KURVA S

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM AIR LIMBAH


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM AIR LIMBAH DOMESTIK DALAM DAERAH KABUPATEN/ KOTA LOKASI
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA INDIVIDUAL
LOKASI : DESA GAPURANA
KECEMATAN TALANGO

Periode Ke
BIAYA Bobot 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
No. NAMA PELAKSANAAN 4/25/2022 5/2/2022 5/9/2022 5/16/2022 5/23/2022 5/30/2022 6/6/2022 6/13/2022 6/20/2022 6/27/2022 7/4/2022 7/11/2022 7/18/2022 7/25/2022 8/1/2022 8/8/2022 8/15/2022 8/22/2022 8/29/2022 9/5/2022 9/12/2022 9/19/2022 9/26/2022 10/3/2022 10/10/2022 10/17/2022 10/24/2022 10/31/2022 11/7/2022 11/14/2022 11/21/2022 11/28/2022 12/5/2022 12/12/2022 12/19/2022 12/26/2022 SKALA KET.
( Rp. ) (%)
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d

5/1/2022 5/8/2022 5/15/2022 5/22/2022 5/29/2022 6/5/2022 6/12/2022 6/19/2022 6/26/2022 7/3/2022 7/10/2022 7/17/2022 7/24/2022 7/31/2022 8/7/2022 8/14/2022 8/21/2022 8/28/2022 9/4/2022 9/11/2022 9/18/2022 9/25/2022 10/2/2022 10/9/2022 10/16/2022 10/23/2022 10/30/2022 11/6/2022 11/13/2022 11/20/2022 11/27/2022 12/4/2022 12/11/2022 12/18/2022 12/25/2022 12/31/2022
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 26 27 28 27 28 29 28 29 30 29 30 31 30 31 32
BANGUNAN WC
0.245 0.245 0.245 0.245 0.245 0.245 100 0.000
PEKERJAAN PONDASI 6,246,100.00 1.470

0.773 0.773 0.773 0.773 0.773 0.773 0.773 0.773 0.000


PEKERJAAN PASANGAN 26,276,257.20 6.183
TYPE A1 = 10 Unit

PEKERJAAN ATAP 6,313,176.80 1.485 0.248 0.248 0.248 0.248 0.248 0.248 0.000

0.003 0.003 0.003 0.003 0.003


PEKERJAAN LANTAI 66,376.80 0.016

IPAL ( INSTALASI PENGOLAHAN AIR LIMBAH )


0.501 0.501 0.501 0.501 0.501 0.501 0.000
PEKERJAAN SANITASI 12,787,500.00 3.009

1.478 1.478 1.478 1.478 1.478 1.478 1.478


PEKERJAAN PASANGAN (Sepictank ) 37,695,509.05 8.870

0.203 0.203 0.203 0.203 0.203 0.203


PEKERJAAN PASANGAN (Resapan ) 4,305,000.00 1.013
75
BANGUNAN WC
0.367 0.367 0.367 0.367 0.367 0.367 0.367 0.367 0.367 0.367 1.470
PEKERJAAN PONDASI 15,615,250.00 3.674

1.288 1.288 1.288 1.288 1.288 1.288 1.288 1.288 1.288 1.288 1.288 1.288

Axis Title
PEKERJAAN PASANGAN 65,690,643.00 15.457
TYPE A2 = 25 Unit

0.464 0.464 0.464 0.464 0.464 0.464 0.464 0.464


PEKERJAAN ATAP 15,782,942.00 3.714

PEKERJAAN LANTAI 165,942.00 0.039 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005

IPAL ( INSTALASI PENGOLAHAN AIR LIMBAH )


0.799 0.799 0.799 0.799 0.799 0.799 0.799 0.799
PEKERJAAN SANITASI 27,168,750.00 6.393

PEKERJAAN PASANGAN (Sepictank ) 47,955,162.34 11.284 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128 1.128

0.317 0.317 0.317 0.317 0.317 0.317 0.317 0.317 50


PEKERJAAN PASANGAN (Resapan ) 10,762,500.00 2.532
BANGUNAN WC
PEKERJAAN PONDASI 6,859,556.25 1.614 0.202 0.202 0.202 0.202 0.202 0.202 0.202 0.202

0.977 0.977 0.977 0.977 0.977 0.977 0.977


PEKERJAAN PASANGAN 29,054,610.68 6.836
TYPE B = 15 Unit

0.411 0.411 0.411 0.411 0.411


PEKERJAAN ATAP 8,723,145.11 2.053

0.004 0.004 0.004 0.004 0.004 0.004


PEKERJAAN LANTAI 99,565.20 0.023

IPAL ( INSTALASI PENGOLAHAN AIR LIMBAH )


0.752 0.752 0.752 0.752 0.752 0.752
PEKERJAAN SANITASI 19,181,250.00 4.513

1.663 1.663 1.663 1.663 1.663 1.663 1.663 1.663


PEKERJAAN PASANGAN (Sepictank ) 56,543,263.58 13.304
25
0.304 0.304 0.304 0.304 0.304
PEKERJAAN PASANGAN (Resapan ) 6,457,500.00 1.519
BOP
ADM

Axis Title
0.200 0.400 0.500 0.300 0.300 0.650 0.350 0.500 0.350 0.350 0.200 0.200 0.400 0.050 0.250
Biaya Operasional 21,250,000.00 5.000
0
JUMLAH ANGGARAN 425,000,000.00 100.000
JUMLAH BOBOT 100.000
Jumlah pada periode ini 0.24 0.24 0.24 0.44 0.75 1.15 1.27 1.77 3.00 3.37 3.37 3.37 3.87 3.87 3.79 3.59 3.59 3.58 3.90 3.53 3.58 3.75 3.90 4.38 4.35 4.35 4.26 4.26 4.27 3.81 2.48 2.44 2.39 1.97 0.56 0.31 Realisasi
RENCANA
Jumlah komulatif periode ini 0 0.24 0.49 0.73 1.18 1.93 3.07 4.35 6.12 9.12 12.49 15.86 19.23 23.10 26.97 30.76 34.34 37.93 41.51 45.41 48.94 52.53 56.28 60.18 64.55 68.90 73.25 77.52 81.78 86.05 89.86 92.34 94.78 97.16 99.13 99.69 100.00
Jumlah pada periode ini - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Rencana
REALISASI
Jumlah komulatif periode ini 0 - - - - - - - - - - - - - - - - - - - - - - - - - - -

Disetujui Oleh, Diperiksa Oleh ; Dibuat Oleh :


Ketua Tim Teknis FASILITATOR PEMBERDAYAAN MASYARAKAT FASILITATOR TEKNIK KSM " NIRWANA "
Kegiatan Pengelolaan dan Pengembangan Sistem Air Limbah Domestik Desa Gapurana Kec. Talango
dalam Daerah Kabupaten/ Kota
Dinas Pekerjaan Umum dan Tata Ruang

RADEN RIANO IRWANSJAH, ST., M.A.P. FAJAR HAMDANY SARDI IRENE YULIANA FARADIBA SAKRANI
NIP. 19760704 201212 1 002 Ketua
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
66
67
68
69
70
71
72

You might also like