You are on page 1of 5

 Project Title:

Online Shopping for Pharmacy (Medicine).

 Project Definition:
Online pharmacy Will Provide the exposure to purchase Online
Medicine(Pharmacy).

 Technology Used:
Front end: PHP
Back end: My SQL

 Project Scope:
Online Pharmacy will sells medicine in all over Gujarat.

 Study of existing System:


o We analyzed the existing system of Pharmacy.
o It is required a lot of time to record details so the
employees should record the details and perform their
o job without doing any mistake.
o It is very complex to maintain the record of stocks
manually.

 Advantage of existing system:


o We Can easily manage customer to Buying a Product.
o Easy to get discount and return the medicine.
o Age appropriate and small children can easily get
medicine.
 Disadvantages of existing System:
o All the medicines are not easily available at one place.
o Currently, all the medical stores have opened in the market,
which means that the competition has increased.
o As the range is reduced due to competition, the income is
reduced.

 Operational level Problems:


 The three most common dispensing errors are: dispensing
an incorrect medication, dosage strength or dosage form;
miscalculating a dose; and failing to identify drug
interactions or contraindications. Errors caused by drug
administration can be made by the health care provider or
by the patient themselves.

 Technical Level Problem:


 Too many disparate resources.
 Increasing specialty medications.
 A demand for multitasking.
 Outdated information across databases.
 The human and financial cost of medical errors.
 Awareness of specific patient population needs.

 Informational Level Problem:


 Medication histories are important in preventing
prescription errors and consequent risks to patients.
 Apart from preventing prescription errors, accurate
medication histories are also useful in detecting drug-
related pathology or changes in clinical signs that may be
the result of drug therapy.
 Proposed System:
 Online pharmacy will sell all types of medicines.
 Deliver Medicine to customer with in 3 hour/days.
 All types of payment option available on the order.
 18% discount on the first 3 order.

 Proposed System advantages and disadvantages:

 Advantages:
o Quick delivery.
o Service when you need it.
o More than just medications.
o Availability of prescription medications.
o Discount price for prescription medications.

 Disadvantages:
o Lack of interaction with physician & Pharmacist.
o Not reply on purity & quality of drug.
o Chance of drug abuse.
o Electronics health record security issue.
o Access to illiterate & poor population difficult.
 SRS including functional requirement and non functional
requirement:
 Functional Requirement:
This section provides requirement overview of the system.
Various functional modules that can be implemented by the
system.
1. Login
2. Search medicines
3. Select Quantity
4. View cart
5. Add coupon
6. Payment
7. Bill generate
8. Give feedback
9. Add/Remove medicine
10. Logout

 Non functional requirement:


1. Security
2. Performance
3. Accessibility
4. Availability
 Feasibility study:

 Operational Feasibility:
The project is operationally feasible. This project is being
made for the pharmacy owners and customers only. This
system will greatly reduce a huge burden of pharmacy owners
and customers. So because of the above stated advantages
the user of the system will not be reluctant at all.

 Technical Feasibility:
During technical analysis the technical merits of the system
are studied and at the same time collecting additional
information about performance, reliability, maintainability
and predictability.

 Economically Feasibility:
Economic justification for a computer based system project
cost benefits analysis is complicated by the criteria that very
with the characteristics of the system to be developed, the
relative size of the project and the expected return on
investment desired as part of company’s strategic plan.

 Scheduled Feasibility:
Scheduling in project management is the listing of activities,
deliverables, and milestones with in a project. A schedule also
usually includes a planned start and finish date, duration, and
resources assigned to each activity. Effective project
scheduling is a critical component of successful time
management.

You might also like