Question 1
The SMACNA IAQ Guidelines for Occupied Buildings under Construction recommends control measures
in what three categories?

(Select 3)
A) HVAC Protection
B) Building Flush-out
C) Source Control
D) Walk-off Mats
E) Scheduling
F) Separation of Chemical Use Areas
G) Pathway Control

Question 2
Which three steps should be taken before submitting a Credit Interpretation Request (CIR)?

(Select 3)
A) Review the intent of the credit or prerequisite and self-evaluate whether the project meets this intent
B) Call the USGBC and ask their advice
C) Consult the LEED Reference Guide
D) Review the CIRs online and see if the same inquiry has been answered
E) Call O’Brien & Company to have them complete the accreditation documentation for the project

Question 3
When writing a CIR, which of the following must be included? (Choose one)

(Select 1)
A) Name of project
B) Relevant drawings related to the question
C) Your contact information
D) Project Overview
E) None of the Above

Question 4
Which of the following statements is true about CIRs? (Choose one)

(Select 1)
A) Points are awarded through the CIR process
B) Each costs $220
C) Only LEED Accredited Professionals can submit CIRs
D) Credit language can be changed through the CIR process

Question 5
Which of the following are considered regularly occupied spaces? (Choose three)

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 2
LEED GA Exam Questions Set - 10
(Select 3)
A) Conference Rooms
B) Offices
C) Classrooms
D) Break rooms
E) Lobbies

Question 6
Rapidly Renewable materials are classified as materials that come from plants that are typically
harvested within a _______ year cycle. (Fill in the blank)

(Select 1)
A) 5
B) 10
C) 15
D) 20

Question 7
What are two responsibilities of the contractor during the Project Construction Phase that supports the
LEED Documentation Process? (Choose two)

(Select 2)
A) Provide cut sheets for tile, gypsum board, and toilet partition submittals
B) Provide energy modeling calculations
C) Provide site photometric plans
D) Provide calculations for waste diverted from landfill

Question 8
All of the following are major environmental/credit categories in the LEED Green Building Rating System
except:

(Select 1)
A) Sustainable Sites
B) Indoor Air Quality
C) Energy & Atmosphere
D) Materials & Resources

Question 9
Which of the following would be the most effective way to reduce heat gain in a building?

(Select 1)
A) Use a window with high shading co-efficient
B) Thermal mass in the floor
C) Plant deciduous trees on the North side of the building
D) Use a roofing material with a high albedo
360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 3
LEED GA Exam Questions Set - 10
Question 10
The total number of points available under LEED BD+C is:

(Select 1)
A) 60
B) 85
C) 90
D) 110

Question 11
All of the following certification levels are achievable under LEED BD+C except:

(Select 1)
A) Certified
B) Bronze
C) Silver
D) Platinum

Question 12
The LEED Rating System allocates points to:

(Select 1)
A) Establish uses of plant based materials in all building components
B) Incentivize building project teams to comply with requirements that best address the social,
environmental, and economic outcomes identified by the USGBC.
C) Reward projects that join a “Green Building” movement that could one day impose costly new
standards on the building industry
D) Promote regional labor for green building in the Pacific Northwest

Question 13
All of the following describe a material’s embodied energy except:

(Select 1)
A) Cradle to grave
B) Operating energy
C) Energy required harvesting, mining, manufacturing, transporting, installing, and disposing of
D) Life-cycle analysis

Question 14
A LEED Reference Guide provides all of the following except:

(Select 1)
A) Documentation requirements
B) Calculation methods
C) Recommended strategies
D) Complete sample Letter Templates
360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 4
LEED GA Exam Questions Set - 10
Question 15
Green building practices encourage commissioning agents to be:

(Select 1)
A) Hired at the start of construction
B) Members of the design team
C) Hired directly by the mechanical subcontractor
D) An independent agent hired directly by the owner

Question 16
Once the final certification application is submitted, the USGBC will:

(Select 1)
A) Send out a certificate and plaque with the level of certification as submitted
B) Review and mark each credit as “Credit Awarded,” “Credit Denied”
C) Schedule a conference call with the project manager to review the decision
D) Audit every credit for documentation verification

Question 17
Which of the following is not a LEED Rating System?

(Select 1)
A) LEED-ND: Plan
B) LEED BD+C: NC
C) LEED-TI
D) LEED-ID+C: CI

Question 18
In the manufacturing of vinyl tiles, some scrap vinyl is left over after the cutting of the tiles. The
manufacturer reuses this material as a raw material in the manufacturing of other vinyl tiles. Which of
the following terms best describes the above material for LEED purposes?

(Select 1)
A) Post consumer recycled content
B) Pre-consumer recycled content
C) Salvaged material
D) None of the above

Question 19
ASHRAE Standard 55–2010 relates to:

(Select 1)
A) Ventilation for acceptable indoor air quality
B) Temperature and humidity ranges for human comfort
C) Carpet emissions
D) Erosion control

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 5
LEED GA Exam Questions Set - 10
Question 20
What does PPM stand for?

(Select 1)
A) Parts per million
B) Particles per million
C) Power per minute
D) None of the above

Question 21
What is a good practice for stabilizing disturbed soils?

(Select 1)
A) Temporary seeding
B) Permanent seeding
C) Mulching
D) All of the above

Question 22
Which is not a rapidly renewable material?

(Select 1)
A) Agrifiber
B) Bauxite
C) Linoleum
D) Wool

Question 23
How does the USGBC allocate point values to credits in the LEED Rating System?

(Select 1)
A) The frequency of credits being pursued on past projects contributes to the point Value
B) The relative strength of a relationship, or association, between a credit out come and goal within an
Impact Category
C) The number of votes that each credit received during the Rating System
Development process
D) The categories with the fewest credits have the most number of points available
Per credit

Question 24
Potable Water is defined as: (Choose three)

(Select 3)
A) Water captured from the site in rain barrels
B) Water suitable for drinking
360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 6
LEED GA Exam Questions Set - 10
C) Water supplied from wells
D) Water supplied from municipal water systems

Question 25
LEED Project registration fees are based on which of the following?

(Select 1)
A) Projected number of building occupants
B) A flat fee based on rating system and project size
C) The number of credits a project is attempting
D) The expected duration of the project

Question 26
The application for project certification is submitted:

(Select 1)
A) Through LEED Online
B) Via email by the LEED AP
C) In hardcopy through the mail
D) Via email by the Project Administrator

Question 27
Projects registered for certification under any of the LEED Design & Construction Rating Systems are
eligible for a split Design and Construction review timeline. A design Review allows project teams to do
what?

(Select 1)
A) Save money on the final certification fee
B) Assess the likelihood of achieving some or all of the design-phase credits
C) Submit a final application before substantial completion
D) Avoid the Construction Review fee

Question 28
A response to the preliminary Design Review may be submitted provided that it satisfies which of the
following?

(Select 1)
A) Must occur within 25 business days of receipt of preliminary Design Review
B) Credits marked as needing clarification are removed from the list of attempted Credits
C) The response is discussed via conference call with the Project Administrator and The Project Reviewer
D) The response must be sent in hardcopy to the Project Reviewer

Question 29
After the preliminary Design Review, attempted credits and prerequisites are designated:

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 7
LEED GA Exam Questions Set - 10
(Select 1)
A) Awarded, Undetermined, or Not Awarded
B) Approved, Undecided, or Not Approved
C) Anticipated, Pending or Denied
D) Accepted, TBD, or Rejected

Question 30
LEED Online is:

(Select 1)
A) The primary resource for managing the LEED documentation process
B) A nationally recognized green building blog
C) An online help forum for and by LEED users
D) The LEED reference guide online library

Question 31
According to the USGBC, the cumulative effects of conventional building practices in the Building
industry include all of the following implications for human health, the Environment, and the economy
EXCEPT::

(Select 1)
A) Clearing of land for development has often destroyed wildlife habitat
B) Extracting, manufacturing, and transporting materials may pollute water and air, Release toxic
chemicals, and emit greenhouse gas emissions
C) Building operations have required large inputs of energy and water and generate Substantial waste
streams
D) Water cycle processes have been enhanced by building in wetland areas
E) Transportation to and from buildings by commuters and service providers has Compounded the
harmful environmental effects associated with vehicle use, such As increased energy consumption and
pollution

Question 32
A project attempting a credit would like a CIR on their strategy for attaining the credit. How does the
team submit the CIR?

(Select 1)
A) In letter form, with all supporting documentation included
B) Through the LEED online submittal form
C) By requesting a conference call with a GBCI representative
D) Before the final application is submitted

Question 33
A land owner in Seattle is planning to build a mixed-use, multi-family apartment complex and wants to
attempt LEED certification but isn’t sure if the project is eligible. As a LEED AP on the project team, you
suggest that the owner does which of the following to Confirm eligibility?
360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 8
LEED GA Exam Questions Set - 10
(Select 1)
A) Call USGBC
B) Call the GBCI
C) Check if the project meets the minimum project requirements
D) Nothing – a building that has mixed residential and retail uses is not eligible for LEED certification

Question 34
LEED certified commercial buildings use what tool to report information for the BPP?

(Select 1)
A) An infrared camera
B) Energy Star Portfolio Manager
C) LEED Online
D) GBCI website

Question 35
The Building Design & Construction (BD+C) reference guide and professional
Accreditation encompasses which LEED Rating Systems?

(Select 1)
A) New Construction
B) Core & Shell and Commercial Interiors
C) New Construction, Core & Shell, and Schools
D) Commercial and Retail Interiors

Question 36
The Interior Design & Construction (ID+C) reference guide and professional Accreditation encompasses
which LEED Rating Systems?

(Select 1)
A) New Construction
B) Core & Shell and Commercial Interiors
C) New Construction, Core & Shell, and Schools
D) Commercial and Retail Interiors

Question 37
According to the USGBC, buildings in the United States account for what percentage of Total CO2
emissions?

(Select 1)
A) 52%
B) 7%
C) 38%
D) 75%

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 9
LEED GA Exam Questions Set - 10
Question 38
The United States General Services Administration requires all new federal government Construction
and substantial renovation projects to:

(Select 1)
A) Complete a preliminary LEED Scorecard to assess it ‘s green potential
B) Commit to getting LEED EB certified by 2015
C) Achieve LEED certification
D) Achieve LEED Platinum certification

Question 39
A Life-Cycle Assessment considers the environmental impact of which processes Involved in construction
and building materials?

(Select 1)
A) Extraction and manufacture
B) Recycling or disposal
C) Transport, installation, disposal
D) Extraction, manufacture, transport, reuse, recycling , disposal

Question 40
Conducting a Life-Cycle Assessment on potential materials for a project can:

(Select 1)
A) If reported to the EPA, offer a tax rebate
B) Minimize environmental burden by providing the full picture of a materials impact
C) Predict maintenance schedules and procedures
D) Harm the projects ability to meet a sustainable goal

Question 41
An integrative design approach…

(Select 1)
A) Emphasizes communication across the project team throughout the duration of a Project
B) Is only relevant during the construction phase of a project
C) Does not allow for an iterative process since it streamlines the project in a linear Fashion
D) Is only relevant during the design phase of a project

Question 42
The purpose of systems thinking is to:

(Select 1)
A) Consider each part of a system in relation to only the other parts of the system That it is directly
connected to

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 10
LEED GA Exam Questions Set - 10
B) Consider each part of a system in relation to its interconnections with all other Parts of the larger
whole
C) Consider each part of a system as a single part unconnected to any other parts in a system
D) Think about a system as many small parts that need to be considered individually without connection
to nay others as an approach to solve problems

Question 43
Construction documents…

(Select 1)
A) Must be notarized after final review
B) Translate the design into something that can be built
C) Are released immediately after the project team has been assembled
D) Are, by law, required to be reviewed by a commissioning agent

Question 44
Careful consideration of a project site location can reduce greenhouse gas emissions by doing which of
the following? (Choose two)

(Select 2)
A) Choosing an infill site in an urban area
B) Using a Brownfield site
C) Locating the building near a bus stop
D) Considering local culture when choosing the site

Question 45
Careful consideration of a building’s orientation can reduce energy consumption by Doing which of the
following?

(Select 1)
A) Orienting the building on an east-west axis
B) Installing pervious pavement rather than asphalt
C) Orienting the building on a north-south axis
D) Installing large windows on the west side of the building

Question 46
46. According to the New Buildings Institute, green buildings have 24% less what than conventional
buildings?

(Select 1)
A) Absenteeism
B) Energy use intensity
C) Air leakage rates
D) Wall space

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 11
LEED GA Exam Questions Set - 10
Question 47
According to the U.S. EPA, Americans spend what percentage of their time indoors?

(Select 1)
A) 63%
B) 79%
C) 34%
D) 90%

Question 48
The additional cost of installing high performance windows can be offset by:

(Select 1)
A) Listing them as business expenses on annual tax submittals
B) The reduced cooling load on the HVAC system, thusly allowing downsizing of the System
C) Hiring temporary workers to install them
D) The reduced need for insulation

Question 49
Triple Bottom Line reporting is corporate performance reporting that includes what other two elements
in addition to the traditional profit information? (Choose two)

(Select 2)
A) Energy
B) Environmental
C) Co2 emissions
D) Social Equity

Question 50
The following statements about Renewable Energy Certificates are all true except?

(Select 1)
A) They are tradable commodities representing proof that a unit of electricity was generated from a
renewable resource
B) They compensate Green-e generators for the premium of production over the Market rate they sell to
the grid
C) Purchasing them gives the purchaser a discount on conventionally generated Electricity
D) They can be used in lieu of actually purchasing green power if Green-e certified Power is not available
through a local utility

Question 51
What is the total area within the legal property boundary defined as within LEED Rating Systems?

(Select 1)
A) Hardscape
360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 12
LEED GA Exam Questions Set - 10
B) Property area
C) LEED project boundary
D) Open space area

Question 52
52. What are the three major concepts that are integral to green building and sustainability according to
the USGBC?

(Select 1)
A) Life-cycle thinking; Integrative process; and Consumption patterning
B) Consumption patterning; Element tracing; and Integrative process
C) Life-cycle thinking; Integrative process; and Systems thinking
D) Systems thinking; Element tracing; and Consumption patterning

Question 53
How many levels of LEED accreditation are there?

(Select 1)
A) Two
B) Three
C) Four
D) Only one

Question 54
New multi-family residential projects taller than eight stories should attempt certification under which
of the LEED Rating Systems?

(Select 1)
A) LEED BD+C: Homes
B) LEED BD+C: New Construction
C) LEED ND: Plan
D) LEED BD+C: Core and Shell

Question 55
A tenant in a downtown commercial office building is considering LEED certification but the property
owners are not interested in pursuing whole building certification. Which of the following LEED Rating
Systems could still allow this tenant to realize their goal?

(Select 1)
A) LEED BD+C: Core & Shell
B) LEED O+M: Existing Buildings
C) LEED ID+C: Commercial Interiors
D) LEED for Commercial Tenants

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 13
LEED GA Exam Questions Set - 10
Question 56
Although a derivative of LEED for Building Design and Construction, LEED for Schools Provides additional
focus in which of the following areas? (Choose two)

(Select 2)
A) Environmental site assessment
B) Tenant education
C) Public transportation access
D) Room acoustics

Question 57
Which LEED Rating System has the additional credit categories of Location & Linkages and Awareness &
Education?

(Select 1)
A) LEED O + M: Existing Buildings
B) LEED for Neighborhood Development
C) LEED for Homes
D) LEED for Retail

Question 58
The weighting system used by the LEED Steering Committee to allocate points in the Rating system is
based on:

(Select 1)
A) The question: What should a LEED project accomplish?
B) The question: What materials do the least damage to the environment?
C) The question: What reduces environmental problems?
D) The question: What transforms a market?

Question 59
A building’s carbon footprint is:

(Select 1)
A) The depth or width of the ground level floor
B) The amount of greenhouse gas emissions associated with a building’s HVAC System
C) The total greenhouse gas emissions associated with the construction and Operation of a building,
over its entire lifetime
D) The percentage of CO2 emission reduction due to sustainable building practices

Question 60
60. All LEED Rating Systems have the option of a two step credit review process except Which of the
following? (Choose two)

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 14
LEED GA Exam Questions Set - 10
(Select 2)
A) LEED BD+C: Homes
B) LEED for Commercial Interiors
C) LEED O+M: Existing Buildings
D) LEED for Neighborhood Development

Question 61
The most sustainable sites are locations that: (Choose two)

(Select 2)
A) Located in rural areas
B) Minimize the impacts of light pollution
C) Require no remediation
D) Reduce transportation demand

Question 62
A Brownfield is a piece of land that:

(Select 1)
A) Should be protected as a sensitive area during construction
B) If used, promotes infill and reduces sprawl
C) Has not been irrigated properly
D) Is contaminated beyond remediation

Question 63
According to USGBC, development density is:

(Select 1)
A) The number of residences per square acre within a particular area
B) The total square footage of all buildings within a particular area
C) The number of buildings larger than 5,000 square feet in a particular area
D) The number of types of spaces or housing types per acre

Question 64
The USGBC defines floor-area ratio as:

(Select 1)
A) The ratio for the most even distribution of daylight from skylights based on floor Area
B) The amount of space an adult needs to perform most office duties at a workstation
C) A tool used by architects to determine the best ceiling height based on floor area
D) The relationship between total building floor area and the allowable land area the Building can cover

Question 65
A Footcandle is equal to what?

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 15
LEED GA Exam Questions Set - 10
(Select 1)
A) 10 lumens per square foot
B) 5 lumens per square foot
C) 1 lumen per square foot
D) None of these are correct

Question 66
The USGBC defines Solar Reflectance Index (SRI) as what?

(Select 1)
A) A measure of how well a material reflects daylight into a space
B) A measure of how well a material rejects solar heat
C) A measure of how much daylight is reflected off a window as opposed to entering a space
D) A measure of the amount of illumination falling on a surface

Question 67
According to the U.S. Energy Information Administration what accounts for 32% of total U.S. greenhouse
gas emissions?

(Select 1)
A) Commercial buildings
B) Refrigerants
C) Residential buildings
D) Transportation

Question 68
In systems thinking, what are leverage points?

(Select 1)
A) Places that determine whether it is an open or a closed system
B) Places where a small intervention can yield large changes
C) Places where only a set number of controls can be located
D) Places in systems where behavior does not apply

Question 69
A building can reduce transportation impacts in many ways. What can a project that is not near access to
public transit do to lessen its commuter’s effect on the environment?

(Select 1)
A) Provide fuel reimbursement to employees
B) Install a green roof
C) Reduce the number of parking spaces for single car drivers on site
D) Provide company cars for all staff travelling more than 10 miles to work

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 16
LEED GA Exam Questions Set - 10
Question 70
What must be done to protect indoor air quality during construction of an occupied Building? (select
two)

(Select 2)
A) Provide lighting control for individual occupants
B) Protect ductwork and ventilation to occupied spaces
C) Provide designated parking spaces for construction workers
D) Seal off occupied areas of the building from the construction
E) Perform a full flush out every night

Question 71
Current fuel technologies are being improved and new fuel options are being explored. Although both
options are important and necessary, the ultimate driver in transportation Demand growth is what
according to the USGBC?

(Select 1)
A) Land use
B) Obesity
C) Consumer marketing
D) Accessibility to vehicles

Question 72
Which of the following strategies can help manage stormwater runoff after construction?

(Select 1)
A) Efficient irrigation systems
B) Silt fences
C) Using captured rainwater for landscape irrigation
D) Land use planning that minimizes impervious surface area

Question 73
Nonpoint source pollution is one of the biggest contributors to water pollution everywhere. Which of
the following strategies can help reduce this type of pollution?

(Select 1)
A) Provide education for landscape maintenance staff about alternative fertilizers
B) Increase municipal stormwater infrastructure capacity on site
C) Increase landscape turf area
D) Install pervious asphalt instead of pervious concrete

Question 74
How water enters, is stored, and leaves a site are the three main topics addressed by What site
development strategy?

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 17
LEED GA Exam Questions Set - 10
(Select 1)
A) Development Density
B) Low-impact development
C) Smart Location
D) Smart Growth

Question 75
When considering site selection, which of the following is NOT a strategy to address Location:

(Select 1)
A) Locate near existing infrastructure
B) Choose redevelopment and infill development
C) Increase density
D) Encourage wetland infill to reduce moisture issues
E) Encourage multiple modes of transportation

Question 76
What is the base-line flush rate for a water closet?

(Select 1)
A) 1.0 gpf
B) 1.2gpf
C) 1.6 gpf
D) 1.0gpm

Question 77
The percentage of water delivered by irrigation equipment that is not wasted through Evaporation,
wind, or falling on hardscape is called what?

(Select 1)
A) Irrigation efficiency
B) Landscape coefficient
C) Evapotranspiration rate
D) Baseline water usage

Question 78
What is the proper written representation of a commercial building that has achieved the First level of
LEED certification?

(Select 1)
A) LEED Silver certified
B) Certified LEED
C) LEED Bronze
D) LEED Certified

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 18
LEED GA Exam Questions Set - 10
Question 79
Building operations account for what portion of the 400 billion gallons of water used in The United
States daily?

(Select 1)
A) 50%
B) 25%
C) More than half
D) Less than a quarter

Question 80
By installing sub-meters in a building, a project can do which of the following?

(Select 1)
A) Qualify for a Federal tax rebate
B) Track energy and water consumption trends
C) Take advantage of the earth’s relatively constant temperature
D) Restrict energy use during peak demand hours

Question 81
The individual on the project team who is granted acting authority by the owner to Register the project
and accept the certification is called the:

(Select 1)
A) Green Rater
B) Registrant
C) Project administrator
D) LEED Provider

Question 82
Which of the following strategies are used when Xeriscaping methods are employed?
(Select 1)
A) Soil amendments to reduce evaporation
B) Pervious asphalt
C) Using wetland vegetation
D) Dry ponds
Question 83
Captured rainwater, graywater, and reclaimed water are all examples of what?

(Select 1)
A) Blackwater
B) Non-potable water
C) Potable water
D) Stormwater management
360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 19
LEED GA Exam Questions Set - 10
Question 84
What is the focus of the MR category?

(Select 1)
A) To establish new facilities for handling waste associated with building Construction
B) Minimize costs of building products regardless of source of location or recycled Content
C) Minimize the embodied energy and other impacts associated with the extraction, processing,
transport, maintenance, and disposal of building materials
D) Maximize the use of low-emitting materials combined with high recycled content in new construction

Question 85
Metering water lost to evaporation in cooling towers is important for which of the following reasons?

(Select 1)
A) It reduces indoor water use, thusly saving the project money
B) It reduces indoor water use, thusly saving natural resources
C) Metering can pinpoint inefficiencies or leaks in the system
D) The project may receive credit from the utility company for sewer charges

Question 86
To assist in analyzing the trade-offs of first-costs and long-term operating costs, a project should
perform which of the following?

(Select 1)
A) Life cycle assessment
B) Life cycle cost analysis
C) Commissioning audit
D) Environmental impact assessment

Question 87
According to the USGBC, Energy use intensity is defined as what?

(Select 1)
A) The energy use of a building compared to an established baseline
B) Energy consumption divided by the number of square feet in a building
C) The rate of energy use fluctuation over the course of one day
D) The average amount of energy used by one building during peak load

Question 88
A project’s top priority is reducing the building’s energy demand. Which of the following Strategies
should this project employ?

(Select 1)
A) Low-flow fixtures
B) Sub-metering
360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 20
LEED GA Exam Questions Set - 10
C) Deciduous trees on the south side of the building
D) Low albedo hardscape

Question 89
The LEED for Homes rating system includes an adjustment to compensate for what?

(Select 1)
A) The effect of square footage on resource consumption
B) Work travel distance based on building location
C) Income level
D) Family size

Question 90
Which of the following is NOT what the USGBC intends a LEED project to accomplish?

(Select 1)
A) Reverse contribution to Global Climate Change
B) Protect, enhance, and restore biodiversity and ecosystem services
C) Contribute to bio-engineering experiments
D) Build a greener economy

Question 91
How does the LEED for Homes home size adjustment compensate for different project sizes?

(Select 1)
A) Provides additional points for homes with specified square footage to bedroom Ratio
B) Requires additional certification fees based on home size
C) Does not allow homes over a certain square feet to number of bedrooms ration
D) Adjusts the point thresholds for each level of certification

Question 92
The building product disclosure and optimization credits share the intent to:

(Select 1)
A) Encourage project teams to use local labor for production
B) Encourage the use of products and materials for which life-cycle information is available and that
have environmentally, economically, and socially preferable Life-cycle impacts
C) Encourage the extraction of new raw materials outside of the US and increase the distance of impacts
from the project site
D) To encourage the use of pre-industrial recycled content over the use of postconsumer Content in
products and materials

Question 93
Passive design strategies include which of the following? (Choose two)

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 21
LEED GA Exam Questions Set - 10
(Select 2)
A) Orienting the building on an east/west axis
B) Single pass cooling systems
C) Operable windows
D) Energy efficient appliances

Question 94
Proper ventilation rates to be applied to projects are prescribed by which of the following standards?

(Select 1)
A) IPMVP Option B
B) ASHRAE 90.1
C) SCAQMD Rule 1113
D) ASHRAE 62.1

Question 95
Exemplary performance points are awarded when a project:

(Select 1)
A) Uses a new, innovative strategy
B) Meets and then measurably and significantly exceeds a credit requirement
C) Reports the utility usage data within 6-18 months of occupancy
D) Takes an alternative approach to an existing credit requirement

Question 96
A measurement of 530 parts per million of CO2 indoors could be an indication of what?

(Select 1)
A) More than adequate ventilation
B) Excellent HVAC filtration
C) Less than adequate ventilation
D) Inadequate daylight

Question 97
Energy consumption divided by the number of square feet in a building is known as what according to
USGBC?

(Select 1)
A) Energy per capita
B) Lighting power density
C) British Thermal Units
D) Energy use intensity

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 22
LEED GA Exam Questions Set - 10
Question 98
The earliest a preliminary design review via LEED On-line is submitted:

(Select 1)
A) At the end of Design Development
B) At 100% Construction Documents
C) When all the Design credits have been documented online
D) By paying an additional fee

Question 99
What is the “Prius effect”?

(Select 1)
A) The effect of using low-emitting vehicle transportation to work
B) The effect of changed behavior as a result of making information about a subject More visible and
available
C) The effect of new minimum parking requirements for alternative transportation
D) The effect of sales of vehicles on medium duty trucks

Question 100
What is the optimal time to begin the integrated design process?

(Select 1)
A) Construction
B) Pre-Design
C) Prior to submitting for certification
D) Schematic Design
E) Design Development

360 TSL,
TSL The Art of Solutions (House # 3/1, 1st Floor, Road # 8, Dhanmondi, Dhaka -2015, Tel: 02 9613964) Page 23
LEED GA Exam Questions Set - 10
LEED GA Exam Questions Set – 10
Answer Key

1. A, C, E 35. C 69. C
2. A, C, D 36. D 70. B, D
3. E 37. C 71. A
4. B 38. C 72. C
5. A, B, C 39. D 73. A
6. B 40. B 74. B
7. A, D 41. A 75. D
8. B 42. B 76. C
9. D 43. B 77. A
10. D 44. A, C 78. D
11. B 45. A 79. D
12. B 46. B 80. B
13. B 47. D 81. C
14. D 48. B 82. A
15. D 49. B, D 83. B
16. B 50. C 84. C
17. C 51. B 85. D
18. D 52. C 86. B
19. B 53. B 87. B
20. A 54. B 88. B
21. D 55. C 89. A, D
22. C 56. A, D 90. C
23. B 57. C 91. D
24. B, C, D 58. A 92. B
25. B 59. C 93. A, C
26. A 60. A, D 94. D
27. B 61. B, D 95. B
28. A 62. B 96. C
29. C 63. B 97. D
30. A 64. D 98. B
31. D 65. C 99. B