DAILY ACTIVITY REPORT

ABOU SULTAN PROJECT - CHP


26/04/2012

Serial Dredger Mawany 7 Dredger Mawany 11

Ongoing for removing valves and piping system for Ongoing for filling the bulk suction pipe by hard face
1
inspection and clean activity metal

Removing all pipe


2

Cut the cupper sleeve e and remove out the flange


3 bolts

1|P age
DAILY ACTIVITY REPORT
ABOU SULTAN PROJECT - CHP

Items which purchasing for Mawany 7

‫الكمية‬ english ‫البند عربي‬ ‫م‬

1 Missile crown 9 inch 2200 watt ‫ وات‬0022 ‫بوصة‬9 ‫صاروخ كراون‬ 1

5 Stone cut 9 inch ‫ بوصة‬9 ‫حجر قطع‬ 2

5 Grinding stone 9 inch ‫ بوصة‬9 ‫حجر جلخ‬ 3

20 Stone cut biscuit ‫حجر قطع بسكوته‬ 4

2|P age