You are on page 1of 1

To

The Chiet General Manager


BSNL West Bengal Telecom Circle
8. Red CrossPlace. CTO
Kolkata-700001
Bldg.

(Through Proper Channel)


Sub: Appeal for ngly in respect
updating date
of appointment and all
benefits
accordingly

of Sri Anindy a Das (HRM and getting


ment Kolkata-reg.
No: 201000896)
896). JTO.
CN-TX
East.

Respected Madam Sir.


With due to intorm you that I. Sri
like
Anindya Das. am respect and humble
umble submission. I would CN-
presently working KOLCN-TX (E) under DENIB
TX(East). Kolkata.
completed JTONIB Induction
as
as aa JTONIB
training on
TTA (2008SY)
Batch No 39 at Saltlake 10(ten) weeks
my
10ten) wecks 29/01/2010 as per letter
EZBC 23/1/2009 to
from
No.CTTCTTA2008SY) Batch no.39/2009-2010
n no.39/2009-2010 dated
datedcircle Asansol SSA under WBTC on at Kolkata. the 29.01.2010,ànd after
successful completion of training I reported to parent
01.02 2010. (But Unable
unable to join on 01.02.2010 as TTA due to PVR delay though
completed my TTA
induction trainins successfully. I joined as a TTA at Asansol SSA
under WBTC E-
on
O1.06.2010 after getting my per appointment letter No
224/Loose/ 2008/ 106 dated 01/06/2010 at Asansol) kol ad BDM Dx ao pilly fundli'snad
7
t mention
to
is
heretha as
per the office order number corporate 250-32/2014
Estt-l dated 07.03.2017,in case the PVR is not received after completion of 10 weeks
of induction training in JE cadre (erstw hile 1TA) or I" phase of training in JTo ( )
cadre, a candidate should be given provisional appointment order until the PVR is
received from the concerned authorities.
Therefore. it is humbly requested to fix the date of appointment as TTA with effect
from 01.02.2010 instead of 01.06.2010 as the date of appointment due to
delay in receipt of
PVR has nothing to do with the employee conecerned and also to update the Serv ice Book so
that may get all departmental Deneu t getting one increment as
per letterF.No
1-02/2012-PAT (BSNL)dated 13.07.2015as Pjoined after 07.05.2010 due to delay in receipt
at PVR. LDromoted to JIO a y g LIE exam in the batch of year 2015-2016
considering the vacancy year 2016 and subsequently joined as a JTONIB/Kolkata under CN-
TX (E) East on 11.12.2017 and missed one EPP (E1-E2) for not touching the initial basic of
I had
ofE2)
E2) as missed
as
Rs 20.600/- (Initial
Basic one inerement for the PVR
delay issue.
hunmblerrequest lo
look into this
matter
sympathetically oake
and
that my ierdce
Serce Book and
and
appointment date as TTA can be 1
needfulaction
so

also I
et one Increment
may get increment, one
EPP to E2 and all benefits updated w.e.f d TA
01.02.2010 and involved for the
.e
same. is solicited,
this regard
Your kind help in

Bu I
idt aet
Yours' faithfully. reTMS narote fram
/02/10to ot/o6/1o daeto
on
Sub m Hed tAsansal SSA m PVR is not-
Anindya Das
JTONIB/KOL/CN-TX (E)
201000896.
Mob:
943336;
367155
Hrms No:

Enclo: and
R e l e a s e

Order 2. App
Op.

Training Posting ppointment letter 3. Relevant


Ryl.
Orders
4.
JTO
Corporate office

You might also like