01 02 03 04 05 06 07 08 09 10 11
60,000
6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000
1,800 2,400 9,600 2,400 9,600 2,400 9,600 2,400 9,600 2,400 7,800
A A
1,300
1,300
3m 3m 3m 3m 3m 3m
4way Switch Light in Every 3m Light Light in Every 3m 100x900mm thick concrete Light in Every 3m
4gang
5,000
5,000
plinth all round laid to fall
2,400
2,400
Double Soket
1,550
B B
Metal steel door 3m 3m
3m 3m 3m 3m
gate 01 to details Light in Every 3m Light in Every 3m
Light in Every 3m
5,000
5,000
4,500
7,600
R.C ramp to details
C C
1,550
3m 3m 3m 3m 3m 3m 3m 3m
L[01]09
L[01]11
5,000
5,000
2,400
2,400
High level steel
louvred fixed vents
Steel 'H' columns to
Structural Engineer's
specifications
30,000
30,000
2,600
D D
3,175
rwo Light Cable rwo
3m 3m
3m 3m
Light in Every 3m
Light in Every 3m
GODOWN SPACE
5,000
5,000
2,400
Sockets Cable
hardened screed floor
2,400
1,550
E E
Metal steel door 3m 3m 3m 3m
3m 3m
gate 01 to details Light in Every 3m
Light in Every 3m Light in Every 3m
5,000
5,000
4,500
7,025
F F
1,500
1,550
3m 3m
Distribution Board
125AMPs Light in Every 3m
16Wats
5,000
5,000
2,400
2,400
h
itc
Metal sliding Concrete plinth footing with Metal sliding
an Sw
100x900mm thick concrete High level steel
4g way
pre-painted IT4 profile metal sheet gate 03 to details
g
gate 02 to details louvred fixed vents
4
plinth all round laid to fall
walling to approval
1,300
1,300
G G
1,500
1,800 2,400 8,300 5,000 8,300 2,400 3,600 2,400 8,300 5,000 8,300 2,400 1,800
6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000 6,000
Distribution
Board 100AMPs 60,000