THERMAL INSULATION NOTES:
1. ALL EXTERNAL BUILDING WALLS
FROM GROUND FLOOR TO THE
HIGHEST FLOOR LEVEL SHALL
BE OF APPROVED INSULATED
A B C D E F G H I J K L M N O P SIPROX BLOCKS.
35978 558
2. ALL EXTERNAL RC COLUMNS,RC
5500 2300 1950 3950 1200 1300 2650 400 1500 2650 1050 4500 2150 3000 1878 BEAM, RC SHEAR WALL AND CEILING
OF THE CAR PARKING AREAS SHALL
BE INSULATED.
1 1
3. STAIR HEAD ROOM AND BUILDING
2488
2488
ROOF DECK SHALL BE TREATED
2 2 WITH APPROVED INSULATION
MATERIALS.
1450
1450
3 3 4. PRIOR TO CONSTRUCTION,THE
CONTRACTOR SHALL OBTAIN A COPY
OF APPROVED THERMAL INSULATION
2900
2900
DOCUMENTS FROM SAMI ALAALI
4 4 ENGINEERING WHEREAS SHOULD BE
FOLLOWED THE SAME PROCEDURE.
1500
1500
5 5
4000
4000
ROOF ROOF
6 6
700200
700200
7 7
8 8
TOP ROOF
2000
2000
9 9
1797
1797
LOCATION PLAN
10 10
36436
36436
4303
4303
11 TOP ROOF 11
4000
4000
12 12
6100
6100
ROOF ROOF
13 13
3550
3550
PROJECT ID. ASG-Y141324
14 14
1448
1448
15 15
Mr.MALEK JASEM ALALI
5500 2300 1950 3950 1200 1300 2650 400 1500 2650 1050 4500 2150 3000 1878 MODIFIED SEVEN STOREY BUILDING
35978
HIDD
A B C D E F G H I J K L M N O P
يماس يلاعلا ةسدنهلل
SITE PLAN
SCALE ............. 1: 100 DIMENSIONS ARE IN MILLIMETRES
نوسدنهم نويرامعم نويئاشناو تامدخو ينابم
ARCHITECTURAL & STRUCTURAL DESIGN
TEL. 17600447 - FAX : (+973) 17600441 ISA TOWN - BAHRAIN
LICENCE No:EPP/BN/176
SITE PLAN
N.T.S 23/05/2022 00
C/GAS
2488
2488
ONE WAY DRAIVE BE INSULATED.
2 2 3. STAIR HEAD ROOM AND BUILDING
1450 ROOF DECK SHALL BE TREATED
1450
3 3 WITH APPROVED INSULATION
MATERIALS.
4. PRIOR TO CONSTRUCTION,THE
2900
2900
CONTRACTOR SHALL OBTAIN A COPY
OF APPROVED THERMAL INSULATION
4 4 DOCUMENTS FROM SAMI ALAALI
ENGINEERING WHEREAS SHOULD BE
1500
1500
5 5 FOLLOWED THE SAME PROCEDURE.
4000
3800
6
6
700200
700200
7 7
8 8
D1
3500
2000
2000
NEIGHBOUR
9 9
31180
1797
1797
ELE METER
10 10
4100
36178
36436
36436
4303
4303
11 11
3600
4000
4000
D1 D1
4500
12 12
6000
7233
6100
6100
4042
6
575
PROJECT ID. ASG-Y141324
C/GAS
13 13
3550
MODIFIED SEVEN STOREY BUILDING
8
706
HIDD
14 14
يماس يلاعلا ةسدنهلل
1448
1448
15 15
نوسدنهم نويرامعم نويئاشناو تامدخو ينابم
ARCHITECTURAL & STRUCTURAL DESIGN
5500 2300 1950 3950 1200 1300 2650 400 1500 2650 1050 4500 2150 3000 1878
TEL. 17600447 - FAX : (+973) 17600441 ISA TOWN - BAHRAIN
LICENCE No:EPP/BN/176
35978
31638 ARCHITECTURAL DRAWING
A B C D E F G H I J K L M N O P
1:200 M.T.S 23/05/2022 00
A
1 1
SIPROX BLOCKS.
2. ALL EXTERNAL RC COLUMNS,RC
2488
2488
BEAM, RC SHEAR WALL AND CEILING
W1 W1 W1
OF THE CAR PARKING AREAS SHALL
BE INSULATED.
W3
2 2
1450
1450
D4 T E R A S S
TOILET 3. STAIR HEAD ROOM AND BUILDING
3 1.80*2.00 3 ROOF DECK SHALL BE TREATED
BED ROOM KITCHEN WITH APPROVED INSULATION
4.20X4.20 4.70X4.20
BED ROOM MATERIALS.
T E R A S S
2900
2900
TOILET 5.00X4.20 FAMILY HALL SD
1.80*2.00
W3
7.00X4.20 4. PRIOR TO CONSTRUCTION,THE
4 D4 D2 D2 D3 4 CONTRACTOR SHALL OBTAIN A COPY
OF APPROVED THERMAL INSULATION
1500
1500
D2 FLAT AREA 242.00 M2
DOCUMENTS FROM SAMI ALAALI
5 D4 5 ENGINEERING WHEREAS SHOULD BE
TOILET FOLLOWED THE SAME PROCEDURE.
T E R A S S
TOILET
BED ROOM 2.20X1.80 1.60*2.50
T E R A S S
SD
4.00X5.40 D4
MAJLIS
4000
4000
BED ROOM
4.80X4.00 7.50X4.20 SD
D2
6 6
700200
700200
7 W1 7
8 8
W2 D1
2000
2000
W3 W3 W1 W1
9 D1 9
31180
D4
1797
1797
TOILET TOILET D4 TOILET TOILET
2.40X1.80 2.40X1.80 W2
D1 W2 2.40X1.80 2.40X1.80
10 D4
BED ROOM BED ROOM D4 10
5.20X4.00 5.20X4.00
T E R A S S
T E R A S S
36178
D1
36436
36436
4303
4303
SD BED ROOM D2 D2 BED ROOM SD
4.80X4.00 4.80X4.00
D2 D2
11 BED ROOM BED ROOM 11
3.80X5.00 3.80X5.00
D2
T E R A S S
T E R A S S
KITCHEN D1 D1 KITCHEN
4.80X3.80
4000
4000
W1
4.80X3.80 W1
D2 D2
D3 D3
W1 W1
12 12
TOILET
TOILET D4 D4 2.80*1.80
W3
W3
2.80*2.00
D2
D2
D2 D2
TOILET TOILET
6100
6100
1.80*1.75 1.80*1.75
BED ROOM FLAT AREA 246.00 M2 D4 D4 FLAT AREA 246.00 M2 BED ROOM
4.80X4.00 4.80X4.00
3550
Mr.MALEK JASEM ALALI
8
706 MODIFIED SEVEN STOREY BUILDING
14 14
SD SD
HIDD
1448
1448
T E R A S S T E R A S S
15 W1 W1
15 يماس يلاعلا ةسدنهلل
نوسدنهم نويرامعم نويئاشناو تامدخو ينابم
5500 2300 1950 3950 1200 1300 2650 400 1500 2650 1050 4500 2150 3000 1878 ARCHITECTURAL & STRUCTURAL DESIGN
TEL. 17600447 - FAX : (+973) 17600441 ISA TOWN - BAHRAIN
35978 LICENCE No:EPP/BN/176
31638
A
A B C D E F G H I J K L M N O P ARCHITECTURAL DRAWING
2488
2488
BEAM, RC SHEAR WALL AND CEILING
OF THE CAR PARKING AREAS SHALL
2 2 BE INSULATED.
1450
1450
3. STAIR HEAD ROOM AND BUILDING
3 3 ROOF DECK SHALL BE TREATED
WITH APPROVED INSULATION
MATERIALS.
2900
2900
4. PRIOR TO CONSTRUCTION,THE
4 4 CONTRACTOR SHALL OBTAIN A COPY
OF APPROVED THERMAL INSULATION
1500
1500
DOCUMENTS FROM SAMI ALAALI
5 5 ENGINEERING WHEREAS SHOULD BE
FOLLOWED THE SAME PROCEDURE.
4000
4000
ROOF ROOF
6 6
700200
700200
7 7
8 8
W2
2000
2000
9 9
1797
1797
10 10
36436
36436
4303
4303
11 11
4000
4000
D1 D1
12 12
6100
6100
ROOF ROOF
PROJECT ID. ASG-Y141324
13 13
3550
3550
Mr.MALEK JASEM ALALI
1448
15 15 يماس يلاعلا ةسدنهلل
نوسدنهم نويرامعم نويئاشناو تامدخو ينابم
5500 2300 1950 3950 1200 1300 2650 400 1500 2650 1050 4500 2150 3000 1878 ARCHITECTURAL & STRUCTURAL DESIGN
35978
TEL. 17600447 - FAX : (+973) 17600441 ISA TOWN - BAHRAIN
LICENCE No:EPP/BN/176
A B C D E F G H I J K L M N O P ARCHITECTURAL DRAWING
2488
2488
BEAM, RC SHEAR WALL AND CEILING
OF THE CAR PARKING AREAS SHALL
2 2 BE INSULATED.
1450
1450
3. STAIR HEAD ROOM AND BUILDING
3 3 ROOF DECK SHALL BE TREATED
WITH APPROVED INSULATION
MATERIALS.
2900
2900
4. PRIOR TO CONSTRUCTION,THE
4 4 CONTRACTOR SHALL OBTAIN A COPY
OF APPROVED THERMAL INSULATION
1500
1500
DOCUMENTS FROM SAMI ALAALI
5 5 ENGINEERING WHEREAS SHOULD BE
FOLLOWED THE SAME PROCEDURE.
4000
4000
ROOF ROOF
6 6
700200
700200
7 7
8 8
W2
2000
2000
9 9
1797
1797
10 10
36436
36436
4303
4303
11 11
4000
4000
D1 D1
12 12
6100
6100
ROOF ROOF
PROJECT ID. ASG-Y141324
13 13
3550
3550
Mr.MALEK JASEM ALALI
1448
15 15 يماس يلاعلا ةسدنهلل
نوسدنهم نويرامعم نويئاشناو تامدخو ينابم
5500 2300 1950 3950 1200 1300 2650 400 1500 2650 1050 4500 2150 3000 1878 ARCHITECTURAL & STRUCTURAL DESIGN
A B C D E F G H I J K L M N O P ARCHITECTURAL DRAWING
1600 400
+ 28800 STAIR ROOF SLAB LEVEL
1400
BE INSULATED.
+ 25800 STAIR ROOF SLAB LEVEL
3500
MATERIALS.
MAJLIS KITCHEN
+22300 SIXTH FLOOR LEVEL 4. PRIOR TO CONSTRUCTION,THE
CONTRACTOR SHALL OBTAIN A COPY
OF APPROVED THERMAL INSULATION
D3 D3 D3
DOCUMENTS FROM SAMI ALAALI
ENGINEERING WHEREAS SHOULD BE
3500
D3 D3 D3
3500
MAJLIS KITCHEN
+ 15300 FORTH FLOOR LEVEL
28900
D3 D3 D3
3500
MAJLIS KITCHEN
+ 11800 THIRD FLOOR LEVEL
D3 D3 D3
3500
VOID LIFT
MAJLIS KITCHEN
+8300 SECOND FLOOR LEVEL
D3 D3 D3
3500
MAJLIS KITCHEN
+ 4800 FIRST FLOOR LEVEL
4500
Mr.MALEK JASEM ALALI
HIDD
ARCHITECTURAL DRAWING
SD SD SD SD
W1 W1
3500
SD SD SD SD
W1 W1
3500
SD SD SD SD
W1 W1
3500
SD SD SD SD
W1 W1
3500
HIDD
نوسدنهم نويرامعم نويئاشناو تامدخو ينابم
ARCHITECTURAL & STRUCTURAL DESIGN
TEL. 17600447 - FAX : (+973) 17600441 ISA TOWN - BAHRAIN
LICENCE No:EPP/BN/176
DIMENSIONS ARE IN MILLIMETRES SCALE.............. 1: 100 SAMI ALAALI SATHEESH AR-08-1324
DUAL LIGHTING SYSTEM. MEDIUM PROJECT ID. ASG-Y141324
RED ONLY IN DAY TIME & MEDIUM
INTENSITY TYPE B RED FLASHING IN THERMAL INSULATION NOTES:
NIGHT TIME. 1. ALL EXTERNAL BUILDING WALLS
FROM GROUND FLOOR TO THE
HIGHEST FLOOR LEVEL SHALL
LOW INTENSITY LOW INTENSITY BE OF APPROVED INSULATED
TYPE B RED FIXED TYPE B RED FIXED SIPROX BLOCKS.
TYPE @ RL + 45000 TYPE @ RL + 45000
2. ALL EXTERNAL RC COLUMNS,RC
+ 29200 PARAPET LEVEL
BEAM, RC SHEAR WALL AND CEILING
1600 400
+ 28800 STAIR ROOF SLAB LEVEL
OF THE CAR PARKING AREAS SHALL
BE INSULATED.
MATERIALS.
+ 25800 STAIR ROOF SLAB LEVEL
4. PRIOR TO CONSTRUCTION,THE
CONTRACTOR SHALL OBTAIN A COPY
W3 W1 W1 W1 W3 OF APPROVED THERMAL INSULATION
DOCUMENTS FROM SAMI ALAALI
3500
W3 W1 W1 W1 W3
3500
W3 W1 W1 W1 W3
3500
W3 W1 W1 W1 W3
3500
W3 W1 W1 W1 W3
3500
HIDD
نوسدنهم نويرامعم نويئاشناو تامدخو ينابم
ARCHITECTURAL & STRUCTURAL DESIGN
TEL. 17600447 - FAX : (+973) 17600441 ISA TOWN - BAHRAIN
LICENCE No:EPP/BN/176
DUAL LIGHTING SYSTEM. MEDIUM PROJECT ID. ASG-Y141324
RED ONLY IN DAY TIME & MEDIUM
INTENSITY TYPE B RED FLASHING IN THERMAL INSULATION NOTES:
NIGHT TIME. 1. ALL EXTERNAL BUILDING WALLS
FROM GROUND FLOOR TO THE
HIGHEST FLOOR LEVEL SHALL
LOW INTENSITY LOW INTENSITY BE OF APPROVED INSULATED
TYPE B RED FIXED TYPE B RED FIXED SIPROX BLOCKS.
TYPE @ RL + 45000 TYPE @ RL + 45000
2. ALL EXTERNAL RC COLUMNS,RC
+ 29200 PARAPET LEVEL
BEAM, RC SHEAR WALL AND CEILING
+ 28800 STAIR ROOF SLAB LEVEL
D1 OF THE CAR PARKING AREAS SHALL
400
BE INSULATED.
3. STAIR
LEVELHEAD ROOM AND BUILDING
1600
+ 27200 PARAPET
ROOF DECK SHALL BE TREATED
WITH APPROVED INSULATION
MATERIALS.
1400
+ 25800 STAIR ROOF SLAB LEVEL
4. PRIOR TO CONSTRUCTION,THE
SD SD SD W1 SD
CONTRACTOR SHALL OBTAIN A COPY
W3 OF APPROVED THERMAL INSULATION
DOCUMENTS FROM SAMI ALAALI
ENGINEERING WHEREAS SHOULD BE
FOLLOWED THE SAME PROCEDURE.
3500
+22300 SIXTH FLOOR LEVEL
SD SD SD W1 SD
W3
3500
+ 18800 FIFTH FLOOR LEVEL
SD SD SD W1 SD
W3
3500
+ 15300 FORTH FLOOR LEVEL
SD SD SD W1 SD
W3
28900
3500
+ 11800 THIRD FLOOR LEVEL
SD SD SD W1 SD
W3
3500
+8300 SECOND FLOOR LEVEL
SD SD SD W1 SD
W3 PROJECT ID. ASG-Y141324
3500
+ 4800 FIRST FLOORMr.MALEK
LEVEL JASEM ALALI
HIDD
D1
4500
نوسدنهم نويرامعم نويئاشناو تامدخو ينابم
ARCHITECTURAL & STRUCTURAL DESIGN
TEL. 17600447 - FAX : (+973) 17600441 ISA TOWN - BAHRAIN
LICENCE No:EPP/BN/176
300
LEFT SIDE ELEVATION
200
+/- 0000 GROUND
ROAD LEVEL 1:150 M.T.S 23/05/2022 00
DIMENSIONS ARE IN MILLIMETRES SCALE.............. 1: 100
MATERIALS.
+ 25800 STAIR ROOF SLAB LEVEL
4. PRIOR TO CONSTRUCTION,THE
CONTRACTOR SHALL OBTAIN A COPY
W3
SD W1 SD SD SD
OF APPROVED THERMAL INSULATION
DOCUMENTS FROM SAMI ALAALI
3500
SD W1 SD SD SD
W3
3500
SD W1 SD SD SD
W3
3500
SD W1 SD SD SD
W3
3500
SD W1 SD SD SD
W3
3500
W3
SD W1 SD SD SD
PROJECT ID. ASG-Y141324
3500
HIDD
D1
يماس يلاعلا ةسدنهلل
4500
نوسدنهم نويرامعم نويئاشناو تامدخو ينابم
ARCHITECTURAL & STRUCTURAL DESIGN
TEL. 17600447 - FAX : (+973) 17600441 ISA TOWN - BAHRAIN
LICENCE No:EPP/BN/176