You are on page 1of 1

DOWEL BARS TO MATCH

REPUBLIC OF THE PHILIPPINES


HORIZONTAL REINFORCEMENT
OFFICE OF THE BUILDING OFFICIAL
400 400 400 CHB WALL CEBU CITY
100 100

200
RECOMMENDING APPROVAL

CHB "t"

CHB "t"
GENERAL STRUCTURAL/CONSTRUCTION NOTES AND SPECIFICATIONS

200

100
HEAD ARCHITECTURAL SECTION DATE
CHB VERT. REINF. (SEE
(A) GENERAL REQUIREMENTS SCHED. OF REINF.)
CHB HOR. REINF. (SEE
1. ALL STRUCTURAL MATERIALS AND WORK SHALL CONFORM TO THE REQUIREMENTS 6. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS: SCHED. OF REINF.)

100
APPROVED:
OF THE LATEST EDITION OF THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES CHB VERT. REINF. (SEE
FOOTINGS (CAST AGAINST & EXPOSED TO EARTH) . . . . . 75MM (3") SCHED. OF REINF.) DOWEL BARS TO MATCH
(NSCP 2001). HORIZONTAL REINFORCEMENT
WHERE CONCRETE IS EXPOSED TO
2. VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE STARTING CHB HOR. REINF. (SEE
EARTH BUT POURED AGAINST FORMS . . . . . . . . . . . . . . . . 50MM (2")
WORK. NOTIFY THE ENGINEER IMMEDIATELY OF ANY DISCREPANCIES. SCHED. OF REINF.) BUILDING OFFICIAL DATE
SLAB ON GRADE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40MM ( 1 1/2")
3. NOTES AND DETAILS ON THE DRAWINGS TAKE PRECEDENCE OVER THE GENERAL
NOTES AND TYPICAL DETAILS IN CASE OF CONFLICT. COLUMN TIES OR SPIRALS AND BEAM STIRRUPS . . . . . . . 40MM ( 1 1/2")
4. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE SUSPENDED SLABS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20MM ( 3/4")
CHB "t"
WORK, SUCH DETAILS SHALL BE THE SAME AS FOR SIMILAR WORK SHOWN ON THE
DRAWINGS. 7. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP AT LEAST 40 TIMES

5. PIPES, DUCTS, SLEEVES, CHASES, ETC. SHALL NOT BE PLACED IN SLABS, BEAMS, OR
DIAMETER OR 600MM WHICHEVER IS GREATER. STAGGER BOTTOM AT LEAST 1.50M
FROM SPLICES IN OTHER BOTTOM REINFORCEMENT. STAGGER SPLICES FOR TOP
CHB "t"
WALL REINFORCING AT
WALLS UNLESS SPECIFICALLY SHOWN OR NOTED NOR SHALL ANY STRUCTURAL
MEMBER BE CUT FOR PIPES, DUCTS, ETC. UNLESS SPECIFICALLY SHOWN. OBTAIN
REINFORCEMENT SIMILARLY.
WALL REINFORCING AT INTERSECTION END/ DOOR OPENING
PRIOR WRITTEN APPROVAL FROM THE ENGINEER FOR INSTALLATION OF ANY 8. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY
ADDITIONAL PIPES, DUCTS, ETC. POSITION AND SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.
LOCATE AND PROTECT UNDERGROUND OR CONCEALED CONDUIT, PLUMBING OR 400 LAP SPLICE
9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF 7 CONSECUTIVE DAYS
OTHER UTILITIES WHERE NEW WORK IS BEING PERFORMED. IMMEDIATELY AFTER POURING BY THE USE OF CURING COMPOUNDS, OR OTHER 300 CHB WALL
6. LOCATE AND PROTECT UNDERGROUND OR CONCEALED CONDUIT, PLUMBING OR APPROVED METHODS. 100 150

CHB "t"
OTHER UTILITIES WHERE NEW WORK IS BEING PERFORMED. 10. STRIPPING OF FORMS AND SHORES:

300
7. TAKE NECESSARY PRECAUTIONS TO MAINTAIN AND INSURE THE INTEGRITY OF THE FOUNDATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 HRS.
STRUCTURE DURING CONSTRUCTION. NEITHER THE OWNER NOR SUSPENDED SLAB EXCEPT WHEN 150
ARCHITECT/ENGINEER WILL ENFORCE SAFETY MEASURES OR REGULATIONS. IT ADDITIONAL LOADS ARE IMPOSED . . . . . . . . . . . . . . . . . . . . . . . . 8 DAYS CHB VERT. REINF. (SEE

400

400
SHALL BE THE CONTRACTORS RESPONSIBILITY TO PROVIDE ADEQUATE SHORING SCHED. OF REINF.)
BEAMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 DAYS
AND BRACING OF THE STRUCTURE FOR ALL THE LOADS THAT MAYBE IMPOSED @150 O.C (TYP.) @150 O.C (TYP.)
ALTERNATELY PLACED ALTERNATELY PLACED
DURING CONSTRUCTION. FURTHER, THE CONTRACTOR SHALL DESIGN, CONSTRUCT (E) CAMBER REQUIREMENTS DOWEL BARS TO MATCH

200
HORIZONTAL REINFORCEMENT 1@ 50, 5@ 100,
AND MAINTAIN ALL SAFETY DEVICES AND SHALL BE SOLELY RESPONSIBLE FOR REST@ 300MM

400 LAP SPLICE


CONFORMING TO ALL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 1. UNLESS OTHERWISE NOTED ON THE PLANS OR SPECIFICATIONS CAMBER ALL RC CHB HOR. REINF. (SEE
BEAMS AT LEAST 10mm FOR EVERY 4000mm OF CLEAR SPAN EXCEPT CANTILEVERS SCHED. OF REINF.)
8. OBTAIN PRIOR WRITTEN APPROVAL FROM THE ENGINEER IN CASE OF CHANGES TO WHICH WHICH SHALL BE 50mm FOR EVERY 3000mm OF CLEAR SPAN. WB-1 WB-2
THE WORKING DRAWINGS.
2. UNLESS OTHERWISE NOTED ON THE PLANS OR SPECIFICATIONS CAMBER ALL SLABS CHB "t"
(B) DESIGN CRITERIA 8mm PER 3000mm OF SHORTER SPAN AND 14mm FOR EVERY 2000mm OF SLABS TYP. CHB STIFFENER BEAM TYP. BOND BEAM DETAIL
- - - REFER TO STRUCTURAL COMPUTATIONS
CANTILEVER SPAN.
WALL REINFORCING AT CORNER DETAIL
BOND BEAM
(F) MASONRY AND CONCRETE BLOCKS 400
(SEE TYP. DETAIL)
(C) FOUNDATION
1. CONCRETE HOLLOW BLOCKS, UNLESS OTHERWISE SPECIFIED SHALL BE 150MM

100MM
1. FOOTINGS SHALL BEAR ON SOLID UNDISTURBED EARTH (CONTROLLED, COMPACTED THICK. LOAD BEARING BLOCKS SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF

STIFFENER COLUMN @ EVERY 3.00M


STRUCTURAL FILL OR BOTH) AT LEAST 450MM BELOW LOWEST ADJACENT FINISHED 750 PSI (5.175 MPa) WHILE NON-LOAD BEARING SHALL HAVE A MINIMUM
GRADE. COMPRESSIVE STRENGTH OF 400 PSI (2.76 MPa).
CHB WALL WC-1

(SEE TYP. DETAILS)


2. FOOTING IS DESIGNED FOR ASSUMED ALLOWABLE SOIL/FOUNDATION PRESSURE OF 2. 150 O.C TO C.L (TYP.)
CHB VERT. REINF. (SEE CHB. VERT. REINF. (SEE
240 kPa (5000 psf). EACH SIDE OF OPENINGS. SCHED. OF REINF.)
ALTERNATELY PLACED
SCHED. OF REINF.)
3. SUB-GRADE PREPARATION INCLUDING DRAINAGE, EXCAVATION, COMPACTION, 3. LINTEL BEAMS SHALL BEAR AT LEAST 200MM (8") ON EACH SIDE OF MASONRY WALL 400

DOWEL TO MATCH
CHB VERT. BARS
AND FILLING REQUIREMENTS, SHALL CONFORM STRICTLY WITH THE OPENING.

150MM
CHB VERT. REINF. DOWELS
RECOMMENDATIONS GIVEN IN THE SOILS REPORT OR AS DIRECTED BY THE SOILS (TO MATCH VERT. REINF.)
ENGINEER. 4. WALL REINFORCEMENTS SHALL BE AS FOLLOWS:
WALL THICKNESS VERTICAL BARS HORIZONTAL BARS
4. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER FOOTING EXCAVATION TIES; SPACED@150
HAVE BEEN COMPLETED AND PRIOR TO CONCRETING TO CONFIRM THE DESIGN 8 IN. (200 mm) . . . . . . . . . . TO C.L (TYPICAL)
SUSPENDED SLAB
FOUNDATION CAPACITY. 6 IN (150 mm) . . . . . . . . . . .

5. ROOF AND AREA DRAINAGE SHALL BE DIRECTED AWAY FROM THE FOUNDATIONS.
4 IN. (100 mm) . . . . . . . . . . WC-2
5. BLOCK WALL REINFORCING BARS SHALL BE LAPPED OF 30 BAR DIAMETERS WHERE NOTE: PROVIDE STIFFENER COLUMN AT EVERY 4.0 METER MAX. SPACING
6. EXCAVATIONS SHALL BE PROPERLY BACKFILLED. BACKFILL FOR WALLS SHALL BE
PERVIOUS MATERIAL ACCEPTABLE TO THE GEOTECHNICAL ENGINEER. DO NOT PLACE
SPLICED, HORIZONTAL/VERTICAL DOWELS FROM FOOTINGS, COLUMNS/WALLS OR
SLABS SHALL EXTEND INTO THE BLOCK WALL A MINIMUM OF 30 BAR DIAMETERS OR A
WALL BASE REINFORCEMENT TYP. STIFFENER COLUMN
ROOF BEAM

BACKFILL BEHIND WALLS BEFORE THEY HAVE ATTAINED THEIR DESIGN STRENGTH.
SHORE AND PROTECT WALLS FROM LATERAL LOADS UNTIL THE SUPPORTING
MINIMUM OF 400MM WHICHEVER IS LONGER AND DOWELS TO MATCH VERTICAL
REINFORCEMENTS OF WALL.
AT FLAT FLOOR DET. ON CHB WALLS TYPICAL PARAPPET WALL DETAIL
MEMBERS ARE IN PLACE AND HAVE DEVELOPED SPECIFIED STRENGTHS.
(G) STRUCTURAL STEEL
(D) REINFORCED CONCRETE
1. ALL STRUCTURAL STEELS SUCH AS ANGLES, WIDE FLANGE SECTIONS, PIPES,
1. CONCRETE SHALL BE MIXED, PROPORTIONED, CONVEYED AND PLACED IN STIFFENER PLATES, BASE PLATES, ETC. SHALL CONFORM TO ASTM A-36. DOWEL TO MATCH
SEE CONSTRUCTION NOTES
ACCORDANCE WITH THE PROVISIONS SET BY THE NSCP 2001. FOR MASONRY WALL REIN- CHB VERT. BARS
2. ALL STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED BASED ON FORCEMENTS (TYPICAL) DOWEL TO MATCH
2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS THE SPECIFICATION FOR DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL CHB VERT. BARS
WITH CORRESPONDING MAXIMUM SLUMP AND MAXIMUM SIZE AGGREGATE AS STEEL GIVEN BY THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (NSCP). WHERE SLAB
DEPRESSION OCCURS
FOLLOWS: 3. CONNECTION BOLTS ( 34 ROUND, UNLESS SHOWN OTHERWISE) SHALL CONFORM TO FIN. FLR. LVL. 300
STRUCTURAL MEMBER 28 DAY STRENGTH MAX. SLUMP MAX. SIZE AGG. ASTM A-325. ANCHOR BOLTS (EMBEDDED IN MASONRY OR CONCRETE) SHALL DOWEL BARS TO MATCH 300 (TYP.)

DIAMETER
VARIES

DOWELS
CONFORM TO ASTM A307 UNLESS NOTED OTHERWISE ON THE DRAWINGS. CHB VERT. BARS

30 BAR
(TYP.)

DIAMETER
DOWELS
A. SLAB ON GRADE 20.7 MPa (3,000 PSI) 100MM (4") 25MM (1")

30 BAR
B. FOOTINGS & RETAINING WALLS 34.5 MPa (5,000 PSI) 100MM (4") 19MM (3/4") 4. ALL STRUCTURAL STEEL SHALL BE CLEAN, RUST FREE AND SHOP COATED WITH THE N.G.L

DIAMETER
APPROPRIATE PAINT. STRUCTURAL STEEL AND ANCHOR BOLTS SHALL BE MINIMUM

DOWELS
C. COLUMNS / SHEARWALLS 34.5 MPa (5,000 PSI) 100MM (4") 19MM (3/4")

30 BAR
D. BEAMS & SLABS 34.5 MPa (5,000 PSI) 100MM (4") 19MM (3/4") ASTM A-36 DOMESTIC, LATEST REVISION. FIN. FLR. LVL.

600 (MIN.)

250
5. NON - SHRINK GROUT - PRE-MIXED, NON-METALLIC, CEMENT-BASED GROUT, MEETING

250
3. ALL REINFORCING STEEL BARS SHALL CONFORM TO ASTM A615 GRADE 40 FOR THE REQUIREMENT OF ASTM C827, ASTM C109 & CRD-C621, WITH A MINIMUM
COMPRESSIVE STRENGTH OF 7000psi AT 28 DAYS.

250
6. PROVIDE MISCELLANEOUS PLATES, ANGLES AND ANCHORS AS SHOWN OR NOTED ON
4. ALL FABRICATION, DETAILING AND PLACING SHALL CONFORM TO THE PROVISIONS DRAWINGS.
SET BY THE NSCP 2001 EDITION.
7. ALL CUTTING AND BLOCKING OF STEEL SHALL BE SHOWN ON SHOP DRAWINGS AND
5. CLEAR DISTANCE SPACING BETWEEN PARALLED BARS IN A LAYER SHALL NOT BE PERFORMED IN SHOP.
400
LESS THAN 1.50 TIMES THE NOMINAL DIAMETER OF THE BAR, OR 1.33 TIMES MAXIMUM 8. PROVIDE TEMPORARY BRACING AS REQUIRED FOR A SAFE STRUCTURE UNTIL ALL @ 300 O.C.
400 400
1
SIZE AGGREGATE, NOR LESS THAN 38MM (1 2"). FINAL CONNECTIONS ARE MADE.
AT INTERIOR WALLS WITH
AT EDGE / PERIMETER CHB WALL AT INTERIOR CHB WALLS SLAB ELEVATION DIFFERENCE
WALL FOOTING DETAILS (WHERE APPLICABLE)

FROM THE OFFICE OF THE CITY ENGINEER : PROJECT CONSULTANT : PROJECT TITLE: RECOMMENDED BY : APPROVED BY : REVISION SHEET CONTENTS : SHEET NO. :
NO. DESCRIPTION DATE

JERRY B. MARATAS, m.Eng., m.asep


DEPARTMENT OF ENGINEERING CIVIL / STRUCTURAL ENGINEER PROPOSED NEW CEBU CITY S-101
AND PUBLIC WORKS JOSEMARIE POBLETE MICHAEL L. RAMA
ESPINA, PEREZ-ESPINA
& ASSOCIATES
REG. NO. :
92466
PTR NO. :
5439966
DATE :
01-06-14
MEDICAL CENTER CITY ENGINEER MAYOR
GENERAL NOTES
STANDARD TYPICAL DETAILS
01 ---
PLACE : TIN :
ADDRESS : YUTIVO BLG., D. JAKOSALEM ST. CEBU CITY TEL. NOS. 2535754 - 2547323 - 2552775 MANDAUE CITY 928-208-677 LOCATION : COR. PANGANIBAN ST. AND N. BACALSO AVE., CEBU CITY

You might also like