You are on page 1of 4

KUPPAM ENGINEERING COLLEGE, KUPPAM – 517425

III B.TECH II SEM (R19) ME – JNTUA OBJECTIVE MID TEST – I


Building services and maintenance (19A01604b)
.
Time : 20 Minutes Date : 16-7-2022 FN Max Marks:10
Name: H.T. No : Sign. of an Invigilator :
Answer all questions All questions carry equal marks
Q. Question CO
NO mapped
According to Indian Standards, it is recommended that the overall thermal CO1
1 transmittance of a roof should not be more than _______ kcal/m2 h deg C

a) 2 b) 5 c) 7 d)8
The process of direct transmission of heat through a material is known as CO1
2 __________

a)Conduction b)Radiation c ) Thermal insulation d) Thermal energy


Thermal insulation keeps the room cool in winters and hot in summers. CO1
3
a)True b)False

The amount of heat flow through a unit area of material of unit thickness in CO1
4 one hour, when the temperature difference is maintained at 1°C is known as
___________ of the material.

a)Thermal conductivity b) Thermal resistivity


c) Thermal conductance d) Thermal resistance
5. The reciprocal of thermal conductivity is known as __________ CO1
5
a)Thermal conductance b) Surface resistance
c) Specific conductance d) Thermal resistivity
Surface resistance is the reciprocal of __________ CO1
6.
a) Surface coefficient b) Surface resistivity
c) Surface conductance d) Surface conductivity
 According to Indian Standards, overall thermal transmittance of a wall CO1
7. should not be more than __________ kcal/m2 h deg C.

a) 1.3 b) 2.2 c) 3.7 d) 4.6


8. Smoke detector may not be more than __________feet from any point of CO1
ceiling
a)15 b) 13 c) 900 square feet d) 21
Which type of fire protection is required for vapor explosion CO1
9 a) Sprinklers b) fire hydrant c) water mist protection system
d) portable fire extinguisher
Which color band indicates the presence of carbon dioxide in the extinguisher CO1
10 a) Red b) black c)yellow d) white
What is the full form of HVWSS CO2
11 a)High velocity water spray system b) high vital water spray system

c)high velocity suction system d)high versatile water suction system


CO2
12 Unit of fire load _______________
Concrete brick can withstand temperature up to CO2

13 a) 500 degree b) 1000 degree c) 1200 degree d) none


CO2
The thickness of strong room should be minimum ________cm
14
What should be the height of the ‘Roof Pole’? CO2

15 a. Less than 5m b. Less than 3m


c. More than 3m d. More than 10m

How many earth connections are required for the motor frame as per the IE CO2
16 rule 61?

a. One b. Two separate and distinct


c. Three separate and distinct d. none
Which among these tests are to be conducted on wiring installations? CO2
a. Testing of polarity of non-linked single pole switches
17 b. Testing of earth continuity path
c. Testing of earth resistance
d. All of these

18 What is the amount of charcoal and salt needed for GI Pipe earthing? CO2
a. Charcoal 5 kg, salt 8 kg
b. Charcoal 10 kg, salt 8 kg
c. Charcoal 10 kg, salt 10 kg
d. Charcoal 5 kg, salt 5 kg
 What is the specification of GI earth plate? CO2
19 a. 60 cm * 60 cm * 3 mm
b. 60 cm * 60 cm * 6 mm
c. 60 cm * 60 cm * 4 mm
d. 60 cm * 60 cm * 5 mm
20 What is / are the various types of fuse? CO2
a. Kit Kat type
b. Cartridge type
c. Round type
d. All of these
SET-1
KUPPAM ENGINEERING COLLEGE, KUPPAM – 517425
III B.TECH II SEM (R19) ME – JNTUA DECRIPTIVE MID TEST – I
Building services and maintenance –(19A01604b)
Time: 90 Minutes Date: 16-7-2022 FN Max Marks:
15Each question carries 5 marks

Q. Question CO CO’s
NO mapp level
ed
1 Explain the forms of thermal insulating material and also general CO1
methods of thermal insulation
Or
Compute the thermal transmittance (U) value for 22.5 cm thick brick
outside wall provided with 15cm thick cement plaster on both the sides.
What will be the modified value of U if an air gap of 5cm is introduced
between two halves of brick wall?
2 Explain the general fire safety requirements for building in detail CO2
Or
In brief explain the fire resistant construction of different components in
building
3 Explain pipe earthing with a neat diagram CO1
Or &
Write any 15 general rules related to wiring CO2
SET-II

KUPPAM ENGINEERING COLLEGE, KUPPAM – 517425

III B.TECH II SEM (R19) ME – JNTUA DECRIPTIVE MID TEST – I

Building services and maintenance (19A01604b)

Time: 90 Minutes Date: 16-7-2022 FN Max Marks: 15

Each question carries 5 marks

- Question CO CO’s level


mapp
ed
1 Explain the forms of thermal insulating material and also generalCO1 Rememberi
methods of thermal insulation ng
Or
Compute the thermal transmittance (U) value for 22.5 cm thick
brick outside wall provided with 15cm thick cement plaster on
both the sides. What will be the modified value of U if an air gap
of 5cm is introduced between two halves of brick wall
2 In brief explain the fire resistant construction of different CO2 Applying
components in building
or
Explain the general fire safety requirements for building in detail
3 Explain systems of wiring with suitable diagrams CO2 Understandi
Or ng
Explain pipe earthing with a neat diagram

You might also like