Professional Documents
Culture Documents
(E_S4HCON2022)_v1.0_BH
Question. 1
You are performing an SAP S/4HANA conversion with DMO
as an inplace migration. How does SUM transfer the data by
default from the source database to the target database during
the migration?
Answers A
Question. 2
In which case can you use near-Zero Downtime Maintenance
(nZDM)? Note: There are 2 correct answers to this question.
Question. 3
You are performing an SAP S/4HANA conversion with DMO.
You entered a specific number of R3load processes during the
Extraction Roadmap step. Where can you change this during
the migration via the Utilities option of the SUM UI? Note: There
are 2 correct answers to this question.
B. In SUM Parameters
C. In SUM Phaselist
Answers C D
Question. 4
You are performing an SAP S/4HANA conversion. When does
the silent data migration (SDM) take place?
Question. 5
What is the minimum SAP_BASIS release of an SAP ECC
system that can be converted to an SAP S/4HANA Server?
A. 731
B. 700
C. 740
D. 750
Answers B
Question. 6
What is the benefit of using the UPGANA.XML file from a
previous SUM run?
Answers A
Question. 7
You are running an SAP ECC system. For which of the
following activities does SUM allow you to use the near-Zero
Downtime Maintenance (nZDM) capabilities? Note: There are 3
correct answers to this question.
Answers D E
Question. 8
Which preparational steps must be performed for an SAP
S/4HANA conversion? Note: There are 2 correct answers to this
question.
Question. 9
What is the main purpose of performing benchmark runs for an
SAP S/4HANA conversion?
Answers C
Question. 10
When using the DMO of SUM, which files can be handled by
SUM in the download directory? Note: There are 2 correct
answers to this question.
Answers C D
Question. 11
What do you need to consider when performing the SI checks for
an SAP S/4HANA conversion? Note: There are 2 correct
answers to this question.
Answers A B
Question. 12
You performed a custom code check for an SAP S/4HANA
conversion. In which transactions can you review the results?
Note: There are 2 correct answers to this question.
Question. 13
You are planning an SAP S/4HANA conversion. Which
conversion-specific tasks need to be performed during the
preparation phase?
Answers C D
Question. 14
You are executing a standard SUM procedure to update an SAP
system. You did NOT select the nZDM feature. When will the
shadow system be stopped for the last time?
Question. 15
Which of the following SUM activities require a stack XML file
calculated by the maintenance planner? Note: There are 3 correct
answers to this question.
C. Prerequisite check
D. Benchmark tool
Answers B C E
Question. 16
You are performing an SAP S/4HANA conversion. You are in
the BIND_PATCH phase of the Configuration roadmap step. For
some software components, you find entries in the Calculated
level column. What does the Calculated level indicate for those
software components?
Answers C
Question. 17
You are performing an SAP S/4HANA conversion with DMO.
You are using the downtime-optimized data conversion (DoC).
Which steps can partially be moved to uptime processing? Note:
There are 2 correct answers to this question.
A. Software update
B. Main import
C. Migration
D. Conversion
Answers C D
Question. 18
During the upgrade of your development system, you run into
the adjustment of non-dictionary objects, handled by
transaction SPAU. There you find programs that are shown in
status "automatic adjustment" (green traffic light). What will
happen with these programs when you continue with your
upgrade without performing any other actions inside your SAP
system?
Answers A
Question. 19
What SAP systems can you use for the ABAP Test Cockpit
(ATC) to perform the custom code analysis for an SAP
S/4HANA conversion? Note: There are 2 correct answers to this
question.
Answers B D
Question. 20
What are the benefits of using the benchmarking option of the
DMO for SUM? Note: There are 2 correct answers to this
question.
Answers A B C
Question. 21
Which downtime optimization technique requires the
minimized downtime service (MDS) from SAP?
Answers D
Question. 22
You want to perform an SAP S/4HANA conversion using
SUM with DMO. Which steps run before the beginning of the
technical downtime, irrespective of your SUM configuration?
Note: There are 3 correct answers to this question.
Answers A D E
Question. 23
During the configuration of the DMO for SUM, how does the tool
behave if option "Do not compare table contents" is selected
regarding table comparison?
Answers D
Question. 24
You are performing an SAP S/4HANA conversion with the
migration repetition option. After which phase does SUM stop to
enable a test cycle?
A. EU_CLONE_MIG_DT_RUN
B. EU_CLONE_MIG_SOT_RUN
C. EU_IMPORT_ALL
D. EU_CLONE_MIG_DT_CREATE
Answers A
Question. 25
You are performing an SAP S/4HANA conversion. Which
phases are executed during SUM technical downtime? Note:
There are 2 correct answers to this question.
A. TABIM_UPG
B. PARDIST_SHD
C. PARMVNT_UPG
D. TABIM_SHADOW_*
Answers A
Question. 26
You are using DMO of SUM. You defined 40 parallel R3load
processes during uptime and 80 parallel R3load processes
during downtime. The server provides 8 CPU cores. Phase
EU_CLONE_MIG_DT_RUN is running. In the Charts Control
Center, you can see 40 process buckets being executed in
parallel. Why are 40 Process Buckets executed in parallel?
Answers A
Question. 27
Which steps can SUM perform during an SAP S/4HANA
conversion? Note: There are 2 correct answers to this question.
B. Software update
C. Unicode conversion
D. Database migration
Answers B D
Question. 28
You are performing an SAP S/4HANA conversion for your
production system. This conversion project requires that certain
business functions are switched on. Following SAP
recommendations, how will you achieve this? Note: There are 2
correct answers to this question.
A. Import a transport request from the development system that
contains the recording of the activation.
Answers A B
Question. 29
You have selected "Standard" as scenario strategy in the SUM
tool. Which steps take place via the shadow instance? Note: There
are 2 correct answers to this question.
Answers B C
Question. 30
You are performing an SAP S/4HANA conversion of the
development system. Which credentials do you use, and in
which system, to perform the adjustment of dictionary objects
(SPDD)?
Answers D
Question. 31
How does SUM recognize modification adjustment transports
from predecessor systems?
Answers D
Question. 32
Which step can be optimized when you provide the
MIGRATE_DT_DUR.XML file to SUM?
A. Downtime conversion
B. Downtime migration
Answers B
Question. 33
You are running an SAP ECC system with SAP_BASIS 740,
non-Unicode on SAP MaxDB. Which of the following are
possible paths to perform an SAP S/4HANA conversion? Note:
There are 3 correct answers to this question.
B. Unicode conversion
SAP S/4HANA conversion including database migration
C. Unicode conversion
Upgrade to SAP ECC with SAP_BASIS 750 including
database migration
SAP S/4HANA conversion without database migration
D. Unicode conversion
Database migration
SAP S/4HANA conversion without database migration
E. Unicode conversion
SAP S/4HANA conversion without database migration
Database migration
Answers B C D
Question. 34
You want to use the Custom Code Migration Worklist via remote
code analysis using the ABAP Test Cockpit (ATC). How can
you get the latest content of the simplification database?
Question. 35
You are performing an inplace SAP S/4HANA conversion
including DMO. What is the latest point in time when you can
reset the procedure without losing data?
Answers C
Question. 36
Which steps should be performed during the adjustment of
dictionary objects (SPDD) in the development system before
SUM continues? Note: There are 2 correct answers to this
question.
Answers A D
Question. 37
What do you need to know about the SAP S/4HANA
Conversion Guide? Note: There are 2 correct answers to this
question.
C. It is a database-specific document.
Answers A D
Question. 38
Which of the following are valid options to check the progress of
an inplace SUM DMO run? Note: There are 2 correct answers to
this question.
Answers B D
Question. 39
During a SUM run, you want to check if the PARCONV_UPG
phase is still running properly. Where can you find
information about this? Note: There are 2 correct answers to this
question.
Answers A D
Question. 40
SUM was registered at the SAP Host Agent. Where does the
SAP Host Agent find the path to the SUM directory?
A. The path was stored in file host_profile during registration.
Answers D