You are on page 1of 23

85_SAP S4HANA Conversion and SAP System Upgrade

(E_S4HCON2022)_v1.0_BH

Question. 1
You are performing an SAP S/4HANA conversion with DMO
as an inplace migration. How does SUM transfer the data by
default from the source database to the target database during
the migration?

A. Using R3load and memory pipes

B. Using work processes and network socket connection

C. Using R3load and file transfer

D. Using R3load and network socket connection

Answers A

Question. 2
In which case can you use near-Zero Downtime Maintenance
(nZDM)? Note: There are 2 correct answers to this question.

A. When upgrading an SAP S/4HANA Server system

B. When performing an SAP S/4HANA conversion with DMO

C. When upgrading an SAP ECC system with DMO

D. When performing an SAP S/4HANA conversion without


DMO
Answers A C

Question. 3
You are performing an SAP S/4HANA conversion with DMO.
You entered a specific number of R3load processes during the
Extraction Roadmap step. Where can you change this during
the migration via the Utilities option of the SUM UI? Note: There
are 2 correct answers to this question.

A. In DMO Migration Preparation

B. In SUM Parameters

C. In SUM Phaselist

D. In Process Control Center

Answers C D

Question. 4
You are performing an SAP S/4HANA conversion. When does
the silent data migration (SDM) take place?

A. During the Execution roadmap step

B. During the SUM technical downtime

C. Before the start of the SUM technical downtime

D. After SUM has ended


Answers D

Question. 5
What is the minimum SAP_BASIS release of an SAP ECC
system that can be converted to an SAP S/4HANA Server?

A. 731

B. 700

C. 740

D. 750

Answers B

Question. 6
What is the benefit of using the UPGANA.XML file from a
previous SUM run?

A. To make the progress information within SUM UI more


accurate

B. To skip selected phases during the SUM run

C. To repeat specific phases during the SUM run

D. To auto-fill specific fields on selected screens on the SUM UI

Answers A
Question. 7
You are running an SAP ECC system. For which of the
following activities does SUM allow you to use the near-Zero
Downtime Maintenance (nZDM) capabilities? Note: There are 3
correct answers to this question.

A. Use DMO for SUM.

B. Perform an SAP S/4HANA conversion without DMO.

C. Perform an SAP S/4HANA conversion including DMO.

D. Upgrade the SAP system.

E. Apply SAP support packages.

Answers D E

Question. 8
Which preparational steps must be performed for an SAP
S/4HANA conversion? Note: There are 2 correct answers to this
question.

A. Uninstall industry extensions NOT supported by SAP


S/4HANA.

B. Delete client 066 (Early-Watch client).

C. Uninstall Fiori apps NOT released for SAP_UI 7.50.

D. Install add-on SAP Gateway 7.50.


Answers B C

Question. 9
What is the main purpose of performing benchmark runs for an
SAP S/4HANA conversion?

A. To optimize the conversion

B. To optimize the main import

C. To optimize the migration

D. To optimize the activation

Answers C

Question. 10
When using the DMO of SUM, which files can be handled by
SUM in the download directory? Note: There are 2 correct
answers to this question.

A. Breakpoint configuration file SAPUPPHAS.BRK

B. Parameter file SAPup_add.par

C. MIGRATE_DT_DUR.XML file from a previous run

D. Stack XML file calculated by the maintenance planner

Answers C D
Question. 11
What do you need to consider when performing the SI checks for
an SAP S/4HANA conversion? Note: There are 2 correct
answers to this question.

A. You need to build up an SI check framework by applying


SAP Notes.

B. The errors from the SI checks must be solved; otherwise, SUM


will report an error.

C. You need an SAP system based on AS ABAP 7.50 or above


for the SI check framework.

D. The SI checks are executed in the development system and the


results are transported into the subsequent systems.

Answers A B

Question. 12
You performed a custom code check for an SAP S/4HANA
conversion. In which transactions can you review the results?
Note: There are 2 correct answers to this question.

A. SYCM (Simplification Database Content)

B. ATC (ABAP Test Cockpit)

C. SE80 (Object Navigator)

D. SAT (Runtime Analysis)


Answers B C

Question. 13
You are planning an SAP S/4HANA conversion. Which
conversion-specific tasks need to be performed during the
preparation phase?

A. Perform the migration of data to the new data structure.

B. Run the database migration to the SAP HANA database.

C. Check the compatibility of custom code with SAP


S/4HANA.

D. Solve problems from the simplification item (SI) checks.

Answers C D

Question. 14
You are executing a standard SUM procedure to update an SAP
system. You did NOT select the nZDM feature. When will the
shadow system be stopped for the last time?

A. At the end of the downtime

B. As part of the cleanup process

C. Before the downtime starts

D. Early in the downtime


Answers C

Question. 15
Which of the following SUM activities require a stack XML file
calculated by the maintenance planner? Note: There are 3 correct
answers to this question.

A. DMO without system update

B. SAP S/4HANA conversion without DMO

C. Prerequisite check

D. Benchmark tool

E. SAP S/4HANA conversion including DMO

Answers B C E

Question. 16
You are performing an SAP S/4HANA conversion. You are in
the BIND_PATCH phase of the Configuration roadmap step. For
some software components, you find entries in the Calculated
level column. What does the Calculated level indicate for those
software components?

A. The SAP support packages of the support package stack,


calculated by the maintenance planner
B. The SAP support packages contained in the upgrade media,
calculated by the maintenance planner

C. The SAP support packages in the download directory that are


newer than the selected support package stack

D. The SAP support packages that will be bound to the


conversion

Answers C

Question. 17
You are performing an SAP S/4HANA conversion with DMO.
You are using the downtime-optimized data conversion (DoC).
Which steps can partially be moved to uptime processing? Note:
There are 2 correct answers to this question.

A. Software update

B. Main import

C. Migration

D. Conversion

Answers C D

Question. 18
During the upgrade of your development system, you run into
the adjustment of non-dictionary objects, handled by
transaction SPAU. There you find programs that are shown in
status "automatic adjustment" (green traffic light). What will
happen with these programs when you continue with your
upgrade without performing any other actions inside your SAP
system?

A. SUM continues with the next phase and your modifications


are kept as in the start release.

B. SUM refuses to continue unless you have marked a


transport request as modification adjustment transport.

C. SUM continues with the next phase, and your modified


objects are set to the new SAP standard.

D. Before continuing with the next phase, SUM asks for a


modification adjustment transport.

Answers A

Question. 19
What SAP systems can you use for the ABAP Test Cockpit
(ATC) to perform the custom code analysis for an SAP
S/4HANA conversion? Note: There are 2 correct answers to this
question.

A. SAP ECC system from SAP ERP 6.0 EHP 8

B. Standalone AS ABAP with SAP_BASIS 752 and above

C. SAP Solution Manager 7.2


D. SAP S/4HANA Server 1809 and above

Answers B D

Question. 20
What are the benefits of using the benchmarking option of the
DMO for SUM? Note: There are 2 correct answers to this
question.

A. You can find the optimal number of parallel R3load


processes by monitoring host performance.

B. You can record the modification adjustment during


migration and use the transports in the next runs.

C. You can verify that the content of the download directory


matches the stack.XML file.

D. You can obtain migration duration files from a previous


benchmark run that can be used to optimize the next runs.

Answers A B C

Question. 21
Which downtime optimization technique requires the
minimized downtime service (MDS) from SAP?

A. Near-Zero Downtime Maintenance (nZDM)

B. Downtime Optimized Data Conversion (DoC)


C. Downtime Optimized DMO (DoDMO)

D. Near-Zero Downtime Technology (NZDT)

Answers D

Question. 22
You want to perform an SAP S/4HANA conversion using
SUM with DMO. Which steps run before the beginning of the
technical downtime, irrespective of your SUM configuration?
Note: There are 3 correct answers to this question.

A. Activation of dictionary objects in phase ACT_UPG

B. Import of upgrade and language data from the download


directory in phase TABIM_UPG

C. Generation of the new ABAP loads in phase


RUN_SGEN_GENER8

D. Creation of application tables in the SAP HANA database in


phase EU_CLONE_MIG_DT_CREATE

E. Import of dictionary objects from the download directory in


phase DDIC_UPG

Answers A D E
Question. 23
During the configuration of the DMO for SUM, how does the tool
behave if option "Do not compare table contents" is selected
regarding table comparison?

A. It performs a comparison on selected tables using check sum.

B. It does NOT perform any table comparison.

C. It performs a comparison of all tables using check sum.

D. It performs a comparison on all tables using row counts.

Answers D

Question. 24
You are performing an SAP S/4HANA conversion with the
migration repetition option. After which phase does SUM stop to
enable a test cycle?

A. EU_CLONE_MIG_DT_RUN

B. EU_CLONE_MIG_SOT_RUN

C. EU_IMPORT_ALL

D. EU_CLONE_MIG_DT_CREATE

Answers A
Question. 25
You are performing an SAP S/4HANA conversion. Which
phases are executed during SUM technical downtime? Note:
There are 2 correct answers to this question.

A. TABIM_UPG

B. PARDIST_SHD

C. PARMVNT_UPG

D. TABIM_SHADOW_*

Answers A

Question. 26
You are using DMO of SUM. You defined 40 parallel R3load
processes during uptime and 80 parallel R3load processes
during downtime. The server provides 8 CPU cores. Phase
EU_CLONE_MIG_DT_RUN is running. In the Charts Control
Center, you can see 40 process buckets being executed in
parallel. Why are 40 Process Buckets executed in parallel?

A. These are 40 pairs of R3load processes, so there are 80 R3load


processes running.

B. There is a maximum of 40 parallel R3load processes within


this specific phase.
C. SUM is still running in uptime; the 40 defined R3load
processes are considered.

D. The number of CPU cores does NOT allow more than 40


R3load processes to be run in parallel.

Answers A

Question. 27
Which steps can SUM perform during an SAP S/4HANA
conversion? Note: There are 2 correct answers to this question.

A. Custom code analysis

B. Software update

C. Unicode conversion

D. Database migration

Answers B D

Question. 28
You are performing an SAP S/4HANA conversion for your
production system. This conversion project requires that certain
business functions are switched on. Following SAP
recommendations, how will you achieve this? Note: There are 2
correct answers to this question.
A. Import a transport request from the development system that
contains the recording of the activation.

B. During conversion, SUM delivers some business functions


already activated.

C. Activate the required business functions in the switch


framework from section S/4H_ALWAYS_ON_FUNCTIONS.

D. Activate the required business functions manually in the


production system.

Answers A B

Question. 29
You have selected "Standard" as scenario strategy in the SUM
tool. Which steps take place via the shadow instance? Note: There
are 2 correct answers to this question.

A. Modification adjustment (SPAU)

B. Modification adjustment (SPDD)

C. Activation of dictionary objects (ACT_UPG)

D. Conversion of application tables (PARCONV_UPG)

Answers B C
Question. 30
You are performing an SAP S/4HANA conversion of the
development system. Which credentials do you use, and in
which system, to perform the adjustment of dictionary objects
(SPDD)?

A. Credentials of user DDIC in the development client of the


development system

B. Credentials of a named user in the development client of the


development system

C. Credentials of user DDIC in client 000 of the shadow system

D. Credentials of a named user in client 000 of the shadow


system

Answers D

Question. 31
How does SUM recognize modification adjustment transports
from predecessor systems?

A. By searching for transport requests in DIR_TRANS,


subdirectory "transport"

B. By searching for transport requests that are assigned to


project SAP_ADJUST

C. By searching for transport requests named


<sid>K0<number>
D. By searching for transport requests in file umodauto.lst

Answers D

Question. 32
Which step can be optimized when you provide the
MIGRATE_DT_DUR.XML file to SUM?

A. Downtime conversion

B. Downtime migration

C. Shadow on target creation

D. Silent data migration (SDM)

Answers B

Question. 33
You are running an SAP ECC system with SAP_BASIS 740,
non-Unicode on SAP MaxDB. Which of the following are
possible paths to perform an SAP S/4HANA conversion? Note:
There are 3 correct answers to this question.

A. SAP S/4HANA conversion including database migration


and Unicode conversion

B. Unicode conversion
SAP S/4HANA conversion including database migration
C. Unicode conversion
Upgrade to SAP ECC with SAP_BASIS 750 including
database migration
SAP S/4HANA conversion without database migration

D. Unicode conversion
Database migration
SAP S/4HANA conversion without database migration

E. Unicode conversion
SAP S/4HANA conversion without database migration
Database migration

Answers B C D

Question. 34
You want to use the Custom Code Migration Worklist via remote
code analysis using the ABAP Test Cockpit (ATC). How can
you get the latest content of the simplification database?

A. Apply the corresponding SAP Note via the Note Assistant.

B. Generate it by analyzing the specific custom code via RFC.

C. Download it from the SAP Support Portal.

D. Configure it within transaction ATC.


Answers C

Question. 35
You are performing an inplace SAP S/4HANA conversion
including DMO. What is the latest point in time when you can
reset the procedure without losing data?

A. The end of the database migration

B. The start of the Execution roadmap step

C. The end of the business downtime

D. The start of the business downtime

Answers C

Question. 36
Which steps should be performed during the adjustment of
dictionary objects (SPDD) in the development system before
SUM continues? Note: There are 2 correct answers to this
question.

A. Assign the transport request as a modification adjustment


transport.

B. Manually activate the adjusted dictionary objects.

C. Release the transport request containing the modification


adjustment.
D. Create new versions of the objects you need to adjust.

Answers A D

Question. 37
What do you need to know about the SAP S/4HANA
Conversion Guide? Note: There are 2 correct answers to this
question.

A. It contains a section about the simplification item (SI)


checks.

B. It explains the database migration option (DMO) of SUM.

C. It is a database-specific document.

D. It explains where to find information about the custom code


analysis.

Answers A D

Question. 38
Which of the following are valid options to check the progress of
an inplace SUM DMO run? Note: There are 2 correct answers to
this question.

A. Check the dump size of the database export on disk.

B. Check the log files written in the SUM directory,


subdirectory abap, subdirectory log.
C. Check logs for jobs starting with RSUPG_SGEN in the SAP
system.

D. Check the Charts Control Center in the SUM UI.

Answers B D

Question. 39
During a SUM run, you want to check if the PARCONV_UPG
phase is still running properly. Where can you find
information about this? Note: There are 2 correct answers to this
question.

A. Check the running batch job via Job Overview (SM37).

B. Check for running R3trans processes on the host where SUM


is running.

C. Check for running R3load processes on the host where SUM


is running.

D. Check the latest log files in the SUM directory, subdirectory


abap, subdirectory tmp.

Answers A D

Question. 40
SUM was registered at the SAP Host Agent. Where does the
SAP Host Agent find the path to the SUM directory?
A. The path was stored in file host_profile during registration.

B. The path was stored to the environment of user <sid>adm


during registration.

C. The path is taken from the URL entered in the browser to


start SUM.

D. The path was stored in file sumabap.conf during


registration.

Answers D

You might also like