You are on page 1of 29

RH SERIES COILED TUBING HANGERS

The "RH" series was designed to be a highly workable coiled tubing hanger with greater
reliability and more efficiency than other coiled tubing hanger systems.

The "RH" hanger system allows the coiled tubing installer easy access to the slips and
pack-off assembly, through the use of a snubbing window (available from Wellhead
Control Products, Inc.) attached to the BOP stack. This design provides customers the
most reliable and efficient way to set or retrieve the slips and pack-off assembly.

Wellhead Control Products, Inc. wrap around segmented slips are designed for maximum
hanging capacity with minimal tubing deflection. This field proven design is tested and
has been certified for hanging capacity exceeding the maximum tensile strength of
today's high quality tubing.

The "RH" pack-off assembly is a preinstalled lock pin activated primary seal. Wellhead
Control Products, Inc. has developed a unique design incorporating two hardened steel
tubing guide plates above and below the sealing element virtually eliminating wear to
assure pack-off reliability time after time.
CAPILLARY INJECTOR HEAD

10,000 lbs. Continuous pull


5,000 PSI snubbing capacity
200+ feet per minute continuous speed
Single piece skate design
True hydraulic traction and tension systems
Clearance for 2" OD tools
10,000 PSI top load stripper
Folding gooseneck
Small package
Frame: 3' x 3' x 4' tall
Gooseneck: 2.5' tall
Monkey boards: 2' long
CAPILLARY SHEAR AND SEAL UNIT

The shear and seal unit is completely manual. It is fully reusable, and completely
serviceable. The system can shear up to 3/4" tubing, and can handle 2000 psi of well
pressure.
CAPILLARY TUBING COUNTER

The tubing counter uses a high precision counting wheel that is directly coupled to
the manual read out. The counting wheel is machined to .0005", making it extremely
accurate. There are 4 pipe rollers to guide the pipe through the box, and provide the
strength to align the tubing onto the reel. The rollers ride on sealed bearings for
smooth operation and a long life. Snap in axle shafts make roller changes quick and
easy. The body of the counter is split and hinged so that it can be opened for
removal of the tubing.
STAND ALONE CAPILLARY STRIPPER

The stand-alone capillary stripper is designed to be used as a secondary barrier


when running capillary in a live well situation. The unit can be actuated
hydraulically or manually if needed. The manual system also provides a lock in case
the hydraulic system bleeds pressure during operation, or if the unit is left on the
well for extended periods of time.
CAPILLARY HANGER SYSTEMS

RH-C Single String Hanger

This is the RH-C single string capillary


hanger system with the double barrier seal
option.

The RH-C is available in most API


recognized threaded, flanged, and studded
connections. The double barrier seal,
recognizable by it's third set of lockscrews,
is used in extreme situations requiring added
safety measures.

RH-C Dual String Hanger


"Y" SPOOL

WCP Capillary Intervention


System

Capillary tubing often becomes stuck in


the well bore because of salt formation,
paraffin, sand and other contaminants.
Due to it's small size, the capillary string
can easily be parted by an over-pull.
Until recently, a costly fishing job was
required to remove the broken string.
WCP's solution to this problem is the
RH-Y

The "Y" spool provides a method to


deploy/suspend capillary tubing and an
avenue to run a work string or wireline
simultaneously, without retracting the
capillary tube.
Coil Tubing Units

WCP constructs its coil tubing units on an individual basis. Each unit is custom built to
meet the needs and specifications of the customer. This process does take longer than
manufacturing some "cookie-cutter" tubing unit, but the end result is a high quality piece
of equipment.

A Hydraulic System will be designed based on the equipment that will be installed on
the trailer.. It can be either a stand alone, power pack driven system, or it can run off of
the tractor's drive train. WCP will install necessary gearboxes and pumps

Control Cabins and Instrument Panels are made in-house at WCP. The cabin can be
laid out any way you desire. Doors, windows, and chairs can be installed in any
configuration. The instrument panels are machined in our facility, out of stainless steel, to
hold all of the valves and gauges necessary for unit operation. Our average cabin is 8' x 8'
square, but it can be made to any size depending on space requirements. The cabin can be
built as a fixed unit, or one with a hydraulically lifted outer skin. This system allows the
cabin to be mounted much higher on the trailer, which assists visibility while on site. The
roof is then lowered below legal height for transportation. The cabin can also be outfitted
with a number of extra options including, but not limited to: Air Conditioning, power
converters, special lighting, computer systems, air suspension chairs, video monitoring
systems, P.A. system, and communication radios.
Custom instrument panel

Reels can be built to handle any amount of pipe desired. WCP’s high-end reel is the best
on the market. It is an indestructible piece of equipment that is designed for ease of
operation and extreme reliability.

Hose reels can be added to the unit to significantly reduce rig-up and down time when
compared to the standard "hose tree" setup

The Injector Head can be mounted in any number of ways; from a simple flat mount on
the trailer deck to a hydraulically operated tilting mount on the rear of the trailer.

A crane can also be integrated into the trailer if needed.

Walkways, stairs, handrails, and storage compartments can be installed nearly


anywhere, to provide the workers with easy access to mounted components, equipment
and tools, and for personal safety.
TRAILER MOUNTED NITROGEN UNIT

180K heat recovery unit capable of 10,000 psi operating pressure. Main components
include Detroit MTU engine, 2000-gallon LN2 tank, and control cabin
Large 8’square control cabin that is fully insulated, air conditioned and heated.
Operations panels for the hydraulic system (above), the engine (below left), and the
air operated valves (below right).
2000 gallon nitrogen tank with proportional air actuators on all control valves for
remote operation. Pump skid with triplex pump, lube oil system, boost pump, and
storage rack on passenger side for plug valves. Aluminum diamond plate fenders
and toolboxes. Swivel racks below the fenders, and flow iron racks above.
YARD SPOOLING STAND

Rotating joint provides means of pumping through the tubing


Pivoting levelwind arms
Hydraulic chain tension with manual backup and lock
Split pillow block bearings
Manually controlled hydraulic screw type levelwind
Quick reel changes
Lifting eyes and / or forklift pockets
Drip pan and removable chain guard
All spooler skids are custom built to customer requirements
Units can be constructed to hold any size reel desired.
Pictured unit designed for 120" O.D. by 75" wide wood or steel reels
Direct Drive Coil Tubing Counter

Extremely accurate
Rollers available for pipes up to 2-3/8"
Heavy construction handles the thickest walled pipes.
2000 lbs. latch action clamps
5 digit large numeral counter
Output shaft for electronic pulsater
All moving parts ride on high quality sealed bearings

Optional Levelwind Control Console

The remote console allows the user to operate


at a safe location with good visibility.

The lightweight aluminum console with wheels


is effortless to setup and transport.

The panel hosts a levelwind motor directional


valve and a system pressure gauge.

Quick disconnects for pump and reel


connections.

Jumper hoses can be supplied for any length.


HYDROSTATIC TEST EQUIPMENT

Below, is our air operated 30,000-PSI hydro testing unit with B.O.P. control system. It
features a skid mounted control panel with chart recorder and control valves for a Quad
B.O.P. or a double B.O.P. and pack-off. The instrument panel, side panels, and protective
cover are made of stainless steel. It has a 4-1/16" 15M test stump with Auto-Clave
fittings. It comes with a D.S.A. to 3-1/16" 10M. It has a 1-1/2-ton Jib-crane on a
swinging arm to assist in loading, unloading, and disassembly of equipment. The skid
also has a blast shield with bulletproof plexi-glass to protect the operator, a grating
covered drip pan, and forklift pockets.
BLOW-OUT PREVENTER REPAIR

WCP repairs:

TOT
Foley
Bowen
Hydralux
Parveen

We perform all necessary


machine work, and replace all
seals, inserts, hoses, and fittings.
OTHER PRODUCTS

ACCESS WINDOW

Reinstallation Dart and One Way Check with Wash Nozzle


1" - 3 1/2" PUMP OUT PLUG

"SUR-GRIP" CONNECTORS
DOUBLE ROLL-ON CONNECTOR

Roll-On connectors are used to connect two joints of coiled tubing.

Available in sizes from 1" - 3 1/2".


Roll-On connectors are also available for connecting different sizes together.

Velocity Wash Tool


Filter Manifold And Screen
LIVE WELL INSTALLATION
“RH” SERIES COILED TUBING HANGERS

1. Close the lower master valve and bleed off pressure.

2. Remove tree above the lower master valve.

3. Install the “RH” Series hanger on the lower master valve.

4. Place the pack-off assembly in the tubing hanger.

5. Rotate the lock pins inward until the lock pin bevels are entirely in contact with the top
plate bevel. DO NOT ENERGIZE THE PACK-OFF. This is to prevent pressure from
displacing the pack-off assembly when the master valve is opened.

CONTINUED...
6. Connect the access window to the
tubing hanger.

7. Connect the Blowout Preventer.

8. Connect the Coiled Tubing Unit to


the B.O.P. stack.

9. Connect the flow line to the tubing


hanger side outlet.

10. Run the tubing slowly through the


B.O.P. stack, access window, and
pack-off assembly until the tubing
reaches the lower master valve.
Have the tubing sealed with an end
plug.

11. Close access window.

12. Energize the stripper rubber at the


top of the coiled tubing unit.

13. Open the lower master valve.

14. Run the tubing to the desired


depth.

15. Rotate the lock pins clockwise 3/4


of a turn to energize the pack-off.

NOTE: Additional clockwise rotation


maybe necessary if annular
seal is not achieved initially.

16. Tighten the packing gland nuts.

17. Bleed off pressure from B.O.P.


stack.

18. Raise access window and clean


bowl.

19. Secure slips around tubing and release slips into well bore.
CONTINUED...
20. Lower tubing into the well until the weight indicator reads “0”

21. Rough cut tubing a minimum of 6" above the tubing hanger top flange -remove
access window, B.O.P. stack, and coiled tubing unit.

22. The final cut should be measured accurately. This procedure will assure that the
wireline guide fits properly.

23. Install the tree over the coiled tubing hanger.

24. Displace the end plug from the coiled tubing.

25. Remove the lower master valve hand wheel.

INSTALLATION COMPLETE
501 N. Richey
Pasadena, TX 77506
Tel: 713-475-2310
Fax: 713-475-1806
Toll Free: 1-800-457-1198
You can reach us via E-mail

For wellhead and C.T. hanger information please use


wcp@wellheadcontrol.com

For C.T. units or hydraulic system repair please contact


Kevin Hunt- kevin@wellheadcontrol.com

You might also like