Professional Documents
Culture Documents
6-1 Comply with Health & Safety Rules and Regulations as per Ecocem Standard,
following by all Quality team and Monitoring by Quality Manager.
6-1-1 Mandatory wearing PPE (Personal Protective Equipment).
6-1-2 Make risk assessment for Quality tasks (WI-02-F01 Risk Assessment)
6-1-3 (risk measurement done by Quality team with support of Quality Manager)
(Sampling, sample preparation, Moisture test, Sieve analysis, Cleaning Online
analyzer, Bulk density test, Chemical test, Chemical material handling)
6-2 Comply with Environmental Rules and Regulations as per Ecocem and Local
Standards. Following by all Quality team and Monitoring by Quality Manager
6-2-1 Keep Lab and area of Job Housekeeping.
6-4 Making sure the contract with GCC is respected specially the part that related to quality
(Contract between Gasin Cement Company and Ecocem for providing RDF). Following
by Quality Manager.
6-5 Sending the quality report to GCC for water content and low heating value content
(LHV) for the RDF product weekly or any time requested. Following by quality team
and reporting by Quality Manager (WI-02-F05 Daily Online analyzer data)
6-6 Ensure that Lab is ready to conduct required tests in order to provide quick feedback
to the requesters. Following by quality team and providing the required tools and
materials and Monitoring by Quality Manager.
6-7 Ensure by supervising the inspection team for calibration and recalibration of lab
equipment in order to produce accurate and precise results on regular bases with support
of Maintenance team (Automation & Instrumentation), following by Quality team and
Monitoring by Quality Manager.
6-8 Suggest solutions to the concerned departments (Mechanical Process, Bio-Drying and
Maintenance) in order to remove discrepancies between the required and produced
quality, by making trail and present a reports, following by Quality team and requesting
by Quality Manager.
6-9 Recommend the appropriate equipment and assist in the Procurement of lab equipment
and related material in order to save time and cost, following by Quality team and
Monitoring and Purchasing by Quality Manager.
6-10 Deal with the RDF complains of external customers. Inspect and conduct tests and
feeding them back in order to communicate the root cause of problem by providing
reports on the RDF production to the customers, following by Quality team and
Monitoring by Quality manager. (WI-02-F03 RDF Product data information)
6-11 Recruit the right team members with the collaboration of General manager and HR
Department in order to ensure the skill set of team members that can address the
departmental needs. Following by Quality Manager.
6-12 Responsible for collecting and preparation of the required samples of materials and
waste water with support of (Mechanical process and Bio-Drying) team, performing
by Quality team and Monitoring by Quality Manager. (SOP – Sampling, SOP -
Sample Preparation)
6-12-1 MSW sampling (from receiving area, Dropping point and in the Bays)
6-12-2 RDF sampling (from Bunker)
6-12-3 Waste water (Leachate) sampling (from ponds and from the system)
6-13 Responsible for performing lab analysis for MSW, RDF and Waste water (Leachate),
performing by Quality team and Monitoring by Quality Manager.
6-13-1 Moisture Content test for MSW, materials in the Bays at time of Turning, and
RDF production. (SOP - Total Moisture content) (WI-02-F04 Moisture Content)
6-13-2 Sieve analysis for MSW and RDF production (CEN-TS-15149-3-2006 Solid
biofuels - Methods for the determination of particle size distribution - Part 3
Rotary screen method) (WI-02-F06 MSW Sieve Analysis)
6-13-3 Bulk density (EN 15103-2009 Solid biofuels — Determination of bulk density)
(WI-02-F07 RDF and MSW Bulk Density and Moisture)
6-13-4 Sorting for the RDF and MSW.
6-13-5 PH measurement for Waste water (Leachate) by instrument.
6-13-6 Conductivity test for Waste water (Leachate) by instrument.
6-13-7 BOD (Biochemical Oxygen Demand) for Waste water (Leachate) by instrument
(Multi Lab 4010-1W)
6-13-8 COD (Chemical Oxygen Demand) for Waste water (Leachate) by instrument (910
COD Colorimeter)
6-13-9 TKN (Total Kjeldahl Nitrogen) for Waste water (Leachate) by instrument (DR
3900).
6-13-10 Chloride test for Wasteby (Volhard’s Method and Mohr’s Method)
6-13-11 TDS (Total Dissolved Solid) test for Waster Water by Instrument
6-13-12 Turbidity Meter test for Waste water by Instrument (ProDSS Multi Meter)
6-13-13 Hardness test for waste water by Hardness Test Kit.
6-13-14 TSS (Total Suspended Solid) test for Waste Water by instrument (ProDSS
Multi Meter)
6-14 Perform the stability and preparation check for lab devices and Instruments specially for
the Online analyser, performing by Quality team and Monitoring by Quality Manger.
6-15 Prepare the required reports related to the Quality, following by Quality team and
Monitoring by Quality Manager.
6-15-1 Moisture Content report for Input and Output Material (Moisture Content)
6-15-2 RDF Quality report that measuring by Online analyser (Daily Online Analyser data)
6-15-3 RDF production report for GCC (RDF Production data information)
6-15-4 Updated Bays Moisture Status report for Management team (Status of Bays
Moisture update)
6-15-5 MSW Sieve Analysis Report (MSW Sieve analysis)
6-15-6 RDF and MSW Bulk density report (RDF and MSW Bulk Density and Moisture)
6-16 Inform production operators by timely results as per the approved program of control,
sending the test results to the related department by Email. following by quality team
and Monitoring by Quality Manager.
6-17 Making annual Budget for the Quality department for the required items and new
projects (OPEX and CAPEX), prepare it by Quality Manager with support of Quality
team. (Projected Budget for year 2022).
Form
No. Forms Note
Code
For making risk assessment for the tasks that
1 Risk assessment WI‐02‐F01
perform by Quality team
For making report for management weekly meeting
2 Status of Bays Moisture update WI‐02‐F02
for the status of Bays
For Making report for the required data sending to
3 RDF Product data Information WI‐02‐F03
GCC
For reporting the Moisture test analysis that
4 Moisture Content WI‐02‐F04
performing by Quality team
For reporting the Moisture and LHV for the
5 Daily Online analyzer Data WI‐02‐F05
produced RDF that analyzed by Online analyzer
MSW and RDF Moisture test equipment List
Bulk Density test (MSW+RDF) equipment List
MSW Sieve test equipment List
RDF Sieve test equipment List