You are on page 1of 4

1.

Name of Course: Construction of Community Project II


2. Course Code: WTP 8044
3. Names of academic staff: 1. Mr. Abdul Halim bin Hassan - 012 6185434
2. Mr. Zulkifli bin Ahmad – 012 6101840
3. Mr. Che Mohd Supardi bin Ibrahim
4. Mr. Za‘im bin Basiran
5. Mr. Hj. Farid bin Ithnin
6. Mrs. Siti Fitriah binti M.Rosly
4. Rationale for the inclusion of the course in the programme:
The course is designed as a Final-Year Project where it consists of two phases, i.e.
Construction of Community Project I and Construction of Community Project II.
5. Semester and Year offered: Year 2 Semester II
6. Total Student Learning Time (SLT):
Category of Activities Learning Activity Total Hours/ Semester
Lecture 25
Guided learning Tutorial/Practical 56
Student centered learning activities 3
Preparation for assignments/projects 47
Self learning Independent study/revision 25
Preparation for assessment 2
Continuous assessments 2
Formal assessments
Final examination sitting 0
Total SLT 160
7. Credit Value: 4 credits
8. Prerequisite (if any): WTP 7042
Construction of Community Project I
9. Course Learning Outcomes (CLO):
CLO1 Construct the community project as a continuation of Community Project I (C5,
PLO3)
CLO2 Build the approved Community Project I (P7, PLO2)
CLO3 Prepare for constructed project hand-over (A2, PLO6)
10. Transferable Skills (Skills and how they are developed and assessed, project and practical
experience and internship):
PLO3 Critical thinking and problem solving skills are enhanced and assessed through
guided group project.
PLO6 Ethics and morals are enhanced and assessed through guided group project.
11. Teaching-learning and assessment strategies:
CLO Method of Method of KPI
delivery assessment
CLO1 Construct the community Lectures & Log book, 50%
project as a continuation Student-Centred assignment marks
of Community Project I Learning and
(C5, PLO3) Activities above
CLO2 Build the approved Practical Log book,Project 50%
Community Project I Report, marks
(P7, PLO2) Presentation and
above
CLO3 Prepare the constructed Practical Log book, Project 50%
project hand-over Report, marks
(A2, PLO6) Presentation and
above
12. Course Synopsis:
The course is designed as a Final-Year Project where it consists of two phases, i.e.
Construction of Community Project I and Construction of Community Project II. Both phases
provide students with the construction technology knowledge, skills and attitude required
while undertaking the construction of a real community project. In Construction of
Community Project II, students will apply the knowledge and skills they acquire previously in
prior courses and they need to carry out project handover upon completion. Students are
expected to get acquainted with the existing construction market which has socio-economic
impact on as well as knowledge in real work environment, material rates, material quality,
labour wages, and principles of various types of foundation. These will cultivate confidence
in students in their future undertaking.
13. Mode of Delivery (e.g. Lecture, Tutorial, Workshop, Seminar etc):
Student Centred Learning and Guided Project
14. Assessment Methods and Types:
Report and Presentation of Community Project Construction
15. Mapping of the course to the Programme Educational Objectives (PEO):
PEO1 PEO2 PEO3 PEO4
X X
16. Mapping of the course to the Programme Learning Outcomes (PLO):
PLO1 PLO2 PLO3 PLO4 PLO5 PLO6 PLO7 PLO8 PLO9
X X X
17. Content outline of the course and the SLT (lecture hours) per topic:

Student Learning Time


(SLT)

Total (hours)

Assessment
Non
F2F
Course Materials Face to Face (F2F)
Week
(WTP8023)

Practica
Tutorial
Lecture

Exam

Study
Self-
l
1-3 1.0 Arrangement for
Required Materials
1.1 Actual Materials Test,
6 - 12 - 26 44
Needed Practical
1.2 Actual Cost Evaluation
Through Quotations
Working site Build project
4-10 2.0 Building of Approved
Community Project
2.1 Work Progress
Schedule
2.2 Commencement of Group
Project Upon Approval 14 - 28 - 30 72
Assignment
2.3 Supervision on the
Project Standard
2.4 Monitoring of Work
Performance
Working site Build project
11- 3.0 Project Hand-Over
14 Inspection Upon
3.1 Completion of Project
Test,
3.2 Document Submission 8 - 16 - 16 40
for Approval Assignment
3.3 Hand-Over Project to
Community of Concern
Working site Build project
15 Revision 2 - 2 -
16 Examiniation/ Continuos
assessment 2 - 2 -
17
Total 28 - 56 4 72 160 -
Notional hours 40
Creadit value 3

18. Main and additional references supporting the course:


1. Ismail Osman Hakim, Undang–Undang Bangunan Untuk Pembangunan Perumahan :
Universiti Tun Hussin Onn Malaysia.
2. Misnan M Saidin, M Yusof Zakaria, Mohamed A Hakim & Dalib A Rahman. Pengurusan
Keselamatan Projek Pembinaan : Universiti Teknologi Malaysia.
3. Misnan M Saidin, Mohamed A Hakim & Abdullah Mat Naim. Pengurusan Projek
Pembinaan : Universiti Teknologi Malaysia.
4. Salleh Nurul Azita & Hussin Abd Aziz. Penggunaan Alat Keselamatan di Tapak Bina :
Dewan Bahasa Pustaka.
5. International Law Book Services Wisma ILBS, Uniform Building By Laws1984
[G.N.5178/85] (2013). International Law Book Services Wisma ILBS.
6. Hussin A Aziz (2008). Aspek Undang-Undang Dalam Pengurusan Projek Pembinaan :
Universiti Sains Malaysia.
7. Mohd Majid Amran (2009). Pengenalan Kontrak Binaan Reka Dan Bina : Dewan Bahasa
Pustaka.
8. Construction Technology : Pearson Prentice Hall.
9. J.I.W. Bentley (Penterjemah :Abdul Hakim Mohammed), Penenderan dan
Penganggaran Binaan (1990) : Universiti Teknologi Malaysia.
10. Mohamed Abd Hakim & Wan Mat Wan Min. Teknologi Penyelenggaraan Bangunan:
Dewan Bahasa Pustaka.
11. Robert W Wood (1999). Panduan Mudah Membaiki Perpaipan Di Rumah : Dewan
Bahasa Pustaka.
13. Idris M Isa (2007). Asas Pendawaian : IBS Buku Sdn. Bhd.
14. Hamid Md Yusof & Abd.Wahab Suriani Ngah (2012). Teori Dan Praktis Pemeriksaan
Bangunan : Universiti Institut Teknologi Mara.
15. W.Wood Robert (1999). Panduan Mudah Mengecat, Memasang Kertas Dinding dan
Menekap Stens : Dewan Bahasa Pustaka.
19. Other additional information: -