220KV HACOM SUBSTATION
Customer HACOM HOLDINGS
Consultant PECC5
Drawing set HCSL_SERVER
Stage FOR APPROVAL
Issue Date 17.07.2019
Revision Description Date Name Date Name Project Name = SVR
Drawn 31.05.2019 DUONG.NT
SVR_COVER 220KV HACOM SUBSTATION + G
Job Number Drawing set Page A1
Checked 14.06.2019 QUY.NK 1915.HCSL19 HCSL_SERVER of 402
DATE STAMP
17.07.2019
03:31
Table of Contents
Project Name: 220KV HACOM SUBSTATION
Job Number : 1915.HCSL19
Drawing Set Installation Location Page Number Description
HCSL_SERVER SVR G A1 SVR_COVER
HCSL_SERVER SVR G B1 BILL OF MATERIAL
HCSL_SERVER SVR G G1 SVR LAYOUT
HCSL_SERVER SVR RP 1 HEATING & LIGHTING
HCSL_SERVER SVR RP 2 AC DISTRIBUTION
HCSL_SERVER SVR RP 3 DC DISTRIBUTION
HCSL_SERVER SVR RP 5 LAN DIAGRAM
HCSL_SERVER SVR RP 6 LAN DIAGRAM
Revision Description Date Name Date Name Project Name = SVR
Drawn 31.05.2019 DUONG.NT
TABLE OF CONTENTS 220KV HACOM SUBSTATION + G
Job Number Drawing set Page A2
Checked 14.06.2019 QUY.NK 1915.HCSL19 HCSL_SERVER
DATE STAMP
17.07.2019
03:31
BILL OF MATERIAL
Project name: 220KV HACOM SUBSTATION
Item No. Device Tag Installation Location Page Part Number Description Manufacturer
1 ENG SVR RP /5.7 HPC 7242 Computer Advantech
2 ES1 SVR RP /6.2 ML1200-250S-C1-C1-CD-CD-X Ethernet Switch GE
3 ES2 SVR RP /6.5 ML1200-250S-C1-C1-CD-CD-X Ethernet Switch GE
4 FAC SVR RP /1.3 PLS6-C10/2 MCB, AC, 6kA 2poles 10A Eaton
5 FAC SVR RP /1.3 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
6 FAC2 SVR RP /2.3 FAZ-C20/2 MCB, 220VAC, 6kA 2poles 20A Eaton
7 FAC2 SVR RP /2.3 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
8 FDC SVR RP /3.4 FAZ-C10/2-DC MCB, DC, 10kA 2poles 10A Eaton
9 FDC SVR RP /3.4 Z-AHK Auxiliary contacts MCB 1NO1NC Eaton
10 G500.1 SVR RP /5.1 G500 Gateway GE
11 G500.2 SVR RP /5.6 G500 Gateway GE
12 GPS SVR RP /5.4 RT4303XNCA2C08B231 GPS GE
13 HIS SVR RP /5.1 HPC 7242 Computer Advantech
14 HMI1 SVR RP /5.3 HPC 7242 Computer Advantech
15 HMI2 SVR RP /5.5 HPC 7242 Computer Advantech
16 KS SVR RP /3.6 RF-4R Relay fast trip Arteche
17 KS SVR RP /3.6 FN-DE-IP10 Đế lắp DIN rơ le Arteche Arteche
Revision Description Date Name Date Name Project Name = SVR
Drawn 31.05.2019 DUONG.NT
BILL OF MATERIAL 220KV HACOM SUBSTATION + G
Job Number Drawing set Page B1
Checked 14.06.2019 QUY.NK 1915.HCSL19 HCSL_SERVER
DATE STAMP
17.07.2019
03:31
COMPUTER 1
COMPUTER 1
COMPUTER 1
COMPUTER 2
COMPUTER 1
COMPUTER 3
COMPUTER 1
COMPUTER 4
GATEWAY 1
GATEWAY 1
GATEWAY 2
GATEWAY 2
Ethernet Switch
Ethernet Switch
Ethernet Switch
Ethernet Switch
Ghi chú:
800
Computer: HPC 7242/Advantech
MẶT ĐÁY Gateway: G500/GE
Ethernet Switch: ML1200/GE
(thiết kế giá đỡ cho ML1200)
800
Tủ rack 19''
Revision Description Date Name Date Name Project Name = SVR
Drawn 31.05.2019 DUONG.NT
SVR LAYOUT 220KV HACOM SUBSTATION + G
Job Number Drawing set Page G1
Checked 14.06.2019 QUY.NK 1915.HCSL19 HCSL_SERVER
DATE STAMP
17.07.2019
03:32
Revision Description Date Name Date Name Project Name = SVR
Drawn 31.05.2019 DUONG.NT
HEATING & LIGHTING 220KV HACOM SUBSTATION + RP
Job Number Drawing set Page 1
Checked 14.06.2019 QUY.NK 1915.HCSL19 HCSL_SERVER
DATE STAMP
17.07.2019
03:32
Revision Description Date Name Date Name Project Name = SVR
Drawn 31.05.2019 DUONG.NT
AC DISTRIBUTION 220KV HACOM SUBSTATION + RP
Job Number Drawing set Page 2
Checked 14.06.2019 QUY.NK 1915.HCSL19 HCSL_SERVER
DATE STAMP
17.07.2019
03:33
7
3
11
8
4
12
9
5
13
10
6
14
Revision Description Date Name Date Name Project Name = SVR
Drawn 31.05.2019 DUONG.NT
DC DISTRIBUTION 220KV HACOM SUBSTATION + RP
Job Number Drawing set Page 3
Checked 14.06.2019 QUY.NK 1915.HCSL19 HCSL_SERVER
DATE STAMP
17.07.2019
03:33
@SERVER

@SERVER

@SERVER

@SERVER
Revision Description Date Name Date Name Project Name = SVR
Drawn 31.05.2019 DUONG.NT
LAN DIAGRAM 220KV HACOM SUBSTATION + RP
Job Number Drawing set Page 5
Checked 14.06.2019 QUY.NK 1915.HCSL19 HCSL_SERVER
DATE STAMP
17.07.2019
03:34
Revision Description Date Name Date Name Project Name = SVR
Drawn 31.05.2019 DUONG.NT
LAN DIAGRAM 220KV HACOM SUBSTATION + RP
Job Number Drawing set Page 6
Checked 14.06.2019 QUY.NK 1915.HCSL19 HCSL_SERVER
DATE STAMP
17.07.2019
03:34
MÀN HÌNH HỆ THỐNG MÁY TÍNH
Ổ CẮM
Ổ CẮM
Revision Description Date Name Date Name Project Name = NDK