You are on page 1of 6

For more information about BRUSH PRISMIC® BRUSH PRISMIC®

the BRUSH Prismic® 15110 Northwest Freeway, Nottingham Road,


products displayed within this Suite 150, Houston, Texas Loughborough, Leicestershire,
77040, USA LE11 1EX, United Kingdom PRISMIC®
leaflet, please call us direct,
email or visit our website. T +1 281 580 1314 T + 44 (0) 1509 611511
F +1 281 580 5801 F + 44 (0) 1509 612436

prismic@brush.eu
BRUSH PRISMIC® BRUSH PRISMIC®
www.brush.eu P.O. Box 111209, Abu Dhabi, P.O. Box 3007, 2980 DA,
United Arab Emirates Ridderkerk, The Netherlands
T + 971 4362 6391 T + 31 (0) 180 445500
F + 971 2550 1920 F + 31 (0) 180 445445

BRUSH PRISMIC® BRUSH PRISMIC®


Lot PT 5038-5041,
Jalan Teluk Datuk 28/40,
Off Persiaran Sepang,
Tr. Edvarda Beneše 39/564,
301 00 Plzen,
Czech Republic power to
your business
Seksyen 28, T + 420 37 8210717
40400 Shah Alam, F + 420 37 8210337
Selangor D.E. Malaysia
T + 60 (0) 3 5192 7213
F + 60 (0) 3 5192 6293 WITHOUT FAIL
WITHOUT COMPROMISE

AM0057/2/DEC10

PRISMIC ®
PRISMIC® Power Management Systems
LOAD SHEDDING Continuous power is
GENERATOR AUTO DESPATCH fundamental to your business
SYSTEM POWER & VAR CONTROL PRISMIC® PMS is fundamental
SYSTEM FREQUENCY & VOLTAGE CONTROL to your performance

The pressure of maintaining the high Each bespoke PRISMIC ® PMS is tailored to
integrity power system that your business specific site requirements and power system
depends on has just been lifted. topology, with all design data meticulously
controlled and recorded. The systems
The BRUSH PRISMIC ® Power Management are fully designed and tested by electrical
System is an extremely powerful and flexible engineers who use real time simulations to
electrical power system controller. More than fully demonstrate many scenarios which
that, it’s your guardian against outages and can’t be easily tested on site. By adopting
the ensuing disruption and cost. these methods commissioning time is cut
With a reputation for delivering a reliable considerably and down time is minimised.
and stable power supply whatever the A fundamental function of PRISMIC ® PMS
industry or application, PRISMIC ® PMS is to proactively prevent blackouts and
sets the benchmark. That’s why it’s already enable the uninterrupted performance
the most widely used PMS in the oil and gas of critical processes and operations. By
industry in many parts of the world and is preventing disturbances, the PRISMIC ®
becoming widely used across power and PMS maximises operational up time and
utilities sites, data centres, LNG terminals minimises the costs associated with lost
and military facilities. production so that it pays for itself in no
PRISMIC ® PMS is designed and time at all.
produced by BRUSH, the world’s leading
independent manufacturer of generators
and associated equipment. We were one of A superior product with superior benefits
the first companies to use advanced digital
technology and we continue to provide —— Improves power system security by
innovative solutions to meet the most managing energy requirements, using
demanding specifications. multiple techniques, such as load
shedding, generator auto starting
We’ve been refining the design and and load management
functionality for over thirty years, using
our experience and expertise, coupled —— Optimises generator usage to minimise
with technological advancements, to fuel consumption resulting in substantial
add and improve features. cost savings
Our market leading PRISMIC ® PMS —— Proactively highlights potential issues
has none of the limitations of generic helping to avoid blackouts
PLC and off the shelf equipment modules.
It can be used with any equipment from —— Minimises disturbance to operations
other OEMs, multiple types of generators —— Accurately controls power and measures
or prime movers and all other associated system capabilities, rationalises generator
power system equipment. usage and manages type of fuel use
PRISMIC ® PMS is easy to use too. —— Reduces the number of personnel
Operators interact with a fully featured
required through the automation of
Windows Human Machine Interface (HMI)
many processes
by using basic PC skills to navigate through
the comprehensive and simple to use —— Improves environmental performance
displays and settings. by aiding implementation and operation
Your operators can quickly become familiar of DLN/DLE turbine emissions
with the more challenging aspects of reduction systems
generation system control using the BRUSH —— Provides a clear visual representation
power system simulation and utilising real of the power system, all necessary
generators at the BRUSH PRISMIC ®
indications and alarm signals
training facility.
—— Automates sequencing of critical circuit
breaker operations reducing the risk
of human error
comprehensive power
functionality speed
with real flexibility contRol
versatility

PRISMIC ® PMS has been designed to —— Additional Control Options: Intelligent Load Shedding Generator Set Management/Despatch
provide a comprehensive solution for any —— • Load start inhibits PRISMIC ® PMS provides extremely The versatility of PRISMIC ® PMS enables it
industry, location and application, from —— • Load reconnection rapid intelligent load shedding to prevent to interact with any manufacturer’s engine/
oil platforms to financial data centres. And —— • C ontrolled load reduction (VSD etc) blackouts, which means operational uptime turbine and generator control systems,
we’ve made sure it’s flexible enough to is maximised and disturbances to sensitive controlling any size of engine or generator.
—— • Transformer tap-changer control and
be tailored to your specific organisation, loads are minimised. Fast acting load
monitoring —— Generators can be manually started and
to meet your exact site requirements. shedding can be initiated in less than
stopped from the HMI
—— Powerful Human Machine Interface 10ms and intelligent load shedding
—— Intelligent Load Shedding: (HMI): algorithms ensure that only the minimum —— Generators can be automatically started
—— • Fast acting initiated by sudden loss of number of load feeders are tripped and stopped on load demand
—— • HMIs provide improved control
generating capability minimising disruption to operations.
and visualisation of the electrical —— Fuel types used for turbines can be
—— • Generator gradual overload shedding power system Load priority assignments are easily adjusted controlled or monitored
—— • Under frequency shedding —— • Multiple networked workstations can by operators using the HMI software, or
—— DLN/DLE emissions reduction
—— • Rate of change of frequency shedding be fitted locally in control panels and/or automatically using intelligent algorithms,
functionality can be supervised by
—— • Initiated by turbine pre-trip warning such desk mounted to suit individual plant operational needs.
PRISMIC ® PMS
as turbine exhaust over temperature (T5) —— • C omprehensive trending and event Controlled load reduction is also possible to
—— • Initiated by transformer or recording facilities are included avoid the need for load shedding, for example
interconnector overload —— • HMIs can be used for operators to by reducing thruster pitch. Load Start Inhibit
—— • Multiple or dynamic load priority tables initiate commands for any required PMS Gradual overload, under frequency and When the power generation system
—— • Step load limiting functionality such as: rate of change of frequency load shedding spinning reserve is low PRISMIC ® PMS is
—— • Generator starting and stopping functions are also provided to protect the able to prevent additional loads from being
—— Control of Voltage, Frequency, Power, —— • Busbar synchronising power system from a cascade failure connected to the system. The HMI clearly
MVAr/Power Factor: and blackout. displays all loads that are inhibited.
—— • Opening and closing of circuit
—— • Power system frequency and breakers
voltage control —— • Multiple language HMI options Control of Voltage, Frequency, Power, Other Control Features
—— • Power sharing (MW and MVAr) are available MVAr/Power Factor Our flexible approach and extensive
—— • Grid and interconnector power target
—— Data Transfer with External Systems: PRISMIC ® PMS can be configured to knowledge of designing Power Management
control (MW, MVAr and PF)
control system parameters to meet demand Systems allows us to easily implement your
—— • Individual generator baseload target A wide range of communication protocols
requirements to satisfy various combinations custom requirements.
control (MW, MVAr and PF) are available for transfer of data to or from
of operational needs such as minimum
—— • Group set-point target other systems such as: —— Circuit breakers, bus-ties and load
energy usage, export or import of system
(MW, MVAr and PF) —— • DCS/SCADA feeders can be both monitored and
power as required by energy trading
—— • IEDs controlled from the HMI
—— • DLN/DLE operating modes contracts or operation at particular levels to
—— • Voltage boosting facility —— • Switchgear ensure minimum emissions. —— C ontrol of neutral earthing resistors is
—— • Protection relays available, as well as tap-changer control
—— • Generator capability de-rating —— Steady state voltage and frequency of the
of transformers
—— • Motor control centres power system are accurately controlled
—— Generator Set Management/Despatch: —— • Generator and turbine controllers —— PRISMIC ® PMS can be configured to
—— Active and reactive power levels are fully
—— • Automatic start sequence with low synchronise groups of generators across
controlled with power shared evenly
spinning reserve —— Options for Increased Integrity: bus-couplers and interconnectors
between all the generators or controlled
—— • Automatic start sequence prior —— • Single location redundant master control to specified target levels
to large motor start modules – providing a local hot standby
—— Several modes of operation are available
—— • Automatic stop sequence with high —— • Multiple location redundant master
for each generator such as power factor
spinning reserve control modules – autonomous
control and reactive power control,
—— • Manual generator start and stop controllers take control of the
baseload control etc
sequence initiation from HMI respective power system sections if the
—— • Neutral earthing contactor communications network is divided —— PRISMIC ® PMS can actively control
(automatic and manual) —— • Redundant input/output modules power factor and import/export of power
—— • Redundant communication channels from a grid/utility network or another
—— • Black start
interconnected power generation system

EXTREMELY RAPID
INTELLIGENT LOAD
SHEDDING
PRISMIC® PMS Networked HMIs
Distributed Across Your Site
Dual Master Controllers –
These can be physically located
in one of the substation panels
GPS Antenna
and NTP Server
for Time
Synchronisation

Online PrinTer To Plant


Support DCS/SCADA
Distributed hmis

NTP Server


Real Time/Deterministic
Fibre Networks Exclusively
Used by PRISMIC®

HMI Fibre Network

Dual Ethernet
Connections
to IO units

T T T Grid

Turbine Turbine Turbine

Hardwired
G G G
IO for
Critical and Generator Generator Generator

prismic® pms panel Real Time


Signals

S
SWITCHGEAR

S
To UCPs,
Protection
Relays,
Switchgear
IEDs Via
S IEC61850 Scalable to suit
or Other power system
various optical/ Protocols
ethernet networks
S

MODBUS SERIAL LINKS


OVER RS485 S

VSD
S

M M
Substation network

MOTOR MOTOR

SUBSTATION BOUNDARY
PSe Enclosure
Type PSe
19” rack mount
A Continually
SPECIFICATION Processor
Code
Intel IXP425 and Infineon Tricore TC1130
C++ & QNX
developing power
Communications
Distributed systems
Operating systems
Predominantly Ethernet (100BaseT)
Remote IO & multi master
QNX Neutrino real time operating system
management system
Event logging Resolution time = 1ms (time stamped at I/O rack)
Trending Resolution time = 100ms
HMI Windows XP/Vista/7>Ethernet comms/integrated event log
Voltage control 4
ENGINE AND Frequency control 4
GENERATOR Watts control
VAr control
4

CONTROL Grid target (Watts & VArs & PF)


4
4 Real Time Simulation Event Recording and Trending Facility
Group target (Watts & VArs) 4
Generator targets (Watts & VArs & PF)
When we engineer a system, it is totally Whenever an event occurs it is locally
4
Gradual shedding 4
bespoke; we design it specifically in time stamped to 1ms resolution before
LOAD Under frequency shedding 4 consultation with you. We fully test your being stored.
system at BRUSH, to make sure it does
SHEDDING Multiple level under frequency shedding
Rate of change of frequency shedding
4
4 exactly what you need it to do, and accurately
All monitored plant equipment can be
trended by PRISMIC ® PMS so that a clear
Transformer overload protection 4 record all relevant processes. We use a real
graphical representation of the data can
Interconnector overload protection 4 time closed loop simulation package to test
be viewed using the HMI PCs.
Load shed test facilities 4 real scenarios in a controlled environment.
Grid import limit 4 This simulation package is also available for Trending and event data is continuously
Generator breaker (on opening) 4 onsite training. recorded with regular automatic backups
FAST ACTING Generator protection (on operation) 4 and this data can easily be exported for use
Superior design and test methods at
LOAD SHEDDING Pre-trip warning (on alarm)
Turbine temperature HiHi (on alarm)
4
4 BRUSH mean that it is extremely rare to
with other software such as Microsoft Excel.
Interconnector/bus coupler fault 4 need to perform software code modification
Transformer fault 4 onsite, which speeds up the commissioning Communications
Fast shed test 4 process and minimises risk. If any changes
Multiple priority shed tables 4 are needed, we carefully review them with We’ve designed PRISMIC ® PMS with
Dynamic priority shed tables 4 you and plan thoroughly so that when we both a reliable and flexible approach to
Low spinning reserve 4 implement the changes, we’ll know exactly communicating with external systems such
GENERATOR To replace set that has failed to start 4 how it will affect the power system. Unlike as SCADA, DCS, switchgear and IEDs.
STARTING To replace set that has failed to synchronise
To replace set with pre-trip warning
4
4
many PLC based systems, PRISMIC ® PMS —— All data can be sent in an open format to
uses a strict software revision control system the provider’s equipment and is clearly
Manual via HMI 4
with software held on secure servers backed defined for ease of integration
Manual via push button 4
Large load start requirement
up in multiple locations.
4
Manual confirmation
—— Many communication options are
4
Via DCS/SCADA 4
available including Ethernet, OPC,
High spinning reserve 4
Real Time Operating System Modbus and IEC 61850
GENERATOR Generator/turbine warning 4 PRISMIC ® PMS utilises QNX, a real-time —— PRISMIC ® PMS controllers and I/O
STOPPING Manual via HMI 4 operating system considered the most racks communicate using a deterministic
Manual via push button 4 robust industrial option available. QNX Ethernet protocol specifically designed
Manual confirmation 4 has a protected kernel and self healing for power system control and load
Via DCS/SCADA 4 capabilities, which ensure that functionality
Real time deterministic Ethernet shedding applications
4 is particularly robust.
COMMUNICATIONS Serial DCS/SCADA link 4 —— When multiple controllers are interlinked
Ethernet DCS/SCADA 4
on the PRISMIC ® PMS network, it
Serial IED interface 4 HMI – Human Machine Interface is possible to remotely re-program
Ethernet IED interface 4
OPC gateway Multiple HMI display screens are available to controllers to accommodate changes
4
IEC 61850 gateway 4 be used with each PRIMSIC ® PMS. All HMIs in the power system. This is particularly
Time synchronisation 4 (1ms) have multiple access rights for supervisory, useful when sites are geographically
Multiple autonomous masters if comms fails 4 operator and view only modes. Touch screen distant or in hard to reach environments
High speed HMI data refresh rate and trending 4 (100ms) options mounted on the equipment panels
HMI High resolution event logging 4 (1ms) are available, as well as desk mounted
Ethernet PMS to HMI link 4 HMIs. Options are available to locate
Serial PMS to HMI link 4 HMIs remotely to provide access to the
Touch screen HMI 4 PRISMIC ® PMS.
Multiple alarm priorities 4
Multi-language support 4 Multi-language options are available for
Group/multi set synchronising 4 every HMI developed. Features contained
MISCELLANEOUS Tap changer control 4 on the HMI are configurable for operator
Enhanced dry low NOX control 4 requirements.
Load start inhibit 4
Voltage boost for large motor start 4
Load reconnect 4
Manual circuit breaker control 4
Black start 4
System training simulator 4
Temperature compensation 4
Dead bus check and closure 4
CB discrepancy monitoring and associated safe mode 4
Dual fuel compensation 4
Engine load cycling 4
diverse industries
unusual locations
uNRIVALLED service

Many diverse industries depend upon Industrial


PRISMIC® PMS Industrial sites can range from banks to
PRISMIC® PMS has been developed airports, hospitals, military bases, waste
to answer the many and varied demands incineration plants, all with vital and varying
of vastly differing industries and often power generating plant requirements. In
harsh environments. BRUSH is highly many cases standby power is needed in
experienced in providing the exact case of grid/utility power network failure.
functionality and support required by The system can be semi or fully automatic
each individual application. to keep manual intervention to a minimum.
Sites such as manufacturing plants or
water utilities often generate electricity as
Oil and Gas a by-product, which can be used to operate
Oil and Gas installations that are either the plant and any surplus can be exported.
offshore or in remote locations demand a PRISMIC® PMS controls the power flow
substantial and self-contained electrical to or from the site so that operating
power system. PRISMIC® PMS offers fast conditions are always optimised.
acting load shedding to prevent cascade
failure if the generating plant were to go down
unexpectedly. Automatic start/stop facilities, Dockyards
triggered by changes in demand, means that Motor-generator sets are often used to
power generation is constantly matched to provide 60Hz supplies for ships moored at
production demand. This allows operators dockyards where the national power system
to focus on other important tasks without the only operates at 50Hz. PRISMIC® PMS can
worry of controlling the power generation. be used to control such systems, making
adjustments to AVR datum points and stator
Where an installation is connected to a
racking gear to facilitate power sharing.
grid or another power source, such as
interconnected platforms, PRISMIC®
PMS can accurately control power flows Comprehensive Training
to meet import or export agreements
Training for your team is available both
and requirements.
on site and at the BRUSH training facility.
The BRUSH power system simulator and
real generators are used to provide an
Marine
in depth understanding of your power
A number of vessels operate on the ‘Electric management system.
Ship Principle’, whereby the propulsion
and service load are supplied by a common
electrical power supply, which improves 24 Hour Support
flexibility and manoeuvrability. Worldwide presence of BRUSH service
As load profiles can be erratic, PRISMIC® engineers and our technical support
PMS can be tailored to provide specialist team provide you with expert advice and
control features for marine environments, assistance when you need it.
such as electrical propulsion, thruster
control, synchronous compensation and
interface to dynamic positioning computers.

IMPROVING SECURITY
OF POWER GENERATION
NO MATTER WHAT
THE INDUSTRY

You might also like