DAILY ACTIVITY REPORT

ABOU SULTAN PROJECT - CHP


01/06/2021

Serial Dredger Mawany 7 Dredger Mawany 11

Ongoing for assemble the remaining last 3 pipes and Took the measurements for the required seals for the
1
awaiting 2 valves from 3rd part workshop ( under repair ) gearbox shaft and to order the seals

Took the measurements for the dredge pump casing and


Ongoing for welding repair for the Panton after Sand impeller (because of crack & broken parts on dismantled
2
blasting and found some holes and deep pitting’s casing) to find out the right size from the spears at CHP
store area.

Ongoing for assemble the remaining bearings in Planetary


3
gearbox and the required seals and O-rings

Dredger 7 piping assemble / Valve assemble

Dredger 7 Planetary gearbox Bearing assemble

Dredger 7 Panton repair welding activity Dredger 11 gearbox shaft seals