And the quality engineer or manager will lead the Project key
staff from the project manager to its engineers, and project
support.
Perform quality assurance for an ongoing project is required.
Contractor have incorporated Audit Plans as one of the
mandatory requirement in the submission of Project quality
plan.
During project execution, the contractor has to follow and
implement its Audit plans at scheduled intervals throughout
the duration of the project. This type of audit conducted by
the contractor is called Internal audit or 1 st party audit.
PERFORM QUALITY ASSURANCE
The contractor will execute the project and must ensure that
quality control procedures must be followed for each
activities on a daily basis.
The main Quality Control Procedures of the contractor are
the Main activities and sub activities covered by the Project
quality plan; and to do this contractor need to ensure the
process of document submission and approval of Method
Statement for these key activities.
PERFORM QUALITY CONTROL