You are on page 1of 108

1 2 3 4 5 6 7 8

A A

B B

PURCHASER:

C C
CENTRAL POWER CORPORATION

PROJECT:

CPC-KFW3.1chung-G02

D D
PLANT:

110kV IAGRAI SUBSTATION

TITLE: STAMP:

E E
35KV SWITCHYARD SYSTEM

DRAWING No.: EVNCPC/LS-110KV/MV

STANDARD: IEC SHEET No.: A00 QTY OF SHEETS: 16

DRAWN SUB CONTRACTOR:

F CHECK. F

APPR.

DATE 3/10/2020

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

PAGE DESCRIPTION REV. X PAGE DESCRIPTION REV. X

=MV35/A00 35KV SWITCHYARD SYSTEM A =MV35+H02/Z04 REFERENCE OF MEASUREMENT EQUIPMENT A


A A
=MV35/A02 LEGEND TABLE OF SYMBOLS A =MV35+H01/A00 35KV VOLTAGE TRANSFORMER PANEL A
=MV35/A03 LEGEND TABLE OF PROTECTION FUNCTIONS A =MV35+H01/B01 LAYOUT DRAWING A
=MV35/B01 SINGLE LINE DIAGRAM C31 A =MV35+H01/B02 LIST OF EQUIPMENT A
=MV35/B02 CONTROL, PROTECTION & MESUREMENT PRINCIPLE DIAGRAM C31 A =MV35+H01/B03 INTERLOCKING LOGIC DIAGRAM FOR QE24 A
=MV35/B03 TRIP MATRIX A =MV35+H01/D01 AC POWER SUPPLY A
=MV35/B04 FRONT VIEW A =MV35+H01/G01 DC POWER SUPPLY A

B =MV35/B05 SWITCHGEAR CLEARANCE NEW CONSTRUCTION A =MV35+H01/N01 LOAD SHEDDING CIRCUIT A B


=MV35+H02/A00 35KV INCOMING PANEL A =MV35+H01/Q01 INDICATION CIRCUIT A
=MV35+H02/B01 LAYOUT DRAWING A =MV35+H01/R01 BINARY INPUT OF F27 A
=MV35+H02/B02.a LIST OF EQUIPMENT A =MV35+H01/R03 SIGNAL SENT TO OTHER PANEL A
=MV35+H02/B02.b LIST OF EQUIPMENT A =MV35+H01/S01 VOLTAGE CIRCUIT A
=MV35+H02/B03 CLOSING LOGIC DIAGRAM FOR QF01 A =MV35+H01/S02 VOLTAGE CIRCUIT A
=MV35+H02/B04 OPENNING LOGIC DIAGRAM FOR QF01 A =MV35+H01/W01 SPARE CIRCUIT A
C =MV35+H02/B05 INTERLOCKING LOGIC DIAGRAM FOR QE38 A =MV35+H01/Y01 COMMUNICATION PORTS A C

=MV35+H02/D01 AC POWER SUPPLY A =MV35+H01/Z01 REFERENCE OF CONTROL & MESUREMENT EQUIPMENT A


=MV35+H02/G01 DC POWER SUPPLY A =MV35+H01/Z02 REFERENCE OF PROTECTION RELAY: GRD200 A
=MV35+H02/M01 CONTROL & PROTECTION CIRCUIT A =MV35+H03/A00 35KV OUTGOING PANEL A
=MV35+H02/Q01 INDICATION CIRCUIT A =MV35+H03/B01 LAYOUT DRAWING A
=MV35+H02/R01 BINARY INPUT OF F67 A =MV35+H03/B02.a LIST OF EQUIPMENT A
=MV35+H02/R02 BINARY INPUT OF F67 A =MV35+H03/B02.b LIST OF EQUIPMENT A
D D
=MV35+H02/R03 SIGNAL SENT TO OTHER PANEL A =MV35+H03/B03 CLOSING LOGIC DIAGRAM FOR CB A
=MV35+H02/R04 SIGNAL SENT TO OTHER PANEL A =MV35+H03/B04 OPENING LOGIC DIAGRAM FOR CB A
=MV35+H02/R05 SIGNAL SENT TO OTHER PANEL A =MV35+H03/B05 INTERLOCKING LOGIC DIAGRAM FOR QE76 A
=MV35+H02/S01 CURRENT & VOLTAGE CIRCUIT FOR PROTECTION RELAY A =MV35+H03/D01 AC POWER SUPPLY A
=MV35+H02/S02 VOLTAGE CIRCUIT A =MV35+H03/G01 DC POWER SUPPLY A
=MV35+H02/S03 CURRENT & VOLTAGE CIRCUIT FOR PROTECTION RELAY A =MV35+H03/M01 CONTROL & PROTECTION CIRCUIT A

E =MV35+H02/T01 CURRENT & VOLTAGE CIRCUIT FOR METERING A =MV35+H03/Q01 INDICATION CIRCUIT A E
=MV35+H02/W01 SPARE CIRCUIT A =MV35+H03/R01 BINARY INPUT OF F67 A
=MV35+H02/Y01 COMMUNICATION PORTS A =MV35+H03/R02 BINARY INPUT OF F67 A
=MV35+H02/Z01 REFERENCE OF CB, VN1-40.5/COOPER A =MV35+H03/R03 SIGNAL SENT TO OTHER PANEL A
=MV35+H02/Z02 REFERENCE OF PROTECTION RELAY: GRD200 A =MV35+H03/R04 SIGNAL SENT TO OTHER PANEL A
=MV35+H02/Z03 REFERENCE OF CONTROL EQUIPMENT A =MV35+H03/S01 CURRENT & VOLTAGE CIRCUIT FOR PROTECTION RELAY A
X: AUTOMATIC PAGE MODIFIED

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE A01 F
CHECKED NEXT PAGE A01.a
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED TABLE OF CONTENTS EVNCPC/LS-110KV/MV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

PAGE DESCRIPTION REV. X PAGE DESCRIPTION REV. X

=MV35+H03/T01 CURRENT & VOLTAGE CIRCUIT FOR METERING A =MV35+H02/X119 Terminal diagram =MV35+H02-X51 A X
A A
=MV35+H03/W01 SPARE CIRCUIT A =MV35+H02/X120 Terminal diagram =MV35+H02-XN A X
=MV35+H03/Y01 COMMUNICATION PORTS A =MV35+H02/X121 Terminal diagram =MV35+H02-XT A X
=MV35+H03/Z01 REFERENCE OF CB, VN1-40.5/COOPER A =MV35+H03/X104 Terminal diagram =MV35+H03-X1 A X
=MV35+H03/Z02 REFERENCE OF PROTECTION RELAY: GRD200 A =MV35+H03/X105 Terminal diagram =MV35+H03-X2 A X
=MV35+H03/Z03 REFERENCE OF CONTROL EQUIPMENT A =MV35+H03/X106 Terminal diagram =MV35+H03-X3 A X
=MV35+H03/Z04 REFERENCE OF MEASUREMENT EQUIPMENT A =MV35+H03/X107 Terminal diagram =MV35+H03-X6 A X

B =MV35/B06 SECTION VIEW OF TROUGHING FOR INCOMING A =MV35+H03/X108 Terminal diagram =MV35+H03-X9 A X B
=MV35/B07 SECTION VIEW OF TROUGHING FOR VOLTAGE TRANSFORMER A =MV35+H03/X109 Terminal diagram =MV35+H03-X21 A X
=MV35/B08 SECTION VIEW OF TROUGHING FOR OUTGOING A =MV35+H03/X110 Terminal diagram =MV35+H03-X41 A X
=MV35/B10 BUS WIRES A =MV35+H03/X111 Terminal diagram =MV35+H03-X42 A X
=MV35/B11 BUS WIRES A =MV35+H03/X112 Terminal diagram =MV35+H03-XN A X
=MV35/B12 BUS WIRES A =MV35+H03/X113 Terminal diagram =MV35+H03-XT A X
=MV35/A01 TABLE OF CONTENTS A
C =MV35/A01.a TABLE OF CONTENTS A C

=MV35+H01/R02 BINARY INPUT OF F27 A


=MV35+H01/X105 Terminal diagram =MV35+H01-X1 A X
=MV35+H01/X106 Terminal diagram =MV35+H01-X3 A X
=MV35+H01/X107 Terminal diagram =MV35+H01-X9 A X
=MV35+H01/X108 Terminal diagram =MV35+H01-X11 A X
=MV35+H01/X109 Terminal diagram =MV35+H01-X51 A X
D D
=MV35+H01/X110 Terminal diagram =MV35+H01-X53 A X
=MV35+H01/X111 Terminal diagram =MV35+H01-XN A X
=MV35+H01/X112 Terminal diagram =MV35+H01-XT A X
=MV35+H02/X110 Terminal diagram =MV35+H02-X1 A X
=MV35+H02/X111 Terminal diagram =MV35+H02-X2 A X
=MV35+H02/X112 Terminal diagram =MV35+H02-X3 A X

E =MV35+H02/X113 Terminal diagram =MV35+H02-X6 A X E


=MV35+H02/X114 Terminal diagram =MV35+H02-X9 A X
=MV35+H02/X115 Terminal diagram =MV35+H02-X21 A X
=MV35+H02/X116 Terminal diagram =MV35+H02-X41 A X
=MV35+H02/X117 Terminal diagram =MV35+H02-X42 A X
=MV35+H02/X118 Terminal diagram =MV35+H02-X43 A X
X: AUTOMATIC PAGE MODIFIED

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE A01.a F
CHECKED NEXT PAGE A02
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED TABLE OF CONTENTS EVNCPC/LS-110KV/MV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

SYMBOL DESCRIPTION SYMBOL DESCRIPTION SYMBOL DESCRIPTION

A A

THREE WINDING TRANSFORMER NOMINAL OPEN CONTACT INDICATOR LAMP

TWO WINDING TRANSFORMER NOMINAL CLOSE CONTACT A AMPE METER

HIGHT VOLTAGE CIRCUIT BREAKER CHANGE-OVER CONTACT V VOLT METER


B B

M
MEDIUM VOLTAGE CIRCUIT BREAKER CONTACT OF RELAY TEST BLOCK MOTOR

DISCONNECTOR SWITCH CONTACT OF CURRENT & VOLTAGE TEST BLOCK AUXILIARY POWER SUPPLY FOR DEVICE

M
DISCONNECTOR SWITCH WITH MOTOR CONTACT OF DOOR SWITCH I>
MCB
C C

EARTHING SWITCH CONTACT OF THEMOSTAT FUSE

M EARTHING SWITCH WITH MOTOR NOMINAL OPEN PUSH BUTTON SOCKET

MEDIUM VOLTAGE BUS-RISER NOMINAL CLOSE PUSH BUTTON LIGHTING LAMP


D D

CURRENT TRANSFORMER COIL HEATING RESISTOR

CAPACITOR BINARY INPUT OF RELAY EARTHING BUSBAR

SURGE ARRESTER CURRENT/VOLTAGE INPUT


E E

FUSE VOLTAGE TERMINAL, SIGNAL TERMINAL

CURRENT TERMINAL

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE A02 F
CHECKED NEXT PAGE A03
35KV SWITCHYARD SYSTEM DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED LEGEND TABLE OF SYMBOLS EVNCPC/LS-110KV/MV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

ANSI No. DESCRIPTION ANSI No. DESCRIPTION

21 PHASE DISTANCE PROTECTION BCU BAY CONTROLLER UNIT


A A
21N GROUND DISTANCE PROTECTION A MEASUREMENT AMPE

25 SYNCHRONISM CHECK V MEASUREMENT VOLTAGE

27 UNDERVOLTAGE PROTECTION f MEASUREMENT FREQUENCY

49 OVERLOAD PROTECTION ‎cosφ MEASUREMENT POWER FACTOR

50 PHASE INSTANTANEOUS OVERCURRENT PROTECTION W MEASUREMENT ACTIVE POWER

50BF BREAKER FAILURE PROTECTION VAR MEASUREMENT REACTIVE POWER


B B
50N NEUTRAL INSTANTANEOUS OVERCURRENT PROTECTION Wh METERING ACTIVE ENERGY

51 PHASE TIME OVERCURRENT PROTECTION VARh METERING REACTIVE ENERGY

51N NEUTRAL TIME OVERCURRENT

59 OVERVOLTAGE PROTECTION

59N OVERVOLTAGE PROTECTION, ZERO-SEQUENCE SYSTEM

64 RESTRICTED EARTHFAULT PROTECTION


C C
67 PHASE DIRECTIONAL OVERCURRENT PROTECTION

67N NEUTRAL DIRECTIONAL OVERCURRENT PROTECTION

74 TRIP CIRCUIT SUPERVISION

79 AUTO RECLOSER

81 OVER/UNDER FREQUENCY PROTECTION

D 85 TELEPROTECTION INTERFACE D

86 TRIPPING AND LOCKOUT

87B BUSBAR DIFFERENTIAL PROTECTION

87L LINE DIFFERENTIAL PROTECTION

87S STUB-BUS DIFFERENTIAL PROTECTION

87T TRANSFORMER DIFFERENTIAL PROTECTION


E E
90 AUTO VOLTAGE REGULATION

94 TRIPPING RELAY

FR FAULT RECORDER

FL FAULT LOCATOR

SOTF SWITCH ON TO FAULT

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE A03 F
CHECKED NEXT PAGE B01
35KV SWITCHYARD SYSTEM DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED LEGEND TABLE OF PROTECTION FUNCTIONS EVNCPC/LS-110KV/MV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Switch-cabinet Name H01 H02 H03 H04 A

Voltage Trans Incoming Outgoing Outgoing


Switch-cabinet Type ASN1-40.5
Panel Panel Panel Panel

Switch-cabinet Purpose

Main Busbar Type (80x8)

B B
Earthing Busbar Specification 30x8

Rated Voltage 40.5kV

Primary wiring diagram

C C
Nether branch Busbar Type 60x6 80x8 60x6 60x6

Name and type No. No. No. No.

Current transformer LZZB7-35G-40.5 400-800-1200/1/1/1A 3

Current transformer LZZB7-35G-40.5 200-400-600/1/1A 3 3

Circuit breaker handcart VN1-40.5/1250A 25kA/1s 1

D Circuit breaker handcart VN1-40.5/630A 25kA/1s 1 1 D

Earthing switch EK6 25kA/1s 1 1 1 1

Voltage transformer truck VN1 (troley part) 1

Voltage transformer JDZX11-35R 38.5/v3:0.11/v3:0.11/3 kV 3

Voltage transformer JDZX9-35 38.5/v3:0.11/v3:0.11/3 kV 3

HV HRC fuses XRNT-36 6.3A 3 3


E E
Capacitive voltage indicator TF-FH2 1 1 1 1

Supportor (fitted with indicator) 3 3 3 3

Busbar Bushing 3 3 3

Dimension WxDxH 1200x2600x2400 1200x2600x2400 1200x2600x2400 1200x2600x2400

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B01 F
CHECKED NEXT PAGE B02
35KV SWITCHYARD SYSTEM DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED SINGLE LINE DIAGRAM C31 EVNCPC/LS-110KV/MV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

H01 H02 H03 (H04)


A A
VOLTAGE TRANSFORMER INCOMING OUTGOING

QE14

B B
QF01 QF01
BVT-C31
38.5 0.11 0.11
kV
3 3 3
3P
0.5

SV
(AV106)
PMT (A1700) PMF (MFM-M8100) PMT (A1700)
C C
V P2 Wh VARh V V A ‎cosφ
P1 Wh VARh V
5P20 0.5
PV (AN356) W VAR A W VAR f W VAR A

400-800-1200/1/1/1A

200-400-600/1/1A
f ‎cosφ f ‎cosφ

F67 (GRD200) F67 (GRD200)


F27/59 (GRD200) 67/67N 50BF BCU 67/67N 50BF BCU
0.5 5P20
27/59 BCU 50/51N 74/86 FR 50/51N 74/86 FR
D 59N FR 50/51 50/27 25 50/51 79 81
D
P1 P2

0.5

3P

TVT
E 38.5 0.11 0.11 QE76 E
kV
3 3 3

QE38

TO F87T FROM 35KV MẠCH ÁP


BUSHING CT
OF TRANSFORMER MẠCH DÒNG

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B02 F
CHECKED NEXT PAGE B03
35KV SWITCHYARD SYSTEM DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02 CONTROL, PROTECTION & MESUREMENT
APPROVED EVNCPC/LS-110KV/MV
PRINCIPLE DIAGRAM C31
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

=E05 50BF
H02 (INCOMING) H03÷H04 (OUTGOING) J03
EQUIPMENTS +WR TRIP
PANEL CB F67 CB F67 F862 F67 BUS
BLOCK START SET BLOCK START SET START SET
SYMBOL TYPE FUNCTION TC CC TC CC EXT TRIP TRIP
CC 50BF 86 CC 50BF 86 79 COIL

F87T GRT200 87T, 87N , 94 X X X


=E05+WR
B B
F67 GRD200 67/67N, 50/51, 50/51N X X X

67/67N, 50/51, 50/51N X X* X*

25 X

F67 GRD200 74 TCS X


H02
86 X

50BF X X X
C C
H01 F27/59 GRD200 27/59,59N X X X

67N X X* X*

67, 50/51, 50/51N, 79 FINAL X X* X*

79 X

74 TCS X
H03÷H04 F67 GRD200
86 X
D D
50BF X

81 X X X

50BF TRIP BUS 94 X X X X X X

J03 F67 GRD200 50BF X X

E E
LEGENT: CB - CIRCUIT BREAKER, TC - TRIPPING COIL, CC - CLOSING COIL, TCS - TRIPPING CIRCUIT SUPERVISION, X* - INTERNAL START

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B03 F
CHECKED NEXT PAGE B04
35KV SWITCHYARD SYSTEM DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED TRIP MATRIX EVNCPC/LS-110KV/MV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
H01 H02 H03 H04
VOLTAGE TRANSFORMER INCOMING OUTGOING OUTGOING

B B
R ASN1-40.5 VOLTAGE TRANSFORMER R ASN1-40.5 INCOMING R ASN1-40.5 OUTGOING R ASN1-40.5 OUTGOING

TOSHIBA TOSHIBA PMF TOSHIBA TOSHIBA

I U P Q

SW
pLS pLT pLC pLO pLS pLT pLC pLO pLS pLT pLC pLO
F27/59 F67 F67 F67
L
R
BRL LX LEC LEO L
R
BRL LX LEC LEO L
R
BRL LX LEC LEO L
R
BRL LX LEC LEO
CLEAR HELP CANCEL ENTER CLEAR HELP CANCEL ENTER CLEAR HELP CANCEL ENTER CLEAR HELP CANCEL ENTER
580

F1 F2 F3 F4 F5 F6 F7
PV F1 F2 F3 F4 F5 F6 F7 F1 F2 F3 F4 F5 F6 F7 F1 F2 F3 F4 F5 F6 F7

A B C 0V A B C 0V A B C 0V A B C 0V

SLR TH DXN SLR SQ0 S25 TH DXN SLR SQ0 S25 TH DXN SLR SQ0 S25 TH DXN
S2K(TH) S2K(TH) S2K(TH) S2K(TH)
L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3

C C
2400

D D

‎合 闸 ‎合 闸 ‎合 闸 ‎合 闸
‎分 闸 ‎分 闸 ‎分 闸 ‎分 闸
‎摇 进 ‎摇 进 ‎摇 进 ‎摇 进
‎摇 出 ‎摇 出 ‎摇 出 ‎摇 出

E E

1200 1200 1200 1200

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B04 F
CHECKED NEXT PAGE B05
35KV SWITCHYARD SYSTEM DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED FRONT VIEW EVNCPC/LS-110KV/MV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

B B

H04 H03 H02 H01

2600
C C

1200 1200 1200 1200 1500


4800

D D

35kV DISTRIBUTION PANEL

E H01 VOLTAGE TRANSFORMER PANEL E

H02 INCOMING PANEL

H03,H04 OUTGOING PANEL

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B05 F
CHECKED NEXT PAGE B06
35KV SWITCHYARD SYSTEM DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED SWITCHGEAR CLEARANCE NEW CONSTRUCTION EVNCPC/LS-110KV/MV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

830 2665

B B

30 215 550 35

2400
C C

Cable Trench
1200

1200
800

35 1035 30

80 150 350
20 40
650 (option) 300
D D
300
2665

E E

200

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B06 F
CHECKED NEXT PAGE B07
35KV SWITCHYARD SYSTEM DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED SECTION VIEW OF TROUGHING FOR INCOMING EVNCPC/LS-110KV/MV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

830 2665

B B

30 35

2400
C C

Cable Trench
1200

1200
35 1035 30

80 150 350
20 40
650 (option) 300
D D
300
2665

E E

200

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B07 F
CHECKED NEXT PAGE B08
35KV SWITCHYARD SYSTEM DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED SECTION VIEW OF TROUGHING FOR VOLTAGE TRANSFORMER
EVNCPC/LS-110KV/MV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

830 2665

B B

30 215 550 35

2400
C C

Cable Trench
1200

1200
800

35 1035 30
150 350
80
20 40
650 (option) 300
D D
300
2665

E E
200

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B08 F
CHECKED NEXT PAGE B10
35KV SWITCHYARD SYSTEM DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED SECTION VIEW OF TROUGHING FOR OUTGOING EVNCPC/LS-110KV/MV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

=LINK

A TYPE WIRES H01 H02 H03 H04 A

FUCTION VOLTAGE TRANS. INCOMING OUTGOING OUTGOING

+H01 +H02 +H03 +H04

50BF TRIP TO C31 + 1 X9 1 X9 1 X9 1 X9 1

BUS 50BF C31 TRIP + 2 -X9 2 -X9 2 -X9 2 -X9 2

B B
COM- 3 -X9 3 -X9 3 -X9 3 -X9 3

27/59 C31 TRIP + 4 -X9 4 -X9 4 -X9 4 -X9 4

ES C31 OPENED + 5 -X9 5 -X9 5 -X9 5 -X9 5

MCB VT C31 OFF+ 6 -X9 6 -X9 6 -X9 6 -X9 6

C C
COM- 7 -X9 7 -X9 7 -X9 7 -X9 7
30x1.5 mm2 (BLACK)

SPARE 8 -X9 8 -X9 8 -X9 8 -X9 8

SPARE 9 -X9 9 -X9 9 -X9 9 -X9 9

SPARE 10 -X9 10 -X9 10 -X9 10 -X9 10


D D
SPARE 11 -X9 11 -X9 11 -X9 11 -X9 11

SPARE 12 -X9 12 -X9 12 -X9 12 -X9 12

SPARE 13 -X9 13 -X9 13 -X9 13 -X9 13

SPARE 14 -X9 14 -X9 14 -X9 14 -X9 14


E E

SPARE 15 -X9 15 -X9 15 -X9 15 -X9 15

SPARE 16 -X9 16 -X9 16 -X9 16 -X9 16

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B10 F
CHECKED NEXT PAGE B11
35KV SWITCHYARD SYSTEM DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED BUS WIRES EVNCPC/LS-110KV/MV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

=LINK

A TYPE WIRES H01 H02 H03 H04 A

FUCTION VOLTAGE TRANS. INCOMING OUTGOING OUTGOING

+H01 +H02 +H03 +H04

SPARE 17 -X9 17 -X9 17 -X9 17 -X9 17

SPARE 18 -X9 18 -X9 18 -X9 18 -X9 18

B B
SPARE 19 -X9 19 -X9 19 -X9 19 -X9 19

SPARE 20 -X9 20 -X9 20 -X9 20 -X9 20

SPARE 21 -X9 21 -X9 21 -X9 21 -X9 21

SPARE 22 -X9 22 -X9 22 -X9 22 -X9 22

C SPARE
C
23 -X9 23 -X9 23 -X9 23 -X9 23
30x1.5 mm2 (BLACK)

SPARE
24 -X9 24 -X9 24 -X9 24 -X9 24

SPARE
25 -X9 25 -X9 25 -X9 25 -X9 25

EHERNET SW
LOSS OF POWER 26 -X9 26 -X9 26 -X9 26 -X9 26
D D
EHERNET SW
FAILURE 27 -X9 27 -X9 27 -X9 27 -X9 27

COM+
28 -X9 28 -X9 28 -X9 28 -X9 28

RELAY
LOSS OF POWER 29 -X9 29 -X9 29 -X9 29 -X9 29

RELAY FAIL
30 -X9 30 -X9 30 -X9 30 -X9 30
E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B11 F
CHECKED NEXT PAGE B12
35KV SWITCHYARD SYSTEM DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED BUS WIRES EVNCPC/LS-110KV/MV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

=LINK
TYPE WIRES H01 H02 H03 H04

A FUCTION VOLTAGE TRANS. INCOMING OUTGOING OUTGOING A

+H01 +H02 +H03 +H04

-XT 1 1.3m -XT 1 -XT 1 -XT 1


AC POWER SUPPLY L 1

-XT 2 -XT 2 -XT 2 -XT 2


AC POWER SUPPLY N 2

-XT 3 -XT 3 -XT 3 -XT 3


B DC1 POWER SUPPLY POSITIVE 3 B

-XT 4 -XT 4 -XT 4 -XT 4


DC1 POWER SUPPLY NEGATIVE 4

-XT 5 -XT 5 -XT 5 -XT 5


VOLTAGE CIRCUIT - CLASS: 0.5 - PHASE A 5

1x2.5 mm2 (BLACK)


-XT 6 -XT 6 -XT 6 -XT 6
VOLTAGE CIRCUIT - CLASS: 0.5 - PHASE B 6

-XT 7 -XT 7 -XT 7 -XT 7


C VOLTAGE CIRCUIT - CLASS: 0.5 - PHASE C 7 C

-XT 8 -XT 8 -XT 8 -XT 8


VOLTAGE CIRCUIT - CLASS: 0.5 - NEUTRAL 8

-XT 9 -XT 9 -XT 9 -XT 9


VOLTAGE CIRCUIT - CLASS: 3P - L1 9

-XT 10 -XT 10 -XT 10 -XT 10


VOLTAGE CIRCUIT - CLASS: 3P - N1 10

-XT 11 -XT 11 -XT 11 -XT 11


D D
SPARE 11

-XT 12 -XT 12 -XT 12 -XT 12


SPARE 12

-XT 13 -XT 13 -XT 13 -XT 13


CB IN TEST POSITION 13
1x1.5 mm2 (BLACK)

-XT 14 -XT 14 -XT 14 -XT 14


CB IN TEST POSITION 14

E -XT 15 -XT 15 -XT 15 -XT 15 E


NEGATIVE 15

-XT 16 -XT 16 -XT 16 -XT 16


DC2 POWER SUPPLY POSITIVE 16

-XT 17 -XT 17 -XT 17 -XT 17


DC2 POWER SUPPLY NEGATIVE 17

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B12 F
CHECKED NEXT PAGE +H01/A00
35KV SWITCHYARD SYSTEM DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED BUS WIRES EVNCPC/LS-110KV/MV
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

B B

PURCHASER:

C C
CENTRAL POWER CORPORATION

PROJECT:

CPC-KFW3.1chung-G02

D D
PLANT:

110kV IAGRAI SUBSTATION

TITLE: STAMP:

E E
35KV VOLTAGE TRANSFORMER PANEL

DRAWING No.: EVNCPC/IA-110KV/MV-H01

STANDARD: IEC SHEET No.: A00 QTY OF SHEETS: 24

DRAWN SUB CONTRACTOR:

F CHECK. F

APPR.

DATE 3/10/2020

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

8
1
R ASN1-38.5 VOLTAGE TRANSFORMER

F27/59
SW
TOSHIBA

pLS pLT LEC LEO

PMV

D LOW VOLTAGE COMPARTMENT LAYOUT


580

2
L
R

V
CLEAR HELP CANCEL ENTER

F1 F2 F3 F4 F5 F6 F7

A B C 0V

3
SMV TH DXN
XTV1.59 XTV2.F59 XTV3.F59
S2K(TH)
L1 L2 L3

6
B 4 F27/59 B
B TOSHIBA

SW
5
A 7
2400

pLS pLT LEC LEO


L
R

CLEAR HELP CANCEL ENTER

F1 F2 F3 F4 F5 F6 F7
PMV
A B C 0V

XTV1.59 XTV2.F59 XTV3.F59 SMV TH DXN


‎合 闸
‎分 闸
‎摇 进

C
‎摇 出 S2K(TH)
L1 L2 L3

C C

LEGEND
NOTE DESCRIPTION SYMBOL DESCRIPTION
A BUSBAR COMPARTMENT F27/59 UNDER/OVER VOLTAGE PROTECTION RELAY

1200 2600 B CIRCUIT BREAKER COMPARTMENT SW SWITCH


C CABLE CONNECTION COMPARTMENT XTV... VOLTAGE TEST BLOCK
D LOW VOLTAGE COMPARTMENT PLS INDICATION LAMP FOR CIRCUIT BREAKER IN SERVICE POSITON
PLT INDICATION LAMP FOR CIRCUIT BREAKER IN TEST POSITION
ITEM DESCRIPTION PEC INDICATION LAMP FOR EARTHING SWITCH IS CLOSED
1 MAIN BUSBAR PEO INDICATION LAMP FOR EARTHING SWITCH IS OPEN
MIMIC DIAGRAM 2 BUSBAR BUSHING PTH TEMPERATURE & HUMIDITY CONTROLLER
3 FIX SCOUT DXN POWER INDICATOR
D 4 EARTHING SWITCH SMV VOLTAGE SWITCH
D
5 SUPPORTOR (FITTED WITH INDICATOR) PMV VOLTAGE METER
6 SHUTTER
7 VOLTAGE TRANSFORMER
1200

8 LINK TERMINALS

E 2600 E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B01 F
CHECKED NEXT PAGE B02
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED LAYOUT DRAWING EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

DIVICE TAG TYPE MANUFACTURER DESCRIPTION TECHNICAL DATA

F27/59 GRT200 TOSHIBA OVER/UNDER VOLTAGE PROTECTION RELAY In: 1A, Un: 110V, fn: 50Hz, Uaux: 220VDC, 5CT, 6VT, 18 x BI, 18 x BO, 2xRJ45
A A
SW KYLAND SWITCH FOR 35KV SIDE Uaux: 220VDC, Red

XTV... KTT FUJI VOLTAGE TEST BLOCK 8A, 400V

PLS YW1P IDEC INDICATION LAMP FOR CIRCUIT BREAKER IN SERVICE POSITON Uaux: 220VDC, Red

PLT YW1P IDEC INDICATION LAMP FOR CIRCUIT BREAKER IN TEST POSITION Uaux: 220VDC, Green

PEC YW1P IDEC INDICATION LAMP FOR EARTH SWITCH IN CLOSED POSITON Uaux: 220VDC, Red

PEO YW1P IDEC INDICATION LAMP FOR EARTH SWITCH IN OPENED POSITON Uaux: 220VDC, Green
B B
PTH GZY-S1W1-C TOUFU TEMPERATURE & HUMIDITY CONTROLLER Uaux: 220VAC

DXN TF-FH2 TOUFU POWER INDICATOR Uaux: 220VAC/DC, 1NO

FQAC NDM1-63C6/2 NADER MCB OF POWER SUPPLY FOR HEATING & LIGHTING 2P-6A, 6kA, 220VAC

FQC NDM1-63C6/2 NADER MCB OF POWER SUPPLY FOR CONTROLLING 2P-6A, 16kA, 220VDC

FQ27 NDM1-63C6/2 NADER MCB OF POWER SUPPLY FOR PROTECTION EQUIPMENT 2P-6A, 16kA, 220VDC

FBVT.M, FBVT.P NDM1-63C2/3 NADER MCB OF BUSBAR VOLTAGE CIRCUIT 3P-2A, 6kA, 220VAC
C C
EH1, EH2 TRG2-200W TAIWAN HEATING RESISTOR 220VAC-200W

2MD, HL5 TAIWAN LIGHTING LAMP 220VAC

S1, LXK TAIWAN DOOR SWITCH

TS TAIWAN TEMPERATURE SENSOR

HS TAIWAN HUMIDITY SENSOR

D XT TERMINAL AT TOP OF LOW VOLTAGE COMPARTMENT D

X1, X2, X3 TB4I PHOENIX SIGNAL TERMINAL FOR CONTROLLING, PROTECTION CIRCUIT 800V/32A/4SQMM MAX

X9 PT4 PHOENIX BUS TERMINALS

XTV TCEVA ABB VOLTAGE TEST BLOCK Imax: 8A, Umax: 400V

PMV AN35600000 IME VOLTAGE METER VT: 38.5/V3/0.11/V3 kV

SMV AV106 IME VOLTAGE SWITCH


E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B02 F
CHECKED NEXT PAGE B03
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED LIST OF EQUIPMENT EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CONTROL AT PANEL CON TROL AT EQUIPMENT

A A

B B

ALL CB IN TEST POSITION

C C

NO VOLTAGE AT BUSBAR OPERATION ES


& QE14

MECHANICAL INTERLOCKING OK

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B03 F
CHECKED NEXT PAGE D01
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED INTERLOCKING LOGIC DIAGRAM FOR QE24 EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

POWER SUPPLY
A FOR HEATING & LIGHTING A

-XT 1

BUS WIRE
220VAC
-XT 2

B B

1 3 12 14

-FQAC 11
2P-6A I> I>

/R01.5
C C
2 4
HEATING LIGHTING

-XN 1 -XN 2
Red Red

-HS -TS
X2 X2
Black Green Black
D 2MD HL5 D
X1 X1

2 8 9 10 7 6
-PTH
TEMPERATURE & HUMIDITY CONTROLLER

1 4 5
13
22
-XN 5 6 7 8 -LXK -S1
21 14
E 1 1 1 1 E
-EH4 -EH3 -EH2 -EH1
2 2 2 2

-XN 3 -XN 9 10 11 12 -XN 4

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE D01 F
CHECKED NEXT PAGE G01
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED AC POWER SUPPLY EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

POWER SUPPLY FOR POWER SUPPLY 1 POWER SUPPLY 2


A PROTECTION RELAY FOR SWITCH FOR SWITCH A

-XT 3
220VDC
-XT 4

BUS WIRE
-XT 16
220VDC
-XT 17

B B

1 3 12 14 1 3 12 14 1 3 12 14

-FQ27 11 -FQSW1 11 -FQSW2 11


2P-6A I> I> 2P-6A I> I> 2P-6A I> I>

/R03.4

/R03.2

/R03.2
C C
2 4 2 4 2 4

-X1 1 59+
/N01.3

-X1 9 59-
/N01.2

D D

29 30 31 32
L+ L- L+ L-
-SW GND
F27 T4
/Z02 -PS

E GRD200
E

-PE

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE G01 F
CHECKED NEXT PAGE N01
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED DC POWER SUPPLY EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

VT CL3P 27/59, 59N TRIP


BUS ES OPENED MCB OFF

B B
59+ 59+
G01.4/ /R01.1

-X1 2
R01.6/
.59+

ES 7
/Z01.1
5
F27 T3
C 22 24 /Z02 C
QE.4 -BO5
/Z01.3
FBVT.M
/S01.3 21
6

-X1 15

D D
-X9 5 -X9 6 -X9 4

-X9 7
BUS TERMINALS

-X1 10
59- 59-
G01.4/ /Q01.1
E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE N01 F
CHECKED NEXT PAGE Q01
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED LOAD SHEDDING CIRCUIT EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

POWER SUPPLY INTERLOCKING


A VT SERVICE VT TEST BUS ES BUS ES OF DXN A
FOR OPERATION ES
POSITION POSITION CLOSED OPENED

POWER INDICATOR

R01.5/
DXN

-CC CABLE CONNECTION COMPARTMENT


2 5

R01.4/
ESO+ DXN
B /Q01.6 B

R01.3/
ESC+
1 6

VTT+
R01.2/ -X1 16

R01.2/
VTS+

C C
-XT 13

IN TEST POSITION
ALL CB
BUS WIRE

-XT 14

-X1 17
D D

-ES 1 10 9 8
/Z01.1 DXN
X1 X1 X1 X1 /Q01.4
-PLS -PLT -PEC -PEO DS
7
/Z01.5 X2 /Z01.5 X2 /Z01.5 X2 /Z01.5 X2
L1 L2 L3
2

E E

PL- -PE
R02.5/ -X1 11 -X1 12

59- 59-
N01.6/ / R01.1

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Q01 F
CHECKED NEXT PAGE R01
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED INDICATION CIRCUIT EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

VT VT BUS ES BUS ES VT CORE 3P VT CORE CL0.5 H02 PANEL SPARE SPARE SPARE SPARE SPARE
SERVICE TEST CLOSED OPENED MCB OFF MCB OFF MCB AC OFF

A A

N01.6/
59+ -X1 8
DXN
-X1 3 4 5 6 7 / Q01.4

.59+
/ N01.4

-VT 31 11 -ES 1 3
/S01 /Z01.1

3 1
B B
S9 S8 QE.1 QE.2
4 2 /Z01.2 /Z01.2

32 12 2 4
12 14 12 14 12 14
-FBVT.P -FBVT.M -FQAC
/S01.6 11 /S01.3 11 /D01.3 11
-X1 18 19 20 21

C C

VTS+ VTT+ ESC+ ESO+


/ Q01.1 / Q01.1 / Q01.1 / Q01.1

D D
X1 22 X1 23 X1 24 X1 25 X1 26

1 3 5 7 9 11 13 15 17 21 23 25
F27 T2
/Z02 BI1 BI2 BI3 BI4 BI5 BI6 BI7 BI8 BI9 BI10 BI11 BI12

2 4 6 8 10 12 14 16 18 22 24 26
E E

59-
/ R02.2

-X1 13
Q01.6/
59- -X1 14

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE R01 F
CHECKED NEXT PAGE R02
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED BINARY INPUT OF F27 EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

SPARE SPARE SPARE SPARE SPARE SPARE

B B

C C

D D
X1 27 X1 28 X1 29 X1 30 X1 31 X1 32

27 29 31 33 35 37
F27 T2
/Z02 BI13 BI14 BI15 BI16 BI17 BI18

28 30 32 34 36 38
E E

59- PL-
R01.8/ / Q01.1

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE R02 F
CHECKED NEXT PAGE R03
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED BINARY INPUT OF F27 EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

BUS TERMINALS

ETHERNET SW RELAY
ETHERNET SWITCH FAIL RELAY FAIL
LOSS OF POWER SUPPLY LOSS OF POWER SUPPLY

X9 26 X9 27 X9 30 X9 29 X9 28

B B

C 10 8 1 3 C
12 14 12 14 -SW F27 T4 12 14
/G01.5 /Z02
FQSW2 FQSW1 FQ27
11 11 /Z02.2 11
/G01.6 /G01.5 /G01.3
9 2

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE R03 F
CHECKED NEXT PAGE S01
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED SIGNAL SENT TO OTHER PANEL EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-VT
JDZX11-35R 38.5
A RANGE: A
38.5/Sqrt(3)
0.11/Sqrt(3)
0.11/(3)
CLASS: 0.5/3P

TVA TVB TVC


* * *
B B
* * * * * *

a x aX xD a x aX xD a x aX xD

VT 2 5 6 3 4 7

C C

-X51 1 2 3 4 X53 1 3
D D
-X51 5 -X53 -X53
2 4

1 3 5 1 3
12 14 22 24 12 14 12 14
-FBVT.M
3P-2A 11 21 -FBVT.P 11 11
I> I> I> 2P-2A I> I>
/R01.5

/N01.4

/R01.4
2 4 6 2 4
VTP2.N1
/ S02.7

E VTP2.L1 E
/ S02.7

VTP2.N
VTP2.L
VTM.N
VTM.A

VTM.C
VTM.B
S02.2

S02.2

S02.2

S02.2

S02.6

S02.6
CENTRAL POWER CORPORATION BAY =MV35
DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE S01 F
CHECKED NEXT PAGE S02
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED VOLTAGE CIRCUIT EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A BUS WIRE - VOLTAGE CIRCUIT - CLASS: 0.5 A


-XT 5

-XT 6

-XT 7

-XT 8

BUS WIRE - VOLTAGE CIRCUIT - CLASS: 3P


-XT 9
B B
-XT 10

-XT 11

-XT 12

VTP2.N1
VTM.A

VTP2.L1
/S01.6

/S01.6
S01.3/

C S01.3/
VTM.B C

VTP2.L

VTP2.N
S01.3/
VTM.C

S01.6/

S01.6/
S01.3/
VTM.N

D D

1 3 5 7 1 3 5 7 1 3
-XTV3.59 -XTV1.59 -XTV2.59
/Z01.5 /Z01.4 /Z01.5

2 4 6 8 2 4 6 8 2 4

E 10 6 2 12 1 3 5 7 E
-SMV - F27 VCT
/Z02
VA VB VC VE
1 3
-PMV
2 4 6 8
1 2
V

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE S02 F
CHECKED NEXT PAGE W01
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED VOLTAGE CIRCUIT EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A POSITION OF VOLTAGE TRANSFOMER A


TEST SERVICE

-X3 1 5 9 13 17 21 23 25 27 31

-VT 13 15 17 19 21 33 35 37 49 51
/S01

3 5 7 9 11 3 5 7 9 11
B B
S8 S8 S8 S8 S8 S9 S9 S9 S9 S9
4 6 8 10 12 4 6 8 10 12

14 16 18 20 22 34 36 38 50 52

-X3 2 6 10 14 18 22 24 26 28 32

C C

STATUS OF EARTHING SWITCH


SPARE SPARE
CLOSED OPENED

X3 3 7 11 15 19 X3 29 X3 33
SPARE TERMINAL

-XN 13 14 15
ES 5 9 13 11 15
D D
/Z01.1
11 13 X1 33 34 35

F27 T3 -X3 35 36 37 38 39 40
QE.3 QE.5 QE.7 QE.6 QE.8 /Z02 BO6 BO7
/Z01.2 /Z01.3 /Z01.4 /Z01.3 /Z01.4 -X51 6 7 8 9 10

12 14
-X53 5 6 7 8 9 10
6 10 14 12 16 X9 1 2 3 8 9 10 11 12 13 14 15 16 17 18 19 20

X9 21 22 23 24 25
E E
XT 15
X3 4 8 12 16 20 X3 30 X3 34

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE W01 F
CHECKED NEXT PAGE X105
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED SPARE CIRCUIT EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H01-X1 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
1 =MV35 +H01 F27-T4-PS 30 /G01.4
2 =MV35 +H01 ES-QE4 7 /N01.3
3 =MV35 +H01 VT-X0 31 /R01.1

B 4 =MV35 +H01 VT-X0 11 /R01.2 B


5 =MV35 +H01 ES-A1 1 /R01.3
=MV35 +H01 -A1 3 6 /R01.3
=MV35 +H01 -FBVT.P 12 7 /R01.4
8 =MV35 +H01 DXN-PS 2 /R01.5
9 =MV35 +H01 F27-T4-PS 32 /G01.4
10 =MV35 +H01 X9 7 /N01.4
11 =MV35 +H01 DXN-PS 1 /Q01.5
12 =MV35 +H01 ES-QE1 2 /Q01.5
=MV35 +H01 BI1 2 13 /R01.1
C 14 /R01.2 C
=MV35 +H01 -X9 5 15 =MV35 +H01 ES-QE4 8 /N01.3
=MV35 +H01 -XT 13 16 =MV35 +H01 DXN-RL 6 /Q01.5
=MV35 +H01 -XT 14 17 =MV35 +H01 ES-A1 1 /Q01.5
=MV35 +H01 BI1 1 18 =MV35 +H01 VT-X0 32 /R01.1
=MV35 +H01 BI2 3 19 =MV35 +H01 VT-X0 12 /R01.2
=MV35 +H01 BI3 5 20 =MV35 +H01 ES-QE1 2 /R01.3
=MV35 +H01 BI4 7 21 =MV35 +H01 ES-QE1 4 /R01.3
22 =MV35 +H01 F27-T2-BI8 15 /R01.6
D 23 =MV35 +H01 F27-T2-BI9 17 /R01.6 D
24 =MV35 +H01 F27-T2-BI10 21 /R01.7
25 =MV35 +H01 F27-T2-BI11 23 /R01.7
26 =MV35 +H01 F27-T2-BI12 25 /R01.8
27 =MV35 +H01 F27-T2-BI13 27 /R02.3
28 =MV35 +H01 F27-T2-BI14 29 /R02.3
29 =MV35 +H01 F27-T2-BI15 31 /R02.4
30 =MV35 +H01 F27-T2-BI16 33 /R02.4
31 =MV35 +H01 F27-T2-BI17 35 /R02.5

E 32 =MV35 +H01 F27-T2-BI18 37 /R02.5 E


33 /W01.6
34 /W01.6
35 /W01.6

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X105 F
CHECKED NEXT PAGE X106
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H01-X1 EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H01-X3 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
1 =MV35 +H01 VT-X0 13 /W01.1
2 =MV35 +H01 VT-X0 14 /W01.1
3 =MV35 +H01 ES-QE3 5 /W01.1

B 4 =MV35 +H01 ES-QE3 6 /W01.1 B


5 =MV35 +H01 VT-X0 15 /W01.1
6 =MV35 +H01 VT-X0 16 /W01.1
7 =MV35 +H01 ES-QE5 9 /W01.2
8 =MV35 +H01 ES-QE5 10 /W01.2
9 =MV35 +H01 VT-X0 17 /W01.2
10 =MV35 +H01 VT-X0 18 /W01.2
11 =MV35 +H01 ES-QE7 13 /W01.2
12 =MV35 +H01 ES-QE7 14 /W01.2
13 =MV35 +H01 VT-X0 19 /W01.2
C 14 =MV35 +H01 VT-X0 20 /W01.2 C
15 =MV35 +H01 ES-QE6 11 /W01.2
16 =MV35 +H01 ES-QE6 12 /W01.2
17 =MV35 +H01 VT-X0 21 /W01.2
18 =MV35 +H01 VT-X0 22 /W01.2
19 =MV35 +H01 ES-QE8 15 /W01.3
20 =MV35 +H01 ES-QE8 16 /W01.3
21 =MV35 +H01 VT-X0 33 /W01.3
22 =MV35 +H01 VT-X0 34 /W01.3
D 23 =MV35 +H01 VT-X0 35 /W01.3 D
24 =MV35 +H01 VT-X0 36 /W01.3
25 =MV35 +H01 VT-X0 37 /W01.3
26 =MV35 +H01 VT-X0 38 /W01.3
27 =MV35 +H01 VT-X0 49 /W01.4
28 =MV35 +H01 VT-X0 50 /W01.4
29 =MV35 +H01 F27-T3-BO6 11 /W01.4
30 =MV35 +H01 F27-T3-BO6 12 /W01.4
31 =MV35 +H01 VT-X0 51 /W01.4

E 32 =MV35 +H01 VT-X0 52 /W01.4 E


33 =MV35 +H01 F27-T3-BO7 13 /W01.4
34 =MV35 +H01 F27-T3-BO7 14 /W01.4
35 /W01.6
36 /W01.6
37 /W01.6
38 /W01.6
39 /W01.6
40 /W01.6

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X106 F
CHECKED NEXT PAGE X107
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H01-X3 EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H01-X9 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
1 /W01.6
2 /W01.6
3 /W01.6

B 4 =MV35 +H01 F27-T3-BO5 6 /N01.5 B


5 =MV35 +H01 X1 15 /N01.3
6 =MV35 +H01 FBVT.M 21 /N01.4
7 =MV35 +H01 X1 10 /N01.4
8 /W01.6
9 /W01.6
10 /W01.6
11 /W01.7
12 /W01.7
13 /W01.7
C 14 /W01.7 C
15 /W01.7
16 /W01.7
17 /W01.7
18 /W01.8
19 /W01.8
20 /W01.8
21 /W01.6
22 /W01.6
D 23 /W01.6 D
24 /W01.6
25 /W01.6
26 =MV35 +H01 FQSW 12 /R03.2
27 =MV35 +H01 SW-R13 10 /R03.3
28 =MV35 +H01 FQ27 11 /R03.5
29 =MV35 +H01 FQ27 12 /R03.4
30 =MV35 +H01 F27-T4-LC1 1 /R03.4

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X107 F
CHECKED NEXT PAGE X109
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H01-X9 EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H01-X51 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
=MV35 +H01 -FBVT.M 1 1 =MV35 +H01 VT-VT 2 /S01.2
=MV35 +H01 -FBVT.M 3 2 =MV35 +H01 VT-VT 3 /S01.3
=MV35 +H01 -FBVT.M 5 3 =MV35 +H01 VT-VT 4 /S01.3

B =MV35 +H01 -XT 8 4 =MV35 +H01 VT-VT 5 /S01.3 B


=MV35 +H01 1PE 5 /S01.3
6 /W01.6
7 /W01.6
8 /W01.6
9 /W01.6
10 /W01.6

C C

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X109 F
CHECKED NEXT PAGE X110
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H01-X51 EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H01-X53 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
=MV35 +H01 -FBVT.P 1 1 =MV35 +H01 VT-VT 6 /S01.6
2 /S01.6
=MV35 +H01 -FBVT.P 3 3 =MV35 +H01 VT-VT 7 /S01.6

B =MV35 +H01 2PE 4 /S01.6 B


5 /W01.6
6 /W01.6
7 /W01.6
8 /W01.6
9 /W01.6
10 /W01.6

C C

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X110 F
CHECKED NEXT PAGE X111
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H01-X53 EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H01-XN A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
2 1 =MV35 +H01 FQAC 4 /D01.3
=MV35 +H01 2MD X2 2 =MV35 +H01 HL5 X2 /D01.5
=MV35 +H01 -FQAC 2 3 1 /D01.3

B =MV35 +H01 -S1 14 4 =MV35 +H01 LXK 21 /D01.5 B


=MV35 +H01 -EH4 1 5 /D01.4
=MV35 +H01 -EH3 1 6 /D01.4
=MV35 +H01 -EH2 1 7 /D01.4
=MV35 +H01 -EH1 1 8 5 /D01.4
4 9 =MV35 +H01 EH4 2 /D01.4
10 =MV35 +H01 EH3 2 /D01.4
11 =MV35 +H01 EH2 2 /D01.4
12 =MV35 +H01 EH1 2 /D01.4
13 /W01.6
C 14 /W01.6 C
15 /W01.6

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X111 F
CHECKED NEXT PAGE X112
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H01-XN EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H01-XT A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
1 =MV35 +H01 FQAC 1 /D01.3
2 =MV35 +H01 FQAC 3 /D01.3
3 =MV35 +H01 FQ27 1 /G01.3

B 4 =MV35 +H01 FQ27 3 /G01.4 B


5 =MV35 +H01 XTV1.59-C1 1 /S02.4
=MV35 +H01 FBVT.M 2
6 =MV35 +H01 XTV1.59-C2 3 /S02.4
=MV35 +H01 FBVT.M 4
7 =MV35 +H01 XTV1.59-C3 5 /S02.4
=MV35 +H01 FBVT.M 6
8 =MV35 +H01 XTV1.59-C4 7 /S02.5
=MV35 +H01 X51 4
9 =MV35 +H01 FBVT.P 2 /S02.7
C 10 =MV35 +H01 FBVT.P 4 /S02.7 C
11 /S02.8
12 /S02.8
13 =MV35 +H01 X1 16 /Q01.5
14 =MV35 +H01 X1 17 /Q01.5
15 /W01.6

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X112 F
CHECKED NEXT PAGE Y01
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H01-XT EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
F27
100 BASE TX 100 BASE TX
PORT 1 PORT 2
/Z02.2 /Z02.2

ETHERNET CABLE RJ45 CONNETOR


B B

SW
C C
100 BASE FX
PORT 1
100 BASE TX
PORT 3 TX RX

FO MULTI-MODE CABLE ST-ST CONNETOR


D D

E =T00+SERVER E

SW TX RX

100 BASE FX
PORT 6

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Y01 F
CHECKED NEXT PAGE Z01
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED COMMUNICATION PORTS EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

VOLTAGE TEST BLOCK

L1 L2 L3
-KTT-VW4 XTV1.59 XTV2.59 XTV3.59

1a
1 2
1n
B B
1a
3 4

EQUIPMENT
1n
/S02.4 /S02.6 /S02.2
1a
5 6
1n

7 8

C C

INDICATION LAMP 220 VAC/VDC

AUXILIARY CONTACT OF EARTHING SWITCH

D D
1 3 5 7 9 11 13 15
-PLS /Q01.2 VT SERVICE POSITION RED

-PLT /Q01.3 VT TEST POSITION GREEN


QE.1 QE.2 QE.3 QE.4 QE.5 QE.6 QE.7 QE.8
-PEC /Q01.3 BUS ES CLOSED RED
2 4 6 8 10 12 14 16 /Q01.4
-PEO BUS ES OPENED GREEN

E E
-ES /R01.3 /R01.3 /W01.1 /N01.3 /W01.2 /W01.2 /W01.2 /W01.3

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Z01 F
CHECKED NEXT PAGE Z02
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED REFERENCE OF CONTROL & MESUREMENT EQUIPMENT EVNCPC/IA-110KV/MV-H01

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

F27 F27 F27


MODULE PWS1 MODULE BO1 FUNCTION MODULE BI1 FUNCTION F27
- T4 - T3 - T2 MODULE VCT31B
A - VCT A
+
1 1
(*2) BO1 BI1 /R01.1 VT SERVICE 1
1 - VA /S02.4
2 2
2
3 +
LC1 /R03.4 3 3
(*2) BO2 BI2 /R01.2 VT TEST 3
2 - VB /S02.4
4 4
4
4 +
5 5
(*2) BO3 BI3 /R01.3 BUS ES CLOSED 5
- VC /S02.4
6 6
6
+
7 7 7
(*2) BO4 BI4 /R01.3 BUS ES OPENED 7
- VE /S02.6
B 9 8 8 B
LC2 8
+
8 9 9
(*2) BO5 /N01.5 27/59, 59N TRIP BI5 /R01.5 VT CORE 3P MCB OFF 9
- VS
10 10 10
10
+
11 11
Power (*2) BO6 /W01.4 SPARE BI6 /R01.5 VT CORE CL0.5 MCB OFF 17
- IA
Supply 12 12
18
+ +
= 29 13 13
BO7 /W01.4 SPARE BI7 /R01.6 H02 PANEL MCB AC OFF 19
- IB
30 14 14
_ /G01.3 20
+
= 31 15 15
BO8 BI8 /R01.6 SPARE 21
- IC
C 32 16 16 C
22
GND +
35 17 17
BO9 BI9 /R01.6 SPARE 23
- IE1
36 18 18
24
+
37 21 21
BO10 BI10 /R01.7 SPARE 25
- IE2
38 22 22
26
+
23 23
BO11 BI11 /R01.7 SPARE 27
- IS
24 24
28
+
25 25
F27 BO12 BI12 - /R01.8 SPARE
D 26 26 GND D
30
+
27 27
BO13 BI13 - /R02.3 SPARE
28 28
PORT1 /Y01.4
+
29 29
BO14 BI14 - /R02.3 SPARE
30 30
+
31 31
BO15 BI15 - /R02.4 SPARE
32 32
+
33 33
E BO16 BI16 - /R02.4 SPARE E
34 34
+
PORT2 /Y01.4 35 35
BO17 BI17 - /R02.5 SPARE
36 36
+
37 37
BO18 BI18 - /R02.5 SPARE
38 38

NOTE: (*2): SEMI-FAST BO


TOSHIBA: GRT200-31-224-00-4L-30-111 ̣(GRT200-303D-4L2-2E)

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Z02 F
CHECKED NEXT PAGE +H02/A00
35KV VOLTAGE TRANSFORMER PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED REFERENCE OF PROTECTION RELAY: GRD200 EVNCPC/IA-110KV/MV-H01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

B B

PURCHASER:

C C
CENTRAL POWER CORPORATION

PROJECT:

CPC-KFW3.1chung-G02

D D
PLANT:

110kV IAGRAI SUBSTATION

TITLE: STAMP:

E E
35KV INCOMING PANEL OF C31 BUSBAR

DRAWING No.: EVNCPC/IA-110KV/MV-H02

STANDARD: IEC SHEET No.: A00 QTY OF SHEETS: 37

DRAWN SUB CONTRACTOR:

F CHECK. F

APPR.

DATE 3/10/2020

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
10
11
1
R ASN1-40.5 INCOMING
F67
PMT
PMF
3
TOSHIBA

D
I U P Q

pLS pLT pLC pLO


L
R

2
CLEAR HELP CANCEL ENTER

BRL LX LEC LEO


580

F1 F2 F3 F4 F5 F6 F7

A B C 0V

XTV1.67 XTV2.67 XTV.PMT

XTC.67 XTC.PMT
SLR SQ0 S25 TH
S2K(TH)
L1
DXN

L2 L3
12 A B 8
LOW VOLTAGE COMPARTMENT LAYOUT
B 5 B

F67
PMT
7 9
TOSHIBA
PMF
2400

2400
I U P Q

pLS pLT pLC pLO

6 CLEAR
L
R

HELP CANCEL ENTER

BRL LX LEC LEO

C
F1 F2 F3 F4 F5 F6 F7

A B C 0V

‎合 闸
XTV1.67 XTV2.67 XTV.PMT
‎分 闸

4
‎摇 进
‎摇 出

C SLR SQ0 S25 TH DXN C


XTC.67 XTC.PMT
S2K(TH)
L1 L2 L3

530 LEGEND
1200 2600 NOTE DESCRIPTION SYMBOL DESCRIPTION
A BUSBAR COMPARTMENT F67 OVERCURRENT PROTECTION RELAY
B CIRCUIT BREAKER COMPARTMENT XTV... VOLTAGE TEST BLOCK
C CABLE CONNECTION COMPARTMENT XTC... CURRENT TEST BLOCK
D LOW VOLTAGE COMPARTMENT PMT TARIFF METER
D SƠ ĐỒ MIMIC PLS INDICATION LAMP FOR CIRCUIT BREAKER IN SERVICE POSITON D
ITEM DESCRIPTION PLT INDICATION LAMP FOR CIRCUIT BREAKER IN TEST POSITION
1 MAIN BUSBAR PLC INDICATION LAMP FOR CIRCUIT BREAKER IS CLOSED
2 BUSBAR BUSHING PLO INDICATION LAMP FOR CIRCUIT BREAKER IS OPENED
3 FIXED SPOUT PLX INDICATION LAMP FOR SPRING STORED ENERGY
4 CURRENT TRANSFORMER PEC INDICATION LAMP FOR EARTHING SWITCH IS CLOSED
5 EARTHING SWITCH PEO INDICATION LAMP FOR EARTHING SWITCH IS OPEN
1200

6 ELECTRICAL CABLE TERMINAL PTH TEMPERATURE & HUMIDITY CONTROLLER


7 SUPPORTOR (FITTED WITH INDICATOR) DXN POWER INDICATOR
8 CIRCUIT BREAKER BRL RESET LOCKOUT PUSH BUTTON
9 SHUTTER S.L/R "LOCAL/REMOTE" CONTROL MODE SELECTOR SWITCH
10 LINK TERMINALS SQ0 CONTROL SWITCH FOR CIRCUIT BREAKER
11 VOLTAGE TRANSFORMER S25 "ON/OFF" SYNCHROCHECK SELECTION SWITCH
E 12 FUSE E

2600

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B01 F
CHECKED NEXT PAGE B02
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED LAYOUT DRAWING EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

DIVICE TAG TYPE MANUFACTURER DESCRIPTION TECHNICAL DATA

F67 GRT200 TOSHIBA DIRECTIONAL OVERCURRENT PROTECTION RELAY In: 1A, Un: 110V, fn: 50Hz, Uaux: 220VDC, 5CT, 6VT, 18 x BI, 18 x BO, 2xRJ45
A A
XTC... KTT FUJI CURRENT TEST BLOCK Imax: 15A, Umax: 400V

XTV... KTT FUJI VOLTAGE TEST BLOCK Imax: 8A, Umax: 400V

PMT A1700 ELSTER TARIFF METER In: 1A, Un: 110VAC, fn: 50Hz, class 0.5

PLS YW1P IDEC INDICATION LAMP FOR CIRCUIT BREAKER IN SERVICE POSITON Uaux: 220VDC, Red

PLT YW1P IDEC INDICATION LAMP FOR CIRCUIT BREAKER IN TEST POSITION Uaux: 220VDC, Green

PLC YW1P IDEC INDICATION LAMP FOR CIRCUIT BREAKER IN CLOSED POSITON Uaux: 220VDC, Red
B B
PLO YW1P IDEC INDICATION LAMP FOR CIRCUIT BREAKER IN OPENED POSITON Uaux: 220VDC, Green

PEC YW1P IDEC INDICATION LAMP FOR EARTH SWITCH IN CLOSED POSITON Uaux: 220VDC, Red

PEO YW1P IDEC INDICATION LAMP FOR EARTH SWITCH IN OPENED POSITON Uaux: 220VDC, Green

PLX YW1P IDEC INDICATION LAMP FOR SPRING STORED ENERGY Uaux: 220VDC, Green

PTH GZY-S1W1-C TOUFU TEMPERATURE & HUMIDITY CONTROLLER Uaux: 220VAC

DXN TF-FH2 TOUFU POWER INDICATOR Uaux: 220VAC/DC, 1NO


C C
BRL YW1B IDEC RESET LOCKOUT PUSH BUTTON 1NO

S.B/M SA16 SALZER "BCU/MIMIC" CONTROL MODE SELECTOR SWITCH 6-POLE, BCU/MIMIC, INSULATION VOLTAGE: 690V, THERMAL CURRENT: 20A

S.25 SA16 SALZER "SYN/BYPASS" SYNCHROCHECK SELECTION SWITCH 3-POLE, SYN-BYPASS, INSULATION VOLTAGE: 690V, THERMAL CURRENT: 20A

SQF01 CA10-A214-620E K&N CONTROL SWITCH FOR CIRCUIT BREAKER INSULATION VOLTAGE: 690V, THERMAL CURRENT: 20A

K... RU4S IDEC AUXILIARY RELAY FOR REPEAT SIGNAL Uaux: 220VDC, 4NO/NC, 6A

D FQAC NDM1-63C6/2 NADER MCB OF POWER SUPPLY FOR HEATING & LIGHTING 2P-6A, 6kA, 220VAC D

FQC NDM1-63C6/2 NADER MCB OF POWER SUPPLY FOR CONTROLLING 2P-6A, 16kA, 220VDC

FQ67 NDM1-63C6/2 NADER MCB OF POWER SUPPLY FOR PROTECTION EQUIPMENT 2P-6A, 16kA, 220VDC

FQMC NDM1-63C6/2 NADER MCB OF POWER SUPPLY FOR SPRING CHARGER MOTOR 2P-6A, 16kA, 220VDC

FBVT.M, FBVT.P NDM1-63C2/3 NADER MCB OF BUSBAR VOLTAGE CIRCUIT 3P-2A, 6kA, 220VAC

EH1, EH2 TRG2-200W TAIWAN HEATING RESISTOR 220VAC-200W


E E
2MD, HL5 TAIWAN LIGHTING LAMP 220VAC

S1, LXK TAIWAN DOOR SWITCH

TS TAIWAN TEMPERATURE SENSOR

HS TAIWAN HUMIDITY SENSOR

XT TERMINAL AT TOP OF LOW VOLTAGE COMPARTMENT

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B02 F
CHECKED NEXT PAGE B03
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED LIST OF EQUIPMENT EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

DIVICE TAG TYPE MANUFACTURER DESCRIPTION TECHNICAL DATA

X51, X52 TB2.5BI PHOENIX VOLTAGE TERMINAL 800V/24A/4SQMM MAX


A A
X41, X42, X43 TB6 RTK PHOENIX CURRENT TERMINAL 400V/41A/6SQMM MAX

X1, X2, X3, X6 TB2.5BI PHOENIX SIGNAL TERMINAL FOR CONTROLLING, PROTECTION CIRCUIT 800V/32A/4SQMM MAX

X9 PT4 PHOENIX BUS TERMINALS 800V/32A/4SQMM MAX

B B

C C

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B03 F
CHECKED NEXT PAGE B04
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED LIST OF EQUIPMENT EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CONTROL FROM SCADA CONTROL AT PANEL CON TROL AT EQUIPMENT

A A

CLOSING ORDER FROM SCADA

B CLOSING ORDER FROM EMERGENCY CLOSING BUTTON B


CONTROL FROM HMI BCU
INTERNAL INTERLOCKING OK

E05-QE38 OPENED
&
CONTROL MODE SELECTION SWITCH ON HMI J04-QE38 OPENED
AT "REMOTE" POSITION
≥1 ES PANEL OPENED
CONTROL MODE SELECTION SWITCH ON HMI &
AT "LOCAL" POSITION CONTROL MODE SELECTION SWITCH ON BCU ES BUS OPENED
C & AT "REMOTE" POSITION
& C
CLOSING ORDER FROM HMI ≥1 TRIP CIRCUITS SUPERVISION OK
CONTROL MODE SELECTION SWITCH ON BCU
AT "LOCAL" POSITION LOCK OUT FUNCTION (86) NOT ACTIVE
&
CLOSING ORDER FROM BCU CB ON "SERVICE" POSITION ≥1 &
CLOSE CB
≥1 QF01
CB ON "TEST" POSITION

QF01 MIMIC
D & D
CONTROL MODE SELECTION SWITCH AT "REMOTE" POSITION
P2
≥1
CONTROL MODE SELECTION SWITCH AT "MIMIC" POSITION

&
CLOSING ORDER FROM CONTROL SWITCH
&
P1
SYNCHRO-CHECK OK
E & E
SYNCHRO-CHECK SWITCH AT "SYN." POSITION
≥1
SYNCHRO-CHECK SWITCH AT "BYPASS" POSITION

QE38
3P

0.5

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B04 F
CHECKED NEXT PAGE B05
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED CLOSING LOGIC DIAGRAM FOR QF01 EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CONTROL FROM SCADA CONTROL AT PANEL CON TROL AT EQUIPMENT

A A

OPENNING ORDER FROM SCADA F87T (E05 UPSTREAM) TRIP

F67 (E05 UPSTREAM) TRIP

F67 TRIP &

50BF OTHER FEEDER TRIP.


B B
CONTROL FROM HMI K94 TRIP

&
CONTROL MODE SELECTION SWITCH ON HMI BCU
AT "REMOTE" POSITION
≥1
CONTROL MODE SELECTION SWITCH ON HMI
AT "LOCAL" POSITION
&
CONTROL MODE SELECTION SWITCH ON BCU
C
& AT "REMOTE" POSITION C
OPENNING ORDER FROM HMI
≥1 OPENING ORDER FROM EMERGENCY OPENING BUTTON
≥1 OPEN CB
CONTROL MODE SELECTION SWITCH ON BCU QF01
AT "LOCAL" POSITION
&
OPENNING ORDER FROM BCU

QF01 MIMIC
D D

P2
&
CONTROL MODE SELECTION SWITCH AT "REMOTE" POSITION

≥1

P1 CONTROL MODE SELECTION SWITCH AT "LOCAL" POSITION

E E
&
OPENNING ORDER FROM CONTROL SWITCH

QE38
3P

0.5

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B05 F
CHECKED NEXT PAGE B06
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED OPENNING LOGIC DIAGRAM FOR QF01 EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CONTROL AT PANEL CON TROL AT EQUIPMENT

A A

B B

DS E05-QL03 OPENED

CB H02-QF01 IN TEST POSITION


&
C C
CB J04-QF01 IN TEST POSITION

OPERATION ES
& QE38

NO VOLTAGE AT CABLE TERMINAL

MECHANICAL INTERLOCKING OK
QF01
D D

P2

P1

E E

QE38
3P

0.5

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B06 F
CHECKED NEXT PAGE D01
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED INTERLOCKING LOGIC DIAGRAM FOR QE38 EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

POWER SUPPLY
FOR HEATING & LIGHTING

A A

-XT 1

BUS WIRE
220VAC
-XT 2

B B

1 3 12 14

-FQAC 11
2P-6A I> I>

/R02.6
2 4
C HEATING LIGHTING
C

-XN 1 -XN 2
Red Red

-HS -TS
X2 X2
Black Green Black
2MD HL5
D X1 X1 D
2 8 9 10 7 6
-PTH
TEMPERATURE & HUMIDITY CONTROLLER

1 4 5
13
22
-XN 5 6 7 8 -LXK -S1
21 14
1 1 1 1
E E
-EH4 -EH3 -EH2 -EH1
2 2 2 2

-XN 3 -XN 9 10 11 12 -XN 4

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE D01 F
CHECKED NEXT PAGE G01
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED AC POWER SUPPLY EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

POWER SUPPLY FOR POWER SUPPLY FOR POWER SUPPLY


A SPRING CHARGER MOTOR PROTECTION RELAY FOR CONTROLLING A

-XT 3

BUS WIRE BUS WIRE


220VDC
-XT 4

-XT 16
220VDC
-XT 17

B B

1 3 12 14 96 98 1 3 12 14 96 98 1 3 12 14 96 98

-FQMC 11 95 -FQ67 11 95 -FQC 11 95


2P-6A I> I>
/R02.6 2P-6A I> I> 2P-6A I> I>

/R03.6

/R02.7
C C
2 4 2 4 2 4

-XN 13

-CB 35 -X2 1 67+ X1 1 C+


/R01.1 /M01.1
/Z01.2
-X2 11 67- X1 8 C-
/R01.1 /M01.1

D D
21
SP3
/Z01.3 22

-M
M 29 30 31 32

/Z01.3
F67 T4
/Z02 -PS
E E

GRD200
25

-XN 14
-PE

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE G01 F
CHECKED NEXT PAGE M01
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED DC POWER SUPPLY EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CONTROL AT LOCAL
CLOSE CB CLOSE CB OPEN CB PROTECTION RELAY EXTERNAL 27/59 C31 50BF FROM TRIP CIRCUIT INTERLOCKING POWER SUPPLY INTERLOCKING
CLOSE OPEN
COMMAND WITH SYN COMMAND TRIP TRIP TRIP OTHER FEEDER SUPERVISION FOR CB TRUCK OF DXN FOR OPERATION ES
A CB CB A
G01.6/
C+ -X1 7
-X1 2 3 4 5 6

-X3 31

=E05+WR
1

F87T & F67 (110KV)TRIP


1 3 5 7 1 2 5
-S.L/R DXN
/Z03.4
F67 T3 F67 T2
LOCAL /Z02 1 5 1 5 /Z02 1 5 /Q01.7
-BO1 -BO2 -BO3 -BO4
2 -K272 -K50BF2 BI1 -KSQE
/R03.3 9 /R03.2 9 /R03.4 9
B 2 4 6 8 1 6 B
2 4 -X3 32 2
-S.QF01
Push close

Push open

/Z03.1
X1 23 -X1 13 -X1 30
1 3

=E05+WR

DS E05-QL01 OPENED
-X3 37

3
-X1 20 -X1 21 -X1 25 26
C -S.25 C
/Z03.1
BYPASS
=C42+J04

=E05+WR
-CB 17 46
4 -X 65 -X3 39 -X3 38

ES E05+QE38 OPEN
ES J04+QE38 OPEN
/Z01.2
51
9 HK23
INTERLOCKING

HK51 -X1 31
FOR CB CLOSE

/Z01.6
F67 T3 /Z01.8 52
/Z02 -BO5
3

J04-QF01 AT TEST POS.


-X 66 -X3 40 7 12
-X3 104
F67 T2

=C42+J04
/Z02 10
D BI2 D
-X1 24 27

-X3 105
4

-X1 16 17 18 19 22 28 29 -X1 32

-CB 53 54 52 14 31 41 2 -ES 1
/Z01.2 /Z03.1
DS

E S82 S92
E
/Z01.6 /Z01.6
HQ TQ Y0
/Z01.4 /Z01.5 /Z01.8
2
TEST SERVICE 4 30 37

C- -X1 -X1 10 -X1 14


9 11 12
-X1 15
G01.6/

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE M01 F
CHECKED NEXT PAGE Q01
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED CONTROL & PROTECTION CIRCUIT EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
CB SERVICE CB TEST CB CB ES ES CB SPRING CB AT
POSITION POSITION CLOSED OPENED CLOSED OPENED CHARGED TEST POSITION

POWER INDICATOR
R01.4/
SPC

R01.6/
ESO
-CC CABLE CONNECTION COMPARTMENT
R01.5/
ESC

B R01.4/
CBO B

R01.3/
CBC

R01.2/
CBT

R01.3/
CBS

C C

D D

10 9 8
DXN
/M01.7
X1 X1 X1 X1 X1 X1 X1 13
7
-PLS -PLT -PLC -PLO -PEC -PEO -PLX -KST
/Z03.4 X2 /Z03.4 X2 /Z03.4 X2 /Z03.4 X2 /Z03.4 X2 /Z03.4 X2 /Z03.4 X2 220VDC 14 L1 L2 L3

E E
PL- 50BF-
R02.8/ / R03.1
-PE

5 9 /R04.3
1
6 10 /R04.4
2
7 11 /R04.4
3
8 12
4
CENTRAL POWER CORPORATION BAY =MV35
DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Q01 F
CHECKED NEXT PAGE R01
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED INDICATION CIRCUIT EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A CB CB CB CB CB SPRING ES ES CONTROL MODE


"ON" FUNCTION 25
RESET A
TEST SERVICE CLOSED OPENED CHARGED CLOSED OPENED "REMOTE" LOCK-OUT

67+ 67+
G01.5/ /R02.1
-X2 2 -X2 3 -X2 4 -X2 5 -X2 6 50BF+
/R03.1

-CB 11 24 -ES 1 3
/Z01.2 /Z03.1
7 1 3
B 1 3 53 61 13 -S.L/R -S.25 -BRL B
/Z03.4 /Z03.1 /Z03.4
S81 S93 HK53 HK61 SP2 QE.1 QE.2
/Z01.6 2 /Z01.6 4 /Z01.6 54 /Z01.6 62 /Z01.3 14 /Z03.1 /Z03.2 REMOTE ON

8 2 4

50 51 21 22 34 2 4

-X2 14 -X2 15 -X2 16 -X2 17 -X2 18 -X2 19 -X2 20

C C

CBT CBS CBC CBO SPC ESC ESO


/ Q01.1 / Q01.1 / Q01.1 / Q01.1 / Q01.1 / Q01.1 / Q01.1

D D

5 7 9 11 13 15 17 21 23 25
F67 T2
/Z02
BI3 BI4 BI5 BI6 BI7 BI8 BI9 BI10 BI11 BI12

6 8 10 12 14 16 18 22 24 26
E E
67-
/R02.1

-X2 12

G01.5/
67- -X2 13

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE R01 F
CHECKED NEXT PAGE R02
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED BINARY INPUT OF F67 EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A SET 86, 27/59 C32 50BF FROM MCB BVT CL0.5 MCB TVT CL0.5 BLOCK INCOMING PANEL MCB TVT CL3P A
START 50BF TRIP OTHER FEEDER OFF OFF FUNCTION 25 MCB OFF OFF

R01.8/
67+ -X2 10
-X2 7 -X2 8 -X2 9
=E05+WR

=C42+J02
F87T, F67(110KV) & 50BF(110KV) TRIP
-X3 29 -X3 47
B B

50BF(22KV) TRIP
2 6 2 6 12 14 12 14 1 5
-K272 -K50BF2 -FBVT.M -FTVT.M -KVTC42.P 12 14 12 14 12 14 12 14
/R03.3 10 /R03.2 10 /T01.6 11 /S02.3 11 /R03.4 9 FQAC -FQMC -FQC -FTVT.P
/D01.3 11 /G01.3 11 /G01.5 11 /S02.6 11

-X3 30 -X3 48

C C

-X2 21 -X2 22

D D

27 29 31 33 35 37
F67 T2
/Z02
BI13 BI14 BI15 BI16 BI17 BI18
E E

28 30 32 34 36 38

67- PL-
R01.8/ /Q01.1

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE R02 F
CHECKED NEXT PAGE R03
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED BINARY INPUT OF F67 EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A
50BF TRIP 50BF TRIP BUS 50BF TRIP 27/59 C32 MCB BVT C31
ES TUC31 OPENED
TRIP OFF RELAY OR ETHERNET SW ETHERNET SWITCH
RELAY FAIL
LOSS OF POWER SUPPLY FAILURE

-X9 1 2 3 4 5 6 7 30 29 28 27

BUS TERMINALS

B B

R01.8/
50BF+

11 13
F67 T3
C /Z02 BO6 BO7
C

12 14
1 3
F67 T4 12 14
/Z02 -FQ67
/G01.4 11
2
-K272 -KSQE -KVTC42.P
13 13 220VDC 13 220VDC 13 220VDC 13
D -K50BF1 -K50BF2 D
220VDC 14 220VDC 14 14 14 14

Q01.6/
50BF-
-X3 3

5 9 /R05.6 5 9 /M01.6 5 9 /M01.5 5 9 /M01.7 5 9 /R02.5


1 1 1 1 1
6 10 /R05.5 6 10 /R02.4 6 10 /R02.3 6 10 6 10 -X3 1 -X3 2 -X3 4
2 2 2 2 2
7 11 7 11 7 11 7 11 7 11
3
8 12
3
8 12
3
8 12
3
8 12
3
8 12
=E05+WR
E 4 4 4 4 4 E

-X8 58 59 11 60

CONTROL & PROTECTION PANEL FOR E05 BAY

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE R03 F
CHECKED NEXT PAGE R04
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED SIGNAL SENT TO OTHER PANEL EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

XT 14 XT 15
BUS TERMINALS

B B

2 6
-KST
/Q01.5 10

C CB IN TEST CB IN SERVICE
C
CB IN TEST POSITION POSITION
POSITION

-CB 55
/Z01.2

3 7 53
D 1 5 -KST S95 D
-KST /Q01.5 11 /Z01.6 54
/Q01.5 9

56

X3 5 6 X3 7 8 X3 9 10

SPARE SPARE SPARE


E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE R04 F
CHECKED NEXT PAGE R05
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED SIGNAL SENT TO OTHER PANEL EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

B B

H01-QE38 50BF H01 50BF H01


CB IN TEST
OPENED TRIP TRIP
POSITION

ES 12 -CB 58
/Z03.1 /Z01.2

52
C 2 6 1 5 C
QE.6 S85
/Z03.3 /Z01.6 51
-K50BF1 -K50BF1
/R03.1 10 /R03.1 9

11 57

-X3 11 12 13 14 15 16 17 18
D D
=C42+J04

=E05+WR
-X3 8 9 -X3 28 -X4 787 -X3 21 22 -X20 7 20

INTERLOCKING INTERLOCKING
TRIP TO J03-QF01 TRIP TO F862 (E06)
FOR J03-QF01 FOR J03-QE38
E E
CONTROL & PROTECTION PANEL FOR E06

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE R05 F
CHECKED NEXT PAGE S01
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED SIGNAL SENT TO OTHER PANEL EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

=T2+CT35 35KV BUSHING CT OF TRANSFORMER


A CORE 2 - CL: 5P20, 400-800-1200/1A A

A B C

B 2S1 2S4 2S1 2S4 2S1 2S4


B

=T2+LCB
BVT.A
-TB9-1 1 4 -TB9-2 1 4 -TB9-3 1 4 /T01.5

BVT.B
/T01.5

BVT.C
/T01.5

C C
BVT.N
/T01.5

TVT.B1
/S02.3
-X44 1 2 3 4

TVT.N1
/S02.3

D D
1 3 5 7 1 3 5 7 1 3
-XTC.67 -XTV1.67 -XTV2.67
/Z04.4 /Z04.4 /Z04.4

2 4 6 8 2 4 6 8 2 4

17 19 21 24 26 1 3 5 8 9
E - F67 VCT E
/Z02
IA IB IC IE1 IE2 VA VB VC VE VS

18 20 22 23 25 2 4 6 7 10

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE S01 F
CHECKED NEXT PAGE S02
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED CURRENT & VOLTAGE CIRCUIT FOR PROTECTION RELAY EVNCPC/IA-110KV/MV-H02

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-VT
A JDZX9-35 A
RANGE:
38.5/Sqrt(3)
0.11/Sqrt(3)
0.11/(3)
CLASS: 0.5/3P

TVA TVB TVC


* * *
B B

* * * * * *

a x aX xD a x aX xD a x aX xD

TVA 1 2 3 TVB 1 2 TVC 1 2 4

C C

D -X51 1 3 5 7 8 9 10 11 14 15 16 D

1 3 5 1 3
12 14 12 14 12 14
-FTVT.M
3P-2A 11 -FTVT.P 11 11
I> I> I> 2P-2A I> I>
/R02.5

/R02.7
2 4 6 2 4

X51 2 4 6 12 13
E E
TVT.N1

VTP2.N
TVT.B1

VTP2.L
VTM.A

VTM.C
S01.7

S01.7

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE S02 F
CHECKED NEXT PAGE S03
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED VOLTAGE CIRCUIT EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-CT
LZZB7-35G-40.5 CORE 2 - CL: 5P20, 400-800-1200/1A CORE 3 - CL: 5P20, 400-800-1200/1A
400-800-1200/1/1/1A
A 0.5/5P20/5P20 A

PA 2S1 2S2 2S3 2S4PB 2S1 2S2 2S3 2S4PC 2S1 2S2 2S3 2S4 PA 3S1 3S2 3S3 3S4PB 3S1 3S2 3S3 3S4PC 3S1 3S2 3S3 3S4
* * * * * *

B B

-X43 4 5 6 7

-X43 12 13 14 15

C C

-X43 8 9 10 11

-X42 1 2 3 4 5 6 7 8 9 10 11 12
-X43 1 2 3

D D

SPARE
=E05+WR

2
E E
-X42 4 4 3

CURRENT INPUT FOR TRANSFORMER DIFFERENT PROTECTION RELAY (F87T)

CONTROL & PROTECTION PANEL FOR TRANSFORMER

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE S03 F
CHECKED NEXT PAGE T01
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED CURRENT & VOLTAGE CIRCUIT FOR PROTECTION RELAY EVNCPC/IA-110KV/MV-H02

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-CT BUS WIRE


A LZZB7-35G-40.5 CORE 1 - CL: 0.5, 600-800-1200/1A A
VOLTAGE CIRCUIT
400-800-1200/1/1/1A
CLASS: 0.5
0.5/5P20/5P20

-XT 5

-XT 6

-XT 7

-XT 8
PA 1S1 1S2 1S3 1S4PB 1S1 1S2 1S3 1S4PC 1S1 1S2 1S3 1S4
B * * * B

1 3 5 12 14
-X41 4 5 6 7
-FBVT.M 11
3P-2A I> I> I>

/R02.4
2 4 6

C -X41 12 13 14 15 / S01.7
BVT.A C

/ S01.7
BVT.B

/ S01.7
BVT.C

-X41 8 9 10 11 / S01.7
BVT.N

1 3 5 7

D -XTV.PMT D
-X41 1 2 3 /Z04.4

2 4 6 8

1 3 5 7
-XTC.PMT
/Z04.4

2 4 6 8 2 5 8 11 8 9 10 7
E 1 3 1 2 E
PMT PMF
4 /Z04.6 6 3 /Z04.6 4

7 9 5 6

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE T01 F
CHECKED NEXT PAGE W01
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED CURRENT & VOLTAGE CIRCUIT FOR METERING EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A CB SPRING A
STATUS OF CIRCUIT BREAKER CB IN "SERVICE" POSITION
CB IN "TEST" POSITION CHARGED
CLOSED OPENED AND CLOSED

X3 19 X3 23 X3 27 X3 33 X3 37 X3 39 X3 41 X3 45 X3 51 X3 53 X3 57

-CB 3 5 9 8 23 28 29 6 27 43 26
/Z01.2

33 43 83 31 31 41 71 73 33 31 41 21
B B
HK33 HK43 HK83 HK21 HK31 HK41 HK71 HK73 S9 S8 S84 SP4
/Z01.6 34 /Z01.6 44 /Z01.6 84 /Z01.7 32 /Z01.7 32 /Z01.7 42 /Z01.7 72 /Z01.5 74 /Z01.5 34 /Z01.7 32 /Z01.7 42 22

13 15 19 18 33 38 39 16 48 44 36

X3 20 X3 24 X3 28 X3 34 X3 38 X3 40 X3 42 X3 48 X3 52 X3 54 X3 58

C C
STATUS OF EARTHING SWITCH CONTROL MODE
CLOSED OPENED SPARE SPARE SPARE "LOCAL"

-X3 21 25 29 31 35 43 46 49 55

ES 5 9 13 7 15
/Z03.1
SPARE TERMINAL
15 17 21 9
D D
F67 T3 -S.L/R
/Z02 /Z03.4
QE.3 QE.5 QE.7 QE.4 QE.8 BO8 BO9 BO10 XN 15
/Z03.2 /Z03.3 /Z03.3 /Z03.2 /Z03.4 LOCAL
X1 33 34 35
16 18 22 10

6 10 14 8 16
-X2 23 24 25

X3 59 60

-X3 22 26 30 32 36 44 47 50 56 X51 17 18 19 20

E -X9 8 9 10 11 12 13 14 15 16 17 E

X9 18 19 20 21 22 23 24 25 26

XT 9 10 11 12 13

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE W01 F
CHECKED NEXT PAGE X110
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED SPARE CIRCUIT EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H02-X1 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
1 =MV35 +H02 FQC 2 /G01.6
2 =MV35 +H02 S.L/R-C1 1 /M01.1
=E05 +WR -X3 31 3 /M01.5

B =MV35 +H02 -K272 5 4 /M01.5 B


5 =MV35 +H02 DXN-PS 2 /M01.8
6 =MV35 +H02 DXN-RL 5 /M01.8
7 /M01.8
8 =MV35 +H02 FQC 4 /G01.6
9 =MV35 +H02 F67-T2-BI2 4 /M01.1
10 =MV35 +H02 CB-X0 4 /M01.4
11 =MV35 +H02 CB-X0 30 /M01.4
12 =MV35 +H02 CB-X0 37 /M01.7
13 =MV35 +H02 DXN-PS 1 /M01.8
C 14 =MV35 +H02 ES-DS 2 /M01.8 C
15 /M01.8
=MV35 +H02 BI2 3 16 =MV35 +H02 CB-X0 53 /M01.2
=E05 +WR -X3 40 17 =MV35 +H02 CB-X0 54 /M01.2
18 =MV35 +H02 CB-X0 52 /M01.3
19 =MV35 +H02 CB-X0 14 /M01.4
=MV35 +H02 -BO5 10 20 =C42 +J04 X 65 /M01.3
=E05 +WR -X3 39 21 =C42 +J04 X 66 /M01.4
=MV35 +H02 -BO4 8 22 =MV35 +H02 CB-X0 31 /M01.4
D =E05 +WR -X3 32 23 =MV35 +H02 K272 9 /M01.5 D
=MV35 +H02 -BO4 8 24 =MV35 +H02 CB-X0 7 /M01.6
25 =MV35 +H02 CB-X0 17 /M01.6
=MV35 +H02 BI1 2 26 =MV35 +H02 CB-X0 32 /M01.6
27 =MV35 +H02 CB-X0 42 /M01.6
28 =MV35 +H02 CB-X0 41 /M01.6
=MV35 +H02 -KSQE 9 29 =MV35 +H02 CB-X0 2 /M01.7
=E05 +WR -X3 37 30 =MV35 +H02 DXN-RL 6 /M01.8
=E05 +WR -X3 38 31 =C42 +J04 X3 104 /M01.8

E =C42 +J04 -X3 105 32 =MV35 +H02 ES-DS 1 /M01.8 E


33 /W01.5
34 /W01.6
35 /W01.6

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X110 F
CHECKED NEXT PAGE X111
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H02-X1

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H02-X2 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
1 =MV35 +H02 F67-T4-PS 30 /G01.4
2 =MV35 +H02 CB-X0 11 /R01.1
3 =MV35 +H02 CB-X0 24 /R01.4

B 4 =MV35 +H02 ES-QE1 1 /R01.5 B


5 =MV35 +H02 ES-QE2 3 /R01.6
6 =MV35 +H02 S.L/R-C4 7 /R01.6
=E05 +WR -X3 29 7 /R02.2
8 =C42 +J02 X3 47 /R02.2
9 =MV35 +H02 K272 6 /R02.3
10 /R02.4
11 =MV35 +H02 F67-T4-PS 32 /G01.4
12 =MV35 +H02 F67-T2-BI3 6 /R01.1
13 /R01.2
C =MV35 +H02 BI3 5 14 =MV35 +H02 CB-X0 50 /R01.1 C
=MV35 +H02 BI4 7 15 =MV35 +H02 CB-X0 51 /R01.2
=MV35 +H02 BI5 9 16 =MV35 +H02 CB-X0 21 /R01.3
=MV35 +H02 BI6 11 17 =MV35 +H02 CB-X0 22 /R01.4
=MV35 +H02 BI7 13 18 =MV35 +H02 CB-X0 34 /R01.4
=MV35 +H02 BI8 15 19 =MV35 +H02 ES-QE1 2 /R01.5
=MV35 +H02 BI9 17 20 =MV35 +H02 ES-QE2 4 /R01.6
=E05 +WR -X3 30 21 =MV35 +H02 F67-T2-BI13 27 /R02.2
=C42 +J02 -X3 48 22 =MV35 +H02 K272 10 /R02.2
D 23 /W01.5 D
24 /W01.6
25 /W01.6

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X111 F
CHECKED NEXT PAGE X112
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H02-X2

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H02-X3 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
=E05 +WR -X8 58 1 =MV35 +H02 F67-T4-LC1 1 /R03.5 41 =MV35 +H02 CB-X0 29 /W01.3
=E05 +WR 59 2 =MV35 +H02 FQ67 12 /R03.5 42 =MV35 +H02 CB-X0 39 /W01.3
3 =MV35 +H02 FQ67 11 /R03.7 43 =MV35 +H02 F67-T3-BO8 15 /W01.3

B =E05 +WR 11 4 =MV35 +H02 X9 28 /R03.7 44 =MV35 +H02 F67-T3-BO8 16 /W01.3 B


5 =MV35 +H02 KST 9 /R04.3 45 =MV35 +H02 CB-X0 6 /W01.4
6 =MV35 +H02 KST 5 /R04.3 46 =MV35 +H02 F67-T3-BO9 17 /W01.4
7 =MV35 +H02 KST 11 /R04.5 47 =MV35 +H02 F67-T3-BO9 18 /W01.4
8 =MV35 +H02 KST 7 /R04.5 48 =MV35 +H02 CB-X0 16 /W01.4
9 =MV35 +H02 CB-X0 55 /R04.5 49 =MV35 +H02 F67-T3-BO10 21 /W01.4
10 =MV35 +H02 CB-X0 56 /R04.6 50 =MV35 +H02 F67-T3-BO10 22 /W01.4
=MV22 +J03 -X3 8 11 =MV35 +H02 ES-QE10 11 /R05.2 51 =MV35 +H02 CB-X0 27 /W01.5
=MV22 +J03 9 12 =MV35 +H02 ES-QE10 12 /R05.3 52 =MV35 +H02 CB-X0 48 /W01.5
=MV22 +J03 -X3 28 13 =MV35 +H02 CB-X0 57 /R05.3 53 =MV35 +H02 CB-X0 43 /W01.5
C =MV22 +J03 -X4 787 14 =MV35 +H02 CB-X0 58 /R05.4 54 =MV35 +H02 CB-X0 44 /W01.5 C
=MV22 +J03 -X3 21 15 =MV35 +H02 K50BF1 6 /R05.4 55 =MV35 +H02 S.L/R-C5 9 /W01.5
=MV22 +J03 22 16 =MV35 +H02 K50BF1 10 /R05.5 56 =MV35 +H02 S.L/R-C5 10 /W01.5
=E05 +WR -X20 7 17 =MV35 +H02 K50BF1 5 /R05.6 57 =MV35 +H02 CB-X0 26 /W01.5
=E05 +WR 20 18 =MV35 +H02 K50BF1 9 /R05.6 58 =MV35 +H02 CB-X0 36 /W01.5
19 =MV35 +H02 CB-X0 3 /W01.1 59 /W01.5
20 =MV35 +H02 CB-X0 13 /W01.1 60 /W01.6
21 =MV35 +H02 ES-QE3 5 /W01.1
22 =MV35 +H02 ES-QE3 6 /W01.1
D 23 =MV35 +H02 CB-X0 5 /W01.1 D
24 =MV35 +H02 CB-X0 15 /W01.1
25 =MV35 +H02 ES-QE5 9 /W01.2
26 =MV35 +H02 ES-QE5 10 /W01.2
27 =MV35 +H02 CB-X0 9 /W01.2
28 =MV35 +H02 CB-X0 19 /W01.2
29 =MV35 +H02 ES-QE8 13 /W01.2
30 =MV35 +H02 ES-QE8 14 /W01.2
31 =MV35 +H02 ES-QE8 7 /W01.2

E 32 =MV35 +H02 ES-QE8 8 /W01.2 E


33 =MV35 +H02 CB-X0 8 /W01.2
34 =MV35 +H02 CB-X0 18 /W01.2
35 =MV35 +H02 ES-QE8 15 /W01.2
36 =MV35 +H02 ES-QE8 16 /W01.2
37 =MV35 +H02 CB-X0 23 /W01.3
38 =MV35 +H02 CB-X0 33 /W01.3
39 =MV35 +H02 CB-X0 28 /W01.3
40 =MV35 +H02 CB-X0 38 /W01.3

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X112 F
CHECKED NEXT PAGE X113
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H02-X3

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H02-X9 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
=MV35 +H02 BO7 13 1 /R03.2
=MV35 +H02 -K50BF2 13 2 /R03.2
=MV35 +H02 -K50BF2 14 3 /R03.3

B =MV35 +H02 -K272 13 4 /R03.3 B


=MV35 +H02 -KSQE 13 5 /R03.4
=MV35 +H02 -KVTC42.P 13 6 /R03.4
=MV35 +H02 -KVTC42.P 14 7 /R03.5
8 /W01.5
9 /W01.6
10 /W01.6
11 /W01.6
12 /W01.6
13 /W01.6
C 14 /W01.6 C
15 /W01.7
16 /W01.7
17 /W01.7
18 /W01.5
19 /W01.6
20 /W01.6
21 /W01.6
22 /W01.6
D 23 /W01.6 D
24 /W01.6
25 /W01.7
26 /W01.7
=E05 +WR 60 27 /R03.7
=MV35 +H02 -X3 4 28 /R03.7
=MV35 +H02 -FQ67 12 29 /R03.6
=MV35 +H02 -LC1 1 30 /R03.6

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X113 F
CHECKED NEXT PAGE X114
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H02-X9

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H02-X41 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
=MV35 +H02 C1 1 1 =MV35 +H02 CT-PA 1S1 /T01.2
=MV35 +H02 C2 3 2 =MV35 +H02 CT-PB 1S1 /T01.2
=MV35 +H02 C3 5 3 =MV35 +H02 CT-PC 1S1 /T01.3

B 4 =MV35 +H02 CT-PA 1S4 /T01.2 B


5 =MV35 +H02 CT-PB 1S4 /T01.3
6 =MV35 +H02 CT-PC 1S4 /T01.4
=MV35 +H02 -PE 7 /T01.4
15 /T01.4
=MV35 +H02 C4 7 11 /T01.4
8 =MV35 +H02 CT-PA 1S2 /T01.2
9 =MV35 +H02 CT-PB 1S2 /T01.3
10 =MV35 +H02 CT-PC 1S2 /T01.3
12 =MV35 +H02 CT-PA 1S3 /T01.2
C 13 =MV35 +H02 CT-PB 1S3 /T01.3 C
14 =MV35 +H02 CT-PC 1S3 /T01.3

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X114 F
CHECKED NEXT PAGE X115
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H02-X41

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H02-X42 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
=E05 +WR -X42 4 1 =MV35 +H02 CT-PA 2S1 /S03.2
5 =MV35 +H02 CT-PB 2S1 /S03.2
=MV35 +H02 -PE 9 =MV35 +H02 CT-PC 2S1 /S03.3

B 2 =MV35 +H02 CT-PA 2S2 /S03.2 B


3 =MV35 +H02 CT-PA 2S3 /S03.2
=E05 +WR 4 4 =MV35 +H02 CT-PA 2S4 /S03.2
6 =MV35 +H02 CT-PB 2S2 /S03.2
7 =MV35 +H02 CT-PB 2S3 /S03.3
2 8 =MV35 +H02 CT-PB 2S4 /S03.3
10 =MV35 +H02 CT-PC 2S2 /S03.3
11 =MV35 +H02 CT-PC 2S3 /S03.3
=E05 +WR 3 12 =MV35 +H02 CT-PC 2S4 /S03.4

C C

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X115 F
CHECKED NEXT PAGE X116
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H02-X42

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H02-X43 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
1 =MV35 +H02 CT-PA 3S1 /S03.5
2 =MV35 +H02 CT-PB 3S1 /S03.6
3 =MV35 +H02 CT-PC 3S1 /S03.7

B 4 =MV35 +H02 CT-PA 3S4 /S03.6 B


5 =MV35 +H02 CT-PB 3S4 /S03.6
6 =MV35 +H02 CT-PC 3S4 /S03.7
=MV35 +H02 -PE 7 /S03.8
15 /S03.7
11 /S03.7
8 =MV35 +H02 CT-PA 3S2 /S03.5
9 =MV35 +H02 CT-PB 3S2 /S03.6
10 =MV35 +H02 CT-PC 3S2 /S03.7
12 =MV35 +H02 CT-PA 3S3 /S03.5
C 13 =MV35 +H02 CT-PB 3S3 /S03.6 C
14 =MV35 +H02 CT-PC 3S3 /S03.7

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X116 F
CHECKED NEXT PAGE X117
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H02-X43

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H02-X44 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
=MV35 +H02 C1 1 1 =T1 +LCB TB9-1 1 /S01.2
=MV35 +H02 C2 3 2 =T1 +LCB TB9-2 1 /S01.2
=MV35 +H02 C3 5 3 =T1 +LCB TB9-3 1 /S01.3

B =MV35 +H02 C4 7 4 =T1 +LCB TB9-3 4 /S01.3 B

C C

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X117 F
CHECKED NEXT PAGE X118
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H02-X44

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H02-X51 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
=MV35 +H02 -FTVT.M 1 1 =MV35 +H02 VT-TVA 1 /S02.2
2 =MV35 +H02 FTVT.M 2 /S02.2
=MV35 +H02 -FTVT.M 3 3 =MV35 +H02 VT-TVB 1 /S02.3

B =MV35 +H02 C1 1 4 =MV35 +H02 FTVT.M 4 /S02.3 B


=MV35 +H02 -FTVT.M 5 5 =MV35 +H02 VT-TVC 1 /S02.3
6 =MV35 +H02 FTVT.M 6 /S02.3
=MV35 +H02 C2 3 7 =MV35 +H02 VT-TVA 2 /S02.3
8 =MV35 +H02 VT-TVB 2 /S02.3
=MV35 +H02 1PE 9 =MV35 +H02 VT-TVC 2 /S02.3
=MV35 +H02 -FTVT.P 1 10 =MV35 +H02 VT-TVA 3 /S02.6
11 /S02.6
12 =MV35 +H02 FTVT.P 2 /S02.6
13 =MV35 +H02 FTVT.P 4 /S02.6
C =MV35 +H02 -FTVT.P 3 14 =MV35 +H02 VT-TVC 4 /S02.6 C
15 /S02.6
=MV35 +H02 1PE 16 /S02.6
17 /W01.5
18 /W01.6
19 /W01.6
20 /W01.6

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X118 F
CHECKED NEXT PAGE X119
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H02-X51

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H02-XN A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
2 1 =MV35 +H02 FQAC 4 /D01.3
=MV35 +H02 2MD X2 2 =MV35 +H02 HL5 X2 /D01.5
=MV35 +H02 -FQAC 2 3 1 /D01.3

B =MV35 +H02 -S1 14 4 =MV35 +H02 LXK 21 /D01.5 B


=MV35 +H02 -EH4 1 5 /D01.4
=MV35 +H02 -EH3 1 6 /D01.4
=MV35 +H02 -EH2 1 7 /D01.4
=MV35 +H02 -EH1 1 8 5 /D01.4
4 9 =MV35 +H02 EH4 2 /D01.4
10 =MV35 +H02 EH3 2 /D01.4
11 =MV35 +H02 EH2 2 /D01.4
12 =MV35 +H02 EH1 2 /D01.4
=MV35 +H02 -FQMC 2 13 =MV35 +H02 CB-X0 35 /G01.3
C =MV35 +H02 -FQMC 4 14 =MV35 +H02 CB-X0 25 /G01.3 C
15 /W01.5

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X119 F
CHECKED NEXT PAGE X120
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H02-XN

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H02-XT A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
1 =MV35 +H02 FQAC 1 /D01.3
2 =MV35 +H02 FQAC 3 /D01.3
3 =MV35 +H02 FQMC 1 /G01.3

B 4 =MV35 +H02 FQMC 3 /G01.3 B


5 =MV35 +H02 FBVT.M 1 /T01.6
6 =MV35 +H02 FBVT.M 3 /T01.6
7 =MV35 +H02 FBVT.M 5 /T01.6
8 =MV35 +H02 XTV.PMT-C4 7 /T01.6
9 /W01.5
10 /W01.6
11 /W01.6
12 /W01.6
13 /W01.6
C 14 =MV35 +H02 KST 6 /R04.4 C
15 =MV35 +H02 KST 10 /R04.5

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X120 F
CHECKED NEXT PAGE Y01
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H02-XT

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

F67 -PMT
100 BASE TX 100 BASE TX /Z04.5
PORT 1 PORT 2 /Z04.7 /Z04.8
/Z02.2 /Z02.2

RS485-1 RS485-2
B B
ETHERNET CABLE RJ45 CONNETOR

C C

CAT6 CABLE

CAT6 CABLE
+H01 +H03 =MV22+J03

D D
SW
-PMT -PMT
RS485-2 RS485-1
100 BASE TX
PORT 1

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Y01 F
CHECKED NEXT PAGE Z01
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED COMMUNICATION PORTS EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

earthing energy storage closedown opening coil assistant switch loop Blocking coil
close coil loop
loop motor loop loop loop for trolley
A /G01.2 /W01.1 /M01.6 /R01.3 /W01.2 /W01.3 /M01.7 A
/R01.4 /G01.3 /M01.4 /M01.4 /W01.4 /W01.1 /W01.2 /R01.4 /W01.3 /W01.3 /M01.6

- 4 - - 20 - 30
1 40 24 26 25 6 3 5 7 9 11 29 8 23 28 46 37 27 44

A4 A7 B15

A3
B14

2
HQ

1
KO
TQ

2
B3 B4
B13
B B
j

2
A6

2
M L8 Y0
i

1
1
l A9
B1
L9
k
A1 B2 A8 B11

14 12 82 64 73 33 43 23 83 53 61 71 21 31 41 51
HK
13 11 81 63 74 34 44 24 84 54 62 72 22 32 42 52

13 21 22 14
SP2 SP2 SP3 SP1
C 14 22 21 A5 13 C
A2

5 2
KO
B7 B12
3
b d

34 36 35 + 32 L4 + 31 41 13 15 17 19 21 22 39 18 33 38 12 2 48 43
Sign Name Function L7
c 52 57 55 27 43
HQ/DC220V DC30V Control closing of
closing Magnet circuit breaker B5
D DC30V Control opening of L1 D
TQ/DC220V closing Magnet circuit breaker 16 9 13 1 3 18 19 10
AC220V MotorStore energy for
M Energy Storage closing of circuit breaker 11 21 51 1 31 41
HK Auxiliary Switch Shift CO operation testing position S8

XT Aviation Plug Header of control wires 12 22 52 2 32 42


13 33 23 53 3
LX Wiring Terminal Header of control wires
Prevent circuit breaker
service position S9
KO/DC220V Trip-free Relay
from tripping 14 34 24 54 4
Shift after closing spring 11 12
SP1~SP3 jiggle switch A11 L6 A13
energy is stored
a f g
E jiggle switch
L5 E
SP5 Locking function L3 L2
e h
A12 A10 A14 14 8 7 2 4 5 6 17 15
S8 auxiliary switch Control closing loop

Divided voltage circuit


S9 auxiliary switch
breaker Remake: X express connect; blank express cut
+ 14 + 49 10 16 53 54 58 56 50 51 48 44
L1~L9 Connective wire Integrated circuit board
Locking Blocking coil L1 L2 L3 L4 L5 L6 L7 L8 L9
Y0 electromagnet for trolley /M01.2 /R05.3 /R01.2 /W01.5 /W01.5
ba gh fe dc af fg cb ij kl
have KO function /W01.4 /M01.2 /R04.6 /R01.1
without locking X X X X X

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Z01 F
CHECKED NEXT PAGE Z02
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED REFERENCE OF CB, VN1-40.5/COOPER EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

F67 F67 F67


MODULE PWS1 MODULE BO1 FUNCTION MODULE BI1 FUNCTION F67
- T4 - T3 - T2 MODULE VCT31B
A - VCT A
+
1 1
(*2) BO1 /M01.2 CLOSE CB COMMAND BI1 /M01.6 TRIP CIRCUIT SUPERVISION 1
1 - VA /S01.4
2 2
2
3 +
LC1 /R03.6 3 3
(*2) BO2 /M01.3 CLOSE CB WITH SYN BI2 /M01.1 CLOSE COMMAND FROM MIMIC 3
2 - VB /S01.4
4 4
4
4 +
5 5
(*2) BO3 /M01.4 OPEN CB COMMAND BI3 /R01.1 CB TEST 5
- VC /S01.5
6 6
6
+
7 7 7
(*2) BO4 /M01.4 PROTECTION RELAY TRIP BI4 /R01.2 CB SERVICE 7
- VE /S01.5
B 9 8 8 B
LC2 8
+
8 9 9
(*2) BO5 /M01.2 INTERLOCKING FOR CLOSE CB BI5 /R01.3 CB CLOSED 9
- VS /S01.6
10 10 10
10
+
11 11
Power (*2) BO6 /R03.1 50BF TRIP BI6 /R01.4 CB OPENED 17
- IA /S01.2
Supply 12 12
18
+ +
= 29 13 13
BO7 /R03.2 50BF TRIP BI7 /R01.4 CB SPRING CHARGED 19
- IB /S01.2
30 14 14
_ /G01.4 20
+
= 31 15 15
BO8 /W01.3 SPARE BI8 /R01.5 ES CLOSED 21
- IC /S01.3
C 32 16 16 C
22
GND +
35 17 17
BO9 /W01.4 SPARE BI9 /R01.6 ES OPENED 23
- IE1 /S01.3
36 18 18
24
+
37 21 21
BO10 /W01.4 SPARE BI10 /R01.6 CONTROL MODE "REMOTE" 25
- IE2 /S01.3
38 22 22
26
+
23 23
BO11 BI11 /R01.7 "ON" FUNCTION 25 27
- IS
24 24
28
+
25 25
F67 BO12 BI12 - /R01.8 RESET LOCK-OUT
D 26 26 GND D
30
+
27 27
BO13 BI13 - /R02.2 SET 86, START 50BF
28 28
PORT1 /Y01.2
+
29 29
BO14 BI14 - /R02.4 MCB BVT CL0.5 OFF
30 30
+
31 31
BO15 BI15 - /R02.5 MCB TVT CL0.5 OFF
32 32
+
33 33
E BO16 BI16 - /R02.5 BLOCK FUNCTION 25 E
34 34
+
PORT2 /Y01.2 35 35
BO17 BI17 - /R02.6 INCOMING PANEL MCB OFF
36 36
+
37 37
BO18 BI18 - /R02.7 MCB TVT CL3P OFF
38 38

NOTE: (*2): SEMI-FAST BO


TOSHIBA: GRT200-31-224-00-4L-30-111 ̣(GRT200-303D-4L2-2E)

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Z02 F
CHECKED NEXT PAGE Z03
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED REFERENCE OF PROTECTION RELAY: GRD200 EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

CONTROL MODE SELECTOR SWITCH "LOCAL/REMOTE":


SA16-FA6037-61042/SALZER
CONTROL SWITCH : CA10-A214-620E/K&N

CLOSE X BCU X X X X X X

OPEN X MIMIC X X X X X X
Push close
Push open

1 3 1 3 5 7 9 11 13 15 17 19 21 23

MIMIC
B B

BCU
2 4 2 4 6 8 10 12 14 16 18 20 22 24

-S.QF01 /M01.1 /M01.2 S.L/R /M01.1 /R01.6 /W01.5

SYNCHROCHECK SELECTION SWITCH SELECTOR SWITCH "ON/OFF":


SA25-FA6037-61038/SALZER INDICATION LAMP 220 VAC/VDC

C /Q01.2 C
SYN X X -PLS CB SERVICE POSITION RED

BYPASS X X -PLT /Q01.2 CB TEST POSITION GREEN

-PLC /Q01.3 CB CLOSED RED


1 3 5 7
BYPASS
SYN

-PLO /Q01.3 CB OPENED GREEN

-PEC /Q01.4 ES CLOSED RED


2 4 6 8
-PEO /Q01.4 ES OPENED GREEN
D D
-S.25 /R01.7 /M01.2 -PLX /Q01.4 CB SPRING CHARGED RED

AUXILIARY CONTACT OF EARTHING SWITCH

1 3 5 7 9 11 13 15
PUSH BUTTON 1NO:

3
E E
QE.1 QE.2 QE.3 QE.4 QE.5 QE.6 QE.7 QE.8

2 4 6 8 10 12 14 16
4

-ES /R01.5 /R01.6 /W01.1 /W01.2 /W01.2 /R05.2 /W01.2 /W01.3 -BRL /R01.8 RESET LOCKOUT RED

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Z03 F
CHECKED NEXT PAGE Z04
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED REFERENCE OF CONTROL EQUIPMENT EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A CURRENT TEST BLOCK TARIFF METER A

L1 L2 L3
-KTT-AW4 XTC.67 XTC.PMT
ELSTER - A1700
S1
1 2
S2

S1
3 4

EQUIPMENT
B S2
/S01.2 /T01.2 B

S1
5 6 RS485 RS485
S2
1 2 3 4 5 6 7 8 9 10 11 RJ45 RJ45

7 8 IA UA IB UB IC UC UN UN

-PMT /T01.6 /Y01.5 /Y01.7

C C
TARIFF METER

VOLTAGE TEST BLOCK

L1 L2 L3
ELSTER - A1700
-KTT-VW4 XTV1.67 XTV2.67 XTV.PMT

1a
1 2
D D
1n

1a
3 4
EQUIPMENT

RS485 RS485
1n
/S01.4 /S01.6 /T01.6
1a 1 8 2 3 9 4 5 10 6 7 RJ45 RJ45
5 6
IA UA IB UB IC UC UN UN
1n

7 8 -PMF /T01.7
E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Z04 F
CHECKED NEXT PAGE +H03/A00
35KV INCOMING PANEL OF C31 BUSBAR DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED REFERENCE OF MEASUREMENT EQUIPMENT EVNCPC/IA-110KV/MV-H02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

B B

PURCHASER:

C C
CENTRAL POWER CORPORATION

PROJECT:

CPC-KFW3.1chung-G02

D D
PLANT:

110kV IAGRAI SUBSTATION

TITLE: STAMP:

E E
35KV OUTGOING PANEL

DRAWING No.: EVNCPC/IA-110KV/MV-H03

STANDARD: IEC SHEET No.: A00 QTY OF SHEETS: 31

DRAWN SUB CONTRACTOR:

F CHECK. F

APPR.

DATE 3/10/2020

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

10

1
R ASN1-40.5 OUTGOING
F67
TOSHIBA
PMT

3
D
F67 pLS pLT pLC pLO
L
R

CLEAR HELP CANCEL ENTER

BRL LX LEC LEO


580

F1 F2 F3 F4 F5 F6 F7

2 LOW VOLTAGE COMPARTMENT LAYOUT


A B C 0V

A
XTV.67 XTV.PMT

B
SLR SQ0 S.81 TH DXN
XTC.67 XTC.PMT
S2K(TH)
L1 L2 L3

8
B B
5 F67
XTC.PMT XTC.PMT
TOSHIBA
PMT

7 9
2400

pLS pLT pLC pLO

2400
F67
L
R

CLEAR HELP CANCEL ENTER

BRL LX LEC LEO


6
F1 F2 F3 F4 F5 F6 F7

A B C 0V

‎摇 进
‎分 闸
‎合 闸
C XTV.67 XTV.PMT

SLR SQ0 S.81 TH DXN


‎摇 出
XTC.67 XTC.PMT
C 4 S2K(TH)
L1 L2 L3
C

100

460 LEGEND
1200 NOTE DESCRIPTION SYMBOL DESCRIPTION
2600
A BUSBAR COMPARTMENT F67 OVERCURRENT PROTECTION RELAY
B CIRCUIT BREAKER COMPARTMENT PMT TARIFF METER
C CABLE CONNECTION COMPARTMENT XTV... VOLTAGE TEST BLOCK
D LOW VOLTAGE COMPARTMENT XTC... CURRENT TEST BLOCK
D MIMIC DIAGRAM PLS INDICATION LAMP FOR CIRCUIT BREAKER IN SERVICE POSITON D
ITEM DESCRIPTION PLT INDICATION LAMP FOR CIRCUIT BREAKER IN TEST POSITION
1 MAIN BUSBAR PLC INDICATION LAMP FOR CIRCUIT BREAKER IS CLOSED
2 BUSBAR BUSHING PLO INDICATION LAMP FOR CIRCUIT BREAKER IS OPENED
3 FIXED SPOUT PLX INDICATION LAMP FOR SPRING STORED ENERGY
4 CURRENT TRANSFORMER PEC INDICATION LAMP FOR EARTHING SWITCH IS CLOSED
5 EARTHING SWITCH PEO INDICATION LAMP FOR EARTHING SWITCH IS OPEN
1200

6 ELECTRICAL CABLE TERMINAL PTH TEMPERATURE & HUMIDITY CONTROLLER


7 SUPPORTOR (FITTED WITH INDICATOR) DXN POWER INDICATOR
8 CIRCUIT BREAKER BRL RESET LOCKOUT PUSH BUTTON
9 SHUTTER SL/R "LOCAL/REMOTE" CONTROL MODE SELECTOR SWITCH
10 LINK TERMINALS SQ0 CONTROL SWITCH FOR CIRCUIT BREAKER
S81 LOAD SHEEDING SELECTION SWITCH
E E

2600

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B01 F
CHECKED NEXT PAGE B02
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED LAYOUT DRAWING EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

DIVICE TAG TYPE MANUFACTURER DESCRIPTION TECHNICAL DATA

F67 GRT200 TOSHIBA DIRECTIONAL OVERCURRENT PROTECTION RELAY In: 1A, Un: 110V, fn: 50Hz, Uaux: 220VDC, 5CT, 6VT, 18 x BI, 18 x BO, 2xRJ45
A A
PMT A1700 ELSTER TARIFF METER In: 1A, Un: 110VAC, fn: 50Hz, class 0.5

XTC... KTT FUJI CURRENT TEST BLOCK Imax: 15A, Umax: 400V

XTV... KTT FUJI VOLTAGE TEST BLOCK Imax: 8A, Umax: 400V

PLS YW1P IDEC INDICATION LAMP FOR CIRCUIT BREAKER IN SERVICE POSITON Uaux: 220VDC, Red

PLT YW1P IDEC INDICATION LAMP FOR CIRCUIT BREAKER IN TEST POSITION Uaux: 220VDC, Green

PLC YW1P IDEC INDICATION LAMP FOR CIRCUIT BREAKER IN CLOSED POSITON Uaux: 220VDC, Red
B B
PLO YW1P IDEC INDICATION LAMP FOR CIRCUIT BREAKER IN OPENED POSITON Uaux: 220VDC, Green

PEC YW1P IDEC INDICATION LAMP FOR EARTH SWITCH IN CLOSED POSITON Uaux: 220VDC, Red

PEO YW1P IDEC INDICATION LAMP FOR EARTH SWITCH IN OPENED POSITON Uaux: 220VDC, Green

PLX YW1P IDEC INDICATION LAMP FOR SPRING STORED ENERGY

PTH GZY-S1W1-C TOUFU TEMPERATURE & HUMIDITY CONTROLLER Uaux: 220VAC

DXN TF-FH2 TUOFU POWER INDICATOR Uaux: 220VAC/DC, 1NO


C C
BRL YW1B IDEC RESET LOCKOUT PUSH BUTTON 1NO

S.L/R SA16-FA 6037-61042 SALZER "LOCAL/REMOTE" CONTROL MODE SELECTOR SWITCH 6-POLE, BCU/MIMIC, INSULATION VOLTAGE: 690V, THERMAL CURRENT: 20A

S81 SA16-FA 6029-61071 SALZER LOAD SHEDDING SELECTION SWITCH 3-POLE, 5-STEP 0FF/1/2/3/4, INSULATION VOLTAGE: 690V, THERMAL CURRENT: 20A

SQF01 CA10 K&N CONTROL SWITCH FOR CIRCUIT BREAKER INSULATION VOLTAGE: 690V, THERMAL CURRENT: 20A

K... RU4S IDEC AUXILIARY RELAY FOR REPEAT SIGNAL Uaux: 220VDC, 4NO/NC, 6A

D FQAC NDM1-63C6/2 NADER MCB OF POWER SUPPLY FOR HEATING & LIGHTING 2P-6A, 6kA, 220VAC D

FQC NDM1-63C6/2 NADER MCB OF POWER SUPPLY FOR CONTROLLING 2P-6A, 16kA, 220VDC

FQ67 NDM1-63C6/2 NADER MCB OF POWER SUPPLY FOR PROTECTION EQUIPMENT 2P-6A, 16kA, 220VDC

FQMC NDM1-63C6/2 NADER MCB OF POWER SUPPLY FOR SPRING CHARGER MOTOR 2P-6A, 16kA, 220VDC

FBVT.M, FBVT.P NDM1-63C2/3 NADER MCB OF BUSBAR VOLTAGE CIRCUIT 3P-2A, 6kA, 220VAC

EH1, EH2 TRG2-200W TAIWAN HEATING RESISTOR 220VAC-200W


E E
2MD, HL5 TAIWAN LIGHTING LAMP 220VAC

S1, LXK TAIWAN DOOR SWITCH

TS TAIWAN TEMPERATURE SENSOR

HS TAIWAN HUMIDITY SENSOR

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B02 F
CHECKED NEXT PAGE B03
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED LIST OF EQUIPMENT EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

DIVICE TAG TYPE MANUFACTURER DESCRIPTION TECHNICAL DATA

XT TERMINAL AT TOP OF LOW VOLTAGE COMPARTMENT


A A
X51, X52 TB2.5BI PHOENIX VOLTAGE TERMINAL 800V/24A/4SQMM MAX

X41, X42, X43 URTK/S PHOENIX CURRENT TERMINAL 400V/41A/6SQMM MAX

X1, X2, X3, X6 TB2.5BI PHOENIX SIGNAL TERMINAL FOR CONTROLLING, PROTECTION CIRCUIT 800V/24A/4SQMM MAX

X9 PT4 PHOENIX BUS TERMINALS 800V/32A/4SQMM MAX

B B

C C

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B03 F
CHECKED NEXT PAGE B04
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED LIST OF EQUIPMENT EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CONTROL AT PANEL CON TROL AT EQUIPMENT

A A

CLOSING ORDER FROM SCADA

B B
CONTROL FROM HMI BCU

&
CONTROL MODE SELECTION SWITCH ON HMI
AT "REMOTE" POSITION
≥1
CONTROL MODE SELECTION SWITCH ON HMI
CLOSING ORDER FROM EMERGENCY CLOSING BUTTON
AT "LOCAL" POSITION &
C
& CONTROL MODE SELECTION SWITCH ON BCU
INTERNAL INTERLOCKING OK C
CLOSING ORDER FROM HMI AT "REMOTE" POSITION
≥1
CONTROL MODE SELECTION SWITCH ON BCU
TCS OK
AT "LOCAL" POSITION
& LOCK OUT (86) NOT ACTIVE
CLOSING ORDER FROM BCU

ES -QE76 OPENED
CLOSE CB
"ON" FUNCTION AUTO RECLOSE ≥1 QF01
BUS ES OPENED
AUTO RECLOSE COMMAND & & ≥1 &
D CB ON "SERVICE" POSITION D

QF01 MIMIC CB ON "TEST" POSITION

CONTROL MODE SELECTION SWITCH AT "BCU" POSITION &


P1
≥1
CONTROL MODE SELECTION SWITCH AT "MIMIC" POSITION

E CLOSING ORDER FROM CONTROL SWITCH & E


P2

QE76

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B04 F
CHECKED NEXT PAGE B05
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED CLOSING LOGIC DIAGRAM FOR CB EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CONTROL FROM SCADA CONTROL AT PANEL CON TROL AT EQUIPMENT

A A

OPENNING ORDER FROM SCADA


F67 TRIP

&
50BF OTHER FEEDER TRIP.

B B
CONTROL FROM HMI

&
CONTROL MODE SELECTION SWITCH ON HMI BCU
AT "REMOTE" POSITION
≥1
CONTROL MODE SELECTION SWITCH ON HMI
AT "LOCAL" POSITION
&
CONTROL MODE SELECTION SWITCH ON BCU
C
& AT "REMOTE" POSITION C
OPENNING ORDER FROM HMI
≥1 OPENING ORDER FROM EMERGENCY OPENING BUTTON
≥1 OPEN CB
CONTROL MODE SELECTION SWITCH ON BCU QF01
AT "LOCAL" POSITION
&
OPENNING ORDER FROM BCU

MIMIC
D D
CONTROL MODE SELECTION SWITCH AT "BCU" POSITION &
QF01

P1 ≥1

E CONTROL MODE SELECTION SWITCH AT "MIMIC" POSITION E


P2
OPENNING ORDER FROM CONTROL SWITCH &

QE76

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B05 F
CHECKED NEXT PAGE B06
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED OPENING LOGIC DIAGRAM FOR CB EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CONTROL AT PANEL CON TROL AT EQUIPMENT

A A

B B

CB QF01 IN TEST POSITION

C C

NO VOLTAGE AT CABLE TERMINAL OPERATION ES


& QE76

MECHANICAL INTERLOCKING OK

D D

QF01

P1

E E
P2

QE76

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE B06 F
CHECKED NEXT PAGE D01
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED INTERLOCKING LOGIC DIAGRAM FOR QE76 EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

POWER SUPPLY
A FOR HEATING & LIGHTING A

-XT 1

BUS WIRE
220VAC
-XT 2

B B

1 3 12 14

-FQAC 11
2P-6A I> I>
/R02.7

C C
2 4
HEATING LIGHTING

-XN 1 -XN 2
Red Red

-HS -TS
X2 X2
Black Green Black
D 2MD HL5 D
X1 X1

2 8 9 10 7 6
-PTH
TEMPERATURE & HUMIDITY CONTROLLER

1 4 5
13
22
-XN 5 6 7 8 -LXK -S1
21 14
E 1 1 1 1 E
-EH4 -EH3 -EH2 -EH1
2 2 2 2

-XN 3 -XN 9 10 11 12 -XN 4

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE D01 F
CHECKED NEXT PAGE G01
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED AC POWER SUPPLY EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

POWER SUPPLY FOR POWER SUPPLY FOR POWER SUPPLY


A SPRING CHARGER MOTOR PROTECTION RELAY FOR CONTROLLING A

-XT 3
220VDC
-XT 4

BUS WIRE
-XT 16
220VDC
-XT 17

B B

1 3 12 14 1 3 12 14 1 3 12 14

-FQMC 11 -FQ67 11 -FQC 11


2P-6A I> I>
/R02.6 2P-6A I> I> 2P-6A I> I>

/R04.5

/R02.6
C C
2 4 2 4 2 4

-XN 13

-CB 35 -X2 1 67+ X1 1 C+


/R01.1 /M01.1
/Z01.2
-X2 8 67- X1 7 C-
/R01.1 /M01.1

D D
21
SP3
/Z01.3 22

-M
M 29 30 31 32

/Z01.3
F67 T4
/Z02 -PS
E E

GRD200
25

-XN 14
-PE

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE G01 F
CHECKED NEXT PAGE M01
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED DC POWER SUPPLY EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CONTROL AT LOCAL 50BF FROM POWER SUPPLY INTERLOCKING


CLOSE CB AUTO RECLOSE OPEN CB PROTECTION RELAY TRIP CIRCUIT INTERLOCKING
CLOSE OPEN OTHER FEEDER
COMMAND COMMAND COMMAND TRIP SUPERVISION FOR CB TRUCK OF DXN FOR OPERATION ES
CB CB C42
A G01.6/
C+ -X1 6 A
-X1 2 3 4 5

1
1 3 5 7 1
-S.L/R
/Z03.1
F67 T3 1 5 F67 T2 1 5
2 5
LOCAL /Z02 -BO1 -BO2 -BO3 -BO4 -K50BF2 /Z02 -KSQE
2 /R04.3 9 BI1 /R03.2 9 DXN
ES TUC31-14 /Q01.7
2 4 6 8 OPENED
B 2 4 B
2 1 6
-S.QF01
Push close

Push open

/Z03.6

1 3

-X1 19 -X1 21 22

C C

-CB 17 46
/Z01.2
9
51
INTERLOCKING
FOR CB CLOSE

HK23
F67 T3 HK51
/Z01.6
/Z02 -BO5 /Z01.8 52

10 7 12

D -X1 20 23 D

-X1 14 15 16 17 18 24 25 -X1 11 -X1 26

-CB 53 54 52 14 31 41 2 -ES 1
/Z01.2 /Z03.4

S82 S92 DS
E /Z01.6 /Z01.6
E
HQ TQ Y0
/Z01.4 /Z01.5 /Z01.8
2
TEST SERVICE 4 30 37

-X1 8 9 10 -X1 12
G01.6/
C- -X1 13

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE M01 F
CHECKED NEXT PAGE Q01
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED CONTROL & PROTECTION CIRCUIT EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A CB SERVICE CB TEST CB CB ES ES CB SPRING DISCREPANCY A


POSITION POSITION CLOSED OPENED CLOSED OPENED CHARGED INDICATOR FOR CB

ESO
R01.6/ POWER INDICATOR

R01.5/
ESC

SPC -CC
R01.4/ CABLE CONNECTION COMPARTMENT

R01.4/
CBO
B B
R01.3/
CBC

R01.2/
CBT

R01.2/
CBS

C C

D D

10 9 8
DXN
X1 X1 X1 X1 X1 X1 X1 /M01.7
-PLS -PLT -PLC -PLO -PEC -PEO -PLX 7
/Z03.1 X2 /Z03.1 X2 /Z03.1 X2 /Z03.1 X2 /Z03.1 X2 /Z03.1 X2 /Z03.1 X2
L1 L2 L3

E R02.8/
PL- E

-PE

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Q01 F
CHECKED NEXT PAGE R01
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED INDICATION CIRCUIT EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A CB CB CB CB CB SPRING ES ES CONTROL MODE A


TEST SERVICE CLOSED OPENED CHARGED CLOSED OPENED "REMOTE"

G01.5/
67+ X2 7

X2 2 3 4 5 6 67+
/R02.1

-CB 11 24 -ES 1 3
/Z01.2 /Z03.4
7
1 3 53 61 13 -S.L/R
B /Z03.1 B
S81 S93 HK53 HK61 SP2 QE.1 QE.2
/Z01.6 2 /Z01.6 4 /Z01.6 54 /Z01.6 62 /Z01.3 14 /Z03.5 /Z03.5 REMOTE

50 51 21 22 34 2 4

-X2 11 12 13 14 15 16 17

C C

CBT CBS CBC CBO SPC ESC ESO


/ Q01.1 / Q01.1 / Q01.1 / Q01.1 / Q01.1 / Q01.1 / Q01.1

D D

3 5 7 9 11 13 15 17
F67 T2
/Z02
BI2 BI3 BI4 BI5 BI6 BI7 BI8 BI9
E E

4 6 8 10 12 14 16 18
67-
/R02.1
-X2 9

G01.5/
67- -X2 10

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE R01 F
CHECKED NEXT PAGE R02
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED BINARY INPUT OF F67 EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

LOAD SHEDDING LOAD SHEDDING LOAD SHEDDING LOAD SHEDDING SET 86,
RESET LOCKOUT MCB OFF SPARE SPARE
LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 START 50BF

R01.7/
67+

B B

3 5 7 9 3
-S.81 -BRL 2 6 12 14 12 14 12 14 12 14
/Z03.1 /Z03.6
-K50BF2 -FQMC -FQC -FQAC -FBVT.M
/R04.3 10 /G01.3 11 /G01.5 11 /D01.2 11 /T01.6 11
4 6 8 10 4

C C

D D

-X2 18 -X2 19

21 23 25 27 29 31 33 35 37
E F67 T2 E
/Z02
BI10 BI11 BI12 BI13 BI14 BI15 BI16 BI17 BI18

22 24 26 28 30 32 34 36 38
67- PL-
R01.7/ /Q01.1

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE R02 F
CHECKED NEXT PAGE R03
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED BINARY INPUT OF F67 EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

H03
A A

ES TUC31 OPENED

BUS TERMINALS

-X9 5 -X9 7
B B

5 9 /M01.7
1
6 10 13
2 -KSQE
7 11 220VDC
3 14
8 12
C 4 C

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE R03 F
CHECKED NEXT PAGE R04
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED SIGNAL SENT TO OTHER PANEL EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A 50BF TRIP TO LOSS OF POWER SUPPLY INTERLOCKING A


RELAY FAIL
OTHER FEEFER FOR RELAY FOR BUS ES

X9 1 X9 2 X9 3 X9 30 X9 29 X9 28 XT 13 XT 14

BUS TERMINALS

-X3 1 2

B 13 9 8 B
F67 T3 F67 T4 -CB 57
12 14
/Z02 /Z02 /Z01.2
BO7 -BO3
FQ67
/G01.4 11
51
14 7
S85
/Z01.6 52

58

C C

13
-K50BF2
220VDC 14

5 9 /M01.5
1
6 10 /R02.5
2
7 11
D 3 D
8 12
4

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE R04 F
CHECKED NEXT PAGE S01
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED SIGNAL SENT TO OTHER PANEL EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-CT
LZZB7-35G-40.5
A 200-400-600/1/1A CORE 2 - CL: 5P20, 200-400-600/1A A
0.5/5P20

PA 2S1 2S2 2S3 2S4PB 2S1 2S2 2S3 2S4PC 2S1 2S2 2S3 2S4
* * *
B B

-X42 4 -X42 5 -X42 6 -X42 7

BVT.A
/T01.5

-X42 12 -X42 13 -X42 14 -X42 15 BVT.B


/T01.5
C C

BVT.C
/T01.5

-X42 8 -X42 9 -X42 10 -X42 11 BVT.N


/T01.5

-X42 1 -X42 2 -X42 3


D D

1 3 5 7 1 3 5 7
-XTC.67 -XTV.67
/Z04.4 /Z04.4

2 4 6 8 2 4 6 8

E 17 19 21 24 26 1 3 5 E
- F67 VCT
/Z02
IA IB IC IE1 IE2 VA VB VC

18 20 22 23 25 2 4 6

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE S01 F
CHECKED NEXT PAGE T01
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED CURRENT & VOLTAGE CIRCUIT FOR PROTECTION RELAY EVNCPC/IA-110KV/MV-H03

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

-CT BUS WIRE


A LZZB7-35G-40.5 A
VOLTAGE CIRCUIT
200-400-600/1/1A CORE 1 - CL: 0.5, 200-400-600/1A CLASS: 0.5
0.5/5P20

-XT 5

-XT 6

-XT 7

-XT 8
PA 1S1 1S2 1S3 1S4PB 1S1 1S2 1S3 1S4PC 1S1 1S2 1S3 1S4
B * * * B

-X41 4 5 6 7 1 3 5 12 14

-FBVT.M 11
3P-2A

/R02.7
I> I> I>

2 4 6
C -X41 12 13 14 15
C
/ S01.7
BVT.A

/ S01.7
BVT.B

/ S01.7
BVT.C
-X41 8 9 10 11

/ S01.7
BVT.N

D -X41 1 2 3 1 3 5 7 D
-XTV.PMT
/Z04.4

1 3 5 7
-XTC.PMT 2 4 6 8
/Z04.4

2 4 6 8
2 5 8 11
E 1 3 E
PMT
4 /Z04.6 6

7 9

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE T01 F
CHECKED NEXT PAGE W01
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED CURRENT & VOLTAGE CIRCUIT FOR METERING EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

STATUS OF CIRCUIT BREAKER CB IN "SERVICE" POSITION CB IN SERVICE CB NOT CHARGED


CB IN "TEST" POSITION
CLOSED OPENED AND CLOSED POSITION

X3 3 7 11 17 21 25 27 29 X3 37 X3 39 41 45

-CB 3 5 9 8 23 28 29 6 27 43 55 26
/Z01.2
B B
33 43 83 31 31 41 71 73 33 31 41 53 21
HK33 HK43 HK83 HK21 HK31 HK41 HK71 HK73 S9 S8 S84 S95 SP4
/Z01.6 34 /Z01.6 44 /Z01.6 84 /Z01.7 32 /Z01.7 32 /Z01.7 42 /Z01.7 72 /Z01.5 74 /Z01.5 34 /Z01.7 32 /Z01.7 42 /Z01.6 54 22

13 15 19 18 33 38 39 16 48 44 56 36

X3 4 8 12 18 22 26 28 34 X3 38 X3 40 42 46

C C

STATUS OF EARTHING SWITCH CONTROL MODE


SPARE SPARE SPARE
CLOSED OPENED "LOCAL" SPARE TERMINAL

-X3 5 9 13 15 19 23 30 32 35 43
XN 15
D D
7 11 15 -X1 27 28 29 30
ES 5 9 13
/Z03.4
11 13 15 9
-X2 20 21 22 23 24 25

F67 D -S.L/R
QE.4 QE.6 QE.8 /Z03.1
QE.3 QE.5 QE.7 BO6 BO7 BO8
/Z03.6 /Z03.6 /Z03.7 /Z03.6 /Z03.6 /Z03.7 LOCAL X3 47 48 49 50

12 14 16 10

6 10 14 8 12 16

E E
X9 8 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

-X3 6 10 14 16 20 24 31 33 36 44
X9 4 5 6 7

-XT 9 10 11 12 15

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE W01 F
CHECKED NEXT PAGE X104
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED SPARE CIRCUIT EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H03-X1 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
1 =MV35 +H03 FQC 2 /G01.6
2 =MV35 +H03 S.L/R-C1 1 /M01.1
=MV35 +H03 -K50BF2 5 3 /M01.5

B 4 =MV35 +H03 DXN-PS 2 /M01.7 B


5 =MV35 +H03 DXN-RL 5 /M01.8
6 /M01.8
7 =MV35 +H03 FQC 4 /G01.6
8 =MV35 +H03 CB-X0 4 /M01.4
9 =MV35 +H03 CB-X0 30 /M01.4
10 =MV35 +H03 CB-X0 37 /M01.7
11 =MV35 +H03 DXN-PS 1 /M01.7
12 =MV35 +H03 ES-DS 2 /M01.8
13 /M01.8
C =MV35 +H03 C1 1 14 =MV35 +H03 CB-X0 53 /M01.1 C
=MV35 +H03 -BO5 10 15 =MV35 +H03 CB-X0 54 /M01.3
16 =MV35 +H03 CB-X0 52 /M01.3
17 =MV35 +H03 CB-X0 14 /M01.4
=MV35 +H03 -BO4 8 18 =MV35 +H03 CB-X0 31 /M01.4
19 =MV35 +H03 K50BF2 9 /M01.5
=MV35 +H03 -BO4 8 20 =MV35 +H03 CB-X0 7 /M01.5
21 =MV35 +H03 CB-X0 17 /M01.5
=MV35 +H03 BI1 2 22 =MV35 +H03 CB-X0 32 /M01.6
D 23 =MV35 +H03 CB-X0 42 /M01.6 D
24 =MV35 +H03 CB-X0 41 /M01.6
=MV35 +H03 -KSQE 9 25 =MV35 +H03 CB-X0 2 /M01.7
=MV35 +H03 -RL 6 26 =MV35 +H03 ES-DS 1 /M01.8
27 /W01.6
28 /W01.6
29 /W01.6
30 /W01.6

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X104 F
CHECKED NEXT PAGE X105
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H03-X1 EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H03-X2 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
1 =MV35 +H03 F67-T4-PS 30 /G01.4
=MV35 +H03 -X0 11 2 /R01.1
3 =MV35 +H03 CB-X0 24 /R01.4

B 4 =MV35 +H03 ES-QE1 1 /R01.5 B


5 =MV35 +H03 ES-QE2 3 /R01.6
6 =MV35 +H03 S.L/R-C4 7 /R01.6
7 /R01.8
8 =MV35 +H03 F67-T4-PS 32 /G01.4
9 =MV35 +H03 F67-T2-BI2 4 /R01.1
10 /R01.2
=MV35 +H03 BI2 3 11 =MV35 +H03 CB-X0 50 /R01.1
=MV35 +H03 BI3 5 12 =MV35 +H03 CB-X0 51 /R01.2
=MV35 +H03 BI4 7 13 =MV35 +H03 CB-X0 21 /R01.3
C =MV35 +H03 BI5 9 14 =MV35 +H03 CB-X0 22 /R01.3 C
=MV35 +H03 BI6 11 15 =MV35 +H03 CB-X0 34 /R01.4
=MV35 +H03 BI7 13 16 =MV35 +H03 ES-QE1 2 /R01.5
=MV35 +H03 BI8 15 17 =MV35 +H03 ES-QE2 4 /R01.6
=MV35 +H03 BI17 35 18 /R02.7
=MV35 +H03 BI18 37 19 /R02.7
20 /W01.6
21 /W01.6
22 /W01.6
D 23 /W01.6 D
24 /W01.6
25 /W01.6

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X105 F
CHECKED NEXT PAGE X106
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H03-X2 EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H03-X3 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
=MV35 +H03 XT 13 1 =MV35 +H03 CB-X0 57 /R04.6 41 =MV35 +H03 CB-X0 55 /W01.5
=MV35 +H03 XT 14 2 =MV35 +H03 CB-X0 58 /R04.7 42 =MV35 +H03 CB-X0 56 /W01.5
3 =MV35 +H03 CB-X0 3 /W01.1 43 =MV35 +H03 S.L/R-C5 9 /W01.5

B 4 =MV35 +H03 CB-X0 13 /W01.1 44 =MV35 +H03 S.L/R-C5 10 /W01.5 B


5 =MV35 +H03 ES-QE3 5 /W01.1 45 =MV35 +H03 CB-X0 26 /W01.5
6 =MV35 +H03 ES-QE3 6 /W01.1 46 =MV35 +H03 CB-X0 36 /W01.5
7 =MV35 +H03 CB-X0 5 /W01.1 47 /W01.6
8 =MV35 +H03 CB-X0 15 /W01.1 48 /W01.6
9 =MV35 +H03 ES-QE5 9 /W01.1 49 /W01.6
10 =MV35 +H03 ES-QE5 10 /W01.1 50 /W01.6
11 =MV35 +H03 CB-X0 9 /W01.2
12 =MV35 +H03 CB-X0 19 /W01.2
13 =MV35 +H03 ES-QE7 13 /W01.2
C 14 =MV35 +H03 ES-QE7 14 /W01.2 C
15 =MV35 +H03 ES-QE6 7 /W01.2
16 =MV35 +H03 ES-QE6 8 /W01.2
17 =MV35 +H03 CB-X0 8 /W01.2
18 =MV35 +H03 CB-X0 18 /W01.2
19 =MV35 +H03 ES-QE6 11 /W01.2
20 =MV35 +H03 ES-QE6 12 /W01.2
21 =MV35 +H03 CB-X0 23 /W01.3
22 =MV35 +H03 CB-X0 33 /W01.3
D 23 =MV35 +H03 ES-QE6 15 /W01.3 D
24 =MV35 +H03 ES-QE6 16 /W01.3
25 =MV35 +H03 CB-X0 28 /W01.3
26 =MV35 +H03 CB-X0 38 /W01.3
27 =MV35 +H03 CB-X0 29 /W01.3
28 =MV35 +H03 CB-X0 39 /W01.3
29 =MV35 +H03 CB-X0 6 /W01.4
30 =MV35 +H03 F67-D-BO6 11 /W01.4
31 =MV35 +H03 F67-D-BO6 12 /W01.4

E 32 =MV35 +H03 F67-D-BO7 13 /W01.4 E


33 =MV35 +H03 F67-D-BO7 14 /W01.4
34 =MV35 +H03 CB-X0 16 /W01.4
35 =MV35 +H03 F67-D-BO8 15 /W01.4
36 =MV35 +H03 F67-D-BO8 16 /W01.4
37 =MV35 +H03 CB-X0 27 /W01.4
38 =MV35 +H03 CB-X0 48 /W01.4
39 =MV35 +H03 CB-X0 43 /W01.5
40 =MV35 +H03 CB-X0 44 /W01.5

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X106 F
CHECKED NEXT PAGE X108
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H03-X3 EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H03-X9 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
1 =MV35 +H03 F67-T3-BO7 13 /R04.3
2 =MV35 +H03 K50BF2 13 /R04.3
3 =MV35 +H03 K50BF2 14 /R04.3

B 4 /W01.6 B
5 =MV35 +H03 KSQE 13 /R03.2
5 /W01.6
6 /W01.6
7 =MV35 +H03 KSQE 14 /R03.2
7 /W01.6
8 /W01.6
11 /W01.6
12 /W01.6
13 /W01.6
C 14 /W01.6 C
15 /W01.6
16 /W01.7
17 /W01.7
18 /W01.7
19 /W01.7
20 /W01.7
21 /W01.7
22 /W01.7
D 23 /W01.8 D
24 /W01.8
25 /W01.8
26 /W01.8
27 /W01.8
28 =MV35 +H03 FQ67 11 /R04.5
29 =MV35 +H03 FQ67 12 /R04.5
30 =MV35 +H03 F67-T4-BO3 9 /R04.4

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X108 F
CHECKED NEXT PAGE X110
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H03-X9 EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H03-X41 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
=MV35 +H03 C1 1 1 =MV35 +H03 CT-PA 1S1 /T01.2
=MV35 +H03 C2 3 2 =MV35 +H03 CT-PB 1S1 /T01.2
=MV35 +H03 C3 5 3 =MV35 +H03 CT-PC 1S1 /T01.3

B 4 =MV35 +H03 CT-PA 1S4 /T01.2 B


5 =MV35 +H03 CT-PB 1S4 /T01.3
6 =MV35 +H03 CT-PC 1S4 /T01.4
=MV35 +H03 -PE 7 /T01.4
15 /T01.4
=MV35 +H03 C4 7 11 /T01.4
8 =MV35 +H03 CT-PA 1S2 /T01.2
9 =MV35 +H03 CT-PB 1S2 /T01.3
10 =MV35 +H03 CT-PC 1S2 /T01.3
12 =MV35 +H03 CT-PA 1S3 /T01.2
C 13 =MV35 +H03 CT-PB 1S3 /T01.3 C
14 =MV35 +H03 CT-PC 1S3 /T01.3

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X110 F
CHECKED NEXT PAGE X111
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H03-X41 EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H03-X42 A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
=MV35 +H03 C1 1 1 =MV35 +H03 CT-PA 2S1 /S01.2
=MV35 +H03 C2 3 2 =MV35 +H03 CT-PB 2S1 /S01.2
=MV35 +H03 C3 5 3 =MV35 +H03 CT-PC 2S1 /S01.3

B 4 =MV35 +H03 CT-PA 2S4 /S01.2 B


5 =MV35 +H03 CT-PB 2S4 /S01.3
6 =MV35 +H03 CT-PC 2S4 /S01.4
=MV35 +H03 -PE 7 /S01.4
15 /S01.4
=MV35 +H03 C4 7 11 /S01.4
8 =MV35 +H03 CT-PA 2S2 /S01.2
9 =MV35 +H03 CT-PB 2S2 /S01.3
10 =MV35 +H03 CT-PC 2S2 /S01.3
12 =MV35 +H03 CT-PA 2S3 /S01.2
C 13 =MV35 +H03 CT-PB 2S3 /S01.3 C
14 =MV35 +H03 CT-PC 2S3 /S01.4

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X111 F
CHECKED NEXT PAGE X112
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H03-X42 EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H03-XN A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
2 1 =MV35 +H03 FQAC 4 /D01.3
=MV35 +H03 2MD X2 2 =MV35 +H03 HL5 X2 /D01.5
=MV35 +H03 -FQAC 2 3 1 /D01.3

B =MV35 +H03 -S1 14 4 =MV35 +H03 LXK 21 /D01.5 B


=MV35 +H03 -EH4 1 5 /D01.3
=MV35 +H03 -EH3 1 6 /D01.4
=MV35 +H03 -EH2 1 7 /D01.4
=MV35 +H03 -EH1 1 8 5 /D01.4
4 9 =MV35 +H03 EH4 2 /D01.3
10 =MV35 +H03 EH3 2 /D01.4
11 =MV35 +H03 EH2 2 /D01.4
12 =MV35 +H03 EH1 2 /D01.4
=MV35 +H03 -FQMC 2 13 =MV35 +H03 CB-X0 35 /G01.3
C =MV35 +H03 -FQMC 4 14 =MV35 +H03 CB-X0 25 /G01.3 C
15 /W01.6

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X112 F
CHECKED NEXT PAGE X113
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H03-XN EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A Terminal diagram =MV35+H03-XT A

Connection

Connection

Connection

Connection
Terminal

Terminal
Jumper

Jumper
point

point

point

point
Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column Bay Panel Terminal/Equip. Bay Panel Equipment/Ter. Page/column
1 =MV35 +H03 FQAC 1 /D01.2
2 =MV35 +H03 FQAC 3 /D01.2
3 =MV35 +H03 FQMC 1 /G01.3

B 4 =MV35 +H03 FQMC 3 /G01.3 B


5 =MV35 +H03 FBVT.M 1 /T01.6
6 =MV35 +H03 FBVT.M 3 /T01.6
7 =MV35 +H03 FBVT.M 5 /T01.6
8 =MV35 +H03 XTV.PMT-C4 7 /T01.6
9 /W01.6
10 /W01.6
11 /W01.6
12 /W01.6
13 =MV35 +H03 X3 1 /R04.6
C 14 =MV35 +H03 X3 2 /R04.7 C
15 /W01.6

D D

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE X113 F
CHECKED NEXT PAGE Y01
DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED Terminal diagram =MV35+H03-XT EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

F67
100 BASE TX 100 BASE TX
PORT 1 PORT 2
/Z02.2 /Z02.2

B B
ETHERNET CABLE RJ45 CONNETOR

C C

+H01

D D
SW

100 BASE TX
PORT 1

E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Y01 F
CHECKED NEXT PAGE Z01
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED COMMUNICATION PORTS EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

earthing energy storage closedown opening coil assistant switch loop Blocking coil
close coil loop
loop motor loop loop loop for trolley
A /G01.2 /W01.1 /M01.5 /R01.3 /W01.2 /W01.3 /M01.7 A
/R01.4 /G01.3 /M01.3 /M01.4 /W01.4 /W01.1 /W01.2 /R01.3 /W01.3 /W01.3 /M01.6

- 4 - - 20 - 30
1 40 24 26 25 6 3 5 7 9 11 29 8 23 28 46 37 27 44

A4 A7 B15

A3
B14

2
HQ

1
KO
TQ

2
B3 B4
B13
B B
j

2
A6

2
M L8 Y0
i

1
1
l A9
B1
L9
k
A1 B2 A8 B11

14 12 82 64 73 33 43 23 83 53 61 71 21 31 41 51
HK
13 11 81 63 74 34 44 24 84 54 62 72 22 32 42 52

13 21 22 14
SP2 SP2 SP3 SP1
C 14 22 21 A5 13 C
A2

5 2
KO
B7 B12
3
b d

34 36 35 + 32 L4 + 31 41 13 15 17 19 21 22 39 18 33 38 12 2 48 43
Sign Name Function L7
c 52 57 55 27 43
HQ/DC220V DC30V Control closing of
closing Magnet circuit breaker B5
D DC30V Control opening of L1 D
TQ/DC220V closing Magnet circuit breaker 16 9 13 1 3 18 19 10
AC220V MotorStore energy for
M Energy Storage closing of circuit breaker 11 21 51 1 31 41
HK Auxiliary Switch Shift CO operation testing position S8

XT Aviation Plug Header of control wires 12 22 52 2 32 42


13 33 23 53 3
LX Wiring Terminal Header of control wires
Prevent circuit breaker
service position S9
KO/DC220V Trip-free Relay
from tripping 14 34 24 54 4
Shift after closing spring 11 12
SP1~SP3 jiggle switch A11 L6 A13
energy is stored
a f g
E jiggle switch
L5 E
SP5 Locking function L3 L2
e h
A12 A10 A14 14 8 7 2 4 5 6 17 15
S8 auxiliary switch Control closing loop

Divided voltage circuit


S9 auxiliary switch
breaker Remake: X express connect; blank express cut
+ 14 + 49 10 16 53 54 58 56 50 51 48 44
L1~L9 Connective wire Integrated circuit board
Locking Blocking coil L1 L2 L3 L4 L5 L6 L7 L8 L9
Y0 electromagnet for trolley /M01.1 /R04.6 /R01.2 /W01.4 /W01.5
ba gh fe dc af fg cb ij kl
have KO function /W01.4 /M01.3 /W01.5 /R01.1
without locking X X X X X

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Z01 F
CHECKED NEXT PAGE Z02
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED REFERENCE OF CB, VN1-40.5/COOPER EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

F67 F67 F67


MODULE PWS1 MODULE BO1 FUNCTION MODULE BI1 FUNCTION F67
- T4 - T3 - T2 MODULE VCT31B
A - VCT A
+
1 1
(*2) BO1 /M01.3 CLOSE CB COMMAND BI1 /M01.6 TRIP CIRCUIT SUPERVISION 1
1 - VA /S01.5
2 2
2
3 +
LC1 3 3
(*2) BO2 /M01.3 AUTO RECLOSE COMMAND BI2 /R01.1 CB TEST 3
2 - VB /S01.6
4 4
4
4 +
5 5
(*2) BO3 /M01.4 OPEN CB COMMAND BI3 /R01.2 CB SERVICE 5
- VC /S01.6
6 6
6
+
7 7 7
(*2) BO4 /M01.4 PROTECTION RELAY TRIP BI4 /R01.3 CB CLOSED 7
- VE
B 9 8 8 B
LC2 8
+
8 9 9
(*2) BO5 /M01.3 INTERLOCKING FOR CLOSE CB BI5 /R01.3 CB OPENED 9
- VS
10 10 10
10
+
11 11
Power (*2) BO6 BI6 /R01.4 CB SPRING CHARGED 17
- IA /S01.2
Supply 12 12
18
+ +
= 29 13 13
BO7 /R04.3 50BF TRIP TO OTHER FEEFER BI7 /R01.5 ES CLOSED 19
- IB /S01.3
30 14 14
_ /G01.4 20
+
= 31 15 15
BO8 BI8 /R01.6 ES OPENED 21
- IC /S01.3
C 32 16 16 C
22
GND +
35 17 17
BO9 BI9 /R01.6 CONTROL MODE "REMOTE" 23
- IE1 /S01.4
36 18 18
24
+
37 21 21
BO10 BI10 /R02.1 LOAD SHEDDING LEVEL 1 25
- IE2 /S01.4
38 22 22
26
+
23 23
BO11 BI11 /R02.2 LOAD SHEDDING LEVEL 2 27
- IS
24 24
28
+
25 25
F67 BO12 BI12 - /R02.3 LOAD SHEDDING LEVEL 3
D 26 26 GND D
30
+
27 27
BO13 BI13 - /R02.3 LOAD SHEDDING LEVEL 4
28 28
PORT1 /Y01.2
+
29 29
BO14 BI14 - /R02.5 RESET LOCKOUT
30 30
+
31 31
BO15 BI15 - /R02.5 SET 86, START 50BF
32 32
+
33 33
E BO16 BI16 - /R02.6 MCB OFF E
34 34
+
PORT2 /Y01.2 35 35
BO17 BI17 - /R02.7 SPARE
36 36
+
37 37
BO18 BI18 - /R02.7 SPARE
38 38

NOTE: (*2): SEMI-FAST BO


TOSHIBA: GRT200-31-224-00-4L-30-111 ̣(GRT200-303D-4L2-2E)

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Z02 F
CHECKED NEXT PAGE Z03
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED REFERENCE OF PROTECTION RELAY: GRD200 EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

CONTROL MODE SELECTOR SWITCH "LOCAL/REMOTE":


SA16-FA6037-61042/SALZER
A A

BCU X X X X X X

MIMIC X X X X X X
PUSH BUTTON 1NO:

1 3 5 7 9 11 13 15 17 19 21 23 3
MIMIC
BCU

B 2 4 6 8 10 12 14 16 18 20 22 24 4 B

S.L/R /M01.1 /R01.6 /W01.5 -BRL /R02.5

LOAD SHEDDING SELECTION SWITCH: SA16-FA 61029-61071/SALZER

OFF X X
CONTROL SWITCH : CA10-A214-620E/K&N
01 (STEP1) X X
CLOSE X
02 (STEP2) X X
C OPEN X
C
03 (STEP3) X X

Push close
Push open
04 (STEP4) X X 1 3

1 3 5 7 9 11 13 15 17 19
OFF
01
02
03
04

2 4

2 4 6 8 10 12 14 16 18 20 -S.QF01 /M01.1 /M01.2


D D

-S.81 /R02.1 /R02.2 /R02.3 /R02.3

INDICATION LAMP 220 VAC/VDC AUXILIARY CONTACT OF EARTHING SWITCH

-PLS /Q01.2 CB SERVICE POSITION RED


1 3 5 7 9 11 13 15
-PLT /Q01.2 CB TEST POSITION GREEN
E /Q01.3 E
-PLC CB CLOSED RED
QE.1 QE.2 QE.3 QE.4 QE.5 QE.6 QE.7 QE.8
-PLO /Q01.3 CB OPENED GREEN

/Q01.4
2 4 6 8 10 12 14 16
-PEC ES CLOSED RED

-PEO /Q01.4 ES OPENED GREEN


-ES /R01.5 /R01.6 /W01.1 /W01.2 /W01.1 /W01.2 /W01.2 /W01.3
-PLX /Q01.5 CB SPRING CHARGED RED

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Z03 F
CHECKED NEXT PAGE Z04
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED REFERENCE OF CONTROL EQUIPMENT EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

TARIFF METER
A CURRENT TEST BLOCK A

L1 L2 L3
-KTT-AW4 XTC.67 XTC.PMT
ELSTER - A1700
S1
1 2
S2

S1
3 4

EQUIPMENT
B S2
/S01.1 /T01.2 B

S1 RS485 RS485
5 6
1 2 3 4 5 6 7 8 9 10 11 RJ45 RJ45
S2

IA UA IB UB IC UC UN UN
7 8

-PMT /T01.6

C C

VOLTAGE TEST BLOCK

L1 L2 L3
-KTT-VW4 XTV.67 XTV.PMT

1a
1 2
D D
1n

1a
3 4
EQUIPMENT

1n
/S01.5 /T01.6
1a
5 6
1n

7 8
E E

CENTRAL POWER CORPORATION BAY =MV35


DESIGNED
F CUSTOMER: CENTRAL POWER CORPORATION
110kV IAGRAI SUBSTATION PAGE Z04 F
CHECKED NEXT PAGE
35KV OUTGOING PANEL DATE 3/10/2020
PROJECT: CPC-KFW3.1chung-G02
APPROVED REFERENCE OF MEASUREMENT EQUIPMENT EVNCPC/IA-110KV/MV-H03
1 2 3 4 5 6 7 8