You are on page 1of 14

85_SAP S4HANA Conversion and SAP System Upgrade (E_S4HCON2022)_v1.

0_BH

Question. 1
You are performing an SAP S/4HANA converCIon with DMO as an inplace migration.
How does SUM transfer the data by default from the source database to the target
database during the migration?
A. Using R3load and memory pipes
B. Using work processes and network socket connection
C. Using R3load and file transfer
D. Using R3load and network socket connection

Question. 2
In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2
correct answers to this question.
A. When upgrading an SAP S/4HANA Server system
B. When performing an SAP S/4HANA conversion with DMO
C. When upgrading an SAP ECC system with DMO
D. When performing an SAP S/4HANA conversion without DMO

A, C

Question. 3
You are performing an SAP S/4HANA conversion with DMO. You entered a specific
number of R3load processes during the Extraction Roadmap step. Where can you
change this during the migration via the Utilities option of the SUM UI? Note: There are
2 correct answers to this question.
A. In DMO Migration Preparation
B. In SUM Parameters
C. In SUM Phaselist
D. In Process Control Center

B, D

Question. 4
You are performing an SAP S/4HANA conversion. When does the silent data migration
(SDM) take place?
A. During the Execution roadmap step
B. During the SUM technical downtime
C. Before the start of the SUM technical downtime
D. After SUM has ended

Question. 5
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to
an SAP S/4HANA Server?
A. 731
B. 700
C. 740
D. 750

Question. 6
What is the benefit of using the UPGANA.XML file from a previous SUM run?
A. To make the progress information within SUM UI more accurate
B. To skip selected phases during the SUM run
C. To repeat specific phases during the SUM run
D. To auto-fill specific fields on selected screens on the SUM UI

Question. 7
You are running an SAP ECC system. For which of the following activities does SUM allow
you to use the near-Zero Downtime Maintenance (nZDM) capabilities? Note: There are
3 correct answers to this question.
A. Use DMO for SUM.
B. Perform an SAP S/4HANA conversion without DMO.
C. Perform an SAP S/4HANA conversion including DMO.
D. Upgrade the SAP system.
E. Apply SAP support packages.

A,E
Question. 8

Which preparational steps must be performed for an SAP S/4HANA conversion? Note:
There are 2 correct answers to this question.
A. Uninstall industry extensions NOT supported by SAP S/4HANA.
B. Delete client 066 (Early-Watch client).
C. Uninstall Fiori apps NOT released for SAP_UI 7.50.
D. Install add-on SAP Gateway 7.50.
B,C

Question. 9
What is the main purpose of performing benchmark runs for an SAP S/4HANA
conversion?
A. To optimize the conversion
B. To optimize the main import
C. To optimize the migration
D. To optimize the activation

Question. 10
When using the DMO of SUM, which files can be handled by SUM in the download
directory? Note: There are 2 correct answers to this question.
A. Breakpoint configuration file SAPUPPHAS.BRK

B. Parameter file SAPup_add.par

C. MIGRATE_DT_DUR.XML file from a previous run


D. Stack XML file calculated by the maintenance planner

C, D

Question. 11
What do you need to consider when performing the SI checks for an SAP S/4HANA
conversion? Note: There are 2 correct answers to this question.
A. You need to build up an SI check framework by applying SAP Notes.
B. The errors from the SI checks must be solved; otherwise, SUM will report an
error.
C. You need an SAP system based on AS ABAP 7.50 or above for the SI check
framework.
D. The SI checks are executed in the development system and the results are
transported into the subsequent systems.

AB

Question. 12
You performed a custom code check for an SAP S/4HANA conversion. In which
transactions can you review the results? Note: There are 2 correct answers to this
question.

A. SYCM (Simplification Database Content)


B. ATC (ABAP Test Cockpit)
C. SE80 (Object Navigator)
D. SAT (Runtime Analysis)

B, C

Question. 13
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to
be performed during the preparation phase? There are two correct answers.
A. Perform the migration of data to the new data structure.
B. Run the database migration to the SAP HANA database.
C. Check the compatibility of custom code with SAP S/4HANA.
D. Solve problems from the simplification item (SI) checks.

C, D

Question. 14
You are executing a standard SUM procedure to update an SAP system. You did NOT
select the nZDM feature. When will the shadow system be stopped for the last time?
A. At the end of the downtime
B. As part of the clean-up process
C. Before the downtime starts
D. Early in the downtime

Question. 15
Which of the following SUM activities require a stack XML file calculated by the
maintenance planner? Note: There are 3 correct answers to this question.
A. DMO without system update
B. SAP S/4HANA conversion without DMO
C. Prerequisite check
D. Benchmark tool
E. SAP S/4HANA conversion including DMO

B, C, E

Question. 16
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of
the Configuration roadmap step. For some software components, you find entries in the
calculated level column. What does the calculated level indicate for those software
components?
A. The SAP support packages of the support package stack, calculated by the
maintenance planner
B. The SAP support packages contained in the upgrade media, calculated by the
maintenance planner
C. The SAP support packages in the download directory that are newer than the
selected support package stack
D. The SAP support packages that will be bound to the conversion

Question. 17
You are performing an SAP S/4HANA conversion with DMO.
You are using the downtime-optimized data conversion (DoC).
Which steps can partially be moved to uptime processing? Note: There are 2 correct
answers to this question.
A. Software update
B. Main import
C. Migration
D. Conversion

C, D

Question. 18
During the upgrade of your development system, you run into the adjustment of non-
dictionary objects, handled by transaction SPAU. There you find programs that are
shown in status "automatic adjustment" (green traffic light). What will happen with
these programs when you continue with your upgrade without performing any other
actions inside your SAP system?
A. SUM continues with the next phase and your modifications are kept as in the
start release.
B. SUM refuses to continue unless you have marked a transport request as
modification adjustment transport.
C. SUM continues with the next phase, and your modified objects are set to the
new SAP standard.
D. Before continuing with the next phase, SUM asks for a modification adjustment
transport.

Question. 19
What SAP systems can you use for the ABAP Test Cockpit?
(ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There
are 2 correct answers to this question.
A. SAP ECC system from SAP ERP 6.0 EHP 8
B. Standalone AS ABAP with SAP_BASIS 752 and above
C. SAP Solution Manager 7.2
D. SAP S/4HANA Server 1809 and above

B, D

Question. 20
What are the benefits of using the benchmarking option of the DMO for SUM? Note:
There are 2 correct answers to this question.
A. You can find the optimal number of parallel R3load processes by monitoring host
performance.
B. You can record the modification adjustment during migration and use the
transports in the next runs.
C. You can verify that the content of the download directory matches the
stack.XML file.
D. You can obtain migration duration files from a previous benchmark run that can
be used to optimize the next runs.

A,D

Question. 21
Which downtime optimization technique requires the minimized downtime service
(MDS) from SAP?
A. Near-Zero Downtime Maintenance (nZDM)
B. Downtime Optimized Data Conversion (DoC)
C. Downtime Optimized DMO (DoDMO)
D. Near-Zero Downtime Technology (NZDT)

Question. 22
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps
run before the beginning of the technical downtime, irrespective of your SUM
configuration? Note: There are 3 correct answers to this question.
A. Activation of dictionary objects in phase ACT_UPG
B. Import of upgrade and language data from the download directory in phase
TABIM_UPG
C. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
D. Creation of application tables in the SAP HANA database in phase
EU_CLONE_MIG_DT_CREATE
E. Import of dictionary objects from the download directory in phase DDIC_UPG
A, D, E

Question. 23
During the configuration of the DMO for SUM, how does the tool behave if option "Do
not compare table contents" is selected regarding table comparison?
A. It performs a comparison on selected tables using check sum.
B. It does NOT perform any table comparison.
C. It performs a comparison of all tables using check sum.
D. It performs a comparison on all tables using row counts.
D
Question. 24
You are performing an SAP S/4HANA conversion with the migration repetition option.
After which phase does SUM stop to enable a test cycle?

A. EU_CLONE_MIG_DT_RUN
B. EU_CLONE_MIG_SOT_RUN
C. EU_IMPORT_ALL
D. EU_CLONE_MIG_DT_CREATE

Question. 25
You are performing an SAP S/4HANA conversion. Which phases are executed during
SUM technical downtime? Note:
There are 2 correct answers to this question.

A. TABIM_UPG
B. PARDIST_SHD
C. PARMVNT_UPG
D. TABIM_SHADOW_*

A, ?

Question. 26
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and
80 parallel R3load processes during downtime. The server provides 8 CPU cores. Phase
EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40
process buckets being executed in parallel. Why are 40 Process Buckets executed in
parallel?
A. These are 40 pairs of R3load processes, so there are 80 R3load processes
running.
B. There is a maximum of 40 parallel R3load processes within this specific phase.
C. SUM is still running in uptime; the 40 defined R3load processes are considered.
D. The number of CPU cores does NOT allow more than 40 R3load processes to be
run in parallel.

Question. 27
Which steps can SUM perform during an SAP S/4HANA conversion? Note: There are 2
correct answers to this question.

A. Custom code analysis


B. Software update
C. Unicode conversion
D. Database migration

B, D

Question. 28
You are performing an SAP S/4HANA conversion for your production system. This
conversion project requires that certain business functions are switched on. Following
SAP recommendations, how will you achieve this? Note: There are 2 correct answers to
this question.
A. Import a transport request from the development system that contains the
recording of the activation.
B. During conversion, SUM delivers some business functions already activated.
C. Activate the required business functions in the switch framework from section
S/4H_ALWAYS_ON_FUNCTIONS.
D. Activate the required business functions manually in the production system.

A,B

Question. 29
You have selected "Standard" as scenario strategy in the SUM tool. Which steps take
place via the shadow instance? Note: There are 2 correct answers to this question.

A. Modification adjustment (SPAU)


B. Modification adjustment (SPDD)
C. Activation of dictionary objects (ACT_UPG)
D. Conversion of application tables (PARCONV_UPG)

B, C

Question. 30
You are performing an SAP S/4HANA conversion of the development system. Which
credentials do you use, and in which system, to perform the adjustment of dictionary
objects (SPDD)?
A. Credentials of user DDIC in the development client of the development system
B. Credentials of a named user in the development client of the development system
C. Credentials of user DDIC in client 000 of the shadow system
D. Credentials of a named user in client 000 of the shadow system

Question. 31
How does SUM recognize modification adjustment transports from predecessor
systems?
A. By searching for transport requests in DIR_TRANS, subdirectory "transport"
B. By searching for transport requests that are assigned to project SAP_ADJUST
C. By searching for transport requests named <sid>K0<number>
D. By searching for transport requests in file umodauto.Ist

Question. 32
Which step can be optimized when you provide the MIGRATE_DT_DUR.XML file to
SUM?
A. Downtime conversion
B. Downtime migration
C. Shadow on target creation
D. Silent data migration (SDM)

Question. 33
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB.
Which of the following are possible paths to perform an SAP S/4HANA conversion?
Note: There are 3 correct answers to this question.
A. SAP S/4HANA conversion including database migration and Unicode conversion
B. Unicode conversion SAP S/4HANA conversion including database migration
C. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database
migration SAP S/4HANA conversion without database migration
D. Unicode conversion Database migration SAP S/4HANA conversion without database
migration
E. Unicode conversion SAP S/4HANA conversion without database migration Database
migration

B, C, D

Question. 34
You want to use the Custom Code Migration Worklist via remote code analysis using the
ABAP Test Cockpit (ATC). How can you get the latest content of the simplification
database?
A. Apply the corresponding SAP Note via the Note Assistant.
B. Generate it by analysing the specific custom code via RFC.
C. Download it from the SAP Support Portal.
D. Configure it within transaction ATC.

Question. 35
You are performing an inplace SAP S/4HANA conversion including DMO. What is the
latest point in time when you can reset the procedure without losing data?

A. The end of the database migration


B. The start of the Execution roadmap step
C. The end of the business downtime
D. The start of the business downtime

Question. 36
Which steps should be performed during the adjustment of dictionary objects (SPDD) in
the development system before SUM continues? Note: There are 2 correct answers to
this question.

A. Assign the transport request as a modification adjustment transport.


B. Manually activate the adjusted dictionary objects.
C. Release the transport request containing the modification adjustment.
D. Create new versions of the objects you need to adjust.

A, D

Question. 37
What do you need to know about the SAP S/4 HANA Conversion Guide? Note: There are
2 correct answers to this question.

A. It contains a section about the simplification item (SI) checks.


B. It explains the database migration option (DMO) of SUM.
C. It is a database-specific document.
D. It explains where to find information about the custom code analysis.

A, D

Question. 38
Which of the following are valid options to check the progress of an inplace SUM DMO
run? Note: There are 2 correct answers to this question.

A. Check the dump size of the database export on disk.


B. Check the log files written in the SUM directory, subdirectory abap, and
subdirectory log.
C. Check logs for jobs starting with RSUPG_SGEN in the SAP system.
D. Check the Charts Control Center in the SUM UI.

B, D

Question. 39
During a SUM run, you want to check if the PARCONV_UPG phase is still running
properly. Where can you find information about this? Note: There are 2 correct answers
to this question.

A. Check the running batch job via Job Overview (SM37).


B. Check for running R3trans processes on the host where SUM is running.
C. Check for running R3load processes on the host where SUM is running.
D. Check the latest log files in the SUM directory, subdirectory abap, and subdirectory
tmp.
A, D

Question. 40
SUM was registered at the SAP Host Agent. Where does the SAP Host Agent find the
path to the SUM directory?

A. The path was stored in file host_profile during registration.


B. The path was stored to the environment of user <sid>adm during registration.
C. The path is taken from the URL entered in the browser to start SUM.
D. The path was stored in file sumabap.conf during registration.

You might also like