You are on page 1of 10

Republic of the Philippines

Department of Education
INFORMATION AND COMMUNICATIONS TECHNOLOGY SERVICE
TECHNOLOGY INFRASTRUCTURE DIVISION
Pasig City, Philippines

===============================================================================================

DEPED COMPUTERIZATION PROGRAM (DCP) MONITORING REPORT

Name of School: Calampong Elementary School


Address: Calampong, Virac, Catanduanes
School ID: 113357
School Name: Calampong Elementary School
District: Virac South
School Year: 2021-2022
Date: April 28, 2022
Contact Number of School:
Name of School Head:
Contact Number of School Head:
SCHOOL DATA KINDER GRADE 1 GRADE II GRADE III GRADE IV GRADE V GRADE VI JHS SHS
Number of Registered 10 8 4 9 14 3 8
Learners
Number of Teacher 1 1 1 1
Number of Section 1 1 1 1 1 1 1
Number of Classroom 1 1 1 1
Number of E- Only 1 E-Classroom for all grade level
classroom

Unenergized (Y/N): N_______/__________yes____

I. Profile of ICT Coordinator 1((Preventive Maintenance of the school’s ICT Equipment):


Name: REGINE G. BIÑAS
Position Title: TEACHER 1
Contact No: 09636570515
II. Educational background and experience:
Baccalaureate Degree/Course Graduated: BEED
No. of Years as ICT Coordinator: 1
ICT Related Trainings Attended:
1. Orientation-Workshop On the Utilization of Adobe Creative Cloud Productivity Task Provided to Schools
2. Regional Training and orientation in Adobe Creative Educator for GCE Level 1 and 2
3. Division Orientation and Workshop On the Utilization of Adobe Creative Cloud Productivity

III. Documents
Status Delivery Receipt Property Transfer Report Inspection Acceptance Report
DCP Batch No. or (e.g., Complete,
DCP Package partially complete, Number Date Number Date Number Date
etc.)
26 Partially Complete 49035 05/05/2015
29 Partially Complete 35196 05/02/2016

Note: Put N/A if not applicable


Other Remarks: _________________________________________________________________________________________
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________

IV. Installation Status

DCP Batch No. or DCP Package Installed Not Installed Remarks


26 
29  Only acer laptop, projector and
projector screen are functioning/
sling bag and tipod
If the package is still in the box, please state the batch no. and the reason below
Reason: _________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________

V. Status of the DCP Packages

Status
Fund DCP Batch No. or No. of
Year DCP Package Package Defective
Working For Remarks
For Repair Unrepairable Stolen
replacement
No. of working No. of units for No. of units for ● No. of units for ● Is it already
26 reported (Y/N)?
units: 2 repair: 0 replacement: 0 replacement:
NO RECORD
OF STOLEN

● If yes, please
state the date
reported:

____________

● If no, please
state the
reason:

_____________
BATCH 29 ● No. of working ● No. of units ● No. of units ● No. of units for ● Is it already
reported (Y/N)?
units: 4 for repair: 0 for replacement:
__________
replacement:
● If yes, please
state the date
reported:

____________

● If no, please
state the
reason:

_____________
● No. of working ● No. of units ● No. of units ● No. of units for ● Is it already
reported (Y/N)?
units: for repair: for replacement:
__________
replacement:
● If yes, please
state the date
reported:

____________

● If no, please
state the
reason:

_____________
● No. of working ● No. of units ● No. of units ● No. of units for ● Is it already
reported (Y/N)?
units: for repair: for replacement:
__________
replacement:
● If yes, please
state the date
reported:

____________

● If no, please
state the
reason:

_____________
● No. of working ● No. of units ● No. of units ● No. of units for ● Is it already
reported (Y/N)?
units: for repair: for replacement:
__________
replacement:
● If yes, please
state the date
reported:

____________

● If no, please
state the
reason:

_____________
● No. of working ● No. of units ● No. of units ● No. of units for ● Is it already
reported (Y/N)?
units: for repair: for replacement:
__________
replacement:
● If yes, please
state the date
reported:

____________

● If no, please
state the
reason:

_____________
● No. of working ● No. of units ● No. of units ● No. of units for ● Is it already
reported (Y/N)?
units: for repair: for replacement:
__________
replacement:
● If yes, please
state the date
reported:

____________

● If no, please
state the
reason:

_____________
● No. of working ● No. of units ● No. of units ● No. of units for ● Is it already
reported (Y/N)?
units: for repair: for replacement:
__________
replacement:
● If yes, please
state the date
reported:

____________

● If no, please
state the
reason:

_____________
● No. of working ● No. of units ● No. of units ● No. of units for ● Is it already
reported (Y/N)?
units: for repair: for replacement:
__________
replacement:
● If yes, please
state the date
reported:

____________

● If no, please
state the
reason:

_____________
● No. of working ● No. of units ● No. of units ● No. of units for ● Is it already
reported (Y/N)?
units: for repair: for replacement:
__________
replacement:
● If yes, please
state the date
reported:

____________

● If no, please
state the
reason:

_____________
● No. of working ● No. of units ● No. of units ● No. of units for ● Is it already
reported (Y/N)?
units: for repair: for replacement:
__________
replacement:
● If yes, please
state the date
reported:

____________

● If no, please
state the
reason:

_____________
● No. of working ● No. of units ● No. of units ● No. of units for ● Is it already
reported (Y/N)?
units: for repair: for replacement:
__________
replacement:
● If yes, please
state the date
Others: reported:
please
specify ____________

● If no, please
state the
reason:

_____________

VI. Pictorials/Video of E-Classroom ( current status of e-classroom)

VII. The Effectiveness of DCP Packages in Teaching and Learning


Write T if the statement is True, and F if the statement is False
Teacher’s perception of ICT integration in teaching
I feel confident learning new computer skills. The use of ICT enables the students’ to be more active and
engaging in the lesson.
I find it easier to teach by using ICT. I have more time to cater to students’ need if ICT is used in teaching
I am aware of the great opportunities that ICT offers for effective teaching. I can still have an effective teaching without the use of ICT.
I think that ICT supported teaching makes learning more effective. I think the use of ICT in teaching is a waste of time.
The use of ICT helps teachers to improve teaching with more updated I am confident that my students learn best without the help of ICT.
materials.
I think the use of ICT improves the quality of teaching. The classroom management is out of control if ICT is used in
teaching.
I think the use of ICT helps to prepare teaching resources and materials. Students’ pay less attention when ICT is used in teaching.

a. Effectiveness of ICT integration for student’s learning


ICT allows students’ to be more creative and imaginative. The students are more behaved and under control with the use of
ICT.
The use of ICT helps students to find related knowledge and information The use of ICT enables students to express their ideas and thoughts
for learning. better.
The use of ICT encourages students to communicate more with their The use of ICT promotes active and engaging lesson for students’
classmates. best learning experience.
The use of ICT increases students’ confidence to participate actively in the I think students learn more effectively with the use of ICT.
class.
I think the use of ICT helps to broaden students’ knowledge paradigm. I think the use of ICT helps to improve students’ ability specifically in
reading, writing.

PREPARED & SUBMITTED BY:


_____________________________________
Designated School ICT Coordinator 1
(Preventive Maintenance of the school’s ICT Equipment)

NOTED:
_____________________________________
School Head

VALIDATED BY:
JENNIFER B. METICA
Information Technology Officer-I

You might also like