CLOSE
Q8 OPEN
Q9 OPEN
Q0 OPEN
Q1 OPEN
S11+
-XS 1 8 9 10 11 12 13 14 15 16 17 18 19 20
E E
+CP1
S2101 1 2 3 4 5 6 7 8 9 10 11 12 13 14
S11+
CQ8
OQ8
CQ9
OQ9
CQ52
OQ52
CQ0
OQ0
LQ0
CQ51
OQ51
CQ1
OQ1
/ +CP1/C107-1:B
/ +CP1/C107-1:B
/ +CP1/C107-2:B
/ +CP1/C107-2:B
/ +CP1/C107-3:B
/ +CP1/C107-3:B
/ +CP1/C107-3:B
/ +CP1/C107-4:B
/ +CP1/C107-4:B
/ +CP1/C107-5:B
/ +CP1/C107-6:B
/ +CP1/C107-6:B
/ +CP1/C107-6:B
/ +CP1/C107-7:B
F F
M111 M113
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 INDICATOR FOR CONTROL PANEL BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M112
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
C 5 6 5 6 7 8 5 6 5 6 5 6 5 6 7 8 C
D D
Q9 LOCAL MODE
Q1 LOCAL MODE
Q9 MCB OFF
Q1 MCB OFF
Q52 CLOSE
Q51 CLOSE
Q52 OPEN
Q51 OPEN
Q8 CLOSE
Q9 CLOSE
Q0 CLOSE
Q1 CLOSE
Q8 OPEN
Q9 OPEN
Q0 OPEN
Q1 OPEN
COM+
-XSCA 1 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
E E
+CP1
S2104 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
SCOM
SCQ8
SOQ8
SCQ9
SOQ9
SMQ9
SLQ9
SCQ52
SOQ52
SCQ0
SOQ0
SCQ51
SOQ51
SCQ1
SOQ1
SMQ1
SLQ1
/ +CP1/C111-3:B
/ +CP1/C111-3:B
/ +CP1/C111-3:B
/ +CP1/C111-4:B
/ +CP1/C111-4:B
/ +CP1/C111-4:B
/ +CP1/C111-4:B
/ +CP1/C111-5:B
/ +CP1/C111-5:B
/ +CP1/C111-5:B
/ +CP1/C111-6:B
/ +CP1/C111-6:B
/ +CP1/C111-6:B
/ +CP1/C111-7:B
/ +CP1/C111-7:B
/ +CP1/C111-7:B
/ +CP1/C111-8:B
F F
M112 M114
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 INDICATOR FOR SCADA BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M113
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
-XQ7 17 -XQ7 20
S2307 1 S2307 4
+Q7 +Q7
B B
S2307 2 3 S2307 5 6 7 8
C -XQ7 18 19 -XQ7 21 22 23 24 C
D D
Q7 LOCAL MODE
Q7 MCB OFF
Q7 CLOSE
Q7 CLOSE
Q7 OPEN
Q7 OPEN
-XS 21 -XS 22 23 -XSCA 24 25 26 27 28
C2312 4
5 6 C2312 7 8 9 10 11
E E
+CP2
COMQ7
CQ7
OQ7
SCQ7
SOQ7
SMQ7
SLQ7
SCOM
/ =E02+CP2/C205-7:B
/ =E02+CP2/C205-7:B
/ =E02+CP2/C205-7:B
/ =E02+CP2/C209-7:B
/ =E02+CP2/C209-8:B
/ =E02+CP2/C209-8:B
/ =E02+CP2/C209-8:B
/ =E02+CP2/C209-7:B
F F
M113 M115
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 INDICATOR FOR SCADA BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M114
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
-Q9
LINE DISCONNECT SWITCH 23 25 27 29 31 33 35 37 55 57 59 61 63 65 67 69
ABB
1HYD90161-300 24 26 28 30 32 34 36 38 56 58 60 62 64 66 68 70
/M105-2:C /M105-3:C /M105-3:C /M108-5:C /M109-3:C /M109-6:C /M109-8:C /M112-3:B /M112-3:B /M113-2:B /M113-3:B
B B
-Q1
BUSBAR DISCONNECT SWITCH 23 25 27 29 31 33 35 37 55 57 59 61 63 65 67 69
ABB
1HYD90161-300 24 26 28 30 32 34 36 38 56 58 60 62 64 66 68 70
/M105-2:D /M105-3:D /M105-3:D /M108-4:C /M109-2:C /M109-5:C /M111-3:C /M112-8:B /M112-8:B /M113-7:B /M113-7:B
C -Q7 C
BUSBAR DISCONNECT SWITCH 23 25 27 29 31 33 35 37 55 57 59 61 63 65 67 69
ABB
1HYD90161-300 24 26 28 30 32 34 36 38 56 58 60 62 64 66 68 70
/M111-6:C /M109-7:C /M114-3:B /M114-3:B /M114-6:B /M114-6:B
-Q8
D D
LINE EARTHING SWITCH 23 25 27 29 31 33 35 37 55 57 59 61 63 65 67 69
ABB
1HYD90162-162 24 26 28 30 32 34 36 38 56 58 60 62 64 66 68 70
/M107-2:C /M112-2:B /M112-2:B /M113-1:B /M113-2:B
-Q51
E 23 25 27 29 31 33 35 37 55 57 59 61 63 65 67 69 E
EARTHING SWITCH
ABB
1HYD90162-162 24 26 28 30 32 34 36 38 56 58 60 62 64 66 68 70
/M106-4:C /M107-4:C /M112-7:B /M112-7:B /M113-6:B /M113-6:B
-Q52
F EARTHING SWITCH 23 25 27 29 31 33 35 37 55 57 59 61 63 65 67 69 F
ABB
1HYD90162-162 24 26 28 30 32 34 36 38 56 58 60 62 64 66 68 70
/M106-5:C /M107-5:C /M112-4:B /M112-4:B /M113-4:B /M113-4:B
M114 M116
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 REFERENCE FOR DEVICE BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M115
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
/ M105-6:F
/ M105-6:F
/ M105-2:F
/ M105-3:F
/ M105-2:F
/ M105-4:F
/ M105-5:F
/ M105-5:F
/ M105-6:F
/ M105-8:F
/ M105-8:F
/ M105-7:F
/ M105-7:F
/ M105-7:F
A A
C11+
C11-
INL+
CLOSE
INL-
OPEN
TRIP1
TCSC1
TCSO1
T11+
T11-
TRIP2
TCSC2
TCSO2
+Q0
B B
-X1 1 2 13 11 12 3 4 14 15 23 22 26 5 6 27 28 30 29
1 2 1 2 1 2
F14+ / M117-8:B
-F11 1 -F14 3 -F16
CLOSE 2 TRIP 4
LOCAL REMOTE
1 3 5 7 9
-X1 16 -X1 20
C C
21 31
11 31
-X1 17 -X1 21
1
-S3 2
D D
21 11
-K1 -K1
24 22 14 12
01 07 03 81 13 91
E E
-X1 25 24 -X1 32 31
1 1 1 1 1
F F
3 4 3 4 3 4
F14- / M117-8:C
-F11 -F14 -F16
M115 M117
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 REFERENCE FOR Q0 CIRCUIT BREAKER BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M116
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
/ M102-3:D
/ M102-3:D
/ M101-7:D
/ M101-7:D
/ M110-3:C
/ M110-2:C
/ M110-2:C
/ M110-2:C
/ M110-1:B
A A
DC+
DC-
AC+
AC-
AL4
AL3
AL1
AL2
SC1
+Q0
-X1 7 8 9 10
B USED B
USED
1 1 1
-S3 01 07
2
-S1 -S1
02 08
21 21 21 21 21 21 7 11 11 13
Lighting & 11 21
Motor Heating -F11 -F3 -F4 -F5 -F14 -F16 -S3 -S3 -S12 -S12
-F2 -K2 A2 E2
System 22 22 22 22 22 22 8 12 12 14
C 13 12 24 22
-K3 C
A1 E1
3
-S3
4
3 M116-5:F / -F14-
SPRING SPRING -X3 136
-F3 LOCAL REMOTE SF6 PRESSURE SF6 PRESSURE
MCB AUX. CONTACT CHAGED DISCHAGED
4 INDICATION INDICATION ALARM BLOCKING
INDICATION INDICATION
D D
X3:101 X3:105 X3:109 X3:113 X3:117 X3:121 X3:125 X3:129 X3:133 X3:139 X3:143 X3:147
-Q0 NC
X3:102 X3:106 X3:110 X3:114 X3:118 X3:122 X3:126 X3:130 X3:134 X3:140 X3:144 X3:148
CIRCUIT BREAKER /M106-3:C /M107-3:C /M110-6:C /M112-5:B /M113-5:B
ABB - INDIA
CONTROL: 110VDC X3:103 X3:107 X3:111 X3:115 X3:119 X3:123 X3:127 X3:131 X3:137 X3:141 X3:145 X3:149 X1:33 X1:39
MOTOR: 110 VDC NO
E HEATING: 220VAC X3:104 X3:108 X3:112 X3:116 X3:120 X3:124 X3:128 X3:132 X3:138 X3:142 X3:146 X3:150 X1:34 X1:40
E
/M108-3:C /M110-6:C /M112-5:B /M113-5:B /M110-7:C /M112-6:B
F F
M116 =E02+CP2/C200
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E01 REFERENCE FOR Q0 CIRCUIT BREAKER BAY = E01
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK1
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 18 Page M117
Approval VO CONG CHIEN Replacement of Replaced by
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
=E01+CP1 =E03+CP3
SIGNALING CONTROL AUX. DEVICE
POWER SUPPLY POWER SUPPLY POWER SUPPLY
A DC11+ 1 2 DC11+ A
110VDC +
=E01+CP1/C102-8:A/ /=E03+CP3/C301-1:A
-XDC2 -XDC2
DC11- 3 110VDC - 4 DC11-
=E01+CP1/C102-8:A/ /=E03+CP3/C301-1:A
DC12+ 5 110VDC + 6 DC12+
=E01+CP1/C102-8:A/ /=E03+CP3/C301-1:A
DC12- 7 110VDC - 8 DC12-
=E01+CP1/C102-8:B/ /=E03+CP3/C301-1:B
B B
1 3 1 3 1 3
12 14 12 14
-MCB12 -MCB22 -MCB32
2P-10A 11 2P-10A 11 2P-10A
2 4 2 4 2 4
/C207-5:B
/C207-6:B
C C
D D
-XC2 1 4 2 5 3 6
E E
-S12+
-S12-
-C12+
-SCT2+
-SCT2-
-M12+
-M12-
/ C205-1:A
/ C205-1:F
/ C203-1:A
/ C206-2:C
/ C206-3:C
/ C202-6:C
/ C202-6:C
F F
C200 C202
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV BUSCOUPLER E02 DC POWER SUPPLY BAY = E02
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP2
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 11 Page C201
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=E01+CP1
A UA11 1 A
=E01+CP1/C103-1:B/
-XVB
UB11 3
=E01+CP1/C103-1:B/
UC11 5
=E01+CP1/C103-1:B/
UN11 7
=E01+CP1/C103-1:C/
3 4
=E03+CP3
C201-7:E /
C201-7:E /
5 6
7 8
UA11 2
=E03+CP3/C302-1:A/
-XVB
-M12+
-M12-
UB11 4
=E03+CP3/C302-1:A/
UC11 6 -M12
=E03+CP3/C302-1:A/ Diris A41
C Socomec
C
UN11 8 V1 V2 V3 VN A X
=E03+CP3/C302-1:B/
POWER SUPPLY
MULTI
METER
RS485
+MK2
D D
-CTT2
X 1 1 2
-X -XCT2
X 2 3 4
X 3 5 6
X 4 7 8
E E
F F
C201 C203
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV BUSCOUPLER E02 METERING BAY = E02
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP2
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 11 Page C202
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A C12+ A
C201-5:E/
=COM+RTU
1 2
2 6
-SW12
/C210-2:B 1 5
REM/SUP
1
-XSCA2
+RP2 5 7
B B
-Q02
/C210-6:C 6 8
ON-P/OFF-P
C C
X 7
X -XC2
X 8
-XC2 9
D D
Spare Interlock
Jump if no use
-XC2 10
E E
-XC2 11 12
+MK2
F X X X X F
C202 C204
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV BUSCOUPLER E02 CIRCUIT BREAKER CONTROL BAY = E02
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP2
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 11 Page C203
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
CONTROL Q1 FROM PANEL CONTROL Q2 FROM PANEL CONTROL Q7 FROM PANEL RE/SUP FOR SCADA
+MK2 =E01+MK1
/ =E01+MK1/M108-6:B
/ =E01+MK1/M108-7:B
/ =E01+MK1/M108-8:B
A A
X X X X X X X X X X X X
COM7
Q7ON
Q7OFF
B C2312 1 2 3 B
-XC2 13 14 15 16 17 18 19 20 21
C C
1 2
4 8 5 7 1 2
10 14 5 7 1 2
18 20 5 7 1 2
12 16
-SW12 -Q12 -SW12 -Q22 -SW12 -Q72 -SW12
/C210-2:B 3 7 /C210-6:B 6 8 /C210-2:B 9 13 /C210-5:D 6 8 /C210-2:B 17 19 /C210-1:D 6 8 /C210-2:B 11 15
REM/SUP ON-P/OFF-P REM/SUP ON-P/OFF-P REM/SUP ON-P/OFF-P REM/SUP
D D
REMOTE
SUPERVISION
E E
-XSCA2 4 5 6 7 8 9 10 11 12 13 17 18
=COM+RTU
F F
C203 C205
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV BUSCOUPLER E02 DISCONNECTOR SWITCH CONTROL BAY = E02
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP2
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 11 Page C204
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
Q1 INDICATOR Q51 INDICATOR Q0 INDICATOR Q52 INDICATOR Q2 INDICATOR Q7 INDICATOR LAMP DISCREPANCY
TEST SWITCH
A S12+ A
C201-3:E/
-XS2 1 -XS2 2
+MK2 =E01+MK1
C2312 4
/ =E01+MK1/M114-3:E
/ =E01+MK1/M114-3:E
COMQ7
/ =E01+MK1/M114-2:E
-X X
B B
-X X X X X X X X X X X X
CQ7
OQ7
C2312 5 6
-XS2 15 16 17 18 19 20 21 22 23 24 25 26 27
C 23 C
Q0 LOCAL MODE
-LT2
24
Q51 CLOSE
Q52 CLOSE
Q51 OPEN
Q52 OPEN
Q1 CLOSE
Q0 CLOSE
Q2 CLOSE
Q7 CLOSE
Q1 OPEN
Q0 OPEN
Q2 OPEN
Q7 OPEN
3 1 3 1 3 1 3 1
1 3
-Q12 -Q02 -Q22 -Q72 6 8 /C207-5:B
/C210-6:B 4 2 /C210-6:C 4 2 /C210-5:D 4 2 /C210-1:D 4 2 5
D OFF/ON OFF/ON OFF/ON OFF/ON D
14
12 11
24 7
31 29 25 23 19 21 /C209-2:C 15 13 9 7
22
-DB2 -DB2 -DB2 -DB2 -DB2 34 -DB2 -DB2 -DB2 -DB2 -KT2
/C210-1:E 32 /C210-1:E 30 /C210-1:E 26 /C210-1:E 24 /C210-1:E 20 /C210-1:E 16 /C210-1:E 14 /C210-1:E 10 /C210-1:E 8 110VDC 2
32 31
44
42 41
E E
1 2 1 2
x1 28 x1 22 x1 18 A1 x1 12 x1 6
-Q12 -DB2 -Q02 -DB2 -LO2 -DB2 -Q22 -DB2 -Q72 -DB2
/C210-6:B x2 /C210-1:E 27 -Q512 /C210-6:C x2 /C210-1:E 21 110VDC x2 /C210-1:E 17 -KL2 A2 -Q522 /C210-5:D x2 /C210-1:E 11 /C210-1:D x2 /C210-1:E 5
110VDC 110VDC 4 110VDC 110 VDC 110VDC 4 110VDC 110VDC
C204 C206
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV BUSCOUPLER E02 INDICATOR BAY = E02
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP2
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 11 Page C205
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
-XA2 1
+RP2
-X X
B 13 B
-RS2 -X X X X X X X X
14
13
-ACK2 14
13
-LT2 14
/C205-8:C -XA2 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
C C
C201-6:E /
C201-6:E /
RELAY FAILURE
F742-1 ALARM
F742-2 ALARM
F50/51 TRIP
MCB RP OFF
LAMP TEST
-SCT2+
-SCT2-
F862 TRIP
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
RESET
SC2
37 38 33 35 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50
E BELL1 BELL2 -24V +24V DO DO DO DO DO DO DO DO DO DO DO DO DO DO DO E
+ x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2
-HORN2 -L1 -L2 -L3 -L4 -L5 -L6 -L7 -L8 -L9 -L10 -L11 -L12 -L13 -L14 -L15
- x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1
SC242+
F /C207-1:F F
C205 C207
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV BUSCOUPLER E02 ANNUNCIATION FOR PANEL BAY = E02
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP2
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 11 Page C206
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
-XA2 2 3 4
+MK2
-X X
6 5 12 14 12 14
-KT2
B /C205-8:E 8 -MCB12 11 -MCB22 11 B
/C201-3:B /C201-4:B
2P-10A 2P-10A
-X X X X X X
-XA2 20 21 22 23 24 25 26
C C
DISCREPANCY SWITCH
SPRING DISCHARGED
GAS SF6 ALARM
MCB MK OFF
MCB Q0 OFF
MCB CP OFF
SPARE
SPARE
D -SCT2 IN IN IN IN IN IN IN IN IN
D
/C206-1:D 16 17 18 19 20 21 22 23 24
24DI-48DO
16 17 18 19 20 21 22 23 24
E L L L L L L L L L E
x2 x2 x2 x2 x2 x2 x2 x2 x2
-L16 -L17 -L18 -L19 -L20 -L21 -L22 -L23 -L24
x1 x1 x1 x1 x1 x1 x1 x1 x1
SC242+
F C206-8:F/ F
C206 C208
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV BUSCOUPLER E02 ANNUNCIATION FOR PANEL BAY = E02
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP2
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 11 Page C207
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
=COM+RTU
B B
-XSCA2 14 19 20 21 22 23 24 25 26 27 28 29 30 31 32
C C
DISCREPANCY SWITCH
SPRING DISCHARGED
GAS SF6 ALARM
RELAY FAILURE
F742-1 ALARM
F742-2 ALARM
MCB MK OFF
MCB Q0 OFF
MCB RP OFF
MCB CP OFF
F862 TRIP
COMMON
SPARE
SPARE
D -SCT2 COM DO DO DO DO DO DO DO DO DO DO DO DO DO DO
D
/C206-1:D S S3 S4 S5 S6 S7 S16 S17 S18 S19 S20 S21 S22 S23 S24
24DI-48DO
E E
F F
C207 C209
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV BUSCOUPLER E02 ANNUNCIATION FOR SCADA BAY = E02
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP2
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 11 Page C208
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
/ =E01+MK1/M114-5:E
/ =E01+MK1/M114-6:E
/ =E01+MK1/M114-6:E
/ =E01+MK1/M114-7:E
/ =E01+MK1/M114-7:E
A A
SCOM
SCQ1
SOQ1
SMQ1
SLQ1
SCQ51
SOQ51
SCQ0
SOQ0
SCQ52
SOQ52
SCQ2
SOQ2
SMQ2
SLQ2
SCOM
SCQ7
SOQ7
SMQ7
SLQ7
B B
C2312 7 8 9 10 11
22 24
-KL2
C /C205-5:E 21 C
LOCAL MODE OF Q0
Q1 LOCAL MODE
Q2 LOCAL MODE
Q1 LOCAL MODE
Q1 MCB OFF
Q2 MCB OFF
Q7 MCB OFF
Q51 CLOSE
Q52 CLOSE
Q51 OPEN
Q52 OPEN
Q1 CLOSE
Q0 CLOSE
Q2 CLOSE
Q7 CLOSE
Q1 OPEN
Q0 OPEN
Q2 OPEN
Q7 OPEN
COM+
COM+
D D
=COM+RTU
E E
F F
C208 C210
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV BUSCOUPLER E02 ANNUNCIATION FOR SCADA BAY = E02
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP2
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 11 Page C209
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
B B
1 2
2 4 6 8 10 12 14 16 18 20 1 2
x1 1 3 5 7 9 11
-SW12 -Q12
1 3 5 7 9 11 13 15 17 19 x2 2 4 6 8 10 12
SWITCH 2 POS SWITCH DS
/C203-4:A /C204-1:D /C203-5:A /C204-2:D /C204-3:D /C204-8:D /C204-4:D /C204-8:D /C204-5:D /C204-6:D /C205-2:E /C205-2:D /C205-2:D /C204-2:D /C204-3:D
K&N K&N
5NO & 5NC 3NO & 3NC
C C
1 2
x1 1 3 5 7 9 11
-Q02
x2 2 4 6 8 10 12
SWITCH CB
/C205-3:E /C205-4:D /C205-3:D /C203-4:B /C203-5:B
K&N
3NO & 3NC
D x1 1 3 5 7 9 11 D
1 2
1 2
x1 1 3 5 7 9 11 -Q22
-Q72 x2 2 4 6 8 10 12
SWITCH DS
x2 2 4 6 8 10 12 /C205-6:E /C205-6:D /C205-6:D /C204-4:D /C204-5:D
SWITCH DS K&N
/C205-7:E /C205-7:D /C205-7:D /C204-6:D /C204-7:D
K&N 3NO & 3NC
3NO & 3NC
E E
31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1
-DB2
32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2
/C205-2:E /C205-2:E /C205-2:E /C205-3:E /C205-4:E /C205-4:E /C205-4:E /C205-4:E /C205-6:E /C205-6:E /C205-6:E /C205-7:E /C205-7:E /C205-7:E
DIODE BOARD
CONNECTWELL
16D-1A
F F
C209 =E03+COM/CO00
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV BUSCOUPLER E02 REFERENCE FOR DEVICE BAY = E02
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP2
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 11 Page C210
Approval VO CONG CHIEN Replacement of Replaced by
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
=E05+RP5 =COM+TELE
A A
-C4205 -C4202
10 m 22 m
7G1,5 7G1,5
= RP E03 = TELE PANEL
= RP E05 = RP E03
+RP3
B B
D D
-P4101 -I4101 -V4102 -C4102 -S4101 -S4103 -S4104 -P4302 -P4301 -I4201 -I4202 -C4201 -C4204 -V4202
10 m 62 m 62 m 62 m 62 m 62 m 62 m 62 m 62 m 62 m 62 m 62 m 62 m 62 m
2G2,5 4G4,0 4G4,0 12G1,5 19G1,5 12G1,5 19G1,5 2G2,5 2G2,5 4G4,0 4G4,0 7G1,5 12G1,5 4G4,0
E = CP E03 = CP E03 = CP E03 = CP E03 = CP E03 = CP E03 = CP E03 = DC DIST = AC DIST = RP E03 = RP E03 = RP E03 = RP E03 = RP E03 E
= CP E05 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03
+MK3
F F
CO00 CO02
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 CABLE DIAGRAM BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH CABLE DIAGRAM CT - 12102016 Pages 3 Page CO01
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
=E05+MK5 +VTLINE
+Q8 +Q9 +Q52
EARTHING SWITCH DISCONNECTOR EARTHING SWITCH
B B
-P4310 -C4307 -S4302 -P4307 -P4308 -C4304 -S4303 -P4309 -C4306 -S4304 -C4308 -V4301
20 m 20 m 20 m 20 m 20 m 20 m 20 m 20 m 20 m 20 m 25 m 25 m
2G2,5 12G1,5 7G1,5 2G2,5 2G2,5 19G1,5 12G1,5 2G2,5 12G1,5 7G1,5 7G1,5 4G4,0
= ES Q8 E03 = ES Q8 E03 = ES Q8 E03 = DS Q9 E03 = DS Q9 E03 = DS Q9 E03 = DS Q9 E03 = ES Q52 E03 = ES Q52 E03 = ES Q52 E03 = MK E03 = MK E03
= MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E05 = CVT LINE BOX
C C
+MK3
D D
-P4303 -P4304 -C4301 -C4302 -S4301 -P4305 -P4306 -C4303 -S4306 -P4311 -C4305 -S4305 -I4301 -I4302 -I4303 -I4304 -I4305 -I4306
14 m 14 m 14 m 14 m 14 m 16 m 16 m 16 m 16 m 16 m 16 m 16 m 10 m 10 m 13 m 13 m 16 m 16 m
2G2,5 2G2,5 19G1,5 19G1,5 7G1,5 2G2,5 2G2,5 19G1,5 12G1,5 2G2,5 12G1,5 7G1,5 4G4,0 4G4,0 4G4,0 4G4,0 4G4,0 4G4,0
= CB Q0 E03 = CB Q0 E03 = CB Q0 E03 = CB Q0 E03 = CB Q0 E03 = DS Q1 E03 = DS Q1 E03 = DS Q1 E03 = DS Q1 E03 = ES Q51 E03 = ES Q51 E03 = ES Q51 E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03
= MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = MK E03 = CT BOX A = CT BOX A = CT BOX B = CT BOX B = CT BOX C = CT BOX C
F F
CO01 +CP3/C300
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 CABLE DIAGRAM BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH CABLE DIAGRAM CT - 12102016 Pages 3 Page CO02
Approval VO CONG CHIEN Replacement of Replaced by
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
=E02+CP2 =E05+CP5
SIGNALING CONTROL AUX. DEVICE
POWER SUPPLY POWER SUPPLY POWER SUPPLY
B B
1 3 1 3 1 3
12 14 12 14
-MCB13 -MCB23 -MCB33
2P-10A 11 2P-10A 11 2P-10A
2 4 2 4 2 4
/C308-5:B
/C308-6:B
C C
D D
-XC3 1 4 2 5 3 6 -XC3 7 8 9 10 11 12
C4101 1 2
+RP3
E E
-S13+
-S13-
-C13+
-C13-
-M23+
-M23-
-SCT3+
-SCT3-
-TR3+
-TR3-
C13+
C13-
/ C306-1:A
/ C306-1:F
/ +RP3/R305-1:B
/ +RP3/R305-1:B
/ C303-1:A
/ C303-1:E
/ C302-6:C
/ C302-6:C
/ C307-2:C
/ C307-3:C
/ C302-6:E
/ C302-6:E
F F
C300 C302
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 DC POWER SUPPLY BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP3
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 12 Page C301
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=E02+CP2
METERING FOR 110kV TARIFF METERING FOR 110kV MULTI-METER
A UA11 1 2 A
=E02+CP2/C202-1:C/
-XVB3 -XVB3
UB11 3 4
=E02+CP2/C202-1:C/
UC11 5 6
=E02+CP2/C202-1:C/
UN11 7 8
=E02+CP2/C202-1:C/
-PTT3
B 1 2 B
3 4
C301-6:E /
C301-6:E /
5 6
7 8
-M23+
-M23-
-M13 -M33
ELSTER A1700 Diris A41
3x1(3x1,2)A Socomec
C 2 5 8 11 V1 V2 V3 VN A X C
POWER SUPPLY
TARIFF MULTI
METER METER
RS485
-CTT3
D IA13 I4101 1 1 1 2 D
+MK3/M304-1:F/
-XCT3
IB13 2 2 3 4
+MK3/M304-2:F/
IC13 3 3 5 6
+MK3/M304-2:F/
C301-7:E /
C301-7:E /
IN13 4 4 7 8
+MK3/M304-2:F/
-PTL3
-TR3+
-TR3-
1 2
E E
UL31 V4102 1 1 3 4
+MK3/M303-3:E/ 10 12 49
-XVL3 x1 1 13
4-20mA
5 6 -XSCA3
-M23 V 3 15 50
110kV/110V 63.5V
ULN31 2 3 7 8 x2
+MK3/M303-4:E/
-TRAN3
2
-XVL3
F F
4
C301 C303
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 METERING BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP3
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 12 Page C302
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A C13+ A
C301-5:E/
=COM+RTU
1 2
2 6
-SW13
/C311-2:B 1 5
REM/SUP
1
-XSCA3
+RP3 5 7 9
B B
-Q03
/C311-6:C 6 8 22 24 10
ON-P/OFF-P
-KC3
/C303-6:D 21
253 C4101 3 13
+RP3/R305-2:B/ 2
-XC3
7 5 3
-SW23
/C311-2:C 8 6
AUTO/OFF/MAN
C 793 4 14 C
+RP3/R305-3:B/
CL3+ 5 15
+RP3/R310-6:F/
CL3 6 16
+RP3/R310-7:F/
-XC3 17
D A1 D
-KC3
Spare Interlock 110 VDC A2
Jump if no use
-XC3 18
C13-
C301-5:E/
E E
-XC3 19 -XC3 20
14
C4102 1 2
12 11
+MK3
24
21 /C303-5:B
22
CLOSE
OPEN
34
31 /C305-5:B
32
44
42 41
/ +MK3/M305-3:A
/ +MK3/M305-4:A
F F
C302 C304
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 CIRCUIT BREAKER CONTROL BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP3
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 12 Page C303
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
/ +MK3/M307-6:B
/ +MK3/M307-7:B
/ +MK3/M307-8:B
/ +MK3/M306-6:B
/ +MK3/M306-7:B
/ +MK3/M306-8:B
COM9
Q9ON
Q9OFF
COM1
Q1ON
Q1OFF
B B
C4102 3 4 5 6 7 8
-XC3 21 22 23 24 25 26
C C
1 2
4 8 5 7 1 2
10 14 5 7 1 2
12 16
-SW13 -Q93 -SW13 -Q13 -SW13
/C311-2:B 3 7 /C311-6:B 6 8 /C311-2:B 9 13 /C311-5:D 6 8 /C311-2:B 11 15
REM/SUP ON-P/OFF-P REM/SUP ON-P/OFF-P REM/SUP
D D
REMOTE
SUPERVISION
E E
-XSCA3 4 5 6 7 8 9 10 14 15
=COM+RTU
F F
C303 C305
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 DISCONNECTOR SWITCH CONTROL BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP3
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 12 Page C304
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
79 SWITCH AUTO MANUAL
ON/OFF CLOSE CLOSE
32 34
B B
-KC3
/C303-6:D 31
1 2
1 4 2
C -SW33 -SW23 C
/C311-1:D 2 /C311-2:C 3 1
ON/OFF AUTO/OFF/MAN
D D
AUTO RECLOSE ON
MANUAL CLOSE
AUTO CLOSE
R13+
-XC3 27 28 29 30
E C4101 7 8 9 10 E
+RP3
R13+
BI6
BI7
BI8
/ +RP3/R304-5:B
/ +RP3/R304-5:B
/ +RP3/R304-5:B
/ +RP3/R304-6:B
F F
C304 C306
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 INPUT FOR MAIN RELAY BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP3
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 12 Page C305
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
Q8 INDICATOR Q9 INDICATOR Q52 INDICATOR Q0 INDICATOR Q51 INDICATOR Q1 INDICATOR LAMP DISCREPANCY
TEST SWITCH
A S13+ A
C301-3:E/
-XS3 1 -XS3 2
S4101 1
+MK3
S13+
/ +MK3/M311-2:F
/ +MK3/M311-2:F
/ +MK3/M311-3:F
/ +MK3/M311-3:F
/ +MK3/M311-4:F
/ +MK3/M311-4:F
/ +MK3/M311-5:F
/ +MK3/M311-5:F
/ +MK3/M311-6:F
/ +MK3/M311-7:F
/ +MK3/M311-7:F
/ +MK3/M311-8:F
/ +MK3/M311-8:F
/ +MK3/M311-1:F
B B
CQ8
OQ8
CQ9
OQ9
CQ52
OQ52
CQ0
OQ0
LQ0
CQ51
OQ51
CQ1
OQ1
S4101 2 3 4 5 6 7 8 9 10 11 12 13 14
-XS3 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
C 23 C
Q0 LOCAL MODE
-LT3
24
Q52 CLOSE
Q51 CLOSE
Q52 OPEN
Q51 OPEN
Q8 CLOSE
Q9 CLOSE
Q0 CLOSE
Q1 CLOSE
Q8 OPEN
Q9 OPEN
Q0 OPEN
Q1 OPEN
3 1 3 1 3 1
1 3
-Q93 -Q03 -Q13 6 8 /C308-5:B
/C311-6:B 4 2 /C311-6:C 4 2 /C311-5:D 4 2 5
D OFF/ON OFF/ON OFF/ON D
14
12 11
24 7
31 29 25 23 19 21 /C310-2:C 15 13
22
-DB3 -DB3 -DB3 -DB3 -DB3 34 -DB3 -DB3 -KT3
/C311-1:E 32 /C311-1:E 30 /C311-1:E 26 /C311-1:E 24 /C311-1:E 20 /C311-1:E 16 /C311-1:E 14 110VDC 2
32 31
44
42 41
E E
1 2 1 2 1 2
x1 28 x1 22 x1 18 A1 x1 12
-Q93 -DB3 -Q03 -DB3 -LO3 -DB3 -Q13 -DB3
-Q83 /C311-6:B x2 /C311-1:E 27 -Q523 /C311-6:C x2 /C311-1:E 21 110VDC x2 /C311-1:E 17 -KL3 A2 -Q513 /C311-5:D x2 /C311-1:E 11
110VDC 4 110VDC 110VDC 4 110VDC 110 VDC 110VDC 4 110VDC
C305 C307
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 INDICATOR BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP3
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 12 Page C306
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
-XA3 1
S4102 1
+RP3
SC3
/ +RP3/R305-4:B
/ +RP3/R305-4:B
/ +RP3/R305-5:B
/ +RP3/R305-5:B
/ +RP3/R305-6:B
/ +RP3/R305-6:B
/ +RP3/R305-6:B
/ +RP3/R305-7:B
/ +RP3/R307-6:B
/ +RP3/R307-7:B
/ +RP3/R307-7:B
/ +RP3/R310-2:F
/ +RP3/R310-2:F
/ +RP3/R310-3:F
/ +RP3/R310-4:F
/ +RP3/R305-4:B
B 13 B
-RS3 14
AL1
AL2
AL3
AL4
AL5
AL6
AL7
AL8
AL9
AL10
AL11
AL12
AL13
AL14
AL15
13
-ACK3 14
13
S4102 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
-LT3 14
/C306-8:C -XA3 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
C301-7:E /
RELAY FAILURE
F67 50BF TRIP
F743-1 ALARM
F743-2 ALARM
MCB RP OFF
LAMP TEST
-SCT3+
-SCT3-
F863 TRIP
F67 TRIP
RESET
SC3
37 38 33 35 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50
E BELL1 BELL2 -24V +24V DO DO DO DO DO DO DO DO DO DO DO DO DO DO DO E
+ x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2
-HORN3 -L1 -L2 -L3 -L4 -L5 -L6 -L7 -L8 -L9 -L10 -L11 -L12 -L13 -L14 -L15
- x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1
SC243+
F /C308-1:F F
C306 C308
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 ANNUNCIATION FOR PANEL BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP3
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 12 Page C307
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
-XA3 2 3 4
S4103 1
+MK3 12 14 12 14
-MCB13 11 -MCB23 11
SC3
/ +MK3/M309-2:F
/ +MK3/M309-2:F
/ +MK3/M309-2:F
/ +MK3/M309-3:F
/ +MK3/M309-3:F
/ +MK3/M309-5:F
/C301-3:B /C301-4:B
2P-10A 2P-10A
6 5
/ +MK3/M309-1:F
-KT3
B /C306-8:E 8 B
AL16
AL17
AL18
AL19
AL20
AL21
S4103 2 3 4 5 6 7
-XA3 20 21 22 23 24 25 26
C C
DISCREPANCY SWITCH
SPRING DISCHARGED
GAS SF6 ALARM
VT LINE 2 OFF
GAS SF6 TRIP
MCB MK OFF
MCB Q0 OFF
MCB CP OFF
SPARE
D -SCT3 IN IN IN IN IN IN IN IN IN
D
/C307-1:D 16 17 18 19 20 21 22 23 24
24DI-48DO
49 48 47 46 45 44 43 42 41
E DO DO DO DO DO DO DO DO DO E
x2 x2 x2 x2 x2 x2 x2 x2 x2
-L16 -L17 -L18 -L19 -L20 -L21 -L22 -L23 -L24
x1 x1 x1 x1 x1 x1 x1 x1 x1
SC243+
F C307-8:F/ F
C307 C309
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 ANNUNCIATION FOR PANEL BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP3
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 12 Page C308
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
=COM+RTU
B B
-XSCA3 11 16 17 18 19 20 21 22 23 24 25 26 27 28 29
C C
DISCREPANCY SWITCH
SPRING DISCHARGED
GAS SF6 ALARM
RELAY FAILURE
VT LINE 3 OFF
F741-3 ALARM
F742-3 ALARM
MCB MK OFF
MCB Q0 OFF
MCB RP OFF
MCB CP OFF
F863 TRIP
COMMON
SPARE
D -SCT3 COM DO DO DO DO DO DO DO DO DO DO DO DO DO DO
D
/C307-1:D S S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24
24DI-48DO
E E
F F
C308 C310
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 ANNUNCIATION FOR SCADA BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP3
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 12 Page C309
Approval VO CONG CHIEN Replacement of Replaced by
F
E
B
C
A
Revision
C
C309
1
1
-XSCA3
=COM+RTU
12
Date
Drawn
Checked
Approval
30
DO VINH
12/10/2016
+MK3
VO CONG CHIEN
LUONG NGOC THACH
/C306-5:E
-KL3
2
2
22
LOCAL MODE OF Q0
21
31
24
-XSCA3
COM+ SCOM
Replacement of
/ +MK3/M312-1:F
S4104 1
13
Q8 CLOSE SCQ8
/ +MK3/M312-1:F
2
32
3
3
Q8 OPEN SOQ8
33
Replaced by
Electrical Testing Company
Q9 CLOSE SCQ9
/ +MK3/M312-2:F
4
34
Q9 OPEN SOQ9
/ +MK3/M312-3:F
5
35
4
4
Q9 MCB OFF SMQ9
/ +MK3/M312-3:F
6
36
37
SCQ52
ANNUNCIATION FOR SCADA
Q52 CLOSE
/ +MK3/M312-4:F
8
38
5
5
Q52 OPEN SOQ52
/ +MK3/M312-4:F
9
39
Q0 CLOSE SCQ0
/ +MK3/M312-5:F
10
40
CONTROL PANEL
Q0 OPEN SOQ0
/ +MK3/M312-5:F
11
6
6
42
43
Q1 CLOSE SCQ1
/ +MK3/M312-7:F
14
44
CT - 12102016
SOQ1
7
7
Q1 OPEN
ANNUNCIATION FOR SCADA
/ +MK3/M312-7:F
15
45
Pages
46
12
47
BAY
Page
PANEL
8
8
= E03
+ CP3
C310
C311
F
E
B
C
A
D
1 2 3 4 5 6 7 8
A A
B B
1 2
2 4 6 8 10 12 14 16 17 19 1 2
x1 1 3 5 7 9 11
-SW13 -Q93
1 3 5 7 9 11 13 15 18 20 x2 2 4 6 8 10 12
SWITCH 2 POS SWITCH DS
/C303-4:A /C304-2:D /C303-5:A /C304-2:D /C304-4:D /C304-7:D /C304-4:D /C304-7:D /C306-2:E /C306-3:D /C306-2:D /C304-3:D /C304-3:D
K&N K&N
5NO & 5NC 3NO & 3NC
C C
1 2 3
2 4 5 7 1 2
x1 1 3 5 7 9 11
-SW23 -Q03
1 3 6 8 x2 2 4 6 8 10 12
SWITCH 3 POS SWITCH CB
/C305-6:C /C305-5:C /C303-4:C /C303-4:C /C306-4:E /C306-4:D /C306-4:D /C303-4:B /C303-5:B /C303-6:B
K&N K&N
2NO & 2NC 3NO & 3NC
D 1 3 x1 1 3 5 7 9 11 D
1 2 1 2
-SW33 -Q13
2 4 x2 2 4 6 8 10 12
SWITCH 2 POS SWITCH DS
/C305-4:C /C306-6:E /C306-7:D /C306-6:D /C304-5:D /C304-5:D
K&N K&N
1NO & 1NC 3NO & 3NC
E E
31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1
-DB3
32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2
/C306-2:E /C306-3:E /C306-2:E /C306-4:E /C306-4:E /C306-4:E /C306-5:E /C306-5:E /C306-6:E /C306-7:E /C306-7:E
DIODE BOARD
CONNECTWELL
16D-1A
F F
C310 +RP3/R300
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 REFERENCE FOR DEVICE BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP3
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 12 Page C311
Approval VO CONG CHIEN Replacement of Replaced by
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
=E01+RP1 =E05+RP5
MAIN RELAY INPUT MAIN RELAY BACKUP RELAY INPUT BACKUP RELAY TRIP 2
POWER SUPPLY POWER SUPPLY POWER SUPPLY POWER SUPPLY POWER SUPPLY
B B
1 3 1 3 1 3
12 14 12 14 12 14
-MCB13 -MCB23 -MCB33
2P-10A 11 2P-10A 11 2P-10A 11
2 4 2 4 2 4
/R310-4:B
/R310-4:B
/R310-4:B
C C
D D
E E
F213+
F213-
R13+
R13-
F673+
F673-
R23+
R23-
T13+
T13-
/ R302-3:C
/ R302-3:C
/ R304-1:A
/ R304-1:F
/ R303-3:C
/ R303-3:C
/ R306-1:A
/ R307-1:F
/ R307-1:A
/ R309-5:D
F F
R300 R302
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 DC POWER SUPPLY BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP3
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 14 Page R301
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=E01+RP1
A UA12 1 UA22 A
=E01+RP1/R104-8:A/ /R303-2:A
-XVB3
UB12 3 UB22
=E01+RP1/R104-8:A/ /R303-2:A
UC12 5 UC22
=E01+RP1/R104-8:A/ /R303-2:A
UN12 7 UN22
=E01+RP1/R104-8:B/ /R303-2:B
B B
-TB213 -F213
/R312-1:A VA
/R311-2:B 1 2 VC1-1 VC1-2
VB
3 4 VC1-3 VC1-4
VC
5 6 VC1-5 VC1-6
7 8
C C
+
F213+ 13 14 T4-29
R301-2:E/
-
+MK3 F213- 15 16 T4-31
R301-3:E/ U
VS
UL32 V4202 1 1 9 10 VC1-7 VC1-8
+MK3/M303-5:E/
-XVL3
ULN32 2 2 11 12
+MK3/M303-6:E/
D D
IA
IA23 I4201 1 1 21 22 VC1-11 VC1-12
+MK3/M304-3:F/
-XCT213 IB
IB23 2 2 23 24 VC1-13 VC1-14
+MK3/M304-4:F/
IC
IC23 3 3 25 26 VC1-15 VC1-16
+MK3/M304-4:F/
IE
IN23 4 4 27 28 VC1-18 VC1-17
E +MK3/M304-4:F/ E
F F
R301 R303
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 ANALOGUE INPUT FOR MAIN RELAY BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP3
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 14 Page R302
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A UA22 A
R302-7:A/
UB22
R302-7:A/
UC22
R302-7:A/
UN22
R302-7:B/
B B
-TB673 -F673
/R313-1:A VA
/R311-2:C 1 2 VC1-1 VC1-2
VB
3 4 VC1-3 VC1-4
VC
5 6 VC1-5 VC1-6
7 8
C C
+
F673+ 13 14 T4-29
R301-4:E/
-
F673- 15 16 T4-31
R301-4:E/ U
+MK3
D IA D
IA33 I4202 1 1 21 22 VC1-17 VC1-18
+MK3/M304-5:F/
-XCT673 IB
IB33 2 2 23 24 VC1-19 VC1-20
+MK3/M304-6:F/
IC
IC33 3 3 25 26 VC1-21 VC1-22
+MK3/M304-6:F/
IE1
VC1-24 VC1-23
IE2
VC1-25 VC1-26
IN33 4 4 27 28
E +MK3/M304-6:F/ E
F F
R302 R304
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 ANALOGUE INPUT FOR BACKUP RELAY BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP3
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 14 Page R303
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
R13+ R13+
A R301-3:E/ /R307-1:B A
R13+
R13+
-XX x
/ +MK3/M309-5:F
/ +CP3/C305-3:F
/ +MK3/M309-6:F
/ +MK3/M309-6:F
/ +MK3/M309-7:F
/ +MK3/M309-7:F
/ +MK3/M309-8:F
/ +CP3/C305-4:F
/ +CP3/C305-5:F
/ +CP3/C305-6:F
B B
-XX x
BI1
BI2
BI3
BI4
BI5
BI6
BI7
BI8
C4201 2 3 4 5 6 C4101 8 9 10 C4202 2
C C
-XI3 4 5 6 7 8 9 10 11 12 13
673
/R307-1:B
D D
CIRCUIT BREAKER OFF
CIRCUIT BREAKER ON
AUTO RECLOSE ON
SPRING CHARGED
TELE RECEIVED
MANUAL CLOSE
VT LINE 2 OFF
VT BUS 2 OFF
F67/67N TRIP
AUTO CLOSE
SPARE
-F213
/R312-1:A
E T1-1 T1-3 T1-5 T1-7 T1-9 T1-11 T1-13 T1-15 T1-17 T1-21 T1-23
E
BI1 BI2 BI3 BI4 BI5 BI6 BI7 BI8 BI9 BI10 BI11
T1-2 T1-4 T1-6 T1-8 T1-10 T1-12 T1-14 T1-16 T1-18 T1-22 T1-24
R13-
F R301-3:E/ F
R303 R305
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 DIGITAL INPUT OF MAIN RELAY BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP3
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 14 Page R304
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
/ +CP3/C301-5:E
/ +CP3/C301-5:E
/ +CP3/C303-1:B
/ +CP3/C303-1:C
/ +CP3/C307-3:B
/ +CP3/C307-3:B
/ +CP3/C307-3:B
/ +CP3/C307-4:B
/ +CP3/C307-4:B
/ +CP3/C307-4:B
/ +CP3/C307-5:B
/ +CP3/C307-5:B
/ +CP3/C307-5:B
C13+
C13-
253
793
SC3
AL1
AL2
AL3
AL4
AL5
AL6
AL7
AL8
B B
C4101 1 2 3 4 S4102 1 2 3 4 5 6 7 8 9
-XC3 1 3 5 6 -XA3 1 3 4 5 6 7 8 9 10
-XC3 2 4 -XA3 2
C C
C13- SC3
/R309-1:D /R307-1:A
C13+ WD3
/R306-1:A /R307-8:D
RELAY FAILURE
253
793
-F213
/R312-1:A
E E
T2-9 T2-11 T2-13 T2-15 T2-17 T2-21 T2-23 T2-25 T2-27 T2-29 T4-1
BO5 BO6 BO7 BO8 BO9 BO10 BO11 BO12 BO13 BO14 FAIL1
T2-10 T2-12 T2-14 T2-16 T2-18 T2-22 T2-24 T2-26 T2-28 T2-30 T4-2
F F
R304 R306
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 DIGITAL OUTPUT OF MAIN RELAY BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP3
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 14 Page R305
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
C13+ C13+
A R305-3:D/ /R309-1:A A
R23+ R23+
R301-5:E/ /R307-1:B
=COM+TELE
B B
-XX x x
C4202 3 4
/ R308-1:A
/ R307-1:B
/ R309-1:A
-XT3 27 28
C C
TR863
SBF3
TC13
D D
-F213
/R312-1:A
E E
F F
R305 R307
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 DIGITAL OUTPUT OF MAIN RELAY BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP3
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 14 Page R306
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
START 50BF FOR START 79 FROM TRIP COIL 2 FROM TRIP 50BF FROM ANUNCIATION FROM BACKUP RELAY
BACKUP RELAY BACKUP RELAY BACKUP RELAY BACKUP RELAY
SC3 SC3
A R305-8:C/ /R310-1:A A
T13+ T13+
R301-6:E/ /R309-5:A
R23+ R23+
R306-8:A/ /R308-1:A
+CP3
673
R304-8:D/
/ +CP3/C307-6:B
/ +CP3/C307-6:B
/ +CP3/C307-6:B
B R13+ B
R304-8:A/
SBF3
R306-4:C/
AL9
AL10
AL11
/ R309-5:A
/ R308-1:D
S4102 10 11 12
-XA3 11 12 13
C C
TC23
BF3
11
-TB673
/R311-2:C 12
WD3
/R305-8:D
D D
BREAKER FAILURE 3
RELAY FAILURE
F67 50BF TRIP
TRIP COIL 2-3
67/67N TRIP
START BF3
F67 TRIP
SPARE
-F673
/R313-1:A
E T3-1 T3-3
E
T3-2 T3-4
F F
R23- R23-
R301-5:E/ /R308-1:F
R306 R308
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 DIGITAL INPUT & OUTPUT OF BACKUP BAY = E03
Drawn DO VINH RELAY
110kV CHAU THANH SUBSTATION
PANEL + RP3
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 14 Page R307
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
TRIP FROM 50BF INTERNAL 50BF TRIP 50BF TRIP RESET RESET
MAIN RELAY TRIP FROM E01 FROM E05 REMOTE LOCKOUT
R23+
A R307-8:B/ =E01+RP1 A
TR863 BF31+
R306-3:C/ /=E01+RP1/R109-4:B
-XT3 11 12 13 14 15 -XT3 21
C4205 1
=E01+RP1 =E05+RP5 22 24
-KBF3
BF13+
BF43+
/R308-2:E 21
=E01+RP1/R109-8:B /
=E05+RP5/R509-8:B /
BF31
20 12 14 13 /=E01+RP1/R109-3:B
/ =E01+RP1/R109-8:A
/ =E05+RP5/R509-8:A
B 22 B
-TB213 -KBF3
/R311-2:B 19 /R308-2:E 11 -RE3 14
=E05+RP5
C4205 3 BF34+
BF13
BF43
/=E05+RP5/R508-4:B
-XT3 23
2
32 34
-KBF3
C /R308-2:E 31 C
-XT3 16 17 18 19 20
4 BF34
/=E05+RP5/R508-4:B
24
BF3
R307-5:C/
-XT3 25
D D
42 44
-KBF3
20 /R308-2:E 41
-TB673
/R311-2:C 19
26
E E
A1 b d
-KBF3 -F863
110 VDC A2 /R311-2:D a /R311-2:D c
Trip Coil Reset Coil
R23-
R307-8:F/
14
11 /R308-2:B
12
F 24 F
21 /R308-7:B
22
34
31 /R308-7:C
32
44
41 /R308-7:D
42
R307 R309
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 BREAKER FAILURE & TRIP LOCKOUT BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP3
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 14 Page R308
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
TRIP FROM TRIP FROM TRIP CIRCUIT SUPERVISION 1 TRIP FROM TRIP FROM TRIP CIRCUIT SUPERVISION 2
MAIN RELAY RELAY F863 BACKUP RELAY RELAY F863
C13+ T13+
A R306-8:A/ R307-8:A/ A
TC13 TC23
R306-5:C/ R307-4:C/
B B
-F743-1 -F743-2
18 80 81 110VDC 1 4 13 9 14 10 18 70 71 110VDC 1 4 13 9 14 10
-TB213 -F863 -TB673 -F863
/R311-2:B 17 /R311-2:D 8 12 8 2 5 6 /R311-2:C 17 /R311-2:D 7 12 8 2 5 6
/R310-2:B
/R310-6:B
/R310-3:B
/R310-6:B
C C
C13- T13-
R305-3:C/ R301-6:E/
D D
TRIPPING COIL 1
TRIPPING COIL 2
TCS1 CLOSE
TCS2 CLOSE
TCS1 OPEN
TCS2 OPEN
C13+
T13+
C13-
T13-
E E
-XT3 1 2 3 4 5 -XT3 6 7 8 9 10
C4204 1 2 3 4 5 C4204 6 7 8 9 10
+MK3
TRIP1
TCSC1
TCSO1
C13-
C13+
TRIP2
TCSC2
TCSO2
T13-
T13+
/ +MK3/M305-5:A
/ +MK3/M305-5:A
/ +MK3/M305-6:A
/ +MK3/M305-6:A
/ +MK3/M305-6:A
/ +MK3/M305-7:A
/ +MK3/M305-7:A
/ +MK3/M305-7:A
/ +MK3/M305-8:A
/ +MK3/M305-8:A
F F
R308 R310
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 TRIP CIRCUIT SUPERVISION BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP3
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 14 Page R309
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
SC3
A R307-8:A/ A
14 10
-F743-1
/R309-3:B 6
B B
40 41 13 9 13 9 12 14 12 14 12 14 14 10
-F863 -F743-1 -F743-2 -F743-2
/R311-2:D 4 /R309-3:B 5 /R309-7:B 5 -MCB13 11 -MCB23 11 -MCB33 11 /R309-7:B 6
/R301-2:B /R301-4:B /R301-6:B
C 10 11 C
-F863
/R311-2:D 1
D D
F743-1 ALARM
F743-2 ALARM
MCB RP OFF
F863 TRIP
CL3+
CL3
-XA3 14 15 16 17 -XC3 7 8
E E
+CP3
S4102 13 14 15 16 C4101 5 6
AL12
AL13
AL14
AL15
CL3+
CL3
/ +CP3/C307-7:B
/ +CP3/C307-7:B
/ +CP3/C307-7:B
/ +CP3/C307-8:B
/ +CP3/C303-1:C
/ +CP3/C303-1:D
F F
R309 R311
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 SIGNALING & INTERLOCK BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP3
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 14 Page R310
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
1 3 5 7 9 11 13 15 18 20 21 23 25 27
-TB213
2 4 6 8 10 12 14 16 17 19 22 24 26 28
B TEST BLOCK B
/R302-4:B /R302-4:B /R302-4:C /R302-4:C /R302-4:D /R302-4:D /R302-4:C /R302-4:C /R309-2:B /R308-2:B /R302-4:D /R302-4:E /R302-4:E /R302-4:E
ALSTOM
28 PINS
1 3 5 7 9 11 13 15 18 20 21 23 25 27
C -TB673 C
2 4 6 8 10 12 14 16 17 19 22 24 26 28
TEST BLOCK
/R303-4:B /R303-4:B /R303-4:C /R303-4:C /R307-2:C /R303-4:C /R303-4:C /R309-6:B /R308-2:D /R303-4:D /R303-4:D /R303-4:D /R303-4:E
ALSTOM
28 PINS
10 11 20 21 30 31 40 41 50 51 60 61 70 71 80 81 b d
D -F863 D
1 2 3 4 5 6 7 8 a c
LOCKOUT RELAY /R310-6:C /R310-2:B /R309-6:B /R309-2:B /R308-5:E /R308-6:E
ARTECHE
8 NO/NC
TWO COILS
E E
F F
R310 R312
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 REFERENCE FOR DEVICE BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP3
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 14 Page R311
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
DEVICE ANALOGUE INPUT BINARY INPUT 01 BINARY OUTPUT 02 BINARY INPUT & OUTPUT 03
+
A CIRCUIT A
/R304-2:E BO1 /R306-3:E
BREAKER TRIP 86
-F213 /R302-6:B VA ON
BI1
-
T1-2
T2-1 T2-2
BI1
-
T3-2
T1-3 T3-3
Toshiba
+
VC1-2 CIRCUIT START
GRZ200-11-237-00-13-10-110 BREAKER BI2 /R304-2:E BREAKER
BO2 /R306-4:E BI2
T1-4 T3-4
OFF - FAILURE T2-3 T2-4 -
T1-5 T3-5
VC1-3
+
SPRING BI3 /R304-3:E TRIP BO3 /R306-5:E BI3
VB CHARGED T1-6 COIL 1 T3-6
/R302-6:B -
T2-5 T2-6 -
FAIL1
T1-7 T3-7
+
T4-3 VC1-4 VT LINE 1 BI4 /R304-4:E F21 BO4 /R306-6:E BI4
B OFF T1-8 TELE SEND T3-8 B
/R305-7:E T2-7 T2-8
- -
T4-1 T4-2 T1-9 T3-9
VC1-5
+
CLOSING
VT BUS 1 /R304-4:E BO5 /R305-2:E
BI5 WITH BI5
VC OFF T1-10 T3-10
/R302-6:C - SYN. CHECK T2-9 T2-10 -
T1-11 T3-11
+
FAIL2 VC1-6 AUTO AUTO
/R304-5:E BO6 /R305-3:E
RECLOSE BI6 RECLOSE BI6
T4-9 T1-12 T3-12
ON - OPERATED T2-11 T2-12 -
T1-13 T3-13
VC1-7
+
F21 ZONE 1
AUTO /R304-5:E BO7 /R305-4:E
T4-7 T4-8 BI7 TRIP BI7
VS CLOSE T1-14 T3-14
/R302-6:D (ALARM) T2-13 T2-14
C - - C
T1-15
+
VC1-8 F21 ZONE 2
MANUAL /R304-6:E BO8 /R305-4:E BO1
BI8 TRIP
CLOSE T1-16
- (ALARM) T2-15 T2-16 T3-15 T3-16
T1-17
VC1-9
+
AC OR DC F21 ZONE 3
AUX. SUPPLY F67/67N /R304-6:E BO9 /R305-5:E BO2
+ BI9 TRIP
T4-29 VS2 TRIP T1-18
(ALARM) T2-17 T2-18 T3-17 T3-18
/R302-6:C -
- T1-21
+
T4-31 VC1-10 F21 ZONE 4
U TELE /R304-7:E BO10 /R305-5:E BO3
BI10 TRIP
RECEIVED T1-22
- (ALARM) T2-21 T2-22 T3-21 T3-22
VC1-11 T1-23
D D
+
F21
SPARE /R304-8:E BO11 /R305-6:E BO4
/R302-6:D IA BI11
T1-24
67/50/51 TRIP
- (ALARM) T2-23 T2-24 T3-23 T3-24
T1-25
VC1-12
+
+
F21
BO12 /R305-6:E BO5
BI12 25/79 CLOSE
T1-26
VC1-13 - (ALARM) T2-25 T2-26 T3-25 T3-26
T1-27
+
/R302-6:E IB F21
BO13 /R305-6:E BO6
BI13 SWITCH-ON
T1-28
TO FAULT T2-27 T2-28 T3-27 T3-28
VC1-14 -
T1-29
+
F21
VC1-15 BO14 /R305-7:E BO7
E BI14 TELE PROTECTION E
T1-30
- (ALARM) T2-29 T2-30 T3-29 T3-30
/R302-6:E IC T1-31
+
BI 16 BO16 BO9
IE T1-34
/R302-6:E -
T2-33 T2-34 T3-33 T3-34
T1-35 BO10 T3-36
+
VC1-18 BO17
BI 17
T1-36
F VC1-27 -
T2-35 T2-36 F
T3-38 T3-37
T1-37
+
IEm BO18
BI 18
T1-38
T2-37 T2-38
VC1-28 -
R311 R313
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 REFERENCE FOR MAIN RELAY BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP3
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 14 Page R312
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
DEVICE ANALOGUE INPUT BINARY INPUT & OUTPUT 01 BINARY INPUT & OUTPUT 01
+
A START A
/R307-2:E TRIP BO1 /R307-4:E
BREAKER
-F673 /R303-6:B VA FAILURE
BI1
-
T3-2 COIL 2 T3-21 T3-22
T3-3
Toshiba
+
VC1-2 BREAKER
GRD200-41-213-00-13-10-110 SPARE BI2 /R307-3:E BO2 /R307-5:E
T3-4 FAILURE
-
T3-23 T3-24
T3-5
VC1-3
+
BI3
67/67N BO3 /R307-4:E
VB T3-6 TRIP
/R303-6:B -
T3-25 T3-26
FAIL1
T3-7
+
T4-3 VC1-4 F67
BO4 /R307-6:E
B
BI4 TRIP B
/R307-7:E T3-8
- (ALARM) T3-27 T3-28
T4-1 T4-2 T3-9
VC1-5
+
BI5 BO5
VC T3-10
/R303-6:C -
T3-29 T3-30
T3-11
+
FAIL2 VC1-6 F67
BO6 /R307-7:E
BI6 50BF TRIP
T4-9 T3-12
- (ALARM) T3-31 T3-32
T3-13
VC1-7
+
BI7 BO7
T4-7 T4-8
VE T3-14
T3-33 T3-34
C - C
T3-15 BO8 T3-36
+
VC1-8
BI8
T3-16
-
T3-38 T3-37
AC OR DC VC1-9
AUX. SUPPLY
+
T4-29
/R303-6:C
VS
-
U T4-31 VC1-10
VC1-17
D D
/R303-6:D IA
VC1-18
VC1-19
/R303-6:D IB
VC1-20
E VC1-21 E
/R303-6:D IC
VC1-22
VC1-23
/R303-6:E IE1
VC1-24
F VC1-25 F
/R303-6:E IE2
VC1-26
R312 +MK3/M300
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 REFERENCE FOR BACKUP RELAY BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP3
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 14 Page R313
Approval VO CONG CHIEN Replacement of Replaced by
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
=COM+AC
HEATING & LIGHTING HEATING & LIGHTING FOR DEVICE
A ACM3+ P4301 1 1 A
220VAC-L
=COM+AC/AC11-6:F/
-XAC
ACM3- 2 2 220VAC-N
=COM+AC/AC11-6:F/
B B
1 3 1 3
12 14 12 14
-MCB1 -MCB2
2P-10A 11 2P-10A 11
2 4 2 4
/M309-3:C
/M309-4:C
C C
-XAC 3 10 4 11 5 12 6 13 7 14 8 15 9 16
1 1 HT FAN
D -DS1 -DS2 TS D
P4310 1 2 P4307 1 2 P4309 1 2 P4303 1 2 P4311 1 2 P4305 1 2
2 2 0 °C~50 °C COM
AC+
AC-
-TB 401 403 -TB 401 403 -TB 401 403 -TB 401 403 -TB 401 403
M315-2:A /
M315-2:A /
-SOCKET
E 1 E
x1 x1
x1
PE SPARE
-LIGHT2 -LIGHT1 -HEATER +Q8 +Q9 +Q52 +Q0 +Q51 +Q1
220VAC 220VAC EARTHING SWITCH DISCONNECTOR EARTHING SWITCH CIRCUIT BREAKER EARTHING SWITCH DISCONNECTOR
x2 2
x2 x2
F F
M300 M302
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 AC POWER SUPPLY BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M301
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=COM+DC
POWER SUPPLY TO POWER SUPPLY TO
MOTOR DEVICE 1 MOTOR DEVICE 2
A DCM3+ P4302 1 1 A
110VDC +
=COM+DC/DC06-4:F/
-XDC
DCM3- 2 2 110VDC -
=COM+DC/DC06-4:F/
B B
1 3 1 3
12 14 12 14
-MCB3 -MCB4
2P-10A 11 2P-10A 11
2 4 2 4
/M309-4:C
/M309-4:C
C C
-XDC 3 5 4 6 -XDC 7 9 8 10
D D
P4304 1 2 P4308 1 2 P4306 1 2
M2+
M2-
DC+
DC-
M315-1:A /
/ M308-1:A
/ M308-1:F
-TB 439 420 -TB 439 420
E E
-TB 441 442 -TB 441 442
F F
M301 M303
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 DC POWER SUPPLY BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M302
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
VT LINE CIRCUIT
+VTLINE
A A
-TB a1 n1 a2 n2
B B
V4301 1 2 V4301 3 4
-XVT 1 2 -XVT 5 6
C C
1 3 1 3
12 14 A1 12 14 22 24
-MCBVTL1 -SUV -MCBVTL2
2P-2A 11 63.5VAC A2 2P-2A 11 21
2 4 2 4
/M309-5:C
/M309-5:C
/M309-7:C
14
12 11
D D
24 21 /M308-7:D
22
34
32 31
44
42 41
-XVT 3 4 -XVT 7 8
+CP3 +RP3
V4102 1 2 V4202 1 2
E E
UL31
ULN31
UL32
ULN32
+CP3/C302-1:E /
+CP3/C302-1:F /
+RP3/R302-1:D /
F +RP3/R302-1:D / F
M302 M304
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 VT LINE CIRCUIT BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M303
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+CTB_A +CTB_B +CTB_C +CTB_A +CTB_B +CTB_C +CTB_A +CTB_B +CTB_C +CTB_A +CTB_B +CTB_C
B B
1S1
1S2
1S1
1S2
1S1
1S2
2S1
2S2
2S1
2S2
2S1
2S2
3S1
3S2
3S1
3S2
3S1
3S2
4S1
4S2
4S1
4S2
4S1
4S2
-TB -TB -TB -TB -TB -TB -TB -TB -TB -TB -TB -TB
I4301 1 2 I4303 1 2 I4305 1 2 I4301 3 4 I4303 3 4 I4305 3 4 I4302 1 2 I4304 1 2 I4306 1 2 I4302 3 4 I4304 3 4 I4306 3 4
C C
-XCT 1 4 2 5 3 6 -XCT 7 10 8 11 9 12 -XCT 13 16 14 17 15 18 -XCT 19 22 20 23 21 24
D D
+CP3 +RP3
IB13
IC13
IN13
IA23
IB23
IN23
IC23
IA33
IB33
IN33
IC33
+CP3/C302-1:D /
+CP3/C302-1:D /
+CP3/C302-1:D /
+CP3/C302-1:E /
+RP3/R302-1:D /
+RP3/R302-1:E /
+RP3/R302-1:E /
+RP3/R302-1:E /
+RP3/R303-1:D /
+RP3/R303-1:D /
+RP3/R303-1:E /
+RP3/R303-1:D /
F F
M303 M305
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 CT CIRCUIT BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M304
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
/ +CP3/C303-4:F
/ +CP3/C303-5:F
/ +RP3/R309-2:F
/ +RP3/R309-3:F
/ +RP3/R309-3:F
/ +RP3/R309-4:F
/ +RP3/R309-4:F
/ +RP3/R309-6:F
/ +RP3/R309-7:F
/ +RP3/R309-7:F
/ +RP3/R309-8:F
/ +RP3/R309-8:F
A A
CLOSE
OPEN
TRIP1
TCSC1
TCSO1
C13-
C13+
TRIP2
TCSC2
TCSO2
T13-
T13+
C4102 1 2 C4204 1 2 3 4 5 6 7 8 9 10
B -XC 1 2 B
C4304 6 8 9
+Q9 23 25 27
DISCONNECTOR
-Q9
24 26 28
C C
C4304 7 10 11
C4303 6 8 9
D +Q1 23 25 27 D
DISCONNECTOR
-Q1
24 26 28
TRIPPING COIL 1
TRIPPING COIL 2
TCS 1 CLOSE
TCS 2 CLOSE
TCS 1 OPEN
TCS 2 OPEN
C4303 7 10 11
C13+
T13+
-XQ1 7 -XQ1 10 -XQ1 11
C13-
T13-
E E
-XQ0 1 -XQ0 2 -XQ0 3 -XQ0 4 -XQ0 5 6 7 8 9 10 11 12 13 14
C4301 1 2 3 4 5 6 7 8 9 10 11 12 13 14
+Q0
INL+
INL-
CLOSE
OPEN
TRIP1
TCSC1
TCSO1
C13-
C13+
TRIP2
TCSC2
TCSO2
T13-
T13+
CIRCUIT BREAKER
M314-2:A /
M314-3:A /
M314-2:A /
M314-4:A /
M314-4:A /
M314-5:A /
M314-5:A /
M314-1:A /
M314-1:A /
M314-7:A /
M314-7:A /
M314-8:A /
M314-6:A /
M314-6:A /
F F
M304 M306
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 CIRCUIT BREAKER INTERLOCKING BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M305
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+CP3
A Q15 BAY E04 A
/ +CP3/C304-4:B
/ +CP3/C304-5:B
/ +CP3/C304-5:B
FULLY OPENED
COM1
Q1ON
Q1OFF
B C4102 6 7 8 B
C C
=E05+MK5/M509-2:F /
/ =E05+MK5/M509-3:F
X3:101 23 23
-Q0 -Q51 -Q52
X3:102 24 24
Q13
D D
E E
C4303 1 2 3 4 5
+Q1
DISCONNECTOR
F F
M305 M307
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 Q1 DISCONNECT SWITCH INTERLOCKING BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M306
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+CP3
A A
/ +CP3/C304-2:B
/ +CP3/C304-3:B
/ +CP3/C304-3:B
COM9
Q9ON
Q9OFF
B C4102 3 4 5 B
C C
27 X3:105 27 27
-Q8 -Q0 -Q51 -Q52
28 X3:106 28 28
D D
E E
C4304 1 2 3 4 5
+Q9
DISCONNECTOR
F F
M306 M308
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 Q9 DISCONNECT SWITCH INTERLOCKING BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M307
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
-Q83+
+Q1 +Q9 +Q1 +Q9 +Q9
DISCONNECTOR DISCONNECTOR DISCONNECTOR DISCONNECTOR DISCONNECTOR
=E01+MK1/M111-6:F /
C 31 31 35 35 55 C
-Q1 -Q9 -Q1 -Q9 -Q9
/ =E01+MK1/M111-6:F
32 32 36 36 56
22 24
-SUV 21
/M303-5:C
-Q83
D D
-XQ8 1
E E
+Q51 +Q52 +Q8
EARTHING SWITCH EARTHING SWITCH EARTHING SWITCH
2 2 2
M307 M309
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 EARTHING SWITCH INTERLOCKING BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M308
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
C4308 5
-XQ0 20 -XQ0 26
=E05+MK5
VTB1+
B C4302 5 C4302 10 B
=E05+MK5/M508-7:F /
/ =E05+MK5/M508-8:F
+Q0 +Q0
SC3
12 14 12 14 12 14 12 14 12 14 12 14 22 24
M315-7:A /
/ M315-6:A
/ M315-7:A
/ M315-5:A
/ M315-2:A
X3:107 X3:109 X1:33
-MCB1 11 -MCB2 11 -MCB3 11 -MCB4 11 -MCBVTL1 11 -MCBVTL2 11 -Q0 -MCBVTL2 21
/M301-4:B /M301-5:B /M302-3:B /M302-6:B /M303-3:C /M303-5:C X3:108 X3:110 X1:34 /M303-5:C
VTB1
AL1
AL2
AL3
C AL4 C
C4302 6 7 8 9 C4302 11 12 13 C4308 6
SPRING CHARGED
GAS SF6 ALARM
VT LINE 2 OFF
VT LINE 2 OFF
VT BUS 2 OFF
GAS SF6 TRIP
MCB MK OFF
MCB Q0 OFF
R13+
SC3
-XC 9 10 11 12 13 14 15 -XR 11 13 14 15 16 17
E E
+CP3 +RP3
S4103 1 2 3 4 5 6 7 C4201 1 2 3 4 5 6
SC3
AL16
AL17
AL18
AL19
AL20
AL21
R13+
BI1
BI2
BI3
BI4
BI5
/ +CP3/C308-2:B
/ +CP3/C308-3:B
/ +CP3/C308-3:B
/ +CP3/C308-3:B
/ +CP3/C308-4:B
/ +CP3/C308-4:B
/ +CP3/C308-4:B
/ +RP3/R304-2:B
/ +RP3/R304-2:B
/ +RP3/R304-2:B
/ +RP3/R304-3:B
/ +RP3/R304-4:B
/ +RP3/R304-4:B
F F
M308 M310
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 SIGNALING FROM MARSHALLING KIOSK BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M309
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
INTERLOCK FOR BUSBAR EARTHING SWITCH Q25 INTERLOCK FOR Q7 OF BUSCOUPLER BAY
B B
C C
55 X3:111 29 29
-Q1 -Q0 -Q1 -Q9
56 X3:112 30 30
D D
-XQ1 30 -XQ9 33
E E
C4308 1 2 C2310 1 2
=E05+MK5 =E01+MK1
Q251+
Q251
Q72+
Q72
/ =E05+MK5/M507-7:C
/ =E05+MK5/M507-7:C
/ =E01+MK1/M108-3:C
/ =E01+MK1/M108-2:D
F F
M309 M311
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 INTERLOCK FOR THE OTHERS BAY BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M310
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
C 2 3 2 3 2 3 2 3 7 2 3 2 3 C
D D
Q0 LOCAL MODE
Q52 CLOSE
Q51 CLOSE
Q52 OPEN
Q51 OPEN
Q8 CLOSE
Q9 CLOSE
Q0 CLOSE
Q1 CLOSE
Q8 OPEN
Q9 OPEN
Q0 OPEN
Q1 OPEN
S13+
-XS 1 8 9 10 11 12 13 14 15 16 17 18 19 20
E E
+CP3
S4101 1 2 3 4 5 6 7 8 9 10 11 12 13 14
S13+
CQ8
OQ8
CQ9
OQ9
CQ52
OQ52
CQ0
OQ0
LQ0
CQ51
OQ51
CQ1
OQ1
/ +CP3/C306-1:B
/ +CP3/C306-1:B
/ +CP3/C306-2:B
/ +CP3/C306-2:B
/ +CP3/C306-3:B
/ +CP3/C306-3:B
/ +CP3/C306-3:B
/ +CP3/C306-4:B
/ +CP3/C306-4:B
/ +CP3/C306-5:B
/ +CP3/C306-6:B
/ +CP3/C306-6:B
/ +CP3/C306-6:B
/ +CP3/C306-7:B
F F
M310 M312
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 INDICATOR FOR CONTROL PANEL BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M311
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
C 5 6 5 6 7 8 5 6 5 6 5 6 5 6 7 8 C
D D
Q9 LOCAL MODE
Q1 LOCAL MODE
Q9 MCB OFF
Q1 MCB OFF
Q52 CLOSE
Q51 CLOSE
Q52 OPEN
Q51 OPEN
Q8 CLOSE
Q9 CLOSE
Q0 CLOSE
Q1 CLOSE
Q8 OPEN
Q9 OPEN
Q0 OPEN
Q1 OPEN
COM+
-XSCA 1 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
E E
+CP3
S4104 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
SCOM
SCQ8
SOQ8
SCQ9
SOQ9
SMQ9
SLQ9
SCQ52
SOQ52
SCQ0
SOQ0
SCQ51
SOQ51
SCQ1
SOQ1
SMQ1
SLQ1
/ +CP3/C310-3:B
/ +CP3/C310-3:B
/ +CP3/C310-3:B
/ +CP3/C310-4:B
/ +CP3/C310-4:B
/ +CP3/C310-4:B
/ +CP3/C310-4:B
/ +CP3/C310-5:B
/ +CP3/C310-5:B
/ +CP3/C310-5:B
/ +CP3/C310-6:B
/ +CP3/C310-6:B
/ +CP3/C310-6:B
/ +CP3/C310-7:B
/ +CP3/C310-7:B
/ +CP3/C310-7:B
/ +CP3/C310-8:B
F F
M311 M313
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 INDICATOR FOR SCADA BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M312
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
-Q9
LINE DISCONNECT SWITCH 23 25 27 29 31 33 35 37 55 57 59 61 63 65 67 69
ABB
1HYD90161-300 24 26 28 30 32 34 36 38 56 58 60 62 64 66 68 70
/M305-2:C /M305-3:C /M305-3:C /M310-7:C /M308-3:C /M308-6:C /M308-8:C /M311-3:B /M311-3:B /M312-2:B /M312-3:B
B B
-Q1
BUSBAR DISCONNECT SWITCH 23 25 27 29 31 33 35 37 55 57 59 61 63 65 67 69
ABB
1HYD90161-300 24 26 28 30 32 34 36 38 56 58 60 62 64 66 68 70
/M305-2:D /M305-3:D /M305-3:D /M310-6:C /M308-2:C /M308-5:C /M310-3:C /M311-8:B /M311-8:B /M312-7:B /M312-7:B
C C
-Q8
LINE EARTHING SWITCH 23 25 27 29 31 33 35 37 55 57 59 61 63 65 67 69
ABB
1HYD90162-162 24 26 28 30 32 34 36 38 56 58 60 62 64 66 68 70
/M307-2:C /M311-2:B /M311-2:B /M312-1:B /M312-2:B
D D
-Q51
EARTHING SWITCH 23 25 27 29 31 33 35 37 55 57 59 61 63 65 67 69
ABB
1HYD90162-162 24 26 28 30 32 34 36 38 56 58 60 62 64 66 68 70
/M306-4:C /M307-4:C /M311-7:B /M311-7:B /M312-6:B /M312-6:B
E E
-Q52
EARTHING SWITCH 23 25 27 29 31 33 35 37 55 57 59 61 63 65 67 69
ABB
1HYD90162-162 24 26 28 30 32 34 36 38 56 58 60 62 64 66 68 70
/M306-5:C /M307-5:C /M311-4:B /M311-4:B /M312-4:B /M312-4:B
F F
M312 M314
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 REFERENCE FOR DEVICE BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M313
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
/ M305-6:F
/ M305-6:F
/ M305-2:F
/ M305-3:F
/ M305-2:F
/ M305-4:F
/ M305-5:F
/ M305-5:F
/ M305-6:F
/ M305-8:F
/ M305-8:F
/ M305-7:F
/ M305-7:F
/ M305-7:F
A A
C13+
C13-
INL+
CLOSE
INL-
OPEN
TRIP1
TCSC1
TCSO1
T13+
T13-
TRIP2
TCSC2
TCSO2
+Q0
B B
-X1 1 2 13 11 12 3 4 14 15 23 22 26 5 6 27 28 30 29
1 2 1 2 1 2
F14+ / M315-8:B
-F11 1 -F14 3 -F16
CLOSE 2 TRIP 4
LOCAL REMOTE
1 3 5 7 9
-X1 16 -X1 20
C C
21 31
11 31
-X1 17 -X1 21
1
-S3 2
D D
21 11
-K1 -K1
24 22 14 12
01 07 03 81 13 91
E E
-X1 25 24 -X1 32 31
1 1 1 1 1
F F
3 4 3 4 3 4
F14- / M315-8:C
-F11 -F14 -F16
M313 M315
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 REFERENCE FOR Q0 CIRCUIT BREAKER BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M314
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
/ M302-3:D
/ M302-3:D
/ M301-7:D
/ M301-7:D
/ M309-3:C
/ M309-2:C
/ M309-2:C
/ M309-2:C
/ M309-1:B
A A
DC+
DC-
AC+
AC-
AL4
AL3
AL1
AL2
SC3
+Q0
-X1 7 8 9 10
B USED B
USED
1 1 1
-S3 01 07
2
-S1 -S1
02 08
21 21 21 21 21 21 7 11 11 13
Lighting & 11 21
Motor Heating -F11 -F3 -F4 -F5 -F14 -F16 -S3 -S3 -S12 -S12
-F2 -K2 A2 E2
System 22 22 22 22 22 22 8 12 12 14
C 13 12 24 22
-K3 C
A1 E1
3
-S3
4
3 M314-5:F / -F14-
SPRING SPRING -X3 136
-F3 LOCAL REMOTE SF6 PRESSURE SF6 PRESSURE
MCB AUX. CONTACT CHAGED DISCHAGED
4 INDICATION INDICATION ALARM BLOCKING
INDICATION INDICATION
D D
X3:101 X3:105 X3:109 X3:113 X3:117 X3:121 X3:125 X3:129 X3:133 X3:139 X3:143 X3:147
-Q0 NC
X3:102 X3:106 X3:110 X3:114 X3:118 X3:122 X3:126 X3:130 X3:134 X3:140 X3:144 X3:148
CIRCUIT BREAKER /M306-3:C /M307-3:C /M309-6:C /M311-5:B /M312-5:B
ABB - INDIA
CONTROL: 110VDC X3:103 X3:107 X3:111 X3:115 X3:119 X3:123 X3:127 X3:131 X3:137 X3:141 X3:145 X3:149 X1:33 X1:39
MOTOR: 110 VDC NO
E HEATING: 220VAC X3:104 X3:108 X3:112 X3:116 X3:120 X3:124 X3:128 X3:132 X3:138 X3:142 X3:146 X3:150 X1:34 X1:40
E
/M309-6:C /M310-5:C /M311-5:B /M312-5:B /M309-7:C /M311-6:B
F F
M314 =CABLE+/CA0
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV LINE FEEDER E03 REFERENCE FOR Q0 CIRCUIT BREAKER BAY = E03
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK3
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 16 Page M315
Approval VO CONG CHIEN Replacement of Replaced by
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
1 Vòng bít cáp Cu/PVC/PVC-2Cx2.5 pcs 112 21 Cosse đồng cho ruột 1.5mm2 pcs 1971
2 Vòng bít cáp Cu/PVC/PVC-2Cx35 pcs 4 22 Cosse đồng cho ruột 2.5mm2 pcs 224
3 Vòng bít cáp Cu/PVC/PVC-4Cx10 pcs 4 23 Cosse đồng cho ruột 4.0mm2 pcs 396
D 4 Vòng bít cáp Cu/PVC/PVC-3Cx95+1Cx70 pcs 2 24 Cosse đồng cho ruột 10mm2 pcs 18 D
5 Vòng bít cáp Cu/PVC/PVC-3Cx16+1Cx10 pcs 2 25 Cosse đồng cho ruột 16mm2 pcs 6
6 Vòng bít cáp CVV-S-4Cx4.0 pcs 99 26 Cosse đồng cho ruột 35mm2 pcs 8
7 Vòng bít cáp CVV-S-7Cx1.5 pcs 59 27 Cosse đồng cho ruột 70mm2 pcs 2
8 Vòng bít cáp CVV-S-12Cx1.5 pcs 57 28 Cosse đồng cho ruột 95mm2 pcs 6
9 Vòng bít cáp CVV-S-19Cx1.5 pcs 46 29 Nhãn ruột cáp (loại số và chữ) pcs 12955
10 Ống bịt đầu cáp Cu/PVC/PVC-2Cx2.5 pcs 112 30 Dây rút (200mm) pcs 2000
E E
11 Ống bịt đầu cáp Cu/PVC/PVC-2Cx35 pcs 4
12 Ống bịt đầu cáp Cu/PVC/PVC-4Cx10 pcs 4
13 Ống bịt đầu cáp Cu/PVC/PVC-3Cx95+1Cx70 pcs 2
14 Ống bịt đầu cáp Cu/PVC/PVC-3Cx16+1Cx10 pcs 2
15 Ống bịt đầu cáp CVV-S-4Cx4.0 pcs 99
16 Ống bịt đầu cáp CVV-S-7Cx1.5 pcs 59
F 17 Ống bịt đầu cáp CVV-S-12Cx1.5 pcs 57 F
18 Ống bịt đầu cáp CVV-S-19Cx1.5 pcs 46
19 Kẹp cố định cáp pcs 465
CA0 20 Nhãn cáp pcs 387 CA2
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company Cable Summary BAY = CABLE
Drawn DO VINH
Checked LUONG NGOC THACH 110kV CHAU THANH SUBSTATION
PANEL +
Approval VO CONG CHIEN Replacement of Replaced by CT - 12102016 Pages 68 Page CA1
0 1 2 3 4 5 6 7 8 9
Cable Overview
Cable Description From Panel To Panel Cable Name Cable type Length [m] Remarks
CA1 CA3
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable overview : =COM+AC-CAD1 - = CABLE
Ed. BINH AN =E01+COM-C2308 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA2
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable Overview
Cable Description From Panel To Panel Cable Name Cable type Length [m] Remarks
CA2 CA4
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable overview : =E01+COM-C2310 - = CABLE
Ed. BINH AN =E01+COM-P2308 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA3
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable Overview
Cable Description From Panel To Panel Cable Name Cable type Length [m] Remarks
CA3 CA5
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable overview : =E01+COM-P2309 - = CABLE
Ed. BINH AN =E03+COM-C4301 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA4
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable Overview
Cable Description From Panel To Panel Cable Name Cable type Length [m] Remarks
CA4 CA6
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable overview : =E03+COM-C4302 - = CABLE
Ed. BINH AN =E03+COM-P4308 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA5
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable Overview
Cable Description From Panel To Panel Cable Name Cable type Length [m] Remarks
CA5 CA7
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable overview : =E03+COM-P4309 - = CABLE
Ed. BINH AN =E05+COM-C1306 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA6
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable Overview
Cable Description From Panel To Panel Cable Name Cable type Length [m] Remarks
CA6 CA8
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable overview : =E05+COM-I1101 - = CABLE
Ed. BINH AN =E05+COM-S1302 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA7
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable Overview
Cable Description From Panel To Panel Cable Name Cable type Length [m] Remarks
CA7 CA9
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable overview : =E05+COM-S1303 - = CABLE
Ed. BINH AN =E05+COM-V1303 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA8
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
5
6
7
=COM+AC/AC17-6:E =COM+AC/AC17-6:D
Cable length: 18 Form Panel: = AC DIST To Panel: = INC 22kV J2.1 Cross-section: 2,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=COM+AC/AC11-3:E F404 1 1 XAC 1 =COM+AC/AC11-3:F
=COM+AC/AC11-4:E F404 2 2 XAC 3 =COM+AC/AC11-4:F
=COM+AC/AC17-2:E =COM+AC/AC17-2:D
CA8 CA10
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =COM+AC-CAD1 = CABLE
Ed. BINH AN =COM+AC-PACH =COM+AC-PAD1 +
Appr 110kV CHAU THANH SUBSTATION =COM+AC-PAJ1 CT - 12102016 Page CA9
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 36 Form Panel: = AC DIST To Panel: = MBA TD2 Cross-section: 1Cx70
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=COM+AC/AC05-2:A X1 1L1 1 TD2 U1 =COM+AC/AC05-1:A
=COM+AC/AC05-2:A X1 1L2 2 TD2 V1 =COM+AC/AC05-1:A
=COM+AC/AC05-2:A X1 1L3 3 TD2 W1 =COM+AC/AC05-1:A
=COM+AC/AC05-2:A X1 1N 4 X N1 =COM+AC/AC05-1:A
=COM+AC/AC17-2:C =COM+AC/AC17-2:B
CA9 CA11
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =COM+AC-PALCT1 = CABLE
Ed. BINH AN =COM+AC-PAOLT1 =COM+AC-PARCT1 +
Appr 110kV CHAU THANH SUBSTATION =COM+AC-PATR1 =COM+DC-PDA1 CT - 12102016 Page CA10
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 18 Form Panel: = DC DIST To Panel: = INC 22kV J2.1 Cross-section: 2,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=COM+DC/DC07-2:E F201 1 1 XDC 1 =COM+DC/DC07-2:F
=COM+DC/DC07-2:E F201 2 2 XDC 3 =COM+DC/DC07-2:F
=COM+DC/DC13-2:E =COM+DC/DC13-2:D
CA10 CA12
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =COM+DC-PDA1 = CABLE
Ed. BINH AN =COM+DC-PDBAT =COM+DC-PDCH +
Appr 110kV CHAU THANH SUBSTATION =COM+DC-PDJ1 =COM+DC-PDLCT1 CT - 12102016 Page CA11
Modification Date Name Original Replacement of Replaced by =COM+DC-PDRCT1 Page 304
0 1 2 3 4 5 6 7 8 9
11
12
=E01+COM/CO10-2:D =E01+COM/CO10-2:B
9
10
11
12
CA11 CA13
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =COM+DC-PDRCT1 = CABLE
Ed. BINH AN =E01+COM-C2101 =E01+COM-C2102 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA12
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 22 Form Panel: = TELE PANEL To Panel: = RP E01 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E01+RP1/R105-7:B XX x 1 XI1 3 =E01+RP1/R105-7:A
=E01+RP1/R105-7:B XX x 2 XI1 12 =E01+RP1/R105-7:C
=E01+RP1/R107-6:B XX x 3 XT1 27 =E01+RP1/R107-6:C
=E01+RP1/R107-6:B XX x 4 XT1 28 =E01+RP1/R107-6:C
5
6
7
=E01+COM/CO10-6:B =E01+COM/CO10-5:A
CA12 CA14
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-C2102 = CABLE
Ed. BINH AN =E01+COM-C2201 =E01+COM-C2202 +
Appr 110kV CHAU THANH SUBSTATION =E01+COM-C2203 CT - 12102016 Page CA13
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
11
12
=E01+COM/CO10-8:F =E01+COM/CO10-8:B
CA13 CA15
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-C2203 = CABLE
Ed. BINH AN =E01+COM-C2204 =E01+COM-C2301 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA14
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
16
17
18
19
=E01+COM/CO11-3:E =E01+COM/CO11-3:D
CA14 CA16
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-C2301 = CABLE
Ed. BINH AN =E01+COM-C2302 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA15
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
CA15 CA17
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-C2303 = CABLE
Ed. BINH AN =E01+COM-C2304 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA16
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 18 Form Panel: = ES Q51 E01 To Panel: = MK E01 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E01+MK1/M109-2:E TB 441 1 XQ51 1 =E01+MK1/M109-2:D
=E01+MK1/M109-2:F TB 442 2 XQ51 3 =E01+MK1/M109-2:F
=E01+MK1/M106-4:C Q51 23 3 XQ51 5 =E01+MK1/M106-4:B
=E01+MK1/M106-4:C Q51 24 4 XQ51 6 =E01+MK1/M106-4:E
=E01+MK1/M107-4:C Q51 27 5 XQ51 7 =E01+MK1/M107-4:B
=E01+MK1/M107-4:C Q51 28 6 XQ51 8 =E01+MK1/M107-4:E
7
8
9
10
11
12
=E01+COM/CO11-7:E =E01+COM/CO11-7:D
Cable length: 20 Form Panel: = ES Q52 E01 To Panel: = MK E01 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E01+MK1/M109-4:E TB 441 1 XQ52 1 =E01+MK1/M109-4:D
=E01+MK1/M109-4:F TB 442 2 XQ52 3 =E01+MK1/M109-4:F
=E01+MK1/M106-5:C Q52 23 3 XQ52 5 =E01+MK1/M106-5:B
=E01+MK1/M106-5:C Q52 24 4 XQ52 6 =E01+MK1/M106-5:E
=E01+MK1/M107-5:C Q52 27 5 XQ52 7 =E01+MK1/M107-5:B
CA16 CA18
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-C2304 = CABLE
Ed. BINH AN =E01+COM-C2305 =E01+COM-C2306 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA17
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 20 Form Panel: = ES Q52 E01 To Panel: = MK E01 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E01+MK1/M107-5:C Q52 28 6 XQ52 8 =E01+MK1/M107-5:E
7
8
9
10
11
12
=E01+COM/CO11-6:C =E01+COM/CO11-6:B
5
6
7
8
9
10
11
12
=E01+COM/CO11-3:C =E01+COM/CO11-3:B
CA17 CA19
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-C2306 = CABLE
Ed. BINH AN =E01+COM-C2307 =E01+COM-C2308 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA18
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
5
6
7
=E01+COM/CO12-5:C =E01+COM/CO12-5:B
10
11
12
=E01+COM/CO12-3:C =E01+COM/CO12-3:B
CA18 CA20
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-C2308 = CABLE
Ed. BINH AN =E01+COM-C2310 =E01+COM-C2311 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA19
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
12
=E01+COM/CO12-5:C =E01+COM/CO12-5:B
CA19 CA21
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-C2312 = CABLE
Ed. BINH AN =E01+COM-I2101 =E01+COM-I2201 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA20
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
CA20 CA22
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-I2202 = CABLE
Ed. BINH AN =E01+COM-I2301 =E01+COM-I2302 +
Appr 110kV CHAU THANH SUBSTATION =E01+COM-I2303 CT - 12102016 Page CA21
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
CA21 CA23
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-I2304 = CABLE
Ed. BINH AN =E01+COM-I2305 =E01+COM-I2306 +
Appr 110kV CHAU THANH SUBSTATION =E01+COM-P2101 =E01+COM-P2102 CT - 12102016 Page CA22
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
CA22 CA24
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-P2102 = CABLE
Ed. BINH AN =E01+COM-P2103 =E01+COM-P2104 +
Appr 110kV CHAU THANH SUBSTATION =E01+COM-P2201 =E01+COM-P2202 CT - 12102016 Page CA23
Modification Date Name Original Replacement of Replaced by =E01+COM-P2203 Page 304
0 1 2 3 4 5 6 7 8 9
CA23 CA25
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-P2203 = CABLE
Ed. BINH AN =E01+COM-P2204 =E01+COM-P2301 +
Appr 110kV CHAU THANH SUBSTATION =E01+COM-P2302 =E01+COM-P2303 CT - 12102016 Page CA24
Modification Date Name Original Replacement of Replaced by =E01+COM-P2304 Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 20 Form Panel: = ES Q52 E01 To Panel: = MK E01 Cross-section: 2,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E01+MK1/M101-6:D TB 401 1 XAC 5 =E01+MK1/M101-6:D
CA24 CA26
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-P2304 = CABLE
Ed. BINH AN =E01+COM-P2305 =E01+COM-P2306 +
Appr 110kV CHAU THANH SUBSTATION =E01+COM-P2307 =E01+COM-P2308 CT - 12102016 Page CA25
Modification Date Name Original Replacement of Replaced by =E01+COM-P2309 Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 20 Form Panel: = ES Q52 E01 To Panel: = MK E01 Cross-section: 2,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E01+MK1/M101-6:D TB 403 2 XAC 12 =E01+MK1/M101-6:D
=E01+COM/CO11-6:C =E01+COM/CO11-6:B
Cable length: 18 Form Panel: = ES Q51 E01 To Panel: = MK E01 Cross-section: 2,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E01+MK1/M101-7:D TB 401 1 XAC 7 =E01+MK1/M101-7:D
=E01+MK1/M101-7:D TB 403 2 XAC 14 =E01+MK1/M101-7:D
=E01+COM/CO11-6:D =E01+COM/CO11-6:E
CA25 CA27
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-P2309 = CABLE
Ed. BINH AN =E01+COM-P2310 =E01+COM-P2311 +
Appr 110kV CHAU THANH SUBSTATION =E01+COM-P2312 =E01+COM-P2313 CT - 12102016 Page CA26
Modification Date Name Original Replacement of Replaced by =E01+COM-S2101 Page 304
0 1 2 3 4 5 6 7 8 9
15
16
17
18
19
=E01+COM/CO10-3:F =E01+COM/CO10-3:D
CA26 CA28
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-S2101 = CABLE
Ed. BINH AN =E01+COM-S2102 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA27
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
17
18
19
=E01+COM/CO10-3:D =E01+COM/CO10-3:B
CA27 CA29
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-S2102 = CABLE
Ed. BINH AN =E01+COM-S2103 =E01+COM-S2104 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA28
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
18
19
=E01+COM/CO10-4:F =E01+COM/CO10-4:D
CA28 CA30
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-S2104 = CABLE
Ed. BINH AN =E01+COM-S2301 =E01+COM-S2302 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA29
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
7
=E01+COM/CO11-3:C =E01+COM/CO11-3:B
Cable length: 20 Form Panel: = ES Q52 E01 To Panel: = MK E01 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E01+MK1/M112-4:B Q52 29 1 XQ52 9 =E01+MK1/M112-4:B
=E01+MK1/M112-4:B Q52 30 2 XQ52 10 =E01+MK1/M112-4:C
=E01+MK1/M112-4:B Q52 32 3 XQ52 11 =E01+MK1/M112-4:C
=E01+MK1/M113-4:B Q52 33 4 XQ52 12 =E01+MK1/M113-4:B
=E01+MK1/M113-4:B Q52 34 5 XQ52 13 =E01+MK1/M113-4:C
=E01+MK1/M113-4:B Q52 36 6 XQ52 14 =E01+MK1/M113-4:C
7
=E01+COM/CO11-7:C =E01+COM/CO11-7:B
CA29 CA31
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-S2302 = CABLE
Ed. BINH AN =E01+COM-S2303 =E01+COM-S2304 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA30
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 18 Form Panel: = ES Q51 E01 To Panel: = MK E01 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E01+MK1/M112-7:B Q51 29 1 XQ51 9 =E01+MK1/M112-7:B
=E01+MK1/M112-7:B Q51 30 2 XQ51 10 =E01+MK1/M112-7:C
=E01+MK1/M112-7:B Q51 32 3 XQ51 11 =E01+MK1/M112-7:C
=E01+MK1/M113-6:B Q51 33 4 XQ51 12 =E01+MK1/M113-6:B
=E01+MK1/M113-6:B Q51 34 5 XQ51 13 =E01+MK1/M113-6:C
=E01+MK1/M113-6:B Q51 36 6 XQ51 14 =E01+MK1/M113-6:C
7
=E01+COM/CO11-7:E =E01+COM/CO11-7:D
9
10
11
12
=E01+COM/CO11-5:E =E01+COM/CO11-5:D
CA30 CA32
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-S2305 = CABLE
Ed. BINH AN =E01+COM-S2306 =E01+COM-S2307 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA31
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
3
4
=E01+COM/CO10-2:F =E01+COM/CO10-2:D
3
4
=E01+COM/CO10-8:F =E01+COM/CO10-8:B
CA31 CA33
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-S2307 = CABLE
Ed. BINH AN =E01+COM-V2101 =E01+COM-V2102 +
Appr 110kV CHAU THANH SUBSTATION =E01+COM-V2103 CT - 12102016 Page CA32
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 25 Form Panel: = MK E01 To Panel: = CVT LINE BOX Cross-section: 4,0
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E01+MK1/M103-3:B XVT 1 1 TB a1 =E01+MK1/M103-3:B
=E01+MK1/M103-4:B XVT 2 2 TB n1 =E01+MK1/M103-4:B
=E01+MK1/M103-5:B XVT 5 3 TB a2 =E01+MK1/M103-5:B
=E01+MK1/M103-6:B XVT 6 4 TB n2 =E01+MK1/M103-6:B
=E01+COM/CO12-7:C =E01+COM/CO12-7:B
CA32 CA34
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E01+COM-V2104 = CABLE
Ed. BINH AN =E01+COM-V2301 =E03+COM-C4101 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA33
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
9
10
11
12
=E03+COM/CO01-3:F =E03+COM/CO01-3:D
Cable length: 22 Form Panel: = TELE PANEL To Panel: = RP E03 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E03+RP3/R304-7:B XX x 1 XI3 3 =E03+RP3/R304-7:A
=E03+RP3/R304-7:B XX x 2 XI3 12 =E03+RP3/R304-7:C
=E03+RP3/R306-6:B XX x 3 XT3 27 =E03+RP3/R306-6:C
=E03+RP3/R306-6:B XX x 4 XT3 28 =E03+RP3/R306-6:C
5
6
CA33 CA35
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-C4102 = CABLE
Ed. BINH AN =E03+COM-C4201 =E03+COM-C4202 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA34
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 22 Form Panel: = TELE PANEL To Panel: = RP E03 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
7
=E03+COM/CO01-8:B =E03+COM/CO01-7:A
11
12
=E03+COM/CO01-8:F =E03+COM/CO01-8:B
5
6
7
=E03+COM/CO01-4:B =E03+COM/CO01-3:A
CA34 CA36
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-C4202 = CABLE
Ed. BINH AN =E03+COM-C4204 =E03+COM-C4205 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA35
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
15
16
17
18
19
=E03+COM/CO02-2:E =E03+COM/CO02-2:D
CA35 CA37
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-C4301 = CABLE
Ed. BINH AN =E03+COM-C4302 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA36
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
16
17
18
19
=E03+COM/CO02-2:E =E03+COM/CO02-2:D
CA36 CA38
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-C4302 = CABLE
Ed. BINH AN =E03+COM-C4303 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA37
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 16 Form Panel: = ES Q51 E03 To Panel: = MK E03 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E03+MK3/M308-2:E TB 441 1 XQ51 1 =E03+MK3/M308-2:D
=E03+MK3/M308-2:F TB 442 2 XQ51 3 =E03+MK3/M308-2:F
=E03+MK3/M306-4:C Q51 23 3 XQ51 5 =E03+MK3/M306-4:B
=E03+MK3/M306-4:C Q51 24 4 XQ51 6 =E03+MK3/M306-4:E
=E03+MK3/M307-4:C Q51 27 5 XQ51 7 =E03+MK3/M307-4:B
=E03+MK3/M307-4:C Q51 28 6 XQ51 9 =E03+MK3/M307-4:E
7
8
9
10
11
CA37 CA39
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-C4304 = CABLE
Ed. BINH AN =E03+COM-C4305 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA38
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 16 Form Panel: = ES Q51 E03 To Panel: = MK E03 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
12
=E03+COM/CO02-6:E =E03+COM/CO02-6:D
Cable length: 20 Form Panel: = ES Q52 E03 To Panel: = MK E03 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E03+MK3/M308-4:E TB 441 1 XQ52 1 =E03+MK3/M308-4:D
=E03+MK3/M308-4:F TB 442 2 XQ52 3 =E03+MK3/M308-4:F
=E03+MK3/M306-5:C Q52 23 3 XQ52 5 =E03+MK3/M306-5:B
=E03+MK3/M306-5:C Q52 24 4 XQ52 6 =E03+MK3/M306-5:E
=E03+MK3/M307-5:C Q52 27 5 XQ52 7 =E03+MK3/M307-5:B
=E03+MK3/M307-5:C Q52 28 6 XQ52 9 =E03+MK3/M307-5:E
7
8
9
10
11
12
=E03+COM/CO02-6:C =E03+COM/CO02-6:B
5
6
7
8
9
10
11
12
CA38 CA40
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-C4305 = CABLE
Ed. BINH AN =E03+COM-C4306 =E03+COM-C4307 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA39
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
CA39 CA41
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-C4307 = CABLE
Ed. BINH AN =E03+COM-C4308 =E03+COM-I4101 +
Appr 110kV CHAU THANH SUBSTATION =E03+COM-I4201 CT - 12102016 Page CA40
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
CA40 CA42
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-I4202 = CABLE
Ed. BINH AN =E03+COM-I4301 =E03+COM-I4302 +
Appr 110kV CHAU THANH SUBSTATION =E03+COM-I4303 CT - 12102016 Page CA41
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
CA41 CA43
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-I4304 = CABLE
Ed. BINH AN =E03+COM-I4305 =E03+COM-I4306 +
Appr 110kV CHAU THANH SUBSTATION =E03+COM-P4101 =E03+COM-P4102 CT - 12102016 Page CA42
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
CA42 CA44
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-P4102 = CABLE
Ed. BINH AN =E03+COM-P4201 =E03+COM-P4202 +
Appr 110kV CHAU THANH SUBSTATION =E03+COM-P4301 =E03+COM-P4302 CT - 12102016 Page CA43
Modification Date Name Original Replacement of Replaced by =E03+COM-P4303 Page 304
0 1 2 3 4 5 6 7 8 9
CA43 CA45
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-P4303 = CABLE
Ed. BINH AN =E03+COM-P4304 =E03+COM-P4305 +
Appr 110kV CHAU THANH SUBSTATION =E03+COM-P4306 =E03+COM-P4307 CT - 12102016 Page CA44
Modification Date Name Original Replacement of Replaced by =E03+COM-P4308 Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 20 Form Panel: = ES Q52 E03 To Panel: = MK E03 Cross-section: 2,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E03+MK3/M301-6:D TB 401 1 XAC 5 =E03+MK3/M301-6:D
=E03+MK3/M301-6:D TB 403 2 XAC 12 =E03+MK3/M301-6:D
=E03+COM/CO02-6:C =E03+COM/CO02-6:B
Cable length: 16 Form Panel: = ES Q51 E03 To Panel: = MK E03 Cross-section: 2,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E03+MK3/M301-7:D TB 401 1 XAC 7 =E03+MK3/M301-7:D
=E03+MK3/M301-7:D TB 403 2 XAC 14 =E03+MK3/M301-7:D
=E03+COM/CO02-6:E =E03+COM/CO02-6:D
CA44 CA46
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-P4308 = CABLE
Ed. BINH AN =E03+COM-P4309 =E03+COM-P4310 +
Appr 110kV CHAU THANH SUBSTATION =E03+COM-P4311 =E03+COM-S4101 CT - 12102016 Page CA45
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
15
16
17
18
19
=E03+COM/CO01-3:F =E03+COM/CO01-3:D
17
18
19
CA45 CA47
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-S4101 = CABLE
Ed. BINH AN =E03+COM-S4102 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA46
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
8
9
10
11
12
=E03+COM/CO01-4:F =E03+COM/CO01-4:D
CA46 CA48
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-S4102 = CABLE
Ed. BINH AN =E03+COM-S4103 =E03+COM-S4104 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA47
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
18
19
=E03+COM/CO01-4:F =E03+COM/CO01-4:D
7
=E03+COM/CO02-3:C =E03+COM/CO02-3:B
CA47 CA49
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-S4104 = CABLE
Ed. BINH AN =E03+COM-S4301 =E03+COM-S4302 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA48
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
9
10
11
12
=E03+COM/CO02-4:C =E03+COM/CO02-4:B
Cable length: 20 Form Panel: = ES Q52 E03 To Panel: = MK E03 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E03+MK3/M311-4:B Q52 29 1 XQ52 8 =E03+MK3/M311-4:B
=E03+MK3/M311-4:B Q52 30 2 XQ52 10 =E03+MK3/M311-4:C
=E03+MK3/M311-4:B Q52 32 3 XQ52 11 =E03+MK3/M311-4:C
=E03+MK3/M312-4:B Q52 33 4 XQ52 12 =E03+MK3/M312-4:B
=E03+MK3/M312-4:B Q52 34 5 XQ52 13 =E03+MK3/M312-4:C
=E03+MK3/M312-4:B Q52 36 6 XQ52 14 =E03+MK3/M312-4:C
7
=E03+COM/CO02-6:C =E03+COM/CO02-6:B
Cable length: 16 Form Panel: = ES Q51 E03 To Panel: = MK E03 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E03+MK3/M311-7:B Q51 29 1 XQ51 8 =E03+MK3/M311-7:B
=E03+MK3/M311-7:B Q51 30 2 XQ51 10 =E03+MK3/M311-7:C
=E03+MK3/M311-7:B Q51 32 3 XQ51 11 =E03+MK3/M311-7:C
=E03+MK3/M312-6:B Q51 33 4 XQ51 12 =E03+MK3/M312-6:B
=E03+MK3/M312-6:B Q51 34 5 XQ51 13 =E03+MK3/M312-6:C
=E03+MK3/M312-6:B Q51 36 6 XQ51 14 =E03+MK3/M312-6:C
CA48 CA50
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-S4303 = CABLE
Ed. BINH AN =E03+COM-S4304 =E03+COM-S4305 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA49
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 16 Form Panel: = ES Q51 E03 To Panel: = MK E03 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
7
=E03+COM/CO02-6:E =E03+COM/CO02-6:D
9
10
11
12
=E03+COM/CO02-4:E =E03+COM/CO02-4:D
3
4
=E03+COM/CO01-3:F =E03+COM/CO01-3:D
CA49 CA51
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-S4305 = CABLE
Ed. BINH AN =E03+COM-S4306 =E03+COM-V4102 +
Appr 110kV CHAU THANH SUBSTATION =E03+COM-V4202 CT - 12102016 Page CA50
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 25 Form Panel: = MK E03 To Panel: = CVT LINE BOX Cross-section: 4,0
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E03+MK3/M303-3:B XVT 1 1 TB a1 =E03+MK3/M303-3:B
=E03+MK3/M303-4:B XVT 2 2 TB n1 =E03+MK3/M303-4:B
=E03+MK3/M303-5:B XVT 5 3 TB a2 =E03+MK3/M303-5:B
=E03+MK3/M303-6:B XVT 6 4 TB n2 =E03+MK3/M303-6:B
=E03+COM/CO02-8:C =E03+COM/CO02-8:B
5
6
7
=E05+COM/CO07-4:D =E05+COM/CO07-4:B
6
7
=E05+COM/CO07-4:E =E05+COM/CO07-4:D
CA50 CA52
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E03+COM-V4202 = CABLE
Ed. BINH AN =E03+COM-V4301 =E05+COM-C1101 +
Appr 110kV CHAU THANH SUBSTATION =E05+COM-C1102 CT - 12102016 Page CA51
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 24 Form Panel: = CP E05 To Panel: = INC 22kV J2.1 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+CP5/C506-4:B X3 17 1 XC 22 =E05+CP5/C506-4:B
=E05+CP5/C506-5:B X3 18 2 XC 24 =E05+CP5/C506-5:B
=E05+CP5/C506-5:B X3 20 3 XC 25 =E05+CP5/C506-5:B
=E05+CP5/C506-6:B X3 19 4 XC 23 =E05+CP5/C506-6:B
5
6
7
=E05+COM/CO07-1:D =E05+COM/CO07-1:E
11
12
=E05+COM/CO07-8:E =E05+COM/CO07-8:B
Cable length: 24 Form Panel: = RP E05 To Panel: = INC 22kV J1.1 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
1
2
3
4
=E05+RP5/R509-4:B X4 3 5 XT 23 =E05+RP5/R509-4:A
=E05+RP5/R509-4:B X4 4 6 XT 28 =E05+RP5/R509-4:C
CA51 CA53
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-C1103 = CABLE
Ed. BINH AN =E05+COM-C1201 =E05+COM-C1202 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA52
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 24 Form Panel: = RP E05 To Panel: = INC 22kV J1.1 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
7
=E05+COM/CO07-1:F =E05+COM/CO07-3:B
3
4
5
6
7
=E05+COM/CO07-8:B =E05+COM/CO07-7:A
CA52 CA54
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-C1202 = CABLE
Ed. BINH AN =E05+COM-C1203 =E05+COM-C1301 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA53
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
12
13
14
15
16
17
18
19
=E05+COM/CO08-2:E =E05+COM/CO08-2:D
CA53 CA55
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-C1301 = CABLE
Ed. BINH AN =E05+COM-C1302 =E05+COM-C1303 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA54
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
16
17
18
19
=E05+COM/CO08-4:E =E05+COM/CO08-4:D
Cable length: 20 Form Panel: = ES Q51 E05 To Panel: = MK E05 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+MK5/M507-2:E TB 441 1 XQ51 1 =E05+MK5/M507-2:D
=E05+MK5/M507-2:F TB 442 2 XQ51 3 =E05+MK5/M507-2:F
=E05+MK5/M506-4:C Q51 23 3 XQ51 5 =E05+MK5/M506-4:B
=E05+MK5/M506-4:C Q51 24 4 XQ51 6 =E05+MK5/M506-4:E
=E05+MK5/M509-5:C Q51 27 5 XQ51 7 =E05+MK5/M509-5:B
=E05+MK5/M509-5:C Q51 28 6 XQ51 8 =E05+MK5/M509-5:D
7
8
9
10
11
12
=E05+COM/CO08-6:E =E05+COM/CO08-6:D
CA54 CA56
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-C1303 = CABLE
Ed. BINH AN =E05+COM-C1304 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA55
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 20 Form Panel: = ES Q15 E05 To Panel: = MK E05 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+MK5/M507-5:E XQ25 1 1 TB 441 =E05+MK5/M507-5:E
=E05+MK5/M507-5:F XQ15 3 2 TB 442 =E05+MK5/M507-5:F
=E05+MK5/M506-5:C Q15 23 3 XQ25 5 =E05+MK5/M506-5:B
=E05+MK5/M506-5:C Q15 24 4 XQ25 6 =E05+MK5/M506-5:E
=E05+MK5/M509-2:C Q15 27 5 XQ25 12 =E05+MK5/M509-2:B
=E05+MK5/M509-2:C Q15 28 6 XQ25 13 =E05+MK5/M509-2:D
=E05+MK5/M509-3:C Q15 55 7 XQ25 16 =E05+MK5/M509-3:B
=E05+MK5/M509-3:C Q15 56 8 XQ25 17 =E05+MK5/M509-3:D
9
10
11
12
=E05+COM/CO08-2:C =E05+COM/CO08-2:B
Cable length: 65 Form Panel: = MK E05 To Panel: = INC 22kV J1.1 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+MK5/M505-2:D X4 9 1 XQ22 1 =E05+MK5/M505-2:D
=E05+MK5/M505-2:D X4 10 2 XQ22 2 =E05+MK5/M505-2:E
=E05+MK5/M505-3:D PQ2 4 3 XQ22 3 =E05+MK5/M505-3:D
=E05+MK5/M505-3:D PQ2 9 4 XQ22 4 =E05+MK5/M505-3:E
=E05+MK5/M506-2:C PQ2 1 5 XQ22 5 =E05+MK5/M506-2:B
=E05+MK5/M506-2:D PQ2 3 6 XQ22 6 =E05+MK5/M506-2:E
=E05+MK5/M507-2:C X4 11 7 XQ22 7 =E05+MK5/M507-2:B
=E05+MK5/M507-2:D X4 12 8 XQ22 8 =E05+MK5/M507-2:D
9
10
11
12
=E05+MK5/M509-4:F X3 25 13 XQ22 13 =E05+MK5/M509-4:E
=E05+MK5/M509-5:F X3 30 14 XQ22 14 =E05+MK5/M509-5:E
15
16
17
18
CA55 CA57
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-C1305 = CABLE
Ed. BINH AN =E05+COM-C1306 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA56
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 65 Form Panel: = MK E05 To Panel: = INC 22kV J1.1 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
19
=E05+COM/CO08-6:C =E05+COM/CO08-6:B
Cable length: 24 Form Panel: = CP E05 To Panel: = INC 22kV J2.1 Cross-section: 4,0
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+CP5/C504-1:E XA1 1 1 XCT2 1 =E05+CP5/C504-2:E
=E05+CP5/C504-1:E XA1 3 2 XCT2 2 =E05+CP5/C504-2:E
=E05+CP5/C504-1:E XA1 5 3 XCT2 3 =E05+CP5/C504-2:E
=E05+CP5/C504-1:F XA1 2.4.6.7 4 XCT2 4 =E05+CP5/C504-2:F
=E05+COM/CO07-2:D =E05+COM/CO07-2:E
CA56 CA58
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-C1306 = CABLE
Ed. BINH AN =E05+COM-I1101 =E05+COM-I1102 +
Appr 110kV CHAU THANH SUBSTATION =E05+COM-I1201 =E05+COM-I1202 CT - 12102016 Page CA57
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 24 Form Panel: = RP E05 To Panel: = INC 22kV J1.1 Cross-section: 4,0
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+RP5/R503-1:E XA3 1 1 XCT873 1 =E05+RP5/R503-2:E
=E05+RP5/R503-1:E XA3 3 2 XCT873 2 =E05+RP5/R503-2:E
=E05+RP5/R503-1:E XA3 5 3 XCT873 3 =E05+RP5/R503-2:E
=E05+RP5/R503-1:E XA3 2.4.6.7 4 XCT873 4 =E05+RP5/R503-2:E
=E05+COM/CO07-2:F =E05+COM/CO07-4:B
3
4
=E05+COM/CO07-6:B =E05+COM/CO07-5:A
CA57 CA59
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-I1202 = CABLE
Ed. BINH AN =E05+COM-I1203 =E05+COM-I1204 +
Appr 110kV CHAU THANH SUBSTATION =E05+COM-I1205 =E05+COM-I1301 CT - 12102016 Page CA58
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
CA58 CA60
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-I1301 = CABLE
Ed. BINH AN =E05+COM-I1302 =E05+COM-I1303 +
Appr 110kV CHAU THANH SUBSTATION =E05+COM-I1304 CT - 12102016 Page CA59
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
CA59 CA61
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-I1305 = CABLE
Ed. BINH AN =E05+COM-I1306 =E05+COM-P1301 +
Appr 110kV CHAU THANH SUBSTATION =E05+COM-P1302 =E05+COM-P1303 CT - 12102016 Page CA60
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 20 Form Panel: = ES Q51 E05 To Panel: = MK E05 Cross-section: 2,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+MK5/M501-7:D TB 401 1 XAC 5 =E05+MK5/M501-7:D
=E05+MK5/M501-7:D TB 403 2 XAC 9 =E05+MK5/M501-7:D
=E05+COM/CO08-5:E =E05+COM/CO08-5:D
Cable length: 20 Form Panel: = ES Q15 E05 To Panel: = MK E05 Cross-section: 2,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+MK5/M501-7:D XAC 6 1 TB 401 =E05+MK5/M501-7:D
=E05+MK5/M501-7:D XAC 10 2 TB 403 =E05+MK5/M501-7:D
=E05+COM/CO08-2:C =E05+COM/CO08-2:B
CA60 CA62
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-P1304 = CABLE
Ed. BINH AN =E05+COM-P1305 =E05+COM-P1306 +
Appr 110kV CHAU THANH SUBSTATION =E05+COM-P1307 =E05+COM-P1308 CT - 12102016 Page CA61
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
18
19
=E05+COM/CO07-4:E =E05+COM/CO07-4:D
Cable length: 24 Form Panel: = CP E05 To Panel: = INC 22kV J2.1 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+CP5/C507-6:B XQ0 23 1 XS 2 =E05+CP5/C507-5:A
=E05+CP5/C507-6:B XQ0 24 2 XS 24 =E05+CP5/C507-6:C
=E05+CP5/C507-6:B XQ0 28 3 XS 25 =E05+CP5/C507-6:C
=E05+CP5/C507-7:B X4 20 4 XS 26 =E05+CP5/C507-7:C
=E05+CP5/C510-3:B X4 13 5 XA 3 =E05+CP5/C510-3:A
=E05+CP5/C510-3:B X4 14 6 XA 23 =E05+CP5/C510-3:C
=E05+CP5/C510-3:B X4 6 7 XA 24 =E05+CP5/C510-3:C
=E05+CP5/C510-4:F XSCA 2 8 XA 25 =E05+CP5/C510-4:C
=E05+CP5/C510-7:F XSCA 4 9 XA 26 =E05+CP5/C510-4:C
=E05+CP5/C510-4:B X3 34 10 XA 27 =E05+CP5/C510-4:C
=E05+CP5/C510-4:B X3 32 11 XA 28 =E05+CP5/C510-4:C
CA61 CA63
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-S1101 = CABLE
Ed. BINH AN =E05+COM-S1102 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA62
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 24 Form Panel: = CP E05 To Panel: = INC 22kV J2.1 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+CP5/C510-5:B X3 36 12 XA 29 =E05+CP5/C510-5:C
=E05+CP5/C510-5:B X2 13 13 XA 30 =E05+CP5/C510-5:C
=E05+CP5/C510-5:B X4 16 14 XA 31 =E05+CP5/C510-5:C
=E05+CP5/C510-6:B AX1 9 15 XA 32 =E05+CP5/C510-6:C
16
17
18
19
=E05+CP5/C510-4:F XSCA 2 8 XA 25 =E05+CP5/C510-4:C
=E05+CP5/C510-7:F XSCA 4 9 XA 26 =E05+CP5/C510-4:C
=E05+CP5/C510-6:B AX1 12 15 XA 32 =E05+CP5/C510-6:C
=E05+COM/CO07-2:D =E05+COM/CO07-2:E
14
15
16
17
18
19
CA62 CA64
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-S1102 = CABLE
Ed. BINH AN =E05+COM-S1103 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA63
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
12
=E05+COM/CO07-5:E =E05+COM/CO07-5:D
CA63 CA65
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-S1103 = CABLE
Ed. BINH AN =E05+COM-S1104 =E05+COM-S1105 +
Appr 110kV CHAU THANH SUBSTATION =E05+COM-S1301 CT - 12102016 Page CA64
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
9
10
11
12
=E05+COM/CO08-4:E =E05+COM/CO08-4:D
Cable length: 20 Form Panel: = ES Q51 E05 To Panel: = MK E05 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+MK5/M510-5:B Q51 29 1 XQ51 9 =E05+MK5/M510-5:B
=E05+MK5/M510-5:B Q51 30 2 XQ51 10 =E05+MK5/M510-5:C
=E05+MK5/M510-5:B Q51 32 3 XQ51 11 =E05+MK5/M510-5:C
=E05+MK5/M511-5:B Q51 33 4 XQ51 12 =E05+MK5/M511-5:B
=E05+MK5/M511-5:B Q51 34 5 XQ51 13 =E05+MK5/M511-5:C
=E05+MK5/M511-6:B Q51 36 6 XQ51 14 =E05+MK5/M511-6:C
7
=E05+COM/CO08-6:E =E05+COM/CO08-6:D
CA64 CA66
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-S1301 = CABLE
Ed. BINH AN =E05+COM-S1302 =E05+COM-S1303 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA65
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 20 Form Panel: = ES Q15 E05 To Panel: = MK E05 Cross-section: 1,5
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+MK5/M510-3:B Q15 29 1 XQ25 19 =E05+MK5/M510-3:B
=E05+MK5/M510-3:B Q15 30 2 XQ25 20 =E05+MK5/M510-3:C
=E05+MK5/M510-3:B Q15 32 3 XQ25 21 =E05+MK5/M510-3:C
=E05+MK5/M511-3:B Q15 33 4 XQ25 22 =E05+MK5/M511-3:B
=E05+MK5/M511-3:B Q15 34 5 XQ25 23 =E05+MK5/M511-3:C
=E05+MK5/M511-3:B Q15 36 6 XQ25 24 =E05+MK5/M511-3:C
7
=E05+COM/CO08-3:C =E05+COM/CO08-3:B
Cable length: 24 Form Panel: = CP E05 To Panel: = INC 22kV J2.2 Cross-section: 4,0
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+CP5/C504-1:A XV 2 1 XVB2 1 =E05+CP5/C504-2:A
=E05+CP5/C504-1:A XV 5 2 XVB2 3 =E05+CP5/C504-2:A
=E05+CP5/C504-1:A XV 8 3 XVB2 5 =E05+CP5/C504-2:A
=E05+CP5/C504-1:B XV 11 4 XVB2 7 =E05+CP5/C504-2:B
=E05+COM/CO07-3:E =E05+COM/CO07-3:D
CA65 CA67
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-S1304 = CABLE
Ed. BINH AN =E05+COM-V1101 =E05+COM-V1102 +
Appr 110kV CHAU THANH SUBSTATION =E05+COM-V1103 CT - 12102016 Page CA66
Modification Date Name Original Replacement of Replaced by Page 304
0 1 2 3 4 5 6 7 8 9
Cable length: 18 Form Panel: = MK E05 To Panel: = CVT BUS BOX A Cross-section: 4,0
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+MK5/M503-2:B TB a1 1 XVT1 1 =E05+MK5/M503-2:B
=E05+MK5/M503-2:B TB n1 2 XVT1 4 =E05+MK5/M503-2:B
=E05+MK5/M503-6:B TB a1 3 XVT2 1 =E05+MK5/M503-6:B
=E05+MK5/M503-6:B TB n1 4 XVT2 4 =E05+MK5/M503-6:B
=E05+COM/CO08-7:C =E05+COM/CO08-7:B
Cable length: 21 Form Panel: = MK E05 To Panel: = CVT BUS BOX B Cross-section: 4,0
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+MK5/M503-2:B TB a1 1 XVT1 2 =E05+MK5/M503-2:B
=E05+MK5/M503-3:B TB n1 2 XVT1 5 =E05+MK5/M503-3:B
=E05+MK5/M503-6:B TB a1 3 XVT2 2 =E05+MK5/M503-6:B
=E05+MK5/M503-7:B TB n1 4 XVT2 5 =E05+MK5/M503-7:B
=E05+COM/CO08-7:C =E05+COM/CO08-7:B
Cable length: 24 Form Panel: = MK E05 To Panel: = CVT BUS BOX C Cross-section: 4,0
Function text Page / column Connection Conductor Connection
Target designation from Target designation to Page / column Function text
point point
=E05+MK5/M503-3:B TB a1 1 XVT1 3 =E05+MK5/M503-3:B
=E05+MK5/M503-3:B TB n1 2 XVT1 6 =E05+MK5/M503-3:B
=E05+MK5/M503-7:B TB a1 3 XVT2 3 =E05+MK5/M503-7:B
=E05+MK5/M503-7:B TB n1 4 XVT2 6 =E05+MK5/M503-7:B
=E05+COM/CO08-8:C =E05+COM/CO08-8:B
CA66 =E05+COM/CO00
Date 11/22/2016 Electrical Testing Company Electrical Testing Company Cable diagram =E05+COM-V1301 = CABLE
Ed. BINH AN =E05+COM-V1302 =E05+COM-V1303 +
Appr 110kV CHAU THANH SUBSTATION CT - 12102016 Page CA67
Modification Date Name Original Replacement of Replaced by Page 304
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
800
500
800
500
0
0
SW Mimic Selector Switch K&N 1
A A
Q0 CB Discrepancy Switch K&N 1
2200
M Multimeter PA330 2
CP - E04
MK Tariff Meter Elster A1700 2
SW
C C
110KV
Q15
TU15 Q1
Q51
1000
800
Q0 L
50
D D
50
Q0-J22 L
OVAL HOLE 14 x 30
22KV
500
800
E E
CTT1 PTT1 CTT2 PTT2
SIDE VIEW FRONT VIEW BOTTOM VIEW Dimension (mm) : H2200 x W800 x D800 x T2.0
Protection Degree : IP41
Painted : M9697W Light Grey
F F
CO00 CO02
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 LAYOUT OF TRANSFORMER CONTROL BAY = E05
Drawn DO VINH PANEL
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH LAYOUT OF PANEL CT - 12102016 Pages 9 Page CO01
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
500
800
A A
0
2200
2000
SCT
B B
LK 60x60
MCB KLO KT TH DB
FINDER
1500
LK 60x60
C XAC
C
XC
4
XDC
8
XCT1 30
4
LK 80x60
LK 80x60
LK 80x60
XCT2
4 XS
M11 M12
XVB1
8
XVB2 30
8
1000
XSCA
XA
D 50 D
40
500
E E
SOCKET E
R
CO01 CO03
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 LAYOUT OF TRANSFORMER CONTROL BAY = E05
Drawn DO VINH PANEL
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH LAYOUT OF PANEL CT - 12102016 Pages 9 Page CO02
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
SỐ
KÝ HIỆU MÔ TẢ ĐVT
LƯỢNG
TỦ BẢO VỆ NGĂN MÁY BIẾN ÁP RP.E04 Tủ bảo vệ ngăn máy biến áp Tủ 1
500
800
500
800
A A
0
KLO Rơ-le trung gian (Auxiliary relay) Lô 1
RP.E04.D RP.E04.D F51P, F50G Rơ-le bảo vệ quá ḍng (Overcurrent Relay) Bộ 2
2000
F741, F742 Rơ-le giám sát mạch cắt (Trip Supervisor Circuit Relay) Bộ 2
B B
1500
F87T F87T
C C
F51P F50G F51P F50G
500
800
F861 F862 F741 F742 F861 F862 F741 F742
0
RT RT
1000
D D
500
TB871 TB872 TB51 TB871 TB872 TB51
E E
CO02 CO04
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 LAYOUT OF TRANSFORMER RELAY PANEL BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH LAYOUT OF PANEL CT - 12102016 Pages 9 Page CO03
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
500
800
A A
0
2200
2000
LK 60x60
MCB KBF TH
FINDER
B B
LK 60x60
XAC
4
XDC
8
XCT871
4
1500 XCT872
4
XCT873
4
XCT87N
XCT51P 2
4
C XCT51N 2 C
XC
LK 80x60
LK 80x60
LK 80x60
10
XT
30
XA
1000 25
D D
500
E E
SOCKET E
R
CO03 CO05
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 LAYOUT OF TRANSFORMER RELAY PANEL BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH LAYOUT OF PANEL CT - 12102016 Pages 9 Page CO04
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
SỐ
KÝ HIỆU MÔ TẢ ĐVT
LƯỢNG
TỦ ĐẤU DÂY NGOÀI TRỜI CHO MÁY BIẾN ÁP MK.E04 Tủ đấu dây ngoài trời cho máy biến áp Tủ 1
B B
500
800
500
600
0
0
1500
MK.E04.D
C C
1000
D D
500
E E
CO04 CO06
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 LAYOUT OF TRANSFORMER BAY = E05
Drawn DO VINH MARSHALLING KIOSK PANEL
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH LAYOUT OF PANEL CT - 12102016 Pages 9 Page CO05
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
B B
500
800
500
800
0
0
1500
C LK 80x60 C
MCB MCBVTB TH SUV
FINDER
LK 80x60 LK 80x60
XC XQ0 XQ1 XAC XCT XVT
10 10
20 30
1000 XDC 24
40
XR
LK 80x60
LK 80x60
LK 80x60
LK 80x60
LK 80x60
LK 80x60
LK 80x60
LK 80x60
10
10
XQ15
XS
D XQ22 D
20
30
20
XSCA
XQ51co
20
15m
500
E E
CO05 CO07
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 LAYOUT OF TRANSFORMER BAY = E05
Drawn DO VINH MARSHALLING KIOSK PANEL
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH LAYOUT OF PANEL CT - 12102016 Pages 9 Page CO06
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+LCTC2 +RCTC2
A A
-C1202 -I1203 -I1202 -I1205 -C1203
24 m 24 m 70 m 70 m 10 m
7G1,5 4G4,0 4G4,0 4G4,0 7G1,5
= RP E05 = RP E05 = RP E05 = RP E05 = RP E05
= INC 22kV J1.1 = INC 22kV J1.1 = LCTC1 = LCTC2 = RCTC2
+RP5
B B
D D
-C1103 -S1102 -I1102 -V1102 -V1103 -I1101 -V1101 -C1102 -S1101 -S1105 -P1301 -P1302 -I1201 -I1204 -C1201
24 m 24 m 24 m 24 m 10 m 55 m 55 m 55 m 55 m 55 m 55 m 55 m 55 m 55 m 55 m
7G1,5 19G1,5 4G4,0 4G4,0 4G4,0 4G4,0 4G4,0 7G1,5 19G1,5 12G1,5 2G2,5 2G2,5 4G4,0 4G4,0 12G1,5
= CP E05 = CP E05 = CP E05 = CP E05 = CP E05 = CP E05 = CP E05 = CP E05 = CP E05 = CP E05 = AC DIST = DC DIST = RP E05 = RP E05 = RP E05
= INC 22kV J2.1 = INC 22kV J2.1 = INC 22kV J2.1 = INC 22kV J2.2 = RCTC2 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05
F F
CO06 CO08
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 CABLE DIAGRAM BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH CABLE DIAGRAM CT - 12102016 Pages 9 Page CO07
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
B B
C C
+MK5
D D
-P1303 -P1304 -C1301 -C1302 -S1301 -P1305 -P1306 -C1303 -S1302 -P1307 -C1304 -S1303 -I1301 -I1302 -I1303 -I1304 -I1305 -I1306
14 m 14 m 14 m 14 m 14 m 20 m 20 m 20 m 20 m 20 m 20 m 20 m 10 m 10 m 13 m 13 m 16 m 16 m
2G2,5 2G2,5 19G1,5 19G1,5 7G1,5 2G2,5 2G2,5 19G1,5 12G1,5 2G2,5 12G1,5 7G1,5 4G4,0 4G4,0 4G4,0 4G4,0 4G4,0 4G4,0
= CB Q0 E05 = CB Q0 E05 = CB Q0 E05 = CB Q0 E05 = CB Q0 E05 = DS Q1 E05 = DS Q1 E05 = DS Q1 E05 = DS Q1 E05 = ES Q51 E05 = ES Q51 E05 = ES Q51 E05 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05
= MK E05 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05 = MK E05 = CT BOX A = CT BOX A = CT BOX B = CT BOX B = CT BOX C = CT BOX C
F F
CO07 +CP5/C500
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 CABLE DIAGRAM BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + COM
Checked LUONG NGOC THACH CABLE DIAGRAM CT - 12102016 Pages 9 Page CO08
Approval VO CONG CHIEN Replacement of Replaced by
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
=E01+CP1
HEATING & LIGHTING
A AC1+ P2102 1 1 2 A
220VAC-L
=E01+CP1/C101-8:A/
-XAC -XAC
AC1- 2 3 220VAC-N 4
=E01+CP1/C101-8:A/
B B
1 3
12 14
-MCBAC
2P-10 A 11
2 4
/C509-6:B
C C
1 HT FAN
D -DS TS D
2 0 °C~50 °C COM
-SOCKET
E 1 E
x1
x1
PE
-LIGHT -HEATER
220VAC
Flourescent Light with Contact x2 2
x2
F F
C500 C502
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 AC POWER SUPPLY BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP5
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 14 Page C501
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=E03+CP3
SIGNALING CONTROL AUX. DEVICE
POWER SUPPLY POWER SUPPLY POWER SUPPLY
A DC11+ P4101 1 1 2 A
110VDC +
=E03+CP3/C301-8:A/
-XDC -XDC
DC11- 2 3 110VDC - 4
=E03+CP3/C301-8:A/
DC12+ P4102 1 5 110VDC + 6
=E03+CP3/C301-8:A/
DC12- 2 7 110VDC - 8
=E03+CP3/C301-8:B/
B B
1 3 1 3 1 3
12 14 12 14
-MCB1 -MCB2 -MCB3
2P-10A 11 2P-10A 11 2P-10A
2 4 2 4 2 4
/C509-5:B
/C509-5:B
C C
D D
-XC 1 4 2 5 3 6 -XC 7 10 8 11 9 12
C1101 1 2
+RP5
E E
-S14+
-S14-
-C14+
-M21+
-M21-
-M22+
-M22-
-SCT4+
-SCT4-
C14+
C14-
/ C507-1:A
/ C507-1:F
/ +RP5/R505-4:B
/ +RP5/R505-4:B
/ C505-1:A
/ C503-6:C
/ C503-6:C
/ C504-6:C
/ C504-6:C
/ C508-2:C
/ C508-3:C
F F
C501 C503
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 DC POWER SUPPLY BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP5
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 14 Page C502
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+MK5 =E01+CP1
METERING FOR 110kV TARIFF METERING FOR 110kV MULTI-METER
B B
-PTT1
1 2
3 4
C502-6:E /
C502-6:E /
5 6
7 8
-M21+
-M21-
C C
-M11 -M21
ELSTER A1700 Diris A41
3x1(3x1,2)A Socomec
2 5 8 11 V1 V2 V3 VN A X
POWER SUPPLY
TARIFF MULTI
METER METER
D RS485 D
-CTT1
E IA14 I1101 1 1 1 2 E
+MK5/M504-1:F/
-XCT1
IB14 2 2 3 4
+MK5/M504-2:F/
IC14 3 3 5 6
+MK5/M504-2:F/
IN14 4 4 7 8
+MK5/M504-2:F/
F F
C502 C504
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 METERING FOR 110kV SIDE BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP5
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 14 Page C503
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=22kV+J2.2 +RCTC2
METERING FOR 22kV TARIFF METERING FOR 22kV MULTI-METER
A V1102 1 1 2 V1103 1 A
-XV 5 -XX x
3 5 6 3
-XV 8 -XX x
4 7 8 4
-XV 11 -XX x
B B
-PTT2
1 2
3 4
C502-7:E /
C502-7:E /
5 6
7 8
-M22+
-M22-
C C
-M12 -M22
ELSTER A1700 Diris A41
3x1(3x1,2)A Socomec
2 5 8 11 V1 V2 V3 VN A X
POWER SUPPLY
TARIFF MULTI
METER METER
D RS485 D
=22kV+J2.1
-CTT2
E I1102 1 1 1 2 E
-XA1 1 -XCT2
2 2 3 4
-XA1 3
3 3 5 6
-XA1 5
4 4 7 8
-XA1 2.4.6.7
F F
C503 C505
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 METERING FOR 22kV SIDE BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP5
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 14 Page C504
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A C14+ A
C502-5:E/
=COM+RTU
1 2
2 6
-SW
/C513-2:B 1 5
REM/SUP
1
-XSCA
+RP5 5 7
B B
-Q0
/C513-6:C 6 8
ON-P/OFF-P
C C
CL4+ C1101 3 13
+RP5/R511-5:F/
-XC
CL4 4 14
+RP5/R511-5:F/
-XC 15
D D
Spare Interlock
Jump if no use
-XC 16
E E
-XC 17 18
C1102 1 2
+MK5
CLOSE
OPEN
/ +MK5/M505-3:A
/ +MK5/M505-4:A
F F
C504 C506
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 CIRCUIT BREAKER CONTROL BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP5
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 14 Page C505
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
CONTROL Q1 FROM PANEL CONTROL J2.1 FROM PANEL RE/SUP FOR SCADA
+MK5 =22kV+J2.1
A A
/ +MK5/M506-6:B
/ +MK5/M506-7:B
/ +MK5/M506-8:B
-X3 17 -X3 18 -X3 20 -X3 19
COM1
Q1ON
Q1OFF
B B
C1102 3 4 5 C1103 1 2 3 4
-XC 19 20 21 22 24 25 23
C C
1 2
4 8 5 7 1 2
10 14 5 7 1 2
18 20 1 2
12 16
-SW -Q1 -SW -J2.1 -SW -SW
/C513-2:B 3 7 /C513-6:B 6 8 /C513-2:B 9 13 /C513-5:D 6 8 /C513-2:B 17 19 /C513-2:B 11 15
REM/SUP ON-P/OFF-P REM/SUP ON-P/OFF-P REM/SUP REM/SUP
D D
REMOTE
SUPERVISION
E E
-XSCA 4 5 6 7 9 10 8 11 15 16
=COM+RTU
F F
C505 C507
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 DISCONNECTOR SWITCH CONTROL BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP5
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 14 Page C506
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
Q25 INDICATOR Q1 INDICATOR Q52 INDICATOR Q0 INDICATOR J2.1 22kV INDICATOR LAMP DISCREPANCY
TEST SWITCH
A S14+ A
C502-3:E/
-XS 1 -XS 2
S1101 1 S1102 1
+MK5 =22kV+J2.1
S14+
/ +MK5/M510-3:F
/ +MK5/M510-3:F
/ +MK5/M510-4:F
/ +MK5/M510-4:F
/ +MK5/M510-5:F
/ +MK5/M510-5:F
/ +MK5/M510-6:F
/ +MK5/M510-6:F
/ +MK5/M510-7:F
-XQ0 23 -XQ0 27 -X4 19
/ +MK5/M510-2:F
B B
OQ25
CQ1
OQ1
CQ51
OQ51
CQ0
OQ0
LQ0
S1101 2 3 4 5 6 7 8 9 10 S1102 2 3 4
-XS 15 16 17 18 19 20 21 22 23 24 25 26 27 28
23
Q0 LOCAL MODE
-LT
24
J1.1 CLOSE
Q25 CLOSE
Q51 CLOSE
J1.1 OPEN
Q25 OPEN
Q51 OPEN
Q1 CLOSE
Q0 CLOSE
Q1 OPEN
Q0 OPEN
3 1 3 1 3 1
1 3
-Q1 -Q0 -J2.1 6 8 /C509-5:B
/C513-6:B 4 2 /C513-6:C 4 2 /C513-5:D 4 2 5
D OFF/ON OFF/ON OFF/ON D
14
12 11
24 7
31 29 25 23 19 21 /C512-3:C 15 13 9
22
-DB -DB -DB -DB -DB 34 -DB -DB -DB -KT
/C513-1:E 32 /C513-1:E 30 /C513-1:E 26 /C513-1:E 24 /C513-1:E 20 /C513-1:E 16 /C513-1:E 14 /C513-1:E 10 110VDC 2
32 31
44
42 41
E E
1 2 1 2
x1 28 x1 22 x1 18 A1 x1 12 x1 8
-Q1 -DB -Q0 -DB -LO -DB -J2.1 -DB -LJ2 -DB
-Q25 /C513-6:B x2 /C513-1:E 27 -Q51 /C513-6:C x2 /C513-1:E 21 110VDC x2 /C513-1:E 17 -KLO A2 /C513-5:D x2 /C513-1:E 11 110VDC x2 /C513-1:E 7
110VDC 4 110VDC 110VDC 4 110VDC 110 VDC 110VDC
C506 C508
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 INDICATOR BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP5
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 14 Page C507
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
-XA 1
S1103 1
+RP5
SC4
/ +RP5/R505-6:B
/ +RP5/R505-6:B
/ +RP5/R505-6:B
/ +RP5/R506-6:B
/ +RP5/R506-7:B
/ +RP5/R507-6:B
/ +RP5/R507-7:B
/ +RP5/R511-1:F
/ +RP5/R511-2:F
/ +RP5/R511-2:F
/ +RP5/R511-3:F
/ +RP5/R511-3:F
/ +RP5/R505-5:B
B 13 B
-RS 14
AL1
AL2
AL3
AL4
AL5
AL6
AL7
AL8
AL9
AL10
AL11
AL12
13
-ACK 14
13
S1103 2 3 4 5 6 7 8 9 10 11 12 13
-LT 14
/C507-8:C -XA 5 6 7 8 9 10 11 12 13 14 15 16
C C
C502-7:E /
C502-7:E /
F87 49 OPERATED
RELAY FAILURE
F87 DIFF.TRIP
F50/51P TRIP
F74-1 ALARM
F74-2 ALARM
MCB RP OFF
LAMP TEST
F86-1 TRIP
F86-2 TRIP
-SCT4+
F51N TRIP
-SCT4-
RESET
SC4
61 62 57 59 112 111 110 109 108 107 106 105 104 103 102 101
E BELL1 BELL2 -24V +24V DO DO DO DO DO DO DO DO DO DO DO DO E
+ x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2
-HORN -L1 -L2 -L3 -L4 -L5 -L6 -L7 -L8 -L9 -L10 -L11 -L12
- x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1
SC24+
F /C509-1:F F
C507 C509
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 ANNUNCIATION FOR PANEL BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP5
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 14 Page C508
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
-XA 2
S1101 11
+MK5 12 14 12 14 12 14
SC4
/ +MK5/M508-2:F
/ +MK5/M508-2:F
/ +MK5/M508-3:F
/ +MK5/M508-3:F
/ +MK5/M508-4:F
/ +MK5/M508-5:F
/C502-3:B /C502-4:B /C501-3:B
6 5
/ +MK5/M508-1:F
-KT
B /C507-8:E 8 B
AL13
AL14
AL15
AL16
AL17
AL18
S1101 12 13 14 15 16 17
-XA 17 18 19 20 21 22
C C
DISCREPANCY SWITCH
SPRING DISCHARGED
GAS SF6 ALARM
VT BUS 2 OFF
GAS SF6 TRIP
MCB MK OFF
MCB Q0 OFF
MCB CP OFF
D -SCT DI DI DI DI DI DI DI DI
D
/C508-1:D 13 14 15 16 17 18 19 20
24DI-48DO
100 99 98 97 96 95 94 93
E DO DO DO DO DO DO DO DO E
x2 x2 x2 x2 x2 x2 x2 x2
-L13 -L14 -L15 -L16 -L17 -L18 -L19 -L20
x1 x1 x1 x1 x1 x1 x1 x1
SC24+ SC24+
F C508-8:F/ /C510-1:F F
C508 C510
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 ANNUNCIATION FOR PANEL BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP5
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 14 Page C509
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
-XA 3 -XA 4
S1102 5 S1104 1
=22kV+J2.1 =COM+AC
/ =COM+AC/AC15-8:C
/ =COM+AC/AC15-8:D
SC4
COM1
COM2
-X4 13 -X4 5 -X3 33 -X3 31 -X3 35 -X2 12 -X4 15 -AX1 1 4
/ =COM+AC/AC15-8:C
/ C510-3:F
/ C510-3:F
/ C510-7:F
/ C510-7:F
B B
79
MCBVT
-X4 14 -X4 6 -X3 34 -X3 32 -X3 36 -X2 13 -X4 16 -AX1 9 12
AC
DC
S1102 6 7 8 9 10 11 12 13 14 15 S1104 2 3
-XA 23 24 25 26 27 28 29 30 31 32 33 34
C C
92 91 90 89 88 87 86 85 84 83 82 81
E DO DO DO DO DO DO DO DO DO DO DO DO E
x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2 x2
-L21 -L22 -L23 -L24 -L25 -L26 -L27 -L28 -L29 -L30 -L31 -L32
x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1 x1
SC24+
C509-8:F/ =22kV+J2.1 =22kV+J2.2
=22kV+J2.1 =22kV+J2.5 =22kV+J2.6 =22kV+J2.7 =22kV+J2.8 =22kV+J2.9
COM2
F COM1 C510-4:B/ F
C510-3:B/ -XSCA 3 -AX1 3
-XSCA 1 -X2 14 -X2 14 -X2 14 -X2 14 -X2 14
MCBVT
79 C510-4:B/
C510-4:B/ -XSCA 4 -AX1 11
-XSCA 2 -X2 15 -X2 15 -X2 15 -X2 15 -X2 15
C509 C511
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 ANNUNCIATION FOR PANEL BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP5
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 14 Page C510
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
=COM+RTU
B B
-XSCA 12 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
C C
DISCREPANCY SWITCH
SPRING DISCHARGED
F74-2 ALARM
MCB MK OFF
MCB Q0 OFF
MCB RP OFF
MCB CP OFF
F86-1 TRIP
F86-2 TRIP
COMMON
D -SCT COM DO DO DO DO DO DO DO DO DO DO DO DO DO DO DO DO DO DO DO
D
/C508-1:D S S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 S17 S18 S19 S20 S24 S29 S30 S31 S32
24DI-48DO
E E
F F
C510 C512
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 ANNUNCIATION FOR SCADA BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP5
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 14 Page C511
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+MK5
A A
/ +MK5/M511-2:F
/ +MK5/M511-3:F
/ +MK5/M511-3:F
/ +MK5/M511-4:F
/ +MK5/M511-4:F
/ +MK5/M511-4:F
/ +MK5/M511-5:F
/ +MK5/M511-5:F
/ +MK5/M511-6:F
/ +MK5/M511-6:F
/ +MK5/M511-7:F
SCOM
SCQ25
SOQ25
SCQ1
SOQ1
SMQ1
SLQ1
SCQ51
SOQ51
SCQ0
SOQ0
B B
S1105 1 2 3 4 5 6 7 8 9 10 11
22 24
-KLO
C /C507-5:E 21 C
LOCAL MODE OF Q0
Q1 LOCAL MODE
Q1 MCB OFF
Q25 CLOSE
Q51 CLOSE
Q25 OPEN
Q51 OPEN
Q1 CLOSE
Q0 CLOSE
Q1 OPEN
Q0 OPEN
COM+
D D
-XSCA 13 36 37 -XSCA 14 38 39 40 41 42 43 44 45 46 47
=COM+RTU
E E
F F
C511 C513
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 ANNUNCIATION FOR SCADA BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP5
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 14 Page C512
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
B B
1 2
2 4 6 8 10 12 14 16 18 20 1 2
x1 1 3 5 7 9 11
-SW -Q1
1 3 5 7 9 11 13 15 17 19 x2 2 4 6 8 10 12
SWITCH 2 POS SWITCH DS
/C505-4:A /C506-2:D /C505-5:A /C506-2:D /C506-4:D /C506-7:D /C506-4:D /C506-8:D /C506-6:D /C506-6:D /C507-2:E /C507-3:D /C507-2:D /C506-3:D /C506-3:D
K&N K&N
5NO & 5NC 3NO & 3NC
C C
1 2
x1 1 3 5 7 9 11
-Q0
x2 2 4 6 8 10 12
SWITCH CB
/C507-4:E /C507-4:D /C507-4:D /C505-4:B /C505-5:B
K&N
3NO & 3NC
D x1 1 3 5 7 9 11 D
1 2
-J2.1
x2 2 4 6 8 10 12
SWITCH DS
/C507-6:E /C507-6:D /C506-5:D
K&N
3NO & 3NC
E E
31 29 27 25 23 21 19 17 15 13 11 9 7 5 3 1
-DB
32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2
/C507-2:E /C507-3:E /C507-2:E /C507-4:E /C507-4:E /C507-4:E /C507-5:E /C507-5:E /C507-6:E /C507-6:E /C507-6:E /C507-7:E /C507-7:E
DIODE BOARD
CONNECTWELL
16D-1A
F F
C512 +RP5/R500
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 REFERENCE FOR DEVICE BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + CP5
Checked LUONG NGOC THACH CONTROL PANEL CT - 12102016 Pages 14 Page C513
Approval VO CONG CHIEN Replacement of Replaced by
Electrical Testing Company
Address 1: 22 bis Phan Dang Luu St., 6th Ward, Binh Thanh Dist.
Address 2:
Phone: +84-08 38 414 903
Fax: +84-08 35 511 689
Customer
Address:
Phone:
Fax:
=E01+RP1
HEATING & LIGHTING
A AC2+ P2202 1 1 2 A
220VAC-L
=E01+RP1/R101-8:A/
-XAC -XAC
AC2- 2 3 220VAC-N 4
=E01+RP1/R101-8:A/
B B
1 3
12 14
-MCBAC
2P-10A 11
2 4
/R511-4:B
C C
1 HT FAN
D -DS TS D
2 0 °C~50 °C COM
-SOCKET
E 1 E
x1
x1
PE
-LIGHT -HEATER
220VAC
Flourescent Light with Contact x2 2
x2
F F
R500 R502
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 AC POWER SUPPLY BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP5
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R501
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=E03+RP3
MAIN RELAY POWER SUPPLY FOR BACKUP RELAY POWER SUPPLY FOR TRIP 2
POWER SUPPLY LOCK-OUT RELAY 1 POWER SUPPLY LOCK-OUT RELAY 2 POWER SUPPLY
A DC21+ P4201 1 1 2 A
110VDC +
=E03+RP3/R301-8:A/
-XDC -XDC
DC21- 2 3 110VDC - 4
=E03+RP3/R301-8:A/
DC22+ P4202 1 5 110VDC + 6
=E03+RP3/R301-8:A/
DC22- 2 7 110VDC - 8
=E03+RP3/R301-8:B/
B B
1 3 1 3 1 3
12 14 12 14 12 14
-MCB1 -MCB2 -MCB3
2P-10A 11 2P-10A 11 2P-10A 11
2 4 2 4 2 4
/R511-3:B
/R511-3:B
/R511-4:B
C C
D D
E E
F87+
F87-
R14+
R14-
F50+
F50-
R24+
R24-
T14+
T14-
/ R503-1:F
/ R503-1:F
/ R505-1:A
/ R508-1:F
/ R504-3:C
/ R504-3:D
/ R506-1:B
/ R506-1:F
/ R506-1:A
/ R510-5:D
F F
R501 R503
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 DC POWER SUPPLY BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP5
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R502
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+MK5
-TB871 -F87
/R513-1:A IA1
IA24 I1201 1 1 /R512-2:A 1 2 VC1-5 VC1-6
A +MK5/M504-3:F/ A
-XCT871 IB1
IB24 2 2 3 4 VC1-7 VC1-8
+MK5/M504-4:F/
IC1
IC24 3 3 5 6 VC1-9 VC1-10
+MK5/M504-4:F/
IN24 4 4 7 8
+MK5/M504-4:F/
B B
+LCTC2
IN1
I1202 1 1 17 18 VC1-23 VC1-24
-XX x -XCT87N
2 2 19 20
-XX x
C C
IA2
1 21 22 VC1-11 VC1-12
-XCT872 IB2
2 23 24 VC1-13 VC1-14
IC2
3 25 26 VC1-15 VC1-16
4 27 28
D D
=22kV+J2.1 -TB872
IA3
I1203 1 1 /R512-2:B 1 2 VC1-17 VC1-18
-XA3 1 -XCT873 IB3
2 2 3 4 VC1-19 VC1-20
-XA3 3 IC3
3 3 5 6 VC1-21 VC1-22
-XA3 5
E 4 4 7 8 E
-XA3 2.4.6.7
-TB871
+
F87+ /R512-2:A 13 14 13 14 T4-29
R502-2:E/
-
F87- 15 16 15 16 T4-31
R502-3:E/ U
F F
R502 R504
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 ANALOGUE INPUT FOR MAIN RELAY BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP5
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R503
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
+MK5
-TB51 -F51P
/R514-1:A IA
IA34 I1204 1 1 /R512-2:C 21 22 VC1-7 VC1-8
+MK5/M504-5:F/
-XCT51P IB
IB34 2 2 23 24 VC1-9 VC1-10
+MK5/M504-5:F/
IC
IC34 3 3 25 26 VC1-11 VC1-12
+MK5/M504-6:F/
B IE1 B
VC1-14 VC1-13
IE2
VC1-15 VC1-16
IN34 4 4 27 28
+MK5/M504-6:F/
+
F50+ 13 14 T2-29
R502-4:E/
-
T2-31 U
C C
-F51N
/R514-1:D
+
T2-29
-
D F50- 15 16 T2-31 D
R502-4:E/ U
+LCTC2
IE1
I1205 1 1 17 18 VC1-13 VC1-14
-XX x -XCT51N IE2
2 2 19 20 VC1-16 VC1-15
-XX x
E E
F F
R503 R505
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 ANALOGUE INPUT FOR BACKUP RELAY BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP5
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R504
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
R14+ R14+
R502-3:E/ /R508-1:A
+CP5
/ +CP5/C502-5:E
/ +CP5/C502-5:E
/ +CP5/C508-3:B
/ +CP5/C508-3:B
/ +CP5/C508-3:B
/ +CP5/C508-4:B
B B
C14+
C14-
SC4
AL1
AL2
AL3
/ R508-1:A
C1101 1 2 S1103 1 2 3 4
C C
-XC 1 3 -XA 1 3 4 5 6
TR861
-XC 2 4 -XA 2
C14-
/R510-1:D
C14+
/R510-1:A
D D
TC14 WD4
/R510-1:A /R506-7:C
F87 49 OPERATED
F87 50REF TRIP
RELAY FAILURE
F87 DIFF. TRIP
TRIP COIL 1
TRIP 861
-F87
/R513-1:A
E E
SC4
/R506-1:A
F F
R504 R506
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 DIGITAL OUTPUT OF MAIN RELAY BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP5
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R505
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
START 50BF FOR TRIP F86-2 FROM TRIP 50BF FROM TRIP COIL 2 FROM ANUNCIATION FROM BACKUP RELAY
BACKUP RELAY BACKUP RELAY BACKUP RELAY BACKUP RELAY
SC4 SC4
A R505-8:F/ /R507-1:A A
T14+ T14+
R502-6:E/ /R507-1:A
R24+ R24+
R502-5:E/ /R507-1:B
+CP5
/ +CP5/C508-4:B
/ +CP5/C508-4:B
B B
AL4
AL5
/ R509-1:A
/ R509-1:D
/ R510-4:A
S1103 5 6
30 31 30 31
-F861 -F862
/ R505-8:D
C /R512-2:D 3 /R512-2:E 3 C
-XA 7 8
TR862-1
BF4
TC24-1
WD4
WD4
/R507-7:D
5
D -TB51 D
/R512-2:C 6
BREAKER FAILURE 4
RELAY FAILURE
TRIP COIL 2-1
F50/51P TRIP
START BF4
TRIP 862
SPARE
-F51P
/R514-1:A
E T1-1 T1-3
E
T1-2 T1-4
F F
R24- R24-
R502-5:E/ /R509-1:F
R505 R507
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 DIGITAL INPUT & OUTPUT OF BACKUP BAY = E05
Drawn DO VINH RELAY 1
110kV CHAU THANH SUBSTATION
PANEL + RP5
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R506
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
TRIP F86-2 FROM TRIP 50BF FROM TRIP COIL 2 FROM ANUNCIATION FROM BACKUP RELAY
BACKUP RELAY BACKUP RELAY BACKUP RELAY
SC4 SC4
A R506-8:A/ /R511-1:A A
T14+ T14+
R506-8:A/ /R510-4:A
R24+ R24+
R506-8:B/ /R509-1:A
+CP5
/ +CP5/C508-5:B
/ +CP5/C508-5:B
B B
AL6
AL7
/ R509-1:B
/ R510-4:B
S1103 7 8
C C
-XA 9 10
TR862-2
TC24-2
WD4
/R506-8:D
D D
RELAY FAILURE
TRIP COIL 2-2
F51N TRIP
TRIP 862
-F51N
/R514-1:D
E E
F F
R506 R508
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 DIGITAL OUTPUT OF BACKUP RELAY 2 BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP5
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R507
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
TRIP FROM 50BF INTERNAL 50BF TRIP 50BF TRIP RESET RESET
MAIN RELAY TRIP FROM E01 FROM E03 REMOTE LOCKOUT
R14+
A R505-8:A/ A
TR861
R505-3:C/ =E01+RP1 =E03+RP3
-XT 11 12 13 14 15
C2203 3 C4205 3
BF14+
BF34+
=E01+RP1/R109-8:C /
=E03+RP3/R308-8:C /
10 12 14 13
/ =E01+RP1/R109-8:C
/ =E03+RP3/R308-8:C
B B
-TB871 -KBF
/R512-2:A 9 /R509-2:E 11 -RE 14
/R509-6:B
BF14
BF34
4 4
C C
-XT 16 17 18 19 20
D D
E E
b d
-F861
/R512-2:D a /R512-2:D c
Trip Coil Reset Coil
R14-
R502-3:E/
F F
R507 R509
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 TRIP LOCKOUT F861 BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP5
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R508
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
TRIP FROM 50BF INTERNAL INTERNAL TRANS. 50BF TRIP RESET RESET
MAIN RELAY TRIP SEND TRIP FROM 22kV J2.1 REMOTE LOCKOUT
R24+
A R507-8:B/ =E03+RP3 A
-X x -X4 3 2 BF43
8 10 22 24 23 /=E03+RP3/R308-4:B
B 32 B
-TB51 -TB51 -KBF
/R512-2:C 7 /R512-2:C 9 /R509-2:E 21 -RE 24
/R508-6:B
=E01+RP1
42 44
2 6
-KBF
C /R509-2:E 41 C
-XT 26 27 28 29 30
2 BF41
/=E01+RP1/R109-4:B
34
BF4
R506-4:C/
D D
12
-TB51
/R512-2:C 11
E E
A1 b d
-KBF -F862
110 VDC A2 /R512-2:E a /R512-2:E c
Trip Coil Reset Coil
R24-
R506-8:F/
14
11 /R508-2:B
12
F 24 F
21 /R509-2:B
22
34
31 /R509-7:B
32
44
41 /R509-7:C
42
R508 R510
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 TRIP LOCKOUT F862 & BF TRIP BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP5
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R509
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
TRIP FROM TRIP FROM TRIP FROM TRIP CIRCUIT SUPERVISION 1 TRIP FROM TRIP FROM TRIP FROM TRIP CIRCUIT SUPERVISION 2
MAIN RELAY RELAY F861 RELAY F862 BACKUP RELAY RELAY F861 RELAY F862
C14+ T14+
A R505-4:D/ R507-8:A/ A
TC14 TC24-1
R505-4:D/ R506-5:C/
TC24-2
R507-5:C/
B B
-F74-1 -F74-2
12 80 81 80 81 110VDC 1 4 13 9 14 10 4 2 70 71 70 71 110VDC 1 4 13 9 14 10
-TB871 -F861 -F862 -TB51 -TB51 -F861 -F862
/R512-2:A 11 /R512-2:D 8 /R512-2:E 8 12 8 2 5 6 /R512-2:C 3 /R512-2:C 1 /R512-2:D 7 /R512-2:E 7 12 8 2 5 6
/R511-2:B
/R511-5:B
/R511-3:B
/R511-5:B
C C
C14- T14-
R505-4:D/ R502-6:E/
D D
TRIPPING COIL 1
TRIPPING COIL 2
TCS1 CLOSE
TCS2 CLOSE
TCS1 OPEN
TCS2 OPEN
C14+
T14+
C14-
T14-
E E
-XT 1 -XT 2 3 4 5 -XT 6 -XT 7 8 9 10
C1201 1 2 3 4 5 C1201 6 7 8 9 10
+MK5
TRIP1
TCSC1
TCSO1
C14-
C14+
TRIP2
TCSC2
TCSO2
T14-
T14+
/ +MK5/M505-5:A
/ +MK5/M505-5:A
/ +MK5/M505-6:A
/ +MK5/M505-6:A
/ +MK5/M505-6:A
/ +MK5/M505-7:A
/ +MK5/M505-7:A
/ +MK5/M505-7:A
/ +MK5/M505-8:A
/ +MK5/M505-8:A
F F
R509 R511
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 TRIP CIRCUIT SUPERVISION BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP5
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R510
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
SC4
A R507-8:A/ A
14 10
-F74-1
/R510-3:B 6
B B
40 41 40 41 13 9 13 9 12 14 12 14 12 14 12 14 14 10
-F861 -F862 -F74-1 -F74-2 -F74-2
/R512-2:D 4 /R512-2:E 4 /R510-3:B 5 /R510-7:B 5 -MCB1 11 -MCB2 11 -MCB3 11 -MCBAC 11 /R510-7:B 6
/R502-2:B /R502-4:B /R502-6:B /R501-3:B
C 10 11 20 21 50 51 50 51 C
-F861 -F861 -F861 -F862
/R512-2:D 1 /R512-2:D 2 /R512-2:D 5 /R512-2:E 5
10 11 20 21
-F862 -F862
/R512-2:E 1 /R512-2:E 2
D D
F74-1 ALARM
F74-2 ALARM
MCB RP OFF
F861 TRIP
F862 TRIP
CL4+
CL4
-XA 11 12 13 14 15 -XC 5 6 7 8 9 10
E E
+CP5 =22kV+J2.1
S1103 9 10 11 12 13 C1101 3 4 C1202 1 2 3 4
AL8
AL9
AL10
AL11
AL12
CL4+
CL4
-X3 4 -X3 8 -X3 24 -X3 29
/ +CP5/C508-5:B
/ +CP5/C508-6:B
/ +CP5/C508-6:B
/ +CP5/C508-6:B
/ +CP5/C508-7:B
/ +CP5/C505-1:C
/ +CP5/C505-1:D
F F
R510 R512
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 SIGNALING & INTERLOCK BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP5
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R511
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
1 3 5 7 10 12 13 15 17 19 21 23 25 27
A A
-TB871
2 4 6 8 9 11 14 16 18 20 22 24 26 28
TEST BLOCK
/R503-4:A /R503-4:A /R503-4:A /R503-4:B /R508-2:B /R510-1:B /R503-3:F /R503-3:F /R503-4:B /R503-4:C /R503-4:C /R503-4:C /R503-4:D /R503-4:D
ALSTOM
28 PINS
1 3 5 7 9 11 13 15 17 19 21 23 25 27
B -TB872 B
2 4 6 8 10 12 14 16 18 20 22 24 26 28
TEST BLOCK
/R503-4:E /R503-4:E /R503-4:E /R503-4:E /R503-4:F /R503-4:F
ALSTOM
28 PINS
2 4 5 8 10 12 13 15 17 19 21 23 25 27
C -TB51 C
1 3 6 7 9 11 14 16 18 20 22 24 26 28
TEST BLOCK
/R510-5:B /R510-5:B /R506-2:D /R509-1:B /R509-2:B /R509-2:D /R504-4:C /R504-4:D /R504-4:E /R504-4:E /R504-4:B /R504-4:B /R504-4:B /R504-4:B
ALSTOM
28 PINS
10 11 20 21 30 31 40 41 50 51 60 61 70 71 80 81 b d
D -F861 D
1 2 3 4 5 6 7 8 a c
LOCKOUT RELAY /R511-5:C /R511-7:C /R506-2:C /R511-1:B /R511-8:C /R510-6:B /R510-2:B /R508-5:E /R508-6:E
ARTECHE
8 NO/NC
TWO COILS
10 11 20 21 30 31 40 41 50 51 60 61 70 71 80 81 b d
E E
-F862
1 2 3 4 5 6 7 8 a c
LOCKOUT RELAY /R511-5:D /R511-7:D /R506-2:C /R511-2:B /R511-8:C /R510-6:B /R510-2:B /R509-5:E /R509-6:E
ARTECHE
8 NO/NC
TWO COILS
F F
R511 R513
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 REFERENCE FOR DEVICE BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP5
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R512
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+
A F87 A
BO1 /R505-6:E
DIFF. TRIP
-F87 V
BI1
-
T2-2
(ALARM) T3-1 T3-2
T2-3
Toshiba
+
VC1-2 F87
GRT200-21-224-00-13-10-111 BI2 50REF TRIP
BO2 /R505-6:E
T2-4
(ALARM) T3-3 T3-4
VC1-5 -
T2-5
+
F87
/R503-6:A IA1 BI3 49 OPERATED
BO3 /R505-6:E
T2-6
- (ALARM) T3-5 T3-6
FAIL1
VC1-6 T2-7
+
T4-3
BO4 /R505-3:E
B VC1-7
BI4 TRIP 86 B
/R505-7:E T2-8
-
T3-7 T3-8
T4-1 T4-2 IB1 T2-9
+
/R503-6:A
BI5
TRIP BO5 /R505-4:E
T2-10 COIL 1
VC1-8 -
T3-9 T3-10
T2-11
+
FAIL2 VC1-9 BO6
BI6
T4-9 T2-12
T3-11 T3-12
/R503-6:A IC1 -
T2-13
+
VC1-10 BI7 BO7
T4-7 T4-8
T2-14
T3-13 T3-14
C - C
T2-15
+
VC1-11 BO8
BI8
T2-16
T3-15 T3-16
/R503-6:C IA2 -
T2-17
+
AC OR DC
AUX. SUPPLY VC1-12 BI9 BO9
+
T4-29 T2-18
T3-17 T3-18
/R503-6:F -
- VC1-13 T2-21
+
U T4-31
BO10
/R503-6:C IB2 BI10
T2-22
-
T3-21 T3-22
T2-23
D VC1-14 D
+
BI11 BO11
T2-24
VC1-15 -
T3-23 T3-24
+ T2-25
+
/R503-6:D IC2 BO12
BI12
T2-26
T3-25 T3-26
VC1-16 -
T2-27
+
BI13 BO13
T2-28
VC1-23 VC1-17 -
T3-27 T3-28
T2-29
+
BI 16 BO16
VC1-26 VC1-20 T2-34
-
T3-33 T3-34
T2-35
VC1-27 VC1-21
+
BI 17 BO17
R512 R514
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 REFERENCE FOR MAIN RELAY BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + RP5
Checked LUONG NGOC THACH RELAY PANEL CT - 12102016 Pages 15 Page R513
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+
FAIL 1 /R506-7:E
A START RELAY A
IA /R506-2:E
-F51P /R504-6:B BREAKER
FAILURE
BI1
-
T1-2 TRIP 86
BO1
T1-21 T1-22
/R506-4:E FAILURE
(ALARM)
T2-3 T2-2
VC1-8
Toshiba T1-3
+
GRD200-11-113-00-13-10-110 F50/51 FAIL 2
T2-7
BI2 /R506-3:E BO2 /R506-6:E
VC1-9 SPARE T1-4 TRIP
- (ALARM) T1-23 T1-24 T2-9 T2-8
T1-5
IB
+
/R504-6:B AUXILIARY AC OR DC +
BI3 BREAKER BO3 /R506-4:E T2-29
VC1-10 T1-6 POWER AUX. SUPPLY /R504-6:C
FAILURE T1-25 T1-26
- SUPPLY -
U T2-31
T1-7
B B
+
VC1-11 F50/51
BI4 BO4 /R506-7:E
T1-8 50BF TRIP
- (ALARM) T1-27 T1-28
/R504-6:B IC
T1-9
+
VC1-12
BI5 TRIP BO5 /R506-5:E
T1-10 COIL 2
- T1-29 T1-30
VC1-13 T1-11
+
BI6 BO6
IE1 T1-12
/R504-6:B - T1-31 T1-32
C VC1-14 T1-13 C
+
BI7 BO7
T1-14
VC1-15 - T1-33 T1-34
T1-15
+
/R504-6:B IE2 BI8 BO8
T1-38
T1-16
VC1-16 -
T1-36 T1-37
+
FAIL 1 /R507-7:E
RELAY
D -F51N IA
BI1
-
T1-2 TRIP 86
BO1
T1-21 T1-22
/R507-4:E FAILURE
(ALARM)
T2-3 T2-2 D
Toshiba VC1-8 T1-3
+
GRD200-11-113-00-13-10-110 F50/51 FAIL 2
T2-7
BI2 BO2 /R507-6:E
T1-4 TRIP
VC1-9
- (ALARM) T1-23 T1-24 T2-9 T2-8
T1-5
+
+
IB AUXILIARY AC OR DC +
BI3 BO3
POWER AUX. SUPPLY T2-29 /R504-6:D
VC1-10 T1-6
- T1-25 T1-26 SUPPLY -
U T2-31
T1-7
+
VC1-11
BI4 BO4
E T1-8 E
- T1-27 T1-28
IC T1-9
+
VC1-12
BI5 TRIP BO5 /R507-5:E
T1-10 COIL 2
- T1-29 T1-30
VC1-13 T1-11
+
BI6 BO6
T1-12
/R504-6:E IE1 - T1-31 T1-32
VC1-14 T1-13
+
F BI7 BO7 F
VC1-15 T1-14
- T1-33 T1-34
T1-15
T1-38
+
Customer
Address:
Phone:
Fax:
=COM+AC
HEATING & LIGHTING HEATING & LIGHTING FOR DEVICE
A ACM4+ P1301 1 1 A
220VAC-L
=COM+AC/AC11-7:F/
-XAC
ACM4- 2 2 220VAC-N
=COM+AC/AC11-7:F/
B B
1 3 1 3
12 14 12 14
-MCB1 -MCB2
2P-10A 11 2P-10A 11
2 4 2 4
/M508-4:C
/M508-4:C
C C
-XAC 3 7 4 8 5 9 6 10
1 1 HT FAN
D -DS1 -DS2 TS D
P1303 1 2 P1305 1 2 P1307 1 2 P1308 1 2
2 2 0 °C~50 °C COM
AC+
AC-
-TB 401 403 -TB 401 403 -TB 401 403
M514-2:A /
M514-2:A /
-SOCKET
E 1 E
x1 x1
x1
PE
-LIGHT2 -LIGHT1 -HEATER +Q0 +Q1 +Q51 +Q25
220VAC 220VAC CIRCUIT BREAKER DISCONNECTOR EARTHING SWITCH EARTHING SWITCH
x2 2
x2 x2
F F
M500 M502
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 AC POWER SUPPLY BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK5
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 15 Page M501
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
=COM+DC
POWER SUPPLY TO POWER SUPPLY TO
MOTOR DEVICE 1 MOTOR DEVICE 2
A DCM4+ P1302 1 1 A
110VDC +
=COM+DC/DC06-5:F/
-XDC
DCM4- 2 2 110VDC -
=COM+DC/DC06-5:F/
B B
1 3 1 3
12 14 12 14
-MCB3 -MCB4
2P-10A 11 2P-10A 11
2 4 2 4
/M508-4:C
/M508-5:C
C C
-XDC 3 5 4 6 -XDC 7 9 8 10
D D
P1304 1 2 P1306 1 2
M2+
M2-
DC+
DC-
M514-1:A /
/ M507-1:A
/ M507-1:F
-TB 439 420
E E
-TB 441 442
F F
M501 M503
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 DC POWER SUPPLY BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK5
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 15 Page M502
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
B B
-XVT1 1 4 2 5 3 6 -XVT2 1 4 2 5 3 6
C C
1 3 5 1 3 5
12 14 12 14 22 24 32 34
-MCBVTB1 -MCBVTB2
3P-2A 11 3P-2A 11 21 31
2 4 6 2 4 6
/M508-5:C
/M508-6:C
/M508-7:C
/M508-8:C
D D
-XVT1 7 8 9 10 -XVT2 7 8 9 10
+CP5 =E01+RP1
E V1101 1 2 3 4 V2104 1 2 3 4 E
UA11
UB11
UC11
UN11
UA12
UB12
UC12
UN12
+CP5/C503-1:A /
+CP5/C503-1:A /
+CP5/C503-1:A /
+CP5/C503-1:B /
=E01+RP1/R103-1:A /
=E01+RP1/R103-1:A /
=E01+RP1/R103-1:A /
=E01+RP1/R103-1:B /
F F
M502 M504
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 VT BUS CIRCUIT BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK5
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 15 Page M503
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+CTB_A +CTB_B +CTB_C +CTB_A +CTB_B +CTB_C +CTB_A +CTB_B +CTB_C +CTB_A +CTB_B +CTB_C
B B
1S1
1S2
1S1
1S2
1S1
1S2
2S1
2S2
2S1
2S2
2S1
2S2
3S1
3S2
3S1
3S2
3S1
3S2
4S1
4S2
4S1
4S2
4S1
4S2
-TB -TB -TB -TB -TB -TB -TB -TB -TB -TB -TB -TB
I1301 1 2 I1303 1 2 I1305 1 2 I1301 3 4 I1303 3 4 I1305 3 4 I1302 1 2 I1304 1 2 I1306 1 2 I1302 3 4 I1304 3 4 I1306 3 4
C C
-XCT 1 4 2 5 3 6 -XCT 7 10 8 11 9 12 -XCT 13 16 14 17 15 18 -XCT 19 22 20 23 21 24
D D
+CP5 +RP5
IB14
IC14
IN14
IA24
IB24
IC24
IN24
IA34
IB34
IC34
IN34
+CP5/C503-1:E /
+CP5/C503-1:E /
+CP5/C503-1:E /
+CP5/C503-1:F /
+RP5/R503-1:A /
+RP5/R503-1:A /
+RP5/R503-1:A /
+RP5/R503-1:B /
+RP5/R504-1:B /
+RP5/R504-1:B /
+RP5/R504-1:B /
+RP5/R504-1:B /
F F
M503 M505
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 CT CIRCUIT BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK5
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 15 Page M504
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
/ +CP5/C505-4:F
/ +CP5/C505-5:F
/ +RP5/R510-2:F
/ +RP5/R510-3:F
/ +RP5/R510-3:F
/ +RP5/R510-4:F
/ +RP5/R510-4:F
/ +RP5/R510-6:F
/ +RP5/R510-7:F
/ +RP5/R510-7:F
/ +RP5/R510-8:F
/ +RP5/R510-8:F
A A
CLOSE
OPEN
TRIP1
TCSC1
TCSO1
C14-
C14+
TRIP2
TCSC2
TCSO2
T14-
T14+
C1102 1 2 C1201 1 2 3 4 5 6 7 8 9 10
B -XC 1 2 B
C1303 6 8 9
+Q1 23 25 27
DISCONNECTOR
24 26 28
C C
C1303 7 10 11
-XQ22 1 -XQ22 3
C1306 1 3
D =22kV+J2.1 D
INCOMING -X4 9 -PQ2 4 -PQ2 7
Test position Service position Q0
TRIPPING COIL 1
TRIPPING COIL 2
-X4 10 -PQ2 6 -PQ2 9
TCS 1 CLOSE
TCS 2 CLOSE
TCS 1 OPEN
TCS 2 OPEN
C1306 2 4
C14+
T14+
C14-
T14-
-XQ22 2 -XQ22 4
E E
-XQ0 1 -XQ0 2 -XQ0 3 -XQ0 4 -XQ0 5 6 7 8 9 10 11 12 13 14
C1301 1 2 3 4 5 6 7 8 9 10 11 12 13 14
+Q0
INL+
INL-
CLOSE
OPEN
TRIP1
TCSC1
TCSO1
C14-
C14+
TRIP2
TCSC2
TCSO2
T14-
T14+
CIRCUIT BREAKER
M513-2:A /
M513-3:A /
M513-2:A /
M513-4:A /
M513-4:A /
M513-5:A /
M513-5:A /
M513-1:A /
M513-1:A /
M513-7:A /
M513-7:A /
M513-8:A /
M513-6:A /
M513-6:A /
F F
M504 M506
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 CIRCUIT BREAKER INTERLOCKING BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK5
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 15 Page M505
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
+CP5
A INC 22kV T2 A
/ +CP5/C506-2:B
/ +CP5/C506-3:B
/ +CP5/C506-3:B
OPENED
COM1
Q1ON
Q1OFF
B C1102 3 4 5 B
C C
-PQ2 1
X3:101 23 23
Service position
X3:102 24 24
-PQ2 3
D D
E E
C1303 1 2 3 4 5
+Q1
DISCONNECTOR
F F
M505 M507
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 Q1 DISCONNECT SWITCH INTERLOCKING BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK5
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 15 Page M506
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
M2+
M502-7:D/
-XQ1 12 -XQ1 16
=E01+MK1 =E03+MK3
C1306 7 C1303 12 C2308 1 C4308 1 C1303 14
Q251+
=22kV+J2.1 +Q1 +Q1
Q151+
DISCONNECTOR DISCONNECTOR
-X4 11
=E03+MK3/M310-2:F /
/ =E03+MK3/M310-3:F
=E01+MK1/M111-3:F /
/ =E01+MK1/M111-3:F
C 31 35 C
Test position 32 36
Q251
Q151
-X4 12
D D
-XQ25 1
C1304 1 C1305 1
E E
+Q51 +Q25
EARTHING SWITCH EARTHING SWITCH
2 C1305 2
F -XQ51 3 4 -XQ15 3 4 F
-XQ51 2 -XQ25 2
M2-
M502-7:D/
M506 M508
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 EARTHING SWITCH INTERLOCKING BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK5
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 15 Page M507
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
-XC 7
-XQ0 17
B C1302 3 B
+Q0
SC4
12 14 12 14
12 14 12 14 12 14 12 14 22 24 32 34
M514-7:A /
/ M514-6:A
/ M514-7:A
/ M514-5:A
/ M514-2:A
-MCBVTB1 11 -MCBVTB2 11
-MCB1 11 -MCB2 11 -MCB3 11 -MCB4 11 /M503-2:D /M503-6:D
-MCBVTB2 21 -MCBVTB2 31
/M501-5:B /M501-6:B /M502-3:B /M502-6:B /M503-6:D /M503-6:D
AL1
AL2
AL3
AL4
C C
C1302 4 5 6 7
-XQ0 18 19 20 21
D D
SPRING DISCHARGED
GAS SF6 ALARM
VT BUS 2 OFF
GAS SF6 TRIP
MCB MK OFF
MCB Q0 OFF
SC4
AL13
AL14
AL15
AL16
AL17
AL18
VTB+
VTB
VTB1+
VTB1
/ +CP5/C509-3:B
/ +CP5/C509-3:B
/ +CP5/C509-3:B
/ +CP5/C509-4:B
/ +CP5/C509-4:B
/ +CP5/C509-4:B
/ +CP5/C509-4:B
/ =E01+MK1/M110-8:B
/ =E01+MK1/M110-8:C
/ =E03+MK3/M309-8:B
/ =E03+MK3/M309-8:C
F F
M507 M509
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 SIGNALING FROM MARSHALLING KIOSK BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK5
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 15 Page M508
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
INTERLOCK FOR INTERLOCK FOR INTERLOCK FOR INTERLOCK FOR LOCAL INTERLOCK FOR REMOTE
DISCONNECTOR Q1 E01 DISCONNECTOR Q1 E03 INCOMING J2.1 INCOIMG J2.1 INCOIMG J2.1
B B
C C
27 55 27 X3:105 X3:103
28 56 28 X3:106 X3:104
D D
-XQ25 13 -XQ25 17
-XQ51 8 -XQ0 23 -XQ0 25
-XQ25 11 14 -XQ25 15 18
-XQ22 13 -XQ22 14 -XQ22 9 -XQ22 10 -XQ22 11 -XQ22 12
=E01+MK1 =E03+MK3
=22kV+J2.1
Q11+
Q11
Q13+
Q13
/ =E01+MK1/M106-2:C
/ =E01+MK1/M106-2:D
/ =E03+MK3/M306-2:C
/ =E03+MK3/M306-2:D
-X3 25 -X3 30
F F
M508 M510
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 INTERLOCK FOR THE OTHERS BAY BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK5
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 15 Page M509
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
C 2 3 2 3 2 3 2 3 7 C
D D
Q0 LOCAL MODE
Q25 CLOSE
Q51 CLOSE
Q25 OPEN
Q51 OPEN
Q1 CLOSE
Q0 CLOSE
Q1 OPEN
Q0 OPEN
S14+
-XS 1 6 7 8 9 10 11 12 13 14
E E
+CP5
S1101 1 2 3 4 5 6 7 8 9 10
S14+
CQ25
OQ25
CQ1
OQ1
CQ51
OQ51
CQ0
OQ0
LQ0
/ +CP5/C507-1:B
/ +CP5/C507-1:B
/ +CP5/C507-2:B
/ +CP5/C507-2:B
/ +CP5/C507-3:B
/ +CP5/C507-3:B
/ +CP5/C507-3:B
/ +CP5/C507-4:B
/ +CP5/C507-4:B
/ +CP5/C507-5:B
F F
M509 M511
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 INDICATOR FOR CONTROL PANEL BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK5
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 15 Page M510
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
C 5 6 5 6 7 8 5 6 5 6 C
D D
Q1 LOCAL MODE
Q1 MCB OFF
Q25 CLOSE
Q51 CLOSE
Q25 OPEN
Q51 OPEN
Q1 CLOSE
Q0 CLOSE
Q1 OPEN
Q0 OPEN
COM+
-XSCA 1 6 7 8 9 10 11 12 13 14 15
E E
+CP5
S1105 1 2 3 4 5 6 7 8 9 10 11
SCOM
SCQ25
SOQ25
SCQ1
SOQ1
SMQ1
SLQ1
SCQ51
SOQ51
SCQ0
SOQ0
/ +CP5/C512-4:B
/ +CP5/C512-4:B
/ +CP5/C512-5:B
/ +CP5/C512-5:B
/ +CP5/C512-5:B
/ +CP5/C512-6:B
/ +CP5/C512-6:B
/ +CP5/C512-6:B
/ +CP5/C512-7:B
/ +CP5/C512-7:B
/ +CP5/C512-7:B
F F
M510 M512
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 INDICATOR FOR SCADA BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK5
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 15 Page M511
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
A A
B B
-Q1
BUSBAR DISCONNECT SWITCH 23 25 27 29 31 33 35 37 55 57 59 61 63 65 67 69
ABB
1HYD90161-300 24 26 28 30 32 34 36 38 56 58 60 62 64 66 68 70
C C
-Q15
BUSBAR EARTHING SWITCH 23 25 27 29 31 33 35 37 55 57 59 61 63 65 67 69
ABB
1HYD90162-162 24 26 28 30 32 34 36 38 56 58 60 62 64 66 68 70
D D
-Q51
EARTHING SWITCH 23 25 27 29 31 33 35 37 55 57 59 61 63 65 67 69
ABB
1HYD90162-162 24 26 28 30 32 34 36 38 56 58 60 62 64 66 68 70
E E
F F
M511 M513
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 REFERENCE FOR DEVICE BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK5
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 15 Page M512
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
/ M505-6:F
/ M505-6:F
/ M505-2:F
/ M505-3:F
/ M505-2:F
/ M505-4:F
/ M505-5:F
/ M505-5:F
/ M505-6:F
/ M505-8:F
/ M505-8:F
/ M505-7:F
/ M505-7:F
/ M505-7:F
A A
C14+
C14-
INL+
CLOSE
INL-
OPEN
TRIP1
TCSC1
TCSO1
T14+
T14-
TRIP2
TCSC2
TCSO2
+Q0
B B
-X1 1 2 13 11 12 3 4 14 15 23 22 26 5 6 27 28 30 29
1 2 1 2 1 2
F14+ / M514-8:B
-F11 1 -F14 3 -F16
CLOSE 2 TRIP 4
LOCAL REMOTE
1 3 5 7 9
-X1 16 -X1 20
C C
21 31
11 31
-X1 17 -X1 21
1
-S3 2
D D
21 11
-K1 -K1
24 22 14 12
01 07 03 81 13 91
E E
-X1 25 24 -X1 32 31
1 1 1 1 1
F F
3 4 3 4 3 4
F14- / M514-8:C
-F11 -F14 -F16
M512 M514
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 REFERENCE FOR Q0 CIRCUIT BREAKER BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK5
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 15 Page M513
Approval VO CONG CHIEN Replacement of Replaced by
1 2 3 4 5 6 7 8
/ M502-3:D
/ M502-3:D
/ M501-6:D
/ M501-6:D
/ M508-3:C
/ M508-3:C
/ M508-2:C
/ M508-2:C
/ M508-2:B
A A
DC+
DC-
AC+
AC-
AL4
AL3
AL1
AL2
SC4
+Q0
-X1 7 8 9 10
B USED B
1 1 1
-S3 01 07
2
-S1 -S1
02 08
21 21 21 21 21 21 7 11 11 13
Lighting & 11 21
Motor Heating -F11 -F3 -F4 -F5 -F14 -F16 -S3 -S3 -S12 -S12
-F2 -K2 A2 E2
System 22 22 22 22 22 22 8 12 12 14
C 13 12 24 22
-K3 C
A1 E1
3
-S3
4
3 M513-5:F / -F14-
SPRING SPRING -X3 136
-F3 LOCAL REMOTE SF6 PRESSURE SF6 PRESSURE
MCB AUX. CONTACT CHAGED DISCHAGED
4 INDICATION INDICATION ALARM BLOCKING
INDICATION INDICATION
D D
X3:101 X3:105 X3:109 X3:113 X3:117 X3:121 X3:125 X3:129 X3:133 X3:139 X3:143 X3:147
-Q0
NC
CIRCUIT BREAKER X3:102 X3:106 X3:110 X3:114 X3:118 X3:122 X3:126 X3:130 X3:134 X3:140 X3:144 X3:148
ABB - INDIA
CONTROL: 110VDC X3:103 X3:107 X3:111 X3:115 X3:119 X3:123 X3:127 X3:131 X3:137 X3:141 X3:145 X3:149
MOTOR: 110 VDC NO
E HEATING: 220VAC X3:104 X3:108 X3:112 X3:116 X3:120 X3:124 X3:128 X3:132 X3:138 X3:142 X3:146 X3:150
E
F F
M513
1 2 3 4 5 6 7 8
Revision C Date 12/10/2016
Electrical Testing Company 110kV TRANSFORMER E05 REFERENCE FOR Q0 CIRCUIT BREAKER BAY = E05
Drawn DO VINH
110kV CHAU THANH SUBSTATION
PANEL + MK5
Checked LUONG NGOC THACH MARSHALLING KIOSK PANEL CT - 12102016 Pages 15 Page M514
Approval VO CONG CHIEN Replacement of Replaced by