Professional Documents
Culture Documents
MARCH 2016
FOREWORD
(S.B. Siddagangappa)
Date: 27.02.2017
Secretary to Government,
Bangalore.
Public Works, Ports & Inland
Water Transport Department
ii
PREFACE
Roads and buildings have been constructed in India since ancient times. This
tradition is reflected in the Grand Trunk Road stretching today from Kolkatta to the
Pakistan border passing through New Delhi. Karnataka is no exception to this tradition
of road building. Roads existed connecting the Vijaynagar Empire to the Ports in the west
coast of Karnataka serving the Empire. By 1856 all district Head Quarters were connected
to Bangalore by Road. Between 1834 and 1861 the roads in the then Mysore state were
classified into Imperial, Provincial & Village roads. At the time of re-organization of the
State in 1956, the National Highways length was 864 Kms, State Highways length was
5983 Kms and Major District Roads length was 7006 Kms.
In Karnataka (the then Mysore State) prior to 1834, Revenue Officers were in
charge of Public Works. In 1834, a Superintendent of Maramat was in charge under the
Revenue Department for public works. A separate Public Works Department was created
in 1856 headed by Chief Engineer with an Assistant Chief Engineer, four Assistant
Engineers, eleven Upper Subordinates and nineteen Lower Subordinates. The first Chief
Engineer was Col.C. Bowen R.E. and the first Chief Engineer from Mysore State was
Mr. Y. Srinivasa Rao B.A. in 1909. In 1922 the salary of Engineers in Mysore was
Rs. 500 for a Chief Engineer, Rs. 250 for an Assistant Chief Engineer and Rs. 80 for
an Upper Subordinate. During 1856-1876, the PWD expenditure was Rs. 99 lakhs on
original works and Rs. 89 lakhs on repair works or in other words, the Plan and Non-Plan
expenditures were almost equal. In 1897, two Circles, the Western and Eastern were
created each headed by Superintending Engineer.
Some of the earliest buildings still in use, In 1867 the Bangalore Central Jail built
at a cost of Rs. 46,047. In 1868 the Bowring Hospital, Bangalore built at a cost of Rs.
2,16,454 and in 1879 the Government Museum was built at a cost of Rs. 48, 335. The
tradition of constructing monumental public buildings has continued in Karnataka as a
testimony of which stands the magnificent “Vidhana Soudha” constructed in 1956. This
tradition is kept alive by Constructing “Vikas Soudha” next to the Vidhana Soudha and
completed in the year 2006.
iii
In the modern management, timely information flow has assumed a great
importance. Management Information System introduced by the Office of the Chief
Minister of Karnataka, the Public Works Department with its commitment towards
a transparent administration and an easy flow of information brought out the first
Management Information System publication for the year 1999-2000. Thereafter the
Department is regularly publishing the Management Information System every year. The
present Publication is thus the 17th in this series providing information for the financial year
2015-16.
Smt M. R. Padmaja, Joint Director (Statistics) was the Nodal Officer who
expeditiously collected the information pertaining to the Communication & Buildings
South, North & North East zones, National Highways, KRDCL, KSHIP, PRAMC, SHDP,
Architecture & the Directorate of Ports and processed the same to bring out the present
Publication with the help of Assistant Statistical Officer.
(R. Srinivasa)
Date: 24.12.2016
Chief Engineer,
Bangalore. Communication & Buildings (South)
Bangalore
iv
TABLE OF CONTENTS
No. Title Page No.
CHAPTERS
Chapter 1 Administrative Set Up 1
1. State’s Road Network 4
Chapter 2
2. Roads & Bridges – Plan Allocation 6
Chapter 3 National Highways 12
Chapter 10 Buildings 66
TABLES
Table 1.1 Cadre strength in PWP&IWTD (as on March 2016) 2
Table 2.4 Physical & Financial Progress for the year 2015-16 9
Allocation of Plan & Non Plan Funds for maintenance of Roads &
Table 2.5 11
Bridges during 2015-16
N.H.Zone progress of Roads & Bridges to the end of
Table 3.1 14
March 2016
Table 5.1 Statement showing Targets & Achievements - KSHIP 32
v
No. Title Page No.
CHARTS
Chart 2.1 National Highways by Carriageway width 4
Chart 2.2 State Highways by Surface 5
Chart 2.3 State Highways by Carriageway width 5
Chart 2.4 Major District Roads by Surface 5
Chart 2.5 Major District Roads by Carriageway width 6
Chart 2.6 Karnataka Roads (Plan Budget): 2015-16 7
Chart 2.7 Percentage of Funds for Repair works 11
MAPS
Map No. 1 National Highways in Karnataka 15
Map No. 2 KSHIP Roads in Karnataka 46
ANNEXURES
Annexure I Progress of NABARD Works 90
vi
No. Title Page No.
APPENDICES
Appendix - 1 District- wise Road length in Karnataka: as on 31.3.2016 103
vii
PWP&IWTD’s Vision
PWP&IWTD’s Mission
viii
CHAPTER - 1
ADMINISTRATIVE SET UP
1.1 Public Works Ports and Inland Water Transport Department is responsible for the development
and maintenance of National Highways, State Highways, and Major District Roads and
construction and maintenance of Government Buildings. The Department also undertakes
construction on behalf of other department on Deposit Contribution. At the Secretariat the
Department is headed by a Principal Secretary and a Secretary.
At field level the Department has four Zones namely, Communication and Buildings
(C&B) South Zone, (C&B) North Zone, (C&B) North East Zone and National Highways.
Each Zone is headed by a Chief Engineer. The Zones consist of Circles, Divisions and
Sub-Divisions. The Sub-Divisions are under the control of Divisions, Divisions are under
the control of Circles, and Circles are under the control of Zones. Each Circle is headed
by a Superintending Engineer. The Divisions are headed by Executive Engineers. The Sub-
Divisions are headed by Assistant Executive Engineer. The Communication & Buildings,
South Zone consists of 5 Circles and 20 Divisions. The Communication & Buildings, North
Zone consists of 3 Circles and 13 Divisions. The Communication & Buildings, North East
Zone consists of 2 Circles and 8 Divisions.
The Chief Engineer, National Highway is primarily responsible for the development and
maintenance of National Highways under the Ministry of Road Transport & Highways
(MoRT&H). The major portion of funds operated is from the Government of India. The
National Highways Zone has two Circles and seven Divisions.
Karnataka Road Development Corporation Limited (KRDCL) was established on 21st July
1999, as a wholly owned Government of Karnataka enterprise for development of road
infrastructure in the State headed by the Managing Director.
Karnataka State Highways Improvement Project (KSHIP) is an initiative of the Public Works
Ports and Inland Water Transport Department, Government of Karnataka for the improvement
of core road network in the State undertaking Externally Aided Projects. Chief Project Officer
heads this Project Implementation Unit.
State Highway Development Project (SHDP) was established on 4th November 2011 for
development / improvement of Core Road Network in 2 Phases. Chief Project Officer heads
this Project Implementation.
1
1.2 Cadre strength of engineers in the Department:-
Table – 1 .1
Cadre strength in PWP&IWTD (as on March 2016)
1.3 Total number of Circles, Divisions, and categories of roads under each zone as at the End of
March 2016
Table 1.2
Number of Circles, Divisions and Road Length
(Road length in Km)
Major
Sl Circles Divisions State National
Zone District Total
No (In No.) (In No.) Highways Highways
Roads
1 National Highways 2 8 - - 6572.15 6572.15
2
Organizational Structure
Minister for Public Works, Ports & Inland Water Transport Department
Principal Secretary, Public Works, Ports & Inland Water Transport Department
3
Chief Engineer, Chief Engineer, Chief Engineer, Chief Engineer, Principal
Communication & Communication & Planning & Road National Chief
Buildings (South) Buildings (North) Asset Management Highways Architect
Centre
Chief Engineer,
Chief Engineer,
Communication &
Quality Assurance Zone
Buildings (North East)
CHAPTER - 2
Public Works, Ports & Inland Water Transport Department is responsible for the development
and maintenance of National Highways, State Highways and Major District Roads, adding to
76,059.68 Km. Apart from National Highways the State Highways length is 19,578.15 Km
and Major District Roads length is 49,909.38 Km.
From the viewpoint of infrastructure capabilities, two characteristics of roads are relevant,
namely Surface quality and Carriageway width. Carriageway width is classified under four
categories
The share of the Road length of National Highways, State Highways and Major District roads
according to these two features is presented in the charts below:
National
Carriageway
Highways
Width
( in km)
Single Lane 53.30
Intermediate
1282.93
Lane
Two Lane 4089.70
Total 6572.15
4
State
Surface Type Highways
(in km)
Cement Concrete 179.07
WBM 90.72
Un surfaced 24.27
Total 19578.15
Intermediate 10408.18
Total 19578.15
Major District
Surface Type Roads( in km)
WBM 1683.40
Un surfaced 1056.80
Total 49909.38
5
Carriageway Major District
Width Roads( in km)
Intermediate 8767.60
Total 49909.38
In this Chapter, the budgeted Road and bridge works under Communication and Buildings of
North East, North and South zones are presented, including the additional grants released from
the Finance Department. Programme relating to National Highways is presented in Chapter 3.
The budgeted plan funds are used for strengthening / improving the riding quality of roads and
converting single lane roads into intermediate Lane / two lane / four lane roads.
Table 2.1 shows PWP&IWTD budget in crore for the year 2015-16.
Table – 2.1
Allocation under State’s Plan Budget: 2015-16
(In Crore)
6
The total plan budget for 2015-16 is Rs.6070.68 Crore. However, NABARD works and a
provision for the World Bank Assisted State Highway Improvement Project, State Highway
Development Project and KRDCL takes major share of Plan funds to the tune of Rs.2062.21
crore. The remaining Rs.4008.47 crore is available for regular road and bridge works. The
share of Rs.4008.47 crore among the four zones is in the following manner
Table 2.2
Amount shared by three zones
Rs. Crore
National Highways 631.92
North Zone, North East Zone & South Zone 3374.16
Establishment Charges 2.39
TOTAL 4008.47
Table 2.3 presents Plan allocation for Roads and Bridges in 2015-16 budget sub head wise
(including Rs.62442.00 lakh of central assistance).
The physical and financial progress achieved during 2015-16 against the target of 5327 Km of
road length is 6538 Km of road length. The financial progress of roads & bridges shows that
all the three zones utilized budget grants with respect to the works shown in table 2.4.
The State has been receiving NABARD assistance for roads and bridges under RIDF scheme
since 1996-97. The focus of NABARD assistance is on improvements to rural roads in terms
of connectivity and quality. Since inception and upto 2015-16, 29,574 Km road length and
1201 bridges works have been taken up under this scheme. The achievement as at the end of
March 2016 shows that 28,788 Km of road length and 988 bridges have been completed. The
annual progress details of NABARD RIDF scheme are presented in Annexure I.
7
Table 2.3
Plan Schemes for Roads & Bridges: 2015-16
(Rs. In Lakh)
Central
Sl. Head of Account Scheme Name and Zone State Plan Total
Plan
1 2 3 4 5 6
I C & B North+North East+South (Zones)
1. 5054-04-337-0-01 District & Other Roads
133 Special Development Plan (SDP) 4679.00 0 4679.00
154 Improvements 174851.80 0 174851.80
160 Renewals 13000.00 0 13000.00
422 Special Component Plan (SCP) 58220.00 0 58220.00
423 Tribal Sub Plan (TSP) 23476.00 0 23476.00
2. 5054-04-337-0-02-436 MDR works financed from NABARD 30331.00 0 30331.00
3. 5054-03-337-0-17 State Highway Road Works
154 Improvements 44394.00 0 44394.00
160 Renewals 7534.00 0 7534.00
4. 5054-03-337-0-16 State Highway Bridges
154 Improvement 5200.00 0 5200.00
5. 5054-03-101-0-02-132 MDR Bridges Capital Expenses 6300.00 0 6300.00
Total C & B North+North East+South (Zones) 367985.80 0 367985.80
II National Highways Zone
Road works of Inter-State Importance
6. 5054-05-337-1-01-172 (CSS) 0 1800.00 1800.00
Road works of Economic Importance
7. 5054-05-337-2-01-172 (CSS) 750.00 750.00 1500.00
8. 5054-04-800-2-02-172 Central Road Fund (CRF) 0 59892.00 59892.00
Total National Highways 750.00 62442.00 63192.00
III World Bank Assisted Projects
9. 5054-03-337-0-84-172 KSHIP-II EAP Roads 46700.00 0 46700.00
10. 5054-03-337-0-86-172 KSHIP-II EAP Roads (ADB) 21090.00 0 21090.00
Total KSHIP 67790.00 0 67790.00
IV KRDCL
11. 5054-80-800-0-03-132 Capital Expenses 23100.00 0 23100.00
Total KRDCL 23100.00 0 23100.00
V SHDP
12. 5054-03-337-0-18-154 Improvements 85000.00 0 85000.00
Total SHDP 85000.00 0 85000.00
Grand Total (I + II + III+IV+V ) 544625.80 62442.00 607067.80
8
Table 2.4
Physical and Financial Progress for the year, 2015-16
(C&B South, North & North East Zones)
(Rs.in Lakh)
Physical Progress
Percentage Financial Progress Percentage
Head of Account Scheme Name Achievement Achievement Achievement
Target Achievement to the Target Target to the Target
(Expenditure)
1 2 3 4 5 6 7 8
PLAN
I Budget Works
5054-04-337-0-01-422 Major District & Other Roads (SCP) 610 980 161 58220.00 58132.64 100
5054-04-337-0-01-423 Major District & Other Roads (TSP) 270 395 146 23476.00 23084.00 98
5054-04-337-0-01-133 Major District & Other Roads (SDP) 69 72 105 5000.00 4586.47 92
5054-03-337-0-17-154 SH road works Improvements 600 641 107 24689.00 44389.00 180
9
5054-03-337-0-17-160 SH road works Renewals 205 212 104 13238.00 7331.63 55
Major District & Other Roads
5054-03-337-0-01-154 2783 3314 119 72215.00 174807.76 242
Improvements
Major District & Other Roads
5054-04-337-0-01-160 490 530 108 12500.00 12984.03 104
Renewals
5054-03-337-0-16-154 SH bridges Improvements 38 29 76 5000.00 5196.34 104
5054-03-101-0-02-152 MDR bridges Capital Expenses 49 47 96 3500.00 6296.42 180
Roads (in Km) 5027 6144 122 209338.00 325315.53 155
Total
Bridges (in Nos) 87 76 87 8500.00 11492.76 135
II NABARD Works
5054-04-337-0-02-436 Improvements 330 394 120
37600.00 30317.77 81
Bridges 64 87 136
Roads (in Km)(Total (I + II)) 5327 6538 123
Grand Total 255438.00 367126.06 143
Bridges (in Nos)(Total (I+II)) 151 163 108
Physical and Financial Progress for the year, 2015-16
(SHDP, NH, KSHIP, KRDCL, Ports)
(Rs.in Lakh)
Physical Progress Percentage Financial Progress Percentage
Head of Account Scheme Name Achievement Achievement Achievement
Target Achievement to the Target Target
(Expenditure) to the Target
1 2 3 4 5 6 7 8
PLAN
I Budget Works
5054-03-337-0-18-154 SHDP-Improvements 951 934 98 90000.00 84999.95 94
5054-05-337-1-01-172 Inter State Connectivity Roads (NH) 9 9 100 1000.00 1799.94 180
10
5054-05-337-2-01-172 Economic Importance Roads (NH) 6 7 135 1000.00 1499.92 150
5054-04-800-2-02-172 Central Road Fund (CRF) (NH) 520 578 111 31620.00 59843.29 189
5054-03-337-0-84-172 KSHIP-II (World Bank) 198 216 109 46700.00 46435.42 99
5054-03-337-0-86-172 KSHIP-II (ADB) 104 37 36 33400.00 22325.00 67
KRDCL Roads 70 107 153
5054-80-190-0-01-132 23500.00 35605.00 152
KRDCL Bridges 10 5 50
Ports & Lights
5051-02-201-0-01 to 09 37 37 100 1959.00 1941.83 99
(Consolidated grant)
4711-02-103 Anti Sea Erossion 1000 1000 100 1227.00 2981.12 243
Roads (in Km) 2895 2925 101
Grand Total 230406.00 257431.47 112
Bridges (in Nos) 10 5 50
2.4 Allocation of Funds under the H/A 3054 Plan:
The allocation under the Mukhya Mantri Grameena Raste Abivrudhi Yojane is earmarked for
the maintenance of Major District Roads and bridges. Chart 2.7 indicates the categories and
percentage of funds aportioned for the maintenance.
Renewals
50% Special
Repairs
15%
Annual Repairs and Ordinary Repairs comprise of pothole filling, jungle clearance, berm
cutting etc. Rechipcarpeting / resurfacing are done under renewals Works of any urgent nature
are carried out under Special Repairs. Maintenance of bridge involves cleaning the vents,
removal of vegetation, repairs to Piers, abutments, parapets, painting etc.
Table 2.5 presents total plan and non-plan funds provided under HoA: 3054 head for 2015-16
Table -2.5
Allocation of Plan & Non Plan funds for maintenance of Roads & Bridges during 2015-16
11