DAILY ACTIVITY REPORT

ABOU SULTAN PROJECT - CHP


30/04/2012

Serial Dredger Mawany 7 Dredger Mawany 11

1 Ongoing for Valves and Pumps inspection, cleaning, repair Cleaning activity for another cutter shaft

Ongoing for Substitute for the damaged / poor condition piping


2 systems by fabricating & welding a new piping systems / flanges

Cleaning activity for another cutter shaft


3

Dredger 7 piping Fabrication & welding

Dredger 11 cutter shaft from store ( cleaning activity ) Dredger 7 cutter shaft from store ( cleaning activity