Elemental Cost Analysis
See Section 3 for instructions on completing this form
PROJECT TITLE:
Building type: Type of work:
Location: Client:
Date for receipt: Date of acceptance:
Date for tender/ Base month: Date of site possession:
PROJECT DESCRIPTION
SITE CONDITIONS
CREDITS
Client:
Architect:
Quantity Surveyor:
CDM Coordinator:
Mechanical Engineer:
Electrical Engineer:
Structural Engineer:
General Contractor:
FUNCTIONAL UNITS
Quantity Unit Quantity Unit
1. 2.
BUILDING ACCREDITATION SCORE(S)
Scheme: Scheme:
Version: Version:
Score: Score:
Carbon Emissions:
Basis of calculation: Result:
PROCUREMENT DETAILS
Contract Pricing
Documentation:
Selection of Contractor:
Type of Contract:
Cost Fluctuation:
Contract period Stipulated by Client: Weeks
Offered by contractor: Weeks
Agreed: Weeks
TENDERS
Number of tenders issued: Number of tenders received:
Competitive tender list (where appropriate)
1. £ 6. £
2. £ 7. £
3. £ 8. £
4. £ 9. £
5. £ 10. £
Adjustment on accepted tender (where applicable):
Basis of analysis:
BREAKDOWN OF COST
Contract: Analysed building (where different)
Measured work Measured work
Prime cost sums Prime cost sums
Provisional sums Provisional sums
Preliminaries Preliminaries
Overheads and profit Overheads and profit
Design fees Design fees
Risk (client’s contingencies) Risk (client’s contingencies)
Contract sum Contract sum
* Where the costs analysed are based on a building contract this will be the total contract sum including any employer’s
contingencies and contractor’s design fees. Where other client costs are included these should be identified and the total
will be the project cost.
2 SUPERSTRUCTURE
2.1 Frame
2.1.1 Frame
Frame m²
2.3 Roof
2.3.1 Roof Structure
2.3.2 Roof Coverings
2.3.3 Specialist Roof Systems
2.3.4 Roof Drainage
2.3.5 Rooflights, Skylights and
Openings
2.3.6 Roof Features
Roof m²
3 INTERNAL FINISHES
3.1 Wall Finishes
3.1.1 Wall Finishes
Wall Finishes m²
5 SERVICES
5.1 Sanitary Installations
5.1.1 Sanitary Appliances
5.1.2 Sanitary Ancillaries
Sanitary Installations Nr
BUILDING SUB-TOTAL
8 EXTERNAL WORKS
8.1 Site Preparation Works
8.1.1 Site Clearance
8.1.2 Preparatory Groundworks
Site Preparation Works m²
0 FACILITATING WORKS
0.1 Toxic/Hazardous/Contaminated Material Treatment
0.1.1 Toxic/Hazardous Material
Removal
0.1.2 Contaminated Land
0.1.3 Eradication of Plant Growth
Toxic/Hazardous/Contaminated m²
Material Treatment
* Where the costs analysed are based on a building contract this will be the total contract sum including any employer’s contingencies and contractor’s
design fees. Where other client costs are included these should be identified and the total will be the project cost.
1 SUBSTRUCTURE
1.1 Substructure 1.1.1 Standard Foundations
Nature of soil 1.1.2 Special Foundations
Volume of basement m3
2 SUPERSTRUCTURE
2.1 Frame 2.1.1 Frame
Grid pattern of main columns
Sound insulation dB
2.7.4 Cubicles
3 INTERNAL FINISHES
3.1 Wall Finishes 3.1.1 Wall Finishes
4.1.4 Sign/Notices
4.1.5 Works of Art
4.1.6 Non-Mechanical and Non-
Electrical Equipment
4.1.7 Internal Planting
4.1.8 Bird and Vermin Control
5 SERVICES
5.1 Sanitary Installations 5.1.1 Sanitary Appliances
8 EXTERNAL WORKS
8.2 Roads, Paths, Pavings and 8.2.1 Roads, Paths and Pavings
Surfacings
8.2.2 Special Surfacing and Pavings
0 FACILITATING WORKS
0.1 Toxic/Hazardous/ 0.1.1 Toxic/Hazardous Material
Contaminated Material Removal
Treatment
0.1.2 Contaminated Land
9.2.4 Security
12.1.3 Fees
12.1.4 Charges
12.1.6 Insurances