Professional Documents
Culture Documents
A. Rationale/Background
1
Republic of the Philippines
Province of Camarines Sur
Municipality of Garchitorena
-oOo-
typhoons as well as raise in sea level, which would likely to increase flood
risks. Noticeably, Garchitorena and surrounding areas will face the impact of
climate change in the upcoming years, which might result in an increase of
rate of flooding areas.
B. Objectives
C. Expected Output
2
Republic of the Philippines
Province of Camarines Sur
Municipality of Garchitorena
-oOo-
D. Expected/Potential Impact
The proposed bridge project shall strengthen local economy and improve
the life of every individual in Garchitorena. The bridge shall ensure growth
and contribute to the realization of the economic potentials of the municipality.
The bridge shall serve as vital instrument to mainstream remote communities
and provide the needed services. Its distinctive design shall boost tourism
and give high socio-economic impact to municipality. The bridge shall play a
vital role in the achievement of the social and economic development of the
municipality. Thus, the bridge shall be one of the infrastructures in realizing
the objective of winning the battle against poverty.
The Monitoring and Evaluation unit shall coordinate and oversee the
implementation of all bridge programs. Such unit will be responsible for
maintaining an updated masterlist/masterplan of bridges for the guidance/use
of all implementing agencies; monitoring compliance with the construction
specifications, selection criteria and maintenance requirements; reassessing
the existing policy requiring counterpart from the other agencies; and initiating
the formulation of rules and regulations applicable to foreign assisted
projects, among others.
3
Republic of the Philippines
Province of Camarines Sur
Municipality of Garchitorena
-oOo-
Prepared by:
Submitted by: