DAILY ACTIVITY REPORT

ABOU SULTAN PROJECT - CHP


21/04/2012

Serial Dredger Mawany 7 Dredger Mawany 11

Cleaning by Fuel and rages the Trannien Bens St/p /


1 Continuous cleaning coolers and ready for pressurized
Pt.s )
Gun wash and then test

Sent 3 Hyd. Winch Motors for inspection and test @ 3rd


Heating and removing the Dredger Mega Bolt party ( General Hydraulic company )
2

Continuous cleaning bilge and dirty oil removal Filling up by weld bulk head pipe
3

4 Finish repair of Qty. 1 sea chest valve and ready for test

5 Sent 3 Hyd. Winch Motors for inspection and test @ 3rd


party ( General Hydraulic company )

Removing Mega bolt dredger 7

Coolers cleaning and ready for gun


Pressure wash

Sea chest valve and other valves clean and


Ready for install

1|P age
DAILY ACTIVITY REPORT
ABOU SULTAN PROJECT - CHP

Items which purchasing for Mawany 7

‫الكمية‬ english ‫البند عربي‬ ‫م‬

1 Hose 3.25 Rgr Rgr 52.3 ‫خرطوم‬ 1

1 Pipe 3 inch 6m ‫متر‬6 ‫بوصه‬5 ‫ماسورة‬ 2

5 Elbow 3 inch ‫ بوصه‬5 ‫كوع‬ 3

4 Stuffing 6mm ‫مم بالمتر‬6 ‫حشوات‬ 4

1 Drill crown 810 wat ‫وات كراون‬018 ‫شنيور‬ 5

1 Drill bit 4 4 ‫بونطة‬ 6

1 Drill bit 5 3 ‫بونطة‬ 7

1 Drill bit 6 6 ‫بونطة‬ 8

1 Drill bit 8 0 ‫بونطة‬ 9

1 Drill bit 9 9 ‫بونطة‬ 10

1 Drill bit 10 18 ‫بونطة‬ 11

1 Drill bit 12 1. ‫بونطة‬ 12

12 granular gloves ‫جاونتى محبب‬ 13

3 rubber gloves ‫جاونتى مطاطى‬ 14

‫ك‬1 Oil d cab ‫زيت سيارة الدوبل‬ 15

1 Printer cable 3m ‫متر‬5 ‫كابل للطابعه‬ 16

2|P age