PHASE 01 - 15.08.2022
A-03009

LB01 6.1 6.2 6.3 6.4 6.5 6.6 6.7

PHASE 02 - 15.10.2022
3.75 8.60 4.30 4.30 8.60 3.75

6.A

10.95
6.B

Storage
PHASE 03 - 15.12.2022
-5.000

8.00
H
6.C

Plant Room Pump Room


(Fire Protection) L
HOTEL OPERATOR BLACK BOX
EARLY ACCESS 30.04.2022
A-03009
A-03007

8.00
6.D

8.00
4.1

PHASE 04
4.2
4.2 Water Tanks
5
J
(Fire Protection)
A-03008
4.A 8.4 4.3 6.E
5
0
4.2

7.9 4.4
5

8.00
4.B

7.9 4.5
5 Water Tanks
(Potable Water)
0

8.4 4.6 6.F


7.9

5 Pump Room

LEVEL 18 STORAGE SPACE


G (Potable Water)

4.00
4.7
A-03007 4.2
5 4.8
4.10
4.C
7.7 6.G
9.0 0
0 4.9

5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11
5

4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 3.45 4.25 7.80 6.50 5.30

9.15
1.00 4.75 4.75 4.75 4.75 4.75 4.75 4.75 7.80 4.25 5.50 7.95 7.95 5.50 4.25
9.1

1.15

4.D
5.A
6.H

4.25
Wa
ter

3.70

5.00
Ta
nk
(Fir
-05
0

e
7.9

.16 Pro
tec
7 tio 6.J
5.B
n)

-06
.50
4.E
0

6.95
-05 -07

8.00
.21 .30
7 0 -06
0

.50
4.2

0
4.F
5.C
I
A-03008

4.98
Pu
mp

6.60
Wa (Fir Ro
ter eP om 5.D
(Po Ta rote
tab nk
le W cti
o n)
ate
r)

4.98
-07 Pu
mp
.30 (Po Ro
0 tab om
le W
3.00

3.00
ate
r) Wa -5.000 -5.00 -5.000
ter 5.E
(Fir Ta
eP nk
rote
cti Wa Fire Pumps Room Sprinklers Tank Entertainment
o n) ter
-07 (Fir Ta Water Tank Hotel Water Tank Hotel Water Tank Hotel Water Tank Hotel Water Tank
Wa eP nk
.30

6.95
ter rote
Ta 0
5.30

5.30
(Po nk cti
tab o n)
le W Water
ate -07 Sprinklers Tank
Treatment
r) .30
-06 0
.50
0
Core 2.8 5.F

Entertainment

4.25
Retail Water Tank Water Tank
8.30

8.30
Car Park 5.G
Retail Water Tank
Water Tank
3.00

3.00
Substation

Water Pumps Water Pumps Hot Water Plant Storage Storage Hotel Water Pumps
5.45

5.45
Core 2.9

-05.333 -05.333
9.15

9.15
INTERIOR DESIGN - REFER TO SPECIALIST INTERIORS PACKAGE

FA˙ADE INFORMATION - REFER TO FA˙ADE PACKAGE

LANDSCAPE INFORMATION - REFER TO LANDSCAPE PACKAGE


8.10

8.10
Zone of Substructure
11.15

11.15
F
A-03006
0.63

SPECIALIST INTERIORS PACKAGE

REFER TO I-205001
3.20

3.20
8.60

8.60
8.00

8.00
Core 3.2 Core 1.1

Core 2.9
8.00

8.00
8.00

8.00
E
A-03005
Core 1.2 G 14.12.2018 GENERAL AMENDMENTS MC OH

F 18.10.2016 GENERAL UPDATE MC OH


Core 3.1
8.00

8.00
E 17.12.2014 CONSTRUCTION ISSUE MC OH

D 03.03.2014 CONSTRUCTION ISSUE MC OH

C 01.11.2013 CONSTRUCTION ISSUE MC OH

B 19.04.2013 CONTRACT ISSUE B


8.00

8.00
N A 22.02.2013 CONTRACT ISSUE A
A-33105

FOR CONSTRUCTION

UP
8.00

8.00
M
A-33104
8.00

8.00
Core 3.3

Parking
8.00

8.00
Parking
-04.500 - 04.500

ARCHITECTURAL WORKS
4.70

4.70
Core 3.4 External Core 1.3

GENERAL ARRANGEMENT
LEVEL B01 PLAN
-6.50, -5.17, -5.00, -4.50 M
3.60 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.50 0.50 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.60 7.40 8.00 3.75

22.02.2013

1:500 @ A1
A-01001 G
O A B C D
A-33106 A-03001 A-03002 A-03003 A-03004
1090

A-01001_G.dwg

GENERAL ARRANGEMENT LEVEL B01 PLAN ( -6.50, -5.17, -5.00, -4.50 M )


H1 1:500 @ A1
K
A-03009

6.1 6.2 6.3 6.4 6.5 6.6 6.7

L00
3.75 8.60 4.30 4.30 8.60 3.75

6.A

10.95
6.B

8.00
6.C

L
H
A-03009
A-03007

8.00
6.D

Void

8.00
4.1

4.2
4.2
5
J
A-03008
4.A 8.4 4.3 6.E
5
0
4.2

7.9 4.4
5

8.00
4.B

7.9 4.5
5
0

8.4 4.6 6.F


7.9

5
G

4.00
4.7
A-03007 4.2
5 4.8
4.10
4.C
7.7 6.G
9.0 0
0 4.9

5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11
5

4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 3.45 4.25 7.80 6.50 5.30

9.15
1.00 4.75 4.75 4.75 4.75 4.75 4.75 4.75 7.80 4.25 5.50 7.95 7.95 5.50 4.25
9.1

1.15

4.D
5.A
6.H
Water Tank Water Tank Water Tank

4.25
3.70

5.00
(Fire Protection) (Fire Protection) (Fire Protection)
0

-02
7.9

.33 5.B
3 6.J

4.E -01.667

6.95
-01.250

8.00
-02
.33 Pump Room Water Tank
0

3
4.2

(Fire Protection) (Fire Protection)

4.F
5.C
I
Storage
A-03008

4.98
Sto
rag
e

6.60
5.D
-03
.66 Plant Room
7

4.98
Sto
rag
e
3.00

3.00
5.E

LANDSCAPE PACKAGE

6.95
Water Tank
-01.667 -01.667
5.30

5.30
(Potable Water)

Core 2.8 5.F

4.25
Sto Pump Room Water Tank
rag
e (Potable Water) (Potable Water)
8.30

8.30
5.G

LANDSCAPE PACKAGE

REFER TO L-101159
3.00

3.00
5.45

5.45
Core 2.9 Plant Room Plant Room Mezzanine

Plant Room Time Office Mini Mart

First Aid
9.15

9.15
Core 2.14

Male Executive Lockers/ Dressing Rooms Male Non Executive Lockers/Dressing Rooms Male Non Executive Lockers/Dressing Rooms
-02.333 INTERIOR DESIGN - REFER TO SPECIALIST INTERIORS PACKAGE
Core 2.10

FA˙ADE INFORMATION - REFER TO FA˙ADE PACKAGE

Uniform LANDSCAPE INFORMATION - REFER TO LANDSCAPE PACKAGE


8.10

8.10
Storage

Core 2.11
Additional
Stores

Core 2.1 Core 2.4

-02.333

Fire curtain
Core 2.2 Core 2.12 Core 2.13 Core 2.3
Engineering Offices Engineering Areas - Workshops/Storage Female Lockers/Dressing Rooms Telecom LANDSCAPE PACKAGE
11.15

11.15
-02.333 REFER TO L-101159

Switch Hotel Security


Core 2.15 Core 2.16 Core 2.17 Staff Entrance
boards wc

BD1&3 L00 Car Park Lobby


11%
F
Mechanical Elect & AC Civil
A-03006
0.63

Eng. General Stores Workshop Workshop Workshop

Car Park
Security
Uniform Distribution

Linear Park by JKP


3.20

3.20
8.60

8.60
Staff access & parking -01.667
Parking SPECIALIST INTERIORS PACKAGE -01.667
-01.667 REFER TO I-205001

Core 3.2
8.00

8.00
LANDSCAPE PACKAGE

REFER TO L-101159

Core 1.1
8.00

8.00
Core 2.5
8.00

8.00
E
A-03005
Core 1.2 G 14.12.2018 GENERAL AMENDMENTS MC OH

F 18.10.2016 GENERAL UPDATE MC OH


Core 3.1
8.00

8.00
E 17.12.2014 CONSTRUCTION ISSUE MC OH

D 03.03.2014 CONSTRUCTION ISSUE MC OH

C 01.11.2013 CONSTRUCTION ISSUE MC OH

UP B 19.04.2013 CONTRACT ISSUE B


8.00

8.00
N A 22.02.2013 CONTRACT ISSUE A
A-33105

FOR CONSTRUCTION

DOWN
8.00

8.00
DOWN
M
A-33104
8.00

8.00
DOWN

Core 3.3
8.00

8.00
Parking Parking
-01.667 -01.667

ARCHITECTURAL WORKS
4.70

4.70
Core 3.4 External Core 1.3

GENERAL ARRANGEMENT
LEVEL 00 PLAN
-3.67, -2.33, -1.67, 0.08, 0.17 M
3.60 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.50 0.50 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.60 7.40 8.00 3.75

22.02.2013

1:500 @ A1
A-01002 G
O A B C D
A-33106 A-03001 A-03002 A-03003 A-03004
1090

A-01002_G.dwg

GENERAL ARRANGEMENT LEVEL 00 PLAN ( -3.67, -2.33, -1.67, 0.08, 0.17 M )


H1 1:500 @ A1
K
A-03009

6.1 6.2 6.3 6.4 6.5 6.6 6.7

3.75 8.60 4.30 4.30 8.60 3.75

L
6.A

LANDSCAPE PACKAGE

REFER TO L-101113

10.95
01 6.B

8.00
Lobby
+01.000

ND
6.C

D STA
HAR
VICE
L
H

SER
A-03009
A-03007

FIRE
8.00
6.D

8.00
4.1
TURNING AREA

4.2
4.2
5
J
A-03008
4.A 8.4 4.3 6.E
5

This Drop off area will be used as a


FIR
E SE
RV
0

ICE
HA
RD
4.2

ST
7.9 4.4 AN
D
5

8.00
staging area for HKN
4.B

7.9 4.5
5

RE
FU
SE
CO
0

LL
EC
TION
8.4 4.6 6.F
7.9

LA 5
G ND +01.2

SC
5

4.00
AP 4.7
A-03007 RE EP 4.2 4.8
+01.2
8

FE A
CK 5
RT AG 4.10
4.C OL E
-10
111 9.0
7.7 6.G
1 0
0 4.9 FIRE SERVICE
HARD STAND

-00.5
5 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11
5

4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 3.45 4.25 7.80 6.50 5.30

9.15
1.00 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 7.80 4.25 5.50 7.95 7.95 5.50 4.25
9.1

CA
R PA
RK Hoist
EN [x
]
TR
AN
CE
/ EX
IT
CAR PARK ENTRANCE +01.000 1.15 CAR PARK EXIT FIRE SERVICE HARD STAND

CAR PARK ENTRANCE / EXIT


+01.0
5
HOTEL SERVICE AREA EXIT
REFUSE COLLECTIO
N
4.D

1.385

1.385

R=
5.A

2.61
5
6.H LANDSCAPE PACKAGE

4.25
3.70

5.00
REFER TO L-101114
0
7.9

5.B
6.J

Lo Fire Escape +01.120


4.E bby +0
1.3

6.95
+0 70 G

0.8 +01.583

8.00
33 +01.333 Water
0
4.2

FIRE SERVICE HARD STAND CEB General Treatment


Metering Room Hotel Substation Equipments Courier
4.F
5.C
I
A-03008

4.98
LANDSCAPE PACKAGE

REFER TO L-101111 Core 2.7

6.60
5.D
Hotel Substation Waiting Area

4.98
Retail Unit Mall Retail Unit
Hallway +01.333
(Shell & Core) (Shell & Core) Lobby
door
egre in
ss
with curta

+01.500
Fire

3.00

3.00
Fire curtain with egress door

5.E

+0
0.3
33 HOTEL SERVICE AREA ENTRANCE

+01.167

6.95
LA
5.30

5.30
ND Core 2.8
+00.300
SC
AP
RE EP
FE A CK +01.333
RT AG
O L-1 E
011 5.F
15
+01.167

4.25
Retail Unit
8.30

8.30
(Shell & Core) +00.167
5.G
+01.500
Core 2.6

LANDSCAPE PACKAGE

REFER TO L-101158
3.00

3.00
Hotel loading bay - 7,8

Hotel loading bay - 4,5


Hotel loading bay - 6

Hotel loading bay - 3

Hotel loading bay - 2

Hotel loading bay - 1

Hotel refuse bay - 2

Hotel refuse bay - 1


LANDSCAPE PACKAGE LANDSCAPE PACKAGE
RETAIL + ENTERT. SERVICE AREA
REFER TO L-101112 REFER TO L-101112
5.45

5.45
Core 2.9

LANDSCAPE PACKAGE
+02.667 +01.500
REFER TO L-101158

Entertainment / Hotel Lobby VIP Lobby


Eastern Conference Lobby

LANDSCAPE PACKAGE
+01.500 SPECIALIST INTERIORS PACKAGE SPECIALIST INTERIORS SPECIALIST INTERIORS PACKAGE +01.500
REFER TO L-101155
9.15

9.15
Core 2.14 REFER TO I-210101 PACKAGE REFER TO I-211101

ENTERTAINMENT REFER TO I-210101


+02.333
REF NOTE 11
Core 2.10
+02.667 INTERIOR DESIGN - REFER TO SPECIALIST INTERIORS PACKAGE

FA˙ADE INFORMATION - REFER TO FA˙ADE PACKAGE

LANDSCAPE INFORMATION - REFER TO LANDSCAPE PACKAGE


8.10

8.10
Security

TD
TD
Office Core 2.11

TD
TD
TD

TD
TD

TD
Linen Sorting

TD
TD
Core 2.1 Core 2.4

HD
HD
Retail +02.413 +02.333
Lobby F&B PACKAGE
Core 2.2 Core 2.12 Core 2.13 Core 2.3 Loading Bay & Receiving
+01.333 REFER TO FB-A-218110 +01.500
11.15

11.15
Waste
F&B PACKAGE REFER TO FB-A-218101
Entert. Equip.

A-03006
F
Core 2.16 Core 2.17

Linen Storage
Luggage
Store

Water Treatment Plantroom


Security/ CCTV SPECIALIST INTERIORS PACKAGE +01.500 Bridge by JKP
0.63

Storage
REFER TO I-211101
Western Conference Lobby
3.20

3.20
ENTERTAINMENT
+ 01.480
REF NOTE 11 +01.56 +01.500

LANDSCAPE PACKAGE
8.60

8.60
REFER TO L-101158

+ 01.480 +01.400

Core 3.2
EXIT
FROM
DROP
OFF

+02.667 +01.500
8.00

8.00
+01.000 +02.667
EXIT
FROM
CAR
PARK

Core 1.1

HOTEL
CAR
PARK
& DRO
P OFF
8.00

8.00
Core 2.5

HOTEL
CAR
PARK
& DRO
P OFF

+01.564

CAR
PARK
DROP LOW
ER LEV
OFF ENT ELS
RANCE
8.00

8.00
LANDSCAPE PACKAGE
CAR
PARK

REFER TO L-101155 LANDSCAPE PACKAGE UPPE


R LEV

E
+01.000 ELS

A-03005 REFER TO L-101157


G 14.12.2018 GENERAL AMENDMENTS MC OH
Core 1.2
Core 3.1
+ 02.667 F 18.10.2016 GENERAL UPDATE MC OH
8.00

8.00
E 07.12.2014 CONSTRUCTION ISSUE MC OH

D 03.03.2014 CONSTRUCTION ISSUE MC OH

C 01.11.2013 CONSTRUCTION ISSUE MC OH

B 19.04.2013 CONTRACT ISSUE B


8.00

8.00
N A 22.02.2013 CONTRACT ISSUE A
A-33105

+01.000

+ 01.560
FOR CONSTRUCTION
8.00

8.00
+ 02.667
M
A-33104

BD#1&3 L1 Landscape Area LANDSCAPE PACKAGE


+01.000 + 02.667
+01.667
8.00

8.00
REFER TO L-101156

+ 01.900
+01.500 Core 3.3

+01.500
+01.400
8.00

8.00
LANDSCAPE PACKAGE

+01.500 +01.460 REFER TO L-101157

ARCHITECTURAL WORKS
4.70

4.70
+01.000
+01.000 +01.167 +01.000 +01.000

Core 3.4 External Core 1.3


LANDSCAPE PACKAGE LANDSCAPE PACKAGE

REFER TO L-101156 REFER TO L-101156


GENERAL ARRANGEMENT
LEVEL 01 PLAN
0.83, 1.00, 1.40, 1.50, 2.33,
3.60 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.50 0.50 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.60 7.40 8.00 3.75

2.67 M

22.02.2013

1:500 @ A1
A-01003 G
O A B C D
A-33106 A-03001 A-03002 A-03003 A-03004
1090

A-01003_G.dwg

GENERAL ARRANGEMENT LEVEL 01 PLAN ( 0.83, 1.00, 1.40, 1.50, 2.33, 2.67 M )
H1 1:500 @ A1
L02

Bridge by JKP
K
A-03009

6.1 6.2 6.3 6.4 6.5 6.6 6.7

3.75 8.60 4.30 4.30 8.60 3.75

6.A

10.95
L03 6.B

2022. 02. 28

8.00
+07.000 +06.500
6.C

L
H
A-03009
A-03007

8.00
6.D

8.00
4.1

4.2
4.2
5
J
A-03008
4.A 8.4 4.3 6.E
5
0
4.2

7.9 4.4
5

8.00
4.B

7.9 4.5
5
0

8.4 4.6 6.F


7.9

5
G

4.00
4.7
A-03007 4.2
5 4.8
4.10
4.C
7.7 6.G
9.0 0
0 4.9

5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11
5

4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 3.45 4.25 7.80 6.50 5.30

9.15
1.00 4.75 4.75 4.75 4.75 4.75 4.75 4.75 7.80 4.25 5.50 7.95 7.95 5.50 4.25
9.1

+08.040 +08.500 1.15

4.D
5.A
6.H

4.25
3.70

5.00
Pa
rki
ng
0
7.9

+0 5.B
7.3 6.J
33 HR Department
Training Room

4.E Lo Parking

6.95
bby
+07.250

8.00
+0
7.3
0

33
4.2

Ladies Game Room


4.F
5.C
I
A-03008

4.98
Training Room Core 2.7

6.60
Pa 5.D
rki
ng
+0
8.7
51

4.98
Lobby
+08.667
3.00

3.00
Training Room 5.E

Finances Department

6.95
5.30

5.30
Core 2.8
+08.667

5.F

4.25
+07.000
8.30

8.30
Gents Game Room
Staff Restaurant 5.G
Core 2.6
3.00

3.00
Marketing

Hotel Operator Communications


Department
F&B PACKAGE
5.45

5.45
Core 2.9
REFER TO FB-.A-218115

Black Box
Area :Marketing and Room Sales
Department

Finance Office
9.15

9.15
Staff Lounge Core 2.14

+07.000
Void

Access Date 30.04.22 Meeting Room


Core 2.10 INTERIOR DESIGN - REFER TO SPECIALIST INTERIORS PACKAGE

FA˙ADE INFORMATION - REFER TO FA˙ADE PACKAGE

LANDSCAPE INFORMATION - REFER TO LANDSCAPE PACKAGE


8.10

8.10
Administration
SPECIALIST
Lobby INTERIORS PACKAGE

REFER TO I-219401 Core 2.11

Meeting Room Linen


Chute

Core 2.1 Core 2.4


+07.000
Core 2.2 Core 2.12 Core 2.13 Core 2.3
Hotel Lobby Open to Below ES2.4b F&B PACKAGE
11.15

11.15
ES2.4a REFER TO FB-.A-218115
Staff Kitchen
Core 2.16 Core 2.17 +08.000
F
+07.000
A-03006
0.63

+07.833
3.20

3.20
SPECIALIST INTERIORS PACKAGE

REFER TO I-220101
8.60

8.60
SPECIALIST INTERIORS

Parking PACKAGE

REFER TO I-205002

+07.833

Core 3.2
8.00

8.00
8.00

8.00
Core 2.5
8.00

8.00
I 14.12.2018 CONSTRUCTION ISSUE MC OH

H 23.06.2017 CANOPY REVISION MC OH


E
A-03005
G 18.10.2016 GENERAL UPDATE MC OH

F 07.01.2015 CONSTRUCTION ISSUE MC OH


Core 3.1
8.00

8.00
E 07.09.2014 CONSTRUCTION ISSUE MC OH

D 07.08.2014 CONSTRUCTION ISSUE MC OH

C 07.07.2014 CONSTRUCTION ISSUE MC OH

UP B 19.04.2013 CONTRACT ISSUE B


8.00

8.00
N A 22.02.2013 CONTRACT ISSUE A
A-33105

FOR CONSTRUCTION
8.00

8.00
UP
M
A-33104
8.00

8.00
Core 3.3

Parking
8.00

8.00
Parking Parking
+07.833

ARCHITECTURAL WORKS
4.70

4.70
Core 3.4

GENERAL ARRANGEMENT
LEVEL 03 PLAN
6.50, 7.00, 7.33, 7.83, 8.67 M
3.60 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.50 0.50 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.60 7.40 8.00 3.75

22.02.2013

1:500 @ A1
A-01005 I
O A B C D
A-33106 A-03001 A-03002 A-03003 A-03004
1090

A-01005_I.dwg

GENERAL ARRANGEMENT LEVEL 03 PLAN ( 6.50, 7.00, 7.33, 7.83, 8.67 M )


H1 1:500 @ A1
K
A-03009

6.1 6.2 6.3 6.4 6.5 6.6 6.7

3.75 8.60 4.30 4.30 8.60 3.75

6.A

Lobby

10.95
+08.000

L04
6.B

8.00
6.C

L
H
A-03009
A-03007

8.00
+10.000 +09.500

6.D

8.00
4.1

4.2
4.2
5
J
A-03008
4.A 8.4 4.3 6.E
5
0
4.2

7.9 4.4
5

8.00
4.B

7.9 4.5
5
0

8.4 4.6 6.F


7.9

5
G

4.00
4.7
A-03007 4.2
5 4.8
4.10
4.C
7.7 6.G
9.0 0
0 4.9 Genset

5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11
5

4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 3.45 4.25 7.80 6.50 5.30

9.15
1.00 4.75 4.75 4.75 4.75 4.75 4.75 7.80 4.25 5.50 7.95 7.95 5.50 4.25
9.1

+11.040 +11.500
1.15

4.D
5.A
6.H

4.25
3.70

5.00
Pa
rki
ng
0
7.9

+1 5.B
0.1 6.J
67

4.E Lo Parking

6.95
bby
+10.083

8.00
+1
0.1
0

67
4.2

4.F
5.C
Pool Equip. G

I
A-03008

4.98
wc
200

wc
200

wc
200

wc
200

Core 2.7 Water tank

6.60
Dep
125

Dep
125
Roof

Pa
200 Bal
125

Roof wc

5.D
200 200

rki wc
200

wc

ng
200

wc
200

wc
200

+1
PB
125

Roof
250

1.5 Roof
250

83

4.98
+11.080 F&B PACKAGE REFER TO FB-A-218122
FACADE PACKAGE _DROP-OFF SOFFIT Lobby
+14.833
3.00

3.00
REFER TO F-20232
5.E

Core 2.8

6.95
5.30

5.30
+12.57 (S)

5.F

4.25
8.30

8.30
5.G
Core 2.6

+10.500
Commissary Kitchen
3.00

3.00
F&B PACKAGE REFER TO FB-A-218123
5.45

5.45
Core 2.9

ENTERTAINMENT PLANTROOM

REF NOTE 11
9.15

9.15
Valet Laundry F&B PACKAGE
Core 2.14

REFER TO FB-A-218135

+11.000 Hotel Service Corridor +11.000 +11.000 +11.080


Core 2.10 INTERIOR DESIGN - REFER TO SPECIALIST INTERIORS PACKAGE

FA˙ADE INFORMATION - REFER TO FA˙ADE PACKAGE


FH

LANDSCAPE INFORMATION - REFER TO LANDSCAPE PACKAGE


8.10

8.10
Core 2.11

2.75

Core 2.1 Core 2.4


+10.500 +10.500
Core 2.2 Core 2.12 Core 2.13 Core 2.3
+10.985
11.15

11.15
+11.333
Plant Room
Core 2.16 Core 2.17 +08.000
F SPECIALIST INTERIORS PACKAGE
A-03006
0.63

REFER TO I-220101
3.20

3.20
SPECIALIST INTERIORS

PACKAGE

REFER TO I-205002
8.60

8.60
8.00

8.00
Core 3.2
8.00

8.00
Core 2.5
8.00

8.00
I 14.12.2018 CONSTRUCTION ISSUE MC OH

H 23.06.2017 CANOPY REVISION MC OH


E
A-03005
G 18.10.2016 GENERAL UPDATE MC OH
Core 1.2

F 07.01.2015 CONSTRUCTION ISSUE MC OH


Core 3.1
8.00

8.00
E 07.09.2014 CONSTRUCTION ISSUE MC OH

D 07.08.2014 CONSTRUCTION ISSUE MC OH

C 07.07.2014 CONSTRUCTION ISSUE MC OH

B 19.04.2013 CONTRACT ISSUE B


8.00

8.00
N A 22.02.2013 CONTRACT ISSUE A
A-33105

FOR CONSTRUCTION

UP
8.00

8.00
M
A-33104
8.00

8.00
UP

Core 3.3
8.00

8.00
Parking Parking
+10.667 +10.667

ARCHITECTURAL WORKS
4.70

4.70
Core 3.4 External Core 1.3

GENERAL ARRANGEMENT
LEVEL 04 PLAN
9.50, 10.17, 10.50, 10.67,
3.60 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.50 0.50 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.60 7.40 8.00 3.75

11.50 M

22.02.2013

1:500 @ A1
A-01006 I
O A B C D
A-33106 A-03001 A-03002 A-03003 A-03004
1090

A-01006_I.dwg

GENERAL ARRANGEMENT LEVEL 04 PLAN ( 9.50, 10.17, 10.50, 10.67, 11.50 M )


H1 1:500 @ A1
L05

BD1&3 L05 Car Park Lobby


L06

BD22 L6 Entertainment Black


Box Area

to be used to material storage


after COC
L07

BD22 L7 Entertainment Black


Box Area
To be used to material storage
after COC

BD1 L7 Exhibition center


* Facade enclosure completed. (end of July)
* Internal ID work in progress.
L08

BD2 Conference Area


Lobby and access path

BD#1 L8 Exhibition center


* Facade enclosure completed. (end of July)
* Internal ID work in progress.
L09

BD2 L9 External Landscape Area


Ready for COC without ID work Completion
(ID work completion by End of September)

Spa and Sauna


area

BD1 F&B Area

BD1 L9 Ramp to Infinity (BD1)


Ready for COC (ID Work completion by End of
September)
L10

BD1 L10 External Landscape Area


Infinity (BD1) :
Ready for COC without ID
(ID Work completion by End of September)
L11

L11
6.1 6.2 6.3 6.4 6.5 6.6 6.7

3.75 8.60 4.30 4.30 8.60 3.75

6.A

10.95
Lobby
+50.000

6.B

L12~14

8.00
6.C

8.00
6.D

Offices
+50.000

8.00
4.1

4.2
4.2
5

4.A 8.4 4.3 6.E


5
0
4.2

7.9 4.4
5

8.00
4.B

7.9 4.5
5
0

8.4 4.6 6.F


7.9

4.00
4.7
4.2 4.8
5
4.10
4.C
7.7 6.G
9.0 0
0 4.9

5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11
5

4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 3.45 4.25 7.80 6.50 5.30

9.15
1.00 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 7.80 4.25 5.50 7.95 7.95 5.50 4.25
9.1

1.15

B1
a
4.D B2
c 5.A
6.H

4.25
3.70

5.00
0
7.9

5.B
6.J
B1
b
B2
b
C1 Lo
4.E bby

6.95
+4
2.0

8.00
00
0

C2
4.2

4.F
5.C
B2 B1
a B3
B2

4.98
6.60
5.D

4.98
Lobby
B2 B3
+44.333
3.00

3.00
B1
5.E

6.95
5.30

5.30
5.F

4.25
8.30

8.30
5.G
3.00

3.00
5.45

5.45
LANDSCAPE PACKAGE
9.15

9.15
REFER TO L-121401

SPECIALIST INTERIORS PACKAGE REFER TO I-234101 SPECIALIST INTERIORS


Maid’s Room INTERIOR DESIGN - REFER TO SPECIALIST INTERIORS PACKAGE
PACKAGE

REFER TO I-234102
FA˙ADE INFORMATION - REFER TO FA˙ADE PACKAGE
Equip.
Storage
LANDSCAPE INFORMATION - REFER TO LANDSCAPE PACKAGE
8.10

8.10
Bed Storage

Core 2.1 Core 2.4


SPECIALIST INTERIORS PACKAGE REFER TO I-234101 Hotel Rooms SPECIALIST INTERIORS PACKAGE REFER TO I-234102
LANDSCAPE PACKAGE +52.500 Core 2.2 Core 2.12 Core 2.13 Core 2.3
Hotel Rooms
REFER TO L-125001 +52.500
11.15

11.15
0.63
3.20

3.20
8.60

8.60
8.00

8.00
8.00

8.00
8.00

8.00
G 14.12.2018 CONSTRUCTION ISSUE MC OH

F 18.10.2016 GENERAL UPDATE MC OH


8.00

8.00
E 07.05.2015 CONSTRUCTION ISSUE MC OH
Core 2.5

D 07.12.2014 CONSTRUCTION ISSUE MC OH

C 07.09.2014 CONSTRUCTION ISSUE MC OH

B 19.04.2013 CONTRACT ISSUE B


8.00

8.00
A 22.02.2013 CONTRACT ISSUE A

FOR CONSTRUCTION
8.00

8.00
8.00

8.00
8.00

8.00
ARCHITECTURAL WORKS
4.70

4.70
GENERAL ARRANGEMENT
LEVEL 14 PLAN
42.00, 44.33, 50.00, 52.00 M
3.60 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.50 0.50 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.60 7.40 8.00 3.75

22.02.2013

1:500 @ A1
A-01016 G
1090

A-01016_G.dwg

GENERAL ARRANGEMENT LEVEL 14 PLAN ( 42.00, 44.33, 50.00, 52.00 M )


H1 1:500 @ A1
BALMOND STUDIO LONDON OFFICE
Unit 9, 190a New North Road, London N1 7BJ, UK
Tel: +44 20 7043 0651

BALMOND STUDIO COLOMBO OFFICE


Parkland 12A-C No 33, Park Street, Colombo-02, Sri Lanka
Tel: +94 11 7721701

CONDITIONS OF USE:
© Copyright Balmond Studio 2011.
The author asserts the right to be identified as such.
LIFT SHAFT LIFT SHAFT LIFT SHAFT SC6.01 LIFT SHAFT Documentation is to be used for the intended purpose only. Balmond
Studio accepts no liability, however arising, for misuse of drawings
and documents.
Drawings must be read in conjunction with all relevant Contract
Documentation including Preliminaries, Particular Conditions,
General Conditions, Drawings, Particular Specifications and General
CORRIDOR

Specifications.
FFL + 54.000
SSL + 53.950
Any discrepancies between any drawings, specifications, documents,
PLANT ROOM
etc., should be reported to the Engineer in accordance with the
CLEANING
Conditions of Contract.
BATH ROOM
OFFICES
ROOM (DISABLED)
The Contractor remains fully responsible for setting out the works.
BATH ROOM
BATH ROOM
CORRIDOR
BATH ROOM
BATH ROOM
Do not scale drawings. Use figured dimensions only. Dimensions

L15
LOBBY LOBBY

must be checked by the Contractor on site.

John
Keells
Group

ADÃO DA FONSECA
MAST
ER
engenheiros consultores
BEDR
OOM

APAR FFL + 54.000 SC6.02


BALC TMEN
ONY T SSL + 53.950
STAIR
APAR LOBBY
LIVIN

GET
G ROO BALC TMEN
M
ONY T

GESTÃO DE ENERGIA TÉRMICA, LDA.


LIVIN
G ROO
Engenheiros Consultores
M

MAST
de
BATH ER
ROO
M MAST
ER
Alfredo Costa Pereira e Raul Vasconcelos Bessa
BEDR
OOM

BEDR
OOM MAST
ER
BEDR
OOM
BEDR
OOM
BEDR
OOM
APAR
KITCH TMEN
BATH EN T
ROOM
BATH APAR
ROO
M BALC TMEN
ONY T
BATH
ROO APAR
M BEDR
OOM BALC TMEN
B1c ONY T
B2c
CHUT splas BATH
APAR E hbac ROO
KITCH TMEN k M
EN REFU
T
ROOMSE BATH MAST
ROO ER
M BEDR
APAR OOM
STAI KITCH TMEN
SC4. RCAS EN T
02 E

LIVIN
G ROO
AZ76 Consultores
M

BATH
ROOM STAIR
LIVIN
G ROO
de Investimentos
BEDR APAR
OOM KITCH TMEN
EN T
FSL
SERV4.1
M

APARTMENT BALCONY
e Engenharia, Lda
ICE
LIFT
B1b
APARTMENT BALCONY BEDROOM APARTMENT BALCONY
PL MASTER BEDROOM
BATH 4.1
RESID
ROOM ENTS B2b
BATH LIFT APARTMENT
ROO PL MAS KITCHEN
M 4.2 BATH TER
RESID MASTER BEDROOM
ENTS PLAN ROO MASTER BEDROOM
LIFT M

VS-A
C1 T ROO
LOBB
Y PL M
4.3
RESI
LIVIN DENT
G ROOM S LIFT DINING AREA
BEDR LIVING ROOM
PL APAR OOM LIVING ROOM LIVING ROOM
BEDR RESI4.4 KITC TMEN APARTMENT
OOM DENT HEN T HALLWAY
S LIFT
FFL DINING AREA
LIVIN + 45.16 UNIT TYPE B2a
G ROO SSL MASTER BATH ROOM WALK-IN
BEDR 7
OOM M + 45.1 CLOSET
C2 17 MASTER BATH ROOM
MASTER BATH ROOM
BATH ROOM
UNIT TYPE B1a DINING AREA
UNIT TYPE B1c

APAR
KITCH TMEN
EN T
APAR
KITCH TMEN BEDROOM B2a STAIRCASE
EN T STAIR REFUSE CHUTE
SC5.02
BATH ROOM B1a ROOM B1c BEDROOM
B2a
APAR BATH ROOM
BALC TMEN
ONY T

APARTMENT
KITCHEN
BEDR BATH
ROOM BATH
OOM ROO APARTMENT
MAST M KITCHEN
APAR BATH ER PLANT ROOM
BALC TMEN ROOM
ONY T
LIVIN LOBBY
G ROO BEDR
OOM
M
BEDR
OOM MAST
ER APARTMENT
BEDR
OOM KITCHEN PL5.3 PL5.2 PL5.1 FSL 5.1
RESIDENTS LIFT RESIDENTS LIFT RESIDENTS LIFT SERVICE LIFT

MAST APARTMENT
BATH ER
ROO
M BEDROOM
BATH ROOM
KITCHEN

DAVID GRACE DESIGNS


I N T E R N A T I O N A L P T E. L T D.
BATH ROOM

Surath Wickramasinghe Associates


MAST B1b B1d
ER
BEDR BEDROOM
OOM
B2b

WALK-IN
CLOSET

KE
MASTER BATH ROOM UNIT TYPE B1b UNIT TYPE B1d MASTER BATH ROOM
MASTER BATH ROOM
DINING AREA
BATH ROOM

DINING AREA

UNIT TYPE B2b DINING AREA


APARTMENT
KITCHEN
MASTER BEDROOM LIVING ROOM
LIVING ROOM
MASTER BEDROOM
LIVING ROOM

MASTER BEDROOM
GREEN TECH ENGINEERING CONSULTANTS
APARTMENT BALCONY APARTMENT BALCONY
BEDROOM APARTMENT BALCONY

f oods ervice sing ap ore

KEY PLAN

6
4 5
CLEAN LINEN/
TROLLEY STORE
2

BATH ROOM BATH ROOM BATH ROOM BATH ROOM


CHEMICAL DISPENSER
CORRIDOR

BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM
3 1
DISHWASHER
ICEMACHINE/TRAYS

HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
SK-03B SK-03F-ICK SK-03A-ICK SK-02A SK-02A SK-02B SK-02B SK-02A SK-02A SK-02A SK-02A SK-02C SK-03A SK-03C
SK-02A SK-02A SK-03B

CORRIDOR
CORRIDOR CORRIDOR
HOTEL ROOM CORRIDOR 2.15
SK-03D 558 HOTEL ROOM
STAFF WC CORRIDOR MAID'S ROOM
SK-03D

LIFT LOBBY LOBBY LIFT LOBBY

KEY ELEVATION
SHAFT SHAFT SHAFT
STAIRCASE SHAFT
PL2.12 PL2.13 PL2.18 PL2.19 SHAFT
SHAFT SC2.01 LIFT LOBBY PL2.06 PL2.07 GUEST LIFT GUEST LIFT SHUTTLE LIFT SHUTTLE LIFT
GUEST LIFT GUEST LIFT LIFT LOBBY STAIRCASE CORRIDOR
PLANT ROOM
FSL2.01 FSL2.07
SERVICE LIFT LIFT LOBBY SERVICE LIFT

STAIRCASE
STAIRCASE FSL2.05 FSL2.06 STAIRCASE
SC2.03
SC2.03 SERVICE LIFT SERVICE LIFT SC2.04 PL2.35
GUEST LIFT

FSL2.03
FFL + 56.500 SERVICE LIFT
FSL2.02 FSL2.08
PLANT ROOM STORAGE
SSL + 56.450 SERVICE LIFT PL2.20 SERVICE LIFT FFL + 56.500
PL2.08
PL2.08 PL2.09 PL2.14 PL2.15 SHUTTLE LIFT
FFL + 56.500
GUEST LIFT GUEST LIFT SHUTTLE LIFT GUEST LIFT
SSL + 56.450 SSL + 56.450
EQUIP. STORAGE
FFL + 56.500 FFL + 56.500
SSL + 56.450 SSL + 56.400 CORRIDOR
FSL2.04 SHAFT
SHAFT
BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM PL2.36 BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM
SERVICE LIFT PLANT ROOM
GUEST LIFT STAIRCASE
BED STORAGE
SC2.05
PLANT ROOM PLANT ROOM PLANT ROOM PLANT ROOM
FFL + 56.500
SHAFT
SSL + 56.450 LOBBY
SHAFT PL2.17 PL2.21 SHAFT
PL2.10 PL2.11 PL2.16 SHAFT
STAIRCASE GUEST LIFT SHUTTLE LIFT LIFT LOBBY
GUEST LIFT GUEST LIFT SHUTTLE LIFT
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM SC2.02 HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
ST-03C ST-03A ST-03A ST-03A ST-03C ST-03B-DA ST-03A-DA ST-03A ST-03A ST-03C

LINEN LINEN CHUTE SHAFT


SHAFT PLANT ROOM
CHUTE SHAFT
SHAFT
CORRIDOR
PLANT ROOM
CORRIDOR CORRIDOR

CORRIDOR CORRIDOR
2.15
FFL + 56.500 FFL + 56.500
542
SSL + 56.400 SSL + 56.400

HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
ST-02A-ICT ST-02A-ICT ST-02A-ICT HOTEL ROOM ST-02A-ICT
ST-02B-ICT ST-02A-ICT ST-02A-ICT ST-02A-ICK ST-02A ST-02A-ICT ST-02A-ICT ST-02A-ICT ST-02A-ICT ST-02A-ICT
ST-02A-DA ST-02B

HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
ST-01A-S SK-01A ST-01A-S SK-01A SK-01A-ICK SK-01A-ICK BATH ROOM
SK-01A-ICT SK-01A ST-01A-S SK-01A SK-01A SK-01A SK-01A SK-01A ST-01A-S SK-01A-ICK SK-01A-ICK ST-01A-S ST-01A-S BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM
BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM

BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM BATH ROOM

NOTES

STAIRCASE
SC2.06

A 18.06.2019 PRESENTATION DRAWING SET PMC OH


Rev Date Issue Dwn Ckd

STATUS

NOT FOR CONSTRUCTION


PROJECT

WATERFRONT
INTEGRATED PROJECT
COLOMBO
SRI LANKA
DISCIPLINE

ARCHITECTURE
DRAWING TITLE

ARCHITECTURAL PRESENTATION
PROJECT OVERVIEW
GENERAL ARRANGEMENT
LEVEL 15
Date Drawing No Revision
21.06.2019
Scale
1:900@A3
BS Job No
AP-00117 A
1806
CAD File Name
BALMOND-DWG-AP-A-00117_A.dwg
c

www.balmondstudio.com
Registered in England & Wales No. 7225351
BALMOND STUDIO LONDON OFFICE
Unit 9, 190a New North Road, London N1 7BJ, UK
Tel: +44 20 7043 0651

BALMOND STUDIO COLOMBO OFFICE


Parkland 12A-C No 33, Park Street, Colombo-02, Sri Lanka
Tel: +94 11 7721701

CONDITIONS OF USE:
© Copyright Balmond Studio 2011.
The author asserts the right to be identified as such.
LIFT SHAFT LIFT SHAFT LIFT SHAFT SC6.01 LIFT SHAFT Documentation is to be used for the intended purpose only. Balmond
Studio accepts no liability, however arising, for misuse of drawings
and documents.
Drawings must be read in conjunction with all relevant Contract
Documentation including Preliminaries, Particular Conditions,

L16
General Conditions, Drawings, Particular Specifications and General
CORRIDOR

Specifications.
FFL + 58.000
SSL + 57.950
Any discrepancies between any drawings, specifications, documents,
PLANT ROOM
etc., should be reported to the Engineer in accordance with the
CLEANING
Conditions of Contract.
BATHROOM
OFFICES
ROOM (DISABLED)
The Contractor remains fully responsible for setting out the works.
BATHROOM
BATHROOM
LOBBY
CORRIDOR
BATHROOM
LOBBY BATHROOM
Do not scale drawings. Use figured dimensions only. Dimensions
must be checked by the Contractor on site.

John
Keells
Group

ADÃO DA FONSECA
MAST
ER
engenheiros consultores
BEDR
OOM

APAR SC6.02
BALC TMEN FFL + 58.000
ONY T
SSL + 57.950
STAIR
APAR LOBBY
LIVIN

GET
G ROO BALC TMEN
M
ONY T

GESTÃO DE ENERGIA TÉRMICA, LDA.


LIVIN
G ROO
Engenheiros Consultores
M

MAST
de
BATH ER
ROOM
MAST
ER
BEDR
Alfredo Costa Pereira e Raul Vasconcelos Bessa
OOM

BEDR
OOM MAST
ER
BEDR
OOM
BEDR
OOM
BEDR
OOM
APAR
KITCH TMEN
BATH EN T
ROO
M
BATH APAR
ROO BALC TMEN
M ONY T
BATH
ROO APAR
M BEDR
OOM BALC TMEN
B1c ONY T
B2c
splas BATH
CHUT ROOM
APAR E hback
KITCH TMEN
EN T REFU
ROO SE
M BATH MAST
ROO ER
M BEDR
APAR OOM
STAI KITCH TMEN
SC4.0RCAS EN T
2 E

LIVIN
G ROOM
AZ76 Consultores
BATH
ROO STAIR
LIVIN
G ROO
de Investimentos
BEDR M APAR
OOM KITCH TMEN
EN T
FSL
SERV4.1
ICE
M

APARTMENT BALCONY
e Engenharia, Lda
LIFT
B1b
APARTMENT BALCONY BEDROOM APARTMENT BALCONY
MASTER BEDROOM
BATH PL
4.1
RESI
ROO DENT B2b
M BATH APARTMENT
S LIFT
ROOM MAST KITCHEN
PL
4.2
RESI BATH ER MASTER BEDROOM
DENT ROO
S LIFT PLAN M MASTER BEDROOM

VS-A
C1 T ROO
LOBB M
Y PL
RESI4.3
LIVIN DENT
G ROO S LIFT DINING AREA
BEDR LIVING ROOM
M PL 4.4 APAR OOM LIVING ROOM LIVING ROOM
BEDR RESI KITCHTMEN APARTMENT
OOM DENT EN T HALLWAY
S LIFT DINING AREA
FFL
LIVIN + 48.33 UNIT TYPE B2a
SSL MASTER BATHROOM
BEDR
G ROOM
+ 48.28 3 WALK-IN
OOM 3 CLOSET
MASTER BATHROOM
C2 MASTER BATHROOM
BATHROOM
UNIT TYPE B1a DINING AREA
UNIT TYPE B1c

APAR
KITC TMEN
HEN T

APAR
KITCH TMEN BEDROOM B2a STAIRCASE
EN T STAIR REFUSE CHUTE
BATHROOM SC5.02 ROOM
B1a B1c BEDROOM
B2a
APAR
BATHROOM
BALC TMEN
ONY T

APARTMENT
KITCHEN
BEDR BATH
ROOM BATH
OOM ROOM APARTMENT
MAST KITCHEN
APAR BATH ER PLANT ROOM
BALC TMEN ROO
ONY T M

LIVIN BEDR LOBBY


G ROOM OOM

BEDR
OOM MAST
ER APARTMENT
BEDR
OOM KITCHEN PL5.3 PL5.2 PL5.1 FSL 5.1
RESIDENTS LIFT RESIDENTS LIFT RESIDENTS LIFT SERVICE LIFT

MAST APARTMENT

DAVID GRACE DESIGNS


BATH ER
ROO KITCHEN
M BEDROOM
BATHROOM
I N T E R N A T I O N A L P T E. L T D.
BATHROOM

Surath Wickramasinghe Associates


MAST B1b B1d
ER
BEDR
OOM BEDROOM
B2b

WALK-IN
CLOSET

KE
MASTER BATHROOM UNIT TYPE B1b UNIT TYPE B1d MASTER BATHROOM
MASTER BATHROOM
DINING AREA
BATHROOM

DINING AREA

UNIT TYPE B2b DINING AREA


APARTMENT
KITCHEN
MASTER BEDROOM
LIVING ROOM LIVING ROOM
MASTER BEDROOM
LIVING ROOM

MASTER BEDROOM
GREEN TECH ENGINEERING CONSULTANTS
APARTMENT BALCONY APARTMENT BALCONY
BEDROOM APARTMENT BALCONY

f oods ervice sing ap ore

KEY PLAN

6
4 5
CLEAN LINEN/
TROLLEY STORE
2

BATHROOM BATHROOM BATHROOM BATHROOM


CHEMICAL DISPENSER

BATHROOM BATHROOM
BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM
BATHROOM
BATHROOM BATHROOM BATHROOM BATHROOM
3 1
DISHWASHER
ICEMACHINE/TRAYS

HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
HOTEL ROOM HOTEL ROOM HOTEL ROOM
SK-03F-ICK SK-03A-ICK CORRIDOR SK-02A SK-02B SK-02A SK-02A SK-02C
SK-03B SK-02A SK-02B SK-02A SK-02A SK-02A SK-02A SK-03A SK-03B SK-03C

CORRIDOR CORRIDOR CORRIDOR CORRIDOR


HOTEL ROOM
HOTEL ROOM
SK-03D STAFF WC CORRIDOR MAID'S ROOM
SK-03D

LIFT LOBBY
LOBBY
LIFT LOBBY

KEY ELEVATION
SHAFT SHAFT
STAIRCASE SHAFT
PL2.12 PL2.13 PL2.18 PL2.19 SHAFT
SHAFT SC2.01 LIFT LOBBY PL2.06 PL2.07 GUEST LIFT GUEST LIFT SHUTTLE LIFT SHUTTLE LIFT LIFT LOBBY STAIRCASE CORRIDOR
PLANT ROOM GUEST LIFT GUEST LIFT
FSL2.01 FSL2.07
SERVICE LIFT SERVICE LIFT

STAIRCASE FSL2.05 FSL2.06


STAIRCASE STAIRCASE
SC2.02 SERVICE LIFT SERVICE LIFT
SC2.03 SC2.04 PL2.35
PLANT ROOM GUEST LIFT

FSL2.03
SERVICE LIFT
FFL + 60.500 FSL2.02 FSL2.08
STORAGE
SSL + 60.450 SERVICE LIFT SERVICE LIFT
PLANT ROOM PL2.08 PL2.09 PL2.14 PL2.15
PL2.20 FFL + 60.500 FFL + 60.500
SHUTTLE LIFT
GUEST LIFT GUEST LIFT SHUTTLE LIFT GUEST LIFT SSL + 60.450
EQUIP. STORAGE
SSL + 60.450
FFL + 60.500 FFL + 60.500
SSL + 60.450 SSL + 60.400 CORRIDOR
BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM FSL2.04 SHAFT
SERVICE LIFT PL2.36 BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM
PLANT ROOM GUEST LIFT STAIRCASE
BED STORAGE
PLANT ROOM PLANT ROOM SC2.05 SHAFT
PLANT ROOM PLANT ROOM
FFL + 60.500
SHAFT
SSL + 60.450
SHAFT PL2.17 PL2.21 SHAFT
PL2.10 PL2.11 PL2.16 GUEST LIFT SHUTTLE LIFT LIFT LOBBY
GUEST LIFT GUEST LIFT SHUTTLE LIFT
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
ST-03C ST-03A ST-03A ST-03A ST-03C ST-03B ST-03A ST-03A ST-03A ST-03C
CORRIDOR
SHAFT
LIFT LOBBY
PLANT ROOM
SHAFT
SHAFT
CORRIDOR LINEN CHUTE
PLANT ROOM
CORRIDOR CORRIDOR

CORRIDOR CORRIDOR
FFL + 60.500 FFL + 60.500
SSL + 60.400 SSL + 60.400

HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
ST-02B JNS-01A JNS-01A ST-02B ST-02A
ST-02A-P-ICS JNS-01A JNS-01A ST-02A ST-02A JNS-01B

BATHROOM
BATHROOM BATHROOM
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM BATHROOM
SK-01A SK-01A-S SK-01A SK-01A SK-01A-ICK SK-01A ST-01A
BATHROOM ST-01A SK-01A SK-01A SK-01A SK-01A SK-01A ST-01A SK-01A SK-01A ST-01A ST-01A ST-01A
BATHROOM BATHROOM BATHROOM
BATHROOM

NOTES
LIVING ROOM LIVING ROOM LIVING ROOM
BEDROOM
BEDROOM BEDROOM BEDROOM BEDROOM
LIVING ROOM
LIVING ROOM

STAIRCASE
SC2.06

A 18.06.2019 PRESENTATION DRAWING SET PMC OH


Rev Date Issue Dwn Ckd

STATUS

NOT FOR CONSTRUCTION


PROJECT

WATERFRONT
INTEGRATED PROJECT
COLOMBO
SRI LANKA
DISCIPLINE

ARCHITECTURE
DRAWING TITLE

ARCHITECTURAL PRESENTATION
PROJECT OVERVIEW
GENERAL ARRANGEMENT
LEVEL 16
Date Drawing No Revision
21.06.2019
Scale
1:900@A3
BS Job No
AP-00118 A
1806
CAD File Name
BALMOND-DWG-AP-A-00118_A.dwg
c

www.balmondstudio.com
Registered in England & Wales No. 7225351
BALMOND STUDIO LONDON OFFICE
Unit 9, 190a New North Road, London N1 7BJ, UK
Tel: +44 20 7043 0651

BALMOND STUDIO COLOMBO OFFICE


Parkland 12A-C No 33, Park Street, Colombo-02, Sri Lanka
Tel: +94 11 7721701

CONDITIONS OF USE:
© Copyright Balmond Studio 2011.
The author asserts the right to be identified as such.
LIFT SHAFT LIFT SHAFT LIFT SHAFT SC6.01 LIFT SHAFT Documentation is to be used for the intended purpose only. Balmond
Studio accepts no liability, however arising, for misuse of drawings
and documents.
Drawings must be read in conjunction with all relevant Contract
Documentation including Preliminaries, Particular Conditions,
General Conditions, Drawings, Particular Specifications and General
CORRIDOR

Specifications.
FFL + 62.000
SSL + 61.950
Any discrepancies between any drawings, specifications, documents,
PLANT ROOM
etc., should be reported to the Engineer in accordance with the
CLEANING
Conditions of Contract.
BATHROOM

The Contractor remains fully responsible for setting out the works.
OFFICES
ROOM (DISABLED)

BATHROOM
BATHROOM
LOBBY
CORRIDOR
BATHROOM
LOBBY BATHROOM
Do not scale drawings. Use figured dimensions only. Dimensions
must be checked by the Contractor on site.

L17
John
Keells
Group

ADÃO DA FONSECA
MAST
ER
engenheiros consultores
BEDR
OOM

APAR
FFL + 62.000 SC6.02
BALC TMEN
ONY T
SSL + 61.950
STAIR
APAR LOBBY
LIVIN
BALC TMEN
G ROO
M ONY T
GET GESTÃO DE ENERGIA TÉRMICA, LDA.
LIVIN
G ROO
Engenheiros Consultores
M

MAS
de
BATHTER
ROO
M MAST
ER
Alfredo Costa Pereira e Raul Vasconcelos Bessa
BEDR
OOM

BEDR
OOM MAST
ER
BEDR
OOM
BEDR
OOM
BEDR
OOM
APAR
KITCH TMEN
BATH EN T
ROO
M
BATH APAR
ROOM BALC TMEN
ONY T
BATH
ROO APAR
M BEDR
OOM BALC TMEN
B1c ONY T
B2c
CHU splas BATH
APAR TE hback ROO
KITCHTMEN M
EN T REFU
ROO SE BATH
M MAST
ROO ER
M BEDR
APAR OOM
STAIR KITCH TMEN
SC4.0 CASE EN T
2

LIVIN
G ROO
AZ76 Consultores
M

BATH
ROO STAI
LIVIN
G ROOM
de Investimentos
BEDR M APAR R
OOM KITCH TMEN
EN T
FSL
SERV4.1 APARTMENT BALCONY
e Engenharia, Lda
ICE
LIFT
B1b
APARTMENT BALCONY BEDROOM APARTMENT BALCONY
MASTER BEDROOM
BATH PL
ROO RESI4.1
M DENT B2b
BATH S LIFT APARTMENT
ROO KITCHEN
M PL MAST
RESI4.2 BATH ER MASTER BEDROOM
DENT ROOM
S LIFT PLAN MASTER BEDROOM

VS-A
C1 T ROOM
LOBB
Y PL
RESI4.3
LIVIN DENT DINING AREA
G ROOM S LIFT LIVING ROOM
BEDR
PL APAR OOM LIVING ROOM LIVING ROOM
BEDR RESI4.4 KITC TMEN
APARTMENT
OOM DENT HEN T HALLWAY
S LIFT DINING AREA
FFL
LIVIN + 51.50 UNIT TYPE B2a
G ROO SSL MASTER BATHROOM WALK-IN MASTER BATHROOM
BEDR + 51.45 0
OOM M CLOSET
C2
0
BATHROOM MASTER BATHROOM

UNIT TYPE B1a DINING AREA


UNIT TYPE B1c

APAR
KITC TMEN
HEN T

APAR
KITCH TMEN BEDROOM B2a STAIRCASE STAIR REFUSE CHUTE
EN T SC5.02
BATHROOM ROOM BEDROOM
B2a B1a B1c
APAR BATHROOM
BALC TMEN
ONY T

APARTMENT
KITCHEN
BEDR BATH
ROO BATH
OOM ROO APARTMENT
M MAS M KITCHEN
APAR BATHTER PLANT ROOM
BALC TMEN ROO
ONY T M

LIVIN BEDR LOBBY


G ROO OOM
M

BEDR
OOM MAST
ER APARTMENT
BEDR
OOM KITCHEN PL5.3 PL5.2 PL5.1 FSL 5.1
RESIDENTS LIFT RESIDENTS LIFT RESIDENTS LIFT SERVICE LIFT

MAST APARTMENT

DAVID GRACE DESIGNS


BATH ER
ROO KITCHEN
M BEDROOM
BATHROOM
I N T E R N A T I O N A L P T E. L T D.
BATHROOM
MAST
ER
BEDR
OOM
B1b

B2b
B1d

BEDROOM Surath Wickramasinghe Associates


WALK-IN
CLOSET

KE
MASTER BATHROOM UNIT TYPE B1b UNIT TYPE B1d MASTER BATHROOM
MASTER BATHROOM
DINING AREA
BATHROOM

DINING AREA

UNIT TYPE B2b DINING AREA


APARTMENT
KITCHEN
MASTER BEDROOM LIVING ROOM
LIVING ROOM

LIVING ROOM MASTER BEDROOM

MASTER BEDROOM
GREEN TECH ENGINEERING CONSULTANTS
APARTMENT BALCONY APARTMENT BALCONY
BEDROOM APARTMENT BALCONY

f oods ervice sing ap ore

KEY PLAN

6
4 5
CLEAN LINEN/
TROLLEY STORE
2

BATHROOM BATHROOM BATHROOM BATHROOM


CHEMICAL DISPENSER

BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM
3 1
DISHWASHER
ICEMACHINE/TRAYS

HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
CORRIDOR HOTEL ROOM HOTEL ROOM
SK-03B SK-03F SK-03A SK-02A SK-02A SK-02B SK-02A SK-02A SK-02A SK-02C SK-03A
SK-02B SK-02A SK-02A SK-02A SK-03B SK-03C

CORRIDOR
CORRIDOR
HOTEL ROOM
SK-03D STAFF WC HOTEL ROOM
SK-03D

CORRIDOR MAID'S ROOM

LIFT LOBBY LOBBY


LIFT LOBBY

KEY ELEVATION
SHAFT SHAFT SHAFT
STAIRCASE SHAFT
PL2.12 PL2.13 PL2.18 PL2.19
SHAFT SC2.01 LIFT LOBBY PL2.06 PL2.07 GUEST LIFT GUEST LIFT SHUTTLE LIFT SHUTTLE LIFT
GUEST LIFT GUEST LIFT LIFT LOBBY STAIRCASE CORRIDOR
PLANT ROOM
FSL2.01 FSL2.07
SERVICE LIFT SERVICE LIFT

STAIRCASE FSL2.05 FSL2.06


STAIRCASE STAIRCASE
SC2.02 SERVICE LIFT SERVICE LIFT
SC2.03 SC2.04 PL2.35
GUEST LIFT

FSL2.03
FFL + 64.500 SERVICE LIFT
FSL2.02 STORAGE FSL2.08
PLANT ROOM
SSL + 64.450 SERVICE LIFT PL2.20 SERVICE LIFT
PL2.08
PL2.08 PL2.09 PL2.14 PL2.15 FFL + 64.500 FFL + 64.500
SHUTTLE LIFT
GUEST LIFT GUEST LIFT SHUTTLE LIFT GUEST LIFT SSL + 64.450
EQUIP. STORAGE
SSL + 64.450
FFL + 64.500 FFL + 64.500
SSL + 64.450 SSL + 64.400 CORRIDOR
FSL2.04 SHAFT
SERVICE LIFT PLANT ROOM PL2.36
BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM GUEST LIFT BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM STAIRCASE
BED STORAGE
PLANT ROOM SC2.05
PLANT ROOM PLANT ROOM PLANT ROOM
LIFT LOBBY FFL + 64.500
SHAFT SHAFT
SSL + 64.450
SHAFT PL2.17 PL2.21 SHAFT
PL2.10 PL2.11 PL2.16 GUEST LIFT SHUTTLE LIFT
PL2.10
GUEST LIFT GUEST LIFT SHUTTLE LIFT
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL GUEST HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
ST-03C ST-03A ST-03A ST-03A ST-03C LIFT ST-03B-DA ST-03A-DA ST-03A ST-03A ST-03C
PLANT ROOM
LINEN CHUTE LIFT LOBBY SHAFT
PLANT ROOM SHAFT
SHAFT
PLANT ROOM CORRIDOR
CORRIDOR

FFL + 64.500 CORRIDOR

SSL + 64.400 FFL + 64.500


SSL + 64.400

HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
JNS-01A-ICT HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
ST-02B-P-ICS JNS-01A-ICT ST-02A-P-ICS-a ST-02A-ICK ST-02A-P-ICS-a
ST-02A-P-ICS JNS-01A-ICT JNS-01A-ICT ST-02A-P-ICS JNS-01B-ICT

HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM BATHROOM


HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
SK-01A ST-01A-S SK-01A-ICK SK-01A-ICK SK-01A-ICK SK-01A ST-01A-S ST-01A-S
BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM SK-01A-ICT SK-01A SK-01A SK-01A-ICK ST-01A-S ST-01A-S SK-01A SK-01A-S SK-01A SK-01A-ICK SK-01A-ICK BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM

BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM

NOTES
LIVING ROOM
BEDROOM
BEDROOM BEDROOM BEDROOM
LIVING ROOM BEDROOM
LIVING ROOM
LIVING ROOM

STAIRCASE
SC2.06

A 18.06.2019 PRESENTATION DRAWING SET PMC OH


Rev Date Issue Dwn Ckd

STATUS

NOT FOR CONSTRUCTION


PROJECT

WATERFRONT
INTEGRATED PROJECT
COLOMBO
SRI LANKA
DISCIPLINE

ARCHITECTURE
DRAWING TITLE

ARCHITECTURAL PRESENTATION
PROJECT OVERVIEW
GENERAL ARRANGEMENT
LEVEL 17
Date Drawing No Revision
21.06.2019
Scale
1:900@A3
BS Job No
AP-00119 A
1806
CAD File Name
BALMOND-DWG-AP-A-00119_A.dwg
c

www.balmondstudio.com
Registered in England & Wales No. 7225351
BALMOND STUDIO LONDON OFFICE
Unit 9, 190a New North Road, London N1 7BJ, UK
Tel: +44 20 7043 0651

BALMOND STUDIO COLOMBO OFFICE


Parkland 12A-C No 33, Park Street, Colombo-02, Sri Lanka
Tel: +94 11 7721701

CONDITIONS OF USE:
© Copyright Balmond Studio 2011.
The author asserts the right to be identified as such.
LIFT SHAFT LIFT SHAFT LIFT SHAFT SC6.01 LIFT SHAFT Documentation is to be used for the intended purpose only. Balmond
Studio accepts no liability, however arising, for misuse of drawings
and documents.
Drawings must be read in conjunction with all relevant Contract
Documentation including Preliminaries, Particular Conditions,
General Conditions, Drawings, Particular Specifications and General
CORRIDOR

Specifications.
FFL + 66.000
SSL + 65.950
Any discrepancies between any drawings, specifications, documents,
PLANT ROOM
etc., should be reported to the Engineer in accordance with the
CLEANING
CORRIDOR Conditions of Contract.
BATHROOM
OFFICES
ROOM (DISABLED)
The Contractor remains fully responsible for setting out the works.
BATHROOM
BATHROOM
LOBBY
BATHROOM
LOBBY BATHROOM
Do not scale drawings. Use figured dimensions only. Dimensions
must be checked by the Contractor on site.

L18 John
Keells
Group

ADÃO DA FONSECA
MAST
ER
engenheiros consultores
BEDR
OOM

APAR FFL + 66.000 SC6.02


BALC TMEN
ONY T SSL + 65.950
STAIR
APAR LOBBY
LIVIN

GET
G ROO BALC TMEN
M
ONY T

GESTÃO DE ENERGIA TÉRMICA, LDA.


LIVIN
G ROOM
Engenheiros Consultores
MAST
de
BATH ER
ROOM
MAST
ER
BEDR
Alfredo Costa Pereira e Raul Vasconcelos Bessa
OOM

BEDR
OOM MAST
ER
BEDR
OOM
BEDR
OOM
BEDR
OOM
APAR
KITCHTMEN
BATH EN T
ROOM
BATH APAR
ROO BALC TMEN
M ONY T
BATH
ROO APAR
M BEDR
OOM BALC TMEN
B1c ONY T
B2c
CHUT BATH
APAR E ROOM
KITC TMEN
HEN T REFU
ROOMSE BATH MAST
ROO ER
M BEDR
APAR OOM
STAI KITC TMEN
SC4.0RCAS HEN T
2 E

LIVIN
G ROOM
AZ76 Consultores
BATH
ROO STAIR
LIVIN
G ROO
de Investimentos
BEDR M APAR
OOM KITC TMEN
HEN T
FSL
SERV4.1
M

APARTMENT BALCONY
e Engenharia, Lda
ICE
LIFT
B1b
APARTMENT BALCONY BEDROOM APARTMENT BALCONY
PL MASTER BEDROOM
BATH 4.1
ROOM RESI
DENT B2b
BATH S LIFT APARTMENT
ROO MAST KITCHEN
M PL
4.2
RESI BATH ER MASTER BEDROOM
DENT ROO
S LIFT PLAN M MASTER BEDROOM

VS-A
C1 T ROO
LOBB M
Y PL
4.3
RESI
LIVIN DENT
G ROO S LIFT DINING AREA
BEDR LIVING ROOM
M PL APAR OOM LIVING ROOM
BEDR 4.4 APARTMENT LIVING ROOM
RESI KITC TMEN
OOM DENT HEN T HALLWAY
S LIFT DINING AREA
FFL
LIVIN + 54.6
G ROOM SSL 67 MASTER BATHROOM UNIT TYPE B2a
WALK-IN
BEDR + 54.61
OOM CLOSET
C2 7
MASTER BATHROOM MASTER BATHROOM
BATHROOM
UNIT TYPE B1a DINING AREA
UNIT TYPE B1c

APAR
KITCHTMEN
EN T
APAR
KITCH TMEN BEDROOM B2a STAIRCASE
EN T STAIR REFUSE CHUTE
SC5.02
BATHROOM B1a ROOM B1c BEDROOM
B2a
APAR BATHROOM
BALC TMEN
ONY T

APARTMENT
KITCHEN
BEDR BATH
ROOM BATH
OOM ROO APARTMENT
MAST M KITCHEN
APAR BATH ER PLANT ROOM
BALC TMEN ROOM
ONY T

LIVIN LOBBY
G ROO BEDR
OOM
M
BEDR
OOM MAST
ER APARTMENT
BEDR
OOM KITCHEN PL5.3 PL5.2 PL5.1 FSL 5.1
RESIDENTS LIFT RESIDENTS LIFT RESIDENTS LIFT SERVICE LIFT

MAST APARTMENT

DAVID GRACE DESIGNS


BATH ER
ROOM KITCHEN
BEDROOM
BATHROOM
I N T E R N A T I O N A L P T E. L T D.
BATHROOM

Surath Wickramasinghe Associates


MAST B1b B1d
ER
BEDR BEDROOM
OOM
B2b

WALK-IN
CLOSET

KE
MASTER BATHROOM UNIT TYPE B1b UNIT TYPE B1d MASTER BATHROOM
MASTER BATHROOM

Storage Spaces
DINING AREA
BATHROOM

DINING AREA

UNIT TYPE B2b DINING AREA


APARTMENT
KITCHEN
MASTER BEDROOM LIVING ROOM
LIVING ROOM
MASTER BEDROOM
LIVING ROOM

MASTER BEDROOM
GREEN TECH ENGINEERING CONSULTANTS
APARTMENT BALCONY APARTMENT BALCONY
BEDROOM APARTMENT BALCONY

f oods ervice sing ap ore

KEY PLAN

6
4 5
CLEAN LINEN/
TROLLEY STORE
2

BATHROOM BATHROOM BATHROOM BATHROOM


CHEMICAL DISPENSER

BATHROOM BATHROOM BATHROOM


3 1
BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM
DISHWASHER/
ICEMACHINE/TRAYS

HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
CORRIDOR HOTEL ROOM HOTEL ROOM HOTEL ROOM
SK-03B SK-03F-ICK SK-03A-ICK SK-02A SK-02A SK-02B SK-02B SK-02A SK-02A SK-02A SK-02A SK-02A SK-02C SK-03A SK-03C
SK-02A SK-03B

CORRIDOR
CORRIDOR
HOTEL ROOM MAID'S ROOM
STAFF WC HOTEL ROOM
SK-03D
CORRIDOR SK-03D

LIFT LOBBY

LOBBY
LIFT LOBBY

KEY ELEVATION
SHAFT SHAFT
STAIRCASE SHAFT
PL2.12 PL2.13 PL2.18 PL2.19 SHAFT
SHAFT SC2.01 LIFT LOBBY PL2.06 PL2.07 GUEST LIFT GUEST LIFT SHUTTLE LIFT SHUTTLE LIFT LIFT LOBBY STAIRCASE CORRIDOR
PLANT ROOM GUEST LIFT GUEST LIFT
FSL2.01 FSL2.07
SERVICE LIFT SERVICE LIFT

STAIRCASE FSL2.05 FSL2.06


STAIRCASE STAIRCASE
SC2.02 SERVICE LIFT SERVICE LIFT
SC2.03 SC2.04 PL2.35
GUEST LIFT
TERRACE
FSL2.03
SERVICE LIFT
FFL + 68.500 FSL2.02 FSL2.08
PLANT ROOM STORAGE
SSL + 68.450 SERVICE LIFT SERVICE LIFT
PL2.08 PL2.09 PL2.14 PL2.15
PL2.20 FFL + 68.500 FFL + 68.500
SHUTTLE LIFT
GUEST LIFT GUEST LIFT SHUTTLE LIFT GUEST LIFT SSL + 68.450
EQUIP. STORAGE
SSL + 68.450
FFL + 68.500 FFL + 68.500
SSL + 68.450 SSL + 68.400 CORRIDOR
FSL2.04 SHAFT
SERVICE LIFT PLANT ROOM PL2.36
BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM GUEST LIFT BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM STAIRCASE
BED STORAGE
CORRIDOR PLANT ROOM SC2.05 SHAFT
PLANT ROOM PLANT ROOM
FFL + 68.500
SHAFT
SSL + 68.450
SHAFT PL2.17 PL2.21 SHAFT
PL2.10 PL2.11 PL2.16 GUEST LIFT SHUTTLE LIFT LIFT LOBBY
GUEST LIFT GUEST LIFT SHUTTLE LIFT
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
ST-03C ST-03A ST-03A ST-03A ST-03C ST-03B-DA ST-03A-DA ST-03A ST-03A ST-03C
PLANT ROOM
SHAFT
LINEN CHUTE LIFT LOBBY
PLANT ROOM
SHAFT
SHAFT
PLANT ROOM CORRIDOR
CORRIDOR

FFL + 68.500 CORRIDOR

SSL + 68.400 FFL + 68.500


SSL + 68.400

HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
ST-02B-P-ICS JNS-01A-ICT JNS-01A-ICT ST-02A-P-ICS-a ST-02A-ICK
ST-02A-DA ST-02A ST-02A-P-ICS-a JNS-01A-ICT JNS-01A-ICT ST-02B-P-ICS

BATHROOM BATHROOM
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
SK-01A-ICK SK-01A-ICK SK-01A-ICK SK-01A-ICK SK-01A ST-01A-S SK-01A
BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM SK-01A-ICT SK-01A SK-01A SK-01A-S SK-01A-S SK-01A-ICK SK-01A-ICK ST-01A-S SK-01A-S ST-01A-S SK-01A-ICK SK-01A-ICK BATHROOM BATHROOM BATHROOM BATHROOM

BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM

NOTES
LIVING ROOM
LIVING ROOM

BEDROOM BEDROOM BEDROOM


LIVING ROOM BEDROOM
LIVING ROOM

STAIRCASE
SC2.06

FFL + 68.000
SSL + 67.950

A 18.06.2019 PRESENTATION DRAWING SET PMC OH


Rev Date Issue Dwn Ckd

STATUS

NOT FOR CONSTRUCTION


PROJECT

WATERFRONT
INTEGRATED PROJECT
COLOMBO
SRI LANKA
DISCIPLINE

ARCHITECTURE
DRAWING TITLE

ARCHITECTURAL PRESENTATION
PROJECT OVERVIEW
GENERAL ARRANGEMENT
LEVEL 18
Date Drawing No Revision
21.06.2019
Scale
1:900@A3
BS Job No
AP-00120 A
1806
CAD File Name
BALMOND-DWG-AP-A-00120_A.dwg
c

www.balmondstudio.com
Registered in England & Wales No. 7225351
BALMOND STUDIO LONDON OFFICE
Unit 9, 190a New North Road, London N1 7BJ, UK
Tel: +44 20 7043 0651

BALMOND STUDIO COLOMBO OFFICE


Parkland 12A-C No 33, Park Street, Colombo-02, Sri Lanka
Tel: +94 11 7721701

CONDITIONS OF USE:
© Copyright Balmond Studio 2011.
The author asserts the right to be identified as such.
PL6.2
LOWER LIFT BANK
SC6.01 PL6.3
LOWER LIFT BANK
PL6.6
UPPER LIFT BANK
SC6.01 PL6.7
UPPER LIFT BANK
Documentation is to be used for the intended purpose only. Balmond
Studio accepts no liability, however arising, for misuse of drawings
PL6.2 PL6.4 PL6.5 PL6.8
and documents.
LOWER LIFT BANK LOWER LIFT BANK UPPER LIFT BANK UPPER LIFT BANK

Drawings must be read in conjunction with all relevant Contract


Documentation including Preliminaries, Particular Conditions,
FSL6.1
SERVICE LIFT
FSL6.2
SERVICE LIFT
General Conditions, Drawings, Particular Specifications and General
Specifications.
CORRIDOR
FFL + 70.000
SSL + 69.950 PLANT ROOM
Any discrepancies between any drawings, specifications, documents,
etc., should be reported to the Engineer in accordance with the
ELECTRIC
ROOM

Conditions of Contract.
WATER TANK WATER TANK
(POTABLE WATER)
PLANT ROOM
(HARVESTING WATER)
The Contractor remains fully responsible for setting out the works.
Do not scale drawings. Use figured dimensions only. Dimensions
WATER TANK
must be checked by the Contractor on site.
WATER TANK
(POTABLE WATER) (HARVESTING WATER)

L19
John
Keells
Group

ADÃO DA FONSECA
MAST
ER
engenheiros consultores
BEDR
OOM

APAR
BALC TMEN FFL + 70.000
ONY T
SSL + 69.950 SC6.02
LOBBY
APAR
LIVIN
BALC TMEN
G ROO
M
ONY T
GET GESTÃO DE ENERGIA TÉRMICA, LDA.
LIVIN
G ROO
Engenheiros Consultores
M

MAS
de
BATHTER
ROO
M MAST
ER
BEDR
Alfredo Costa Pereira e Raul Vasconcelos Bessa
OOM

BEDR
OOM MAST
ER
BEDR
OOM
BEDR
OOM
BEDR
OOM
APAR
KITCH TMEN
BATH EN T
ROO
M
BATH APAR
ROOM BALC TMEN
ONY T
BATH
ROOM APAR
BEDR
OOM BALC TMEN
B1c ONY T
B2c
CHU splas BATH
APAR TE hback ROO
KITCH TMEN M
EN T REFU
ROO SE BATH
M MAST
ROO ER
M BEDR
APAR OOM
STAIR
KITC TMEN
SC4.0 CASE HEN T
2

LIVIN
G ROO
AZ76 Consultores
M

BATH
ROO STAI
LIVIN
G ROOM
de Investimentos
BEDR M APAR R
OOM KITCH TMEN
EN T
FSL
SERV4.1 APARTMENT BALCONY
e Engenharia, Lda
ICE
LIFT
B1b
APARTMENT BALCONY BEDROOM APARTMENT BALCONY
MASTER BEDROOM
BATH PL
ROO RESI4.1
M DENT B2b
BATH S LIFT APARTMENT
ROO KITCHEN
M PL MAST
RESI4.2 BATH ER MASTER BEDROOM
DENT ROOM
S LIFT PLAN MASTER BEDROOM

VS-A
C1 T ROO
LOBB
Y PL 4.3 M
RESI
LIVIN DENT DINING AREA
G ROOM S LIFT LIVING ROOM
BEDR
PL APAR OOM LIVING ROOM LIVING ROOM
BEDR RESI4.4 KITC TMEN
APARTMENT
OOM DENT HEN T HALLWAY
FFL S LIFT DINING AREA
+ 57.83
LIVIN SSL 3 UNIT TYPE B2a
G ROOM + 57.78 MASTER BATHROOM WALK-IN
BEDR
OOM 3 CLOSET
C2 MASTER BATHROOM
MASTER BATHROOM
BATHROOM
UNIT TYPE B1a DINING AREA
UNIT TYPE B1c

APAR
KITCH TMEN
EN T
APAR
KITC TMEN BEDROOM B2a STAIRCASE
HEN T STAIR REFUSE CHUTE
SC5.02
BATHROOM ROOM BEDROOM
B2a B1a B1c
APAR BATHROOM
BALC TME
ONY NT

APARTMENT
KITCHEN
BEDR BATH
ROO BATH
OOM ROO APARTMENT
M MAST M KITCHEN
APAR BATH ER PLANT ROOM
BALC TMEN ROO
ONY T M

LIVIN BEDR LOBBY


G ROO OOM
M
BEDR
OOM MAST
ER APARTMENT
BEDR
OOM KITCHEN PL5.3 PL5.2 PL5.1 FSL 5.1
RESIDENTS LIFT RESIDENTS LIFT RESIDENTS LIFT SERVICE LIFT

MAST APARTMENT

DAVID GRACE DESIGNS


BATH ER
ROO KITCHEN
M BEDROOM
BATHROOM
I N T E R N A T I O N A L P T E. L T D.
BATHROOM

Surath Wickramasinghe Associates


MAST B1b B1d
ER
BEDR BEDROOM
OOM
B2b

WALK-IN
CLOSET

KE
MASTER BATHROOM UNIT TYPE B1b UNIT TYPE B1d MASTER BATHROOM
MASTER BATHROOM
DINING AREA
BATHROOM

DINING AREA

UNIT TYPE B2b DINING AREA


APARTMENT
KITCHEN
MASTER BEDROOM LIVING ROOM
LIVING ROOM

LIVING ROOM MASTER BEDROOM

MASTER BEDROOM
GREEN TECH ENGINEERING CONSULTANTS
APARTMENT BALCONY APARTMENT BALCONY
BEDROOM APARTMENT BALCONY

f oods ervice sing ap ore

KEY PLAN

6
4 5
CLEAN LINEN/
TROLLEY STORE
2

BATHROOM BATHROOM BATHROOM BATHROOM


CHEMICAL DISPENSER

BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM
3 1
DISHWASHER
ICEMACHINE/TRAYS

HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
CORRIDOR HOTEL ROOM HOTEL ROOM
SK-03B SK-03F-ICK SK-03A-ICK SK-02A SK-02A SK-02B SK-02A SK-02A SK-02A SK-02C SK-03A
SK-02B SK-02A SK-02A SK-02A SK-03B SK-03C

CORRIDOR
CORRIDOR
HOTEL ROOM
SK-03D MAID'S ROOM HOTEL ROOM
STAFF WC CORRIDOR
SK-03D

LIFT LOBBY
LOBBY

KEY ELEVATION
SHAFT
STAIRCASE SHAFT
PL2.12 PL2.13 PL2.18 PL2.19 SHAFT
SHAFT SC2.01 LIFT LOBBY PL2.06 PL2.07 GUEST LIFT GUEST LIFT SHUTTLE LIFT SHUTTLE LIFT
GUEST LIFT GUEST LIFT LIFT LOBBY STAIRCASE CORRIDOR
PLANT ROOM
FSL2.01 FSL2.07
SERVICE LIFT SERVICE LIFT

STAIRCASE FSL2.05 FSL2.06


STAIRCASE STAIRCASE
SC2.02 SERVICE LIFT SERVICE LIFT
SC2.03 SC2.04 PL2.35
GUEST LIFT
TERRACE
FSL2.03
FFL + 72.500 SERVICE LIFT
FSL2.02 STORAGE FSL2.08
PLANT ROOM
SSL + 72.450 SERVICE LIFT PL2.20 SERVICE LIFT
PL2.08 PL2.09 PL2.14 PL2.15 FFL + 72.500 FFL + 72.500
SHUTTLE LIFT
GUEST LIFT GUEST LIFT SHUTTLE LIFT GUEST LIFT SSL + 72.450
EQUIP. STORAGE
SSL + 72.450
SHAFT FFL + 72.500 FFL + 72.500
SSL + 72.450 SSL + 72.400 CORRIDOR
FSL2.04 SHAFT
SERVICE LIFT PLANT ROOM PL2.36
BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM GUEST LIFT BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM STAIRCASE
BED STORAGE
PLANT ROOM SC2.05 SHAFT
PLANT ROOM PLANT ROOM PLANT ROOM
FFL + 72.500
SHAFT
SHAFT
SSL + 72.450
PL2.17 PL2.21 SHAFT
PL2.10 PL2.11 PL2.16 GUEST LIFT SHUTTLE LIFT LIFT LOBBY
HOTEL ROOM GUEST LIFT GUEST LIFT SHUTTLE LIFT
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
ST-03C ST-03A ST-03A ST-03A ST-03C ST-03B-DA ST-03A-DA ST-03A ST-03A ST-03C
PLANT ROOM
LINEN CHUTE LIFT LOBBY SHAFT
PLANT ROOM
SHAFT
SHAFT
PLANT ROOM CORRIDOR
CORRIDOR

FFL + 72.500 CORRIDOR

SSL + 72.400 FFL + 72.500


SSL + 72.400

HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
JNS-01A-ICT HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
ST-02B-P-ICS JNS-01A-ICT ST-02A-P-ICS-a ST-02A-ICK ST-02A-P-ICS-a JNS-01A-ICT JNS-01A-ICT
ST-02A-DA ST-02A ST-02B-P-ICS

BATHROOM BATHROOM
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM HOTEL ROOM
SK-01A SK-01A SK-01A SK-01A-ICK SK-01A-ICK JNS-04 SK-01A
BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM SK-01A-ICT ST-01A-S SK-01A SK-01A SK-01A SK-01A ST-01A-S SK-01A ST-01A-S SK-01A-ICK SK-01A-ICK BATHROOM BATHROOM BATHROOM BATHROOM

BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM BATHROOM

SK-01A-ICK

NOTES

BEDROOM BEDROOM BEDROOM


BEDROOM BEDROOM
LIVING ROOM LIVING ROOM
LIVING ROOM

LIVING ROOM

STAIRCASE
SC2.06

A 18.06.2019 PRESENTATION DRAWING SET PMC OH


Rev Date Issue Dwn Ckd

STATUS

NOT FOR CONSTRUCTION


PROJECT

WATERFRONT
INTEGRATED PROJECT
COLOMBO
SRI LANKA
DISCIPLINE

ARCHITECTURE
DRAWING TITLE

ARCHITECTURAL PRESENTATION
PROJECT OVERVIEW
GENERAL ARRANGEMENT
LEVEL 19
Date Drawing No Revision
21.06.2019
Scale
1:900@A3
BS Job No
AP-00121 A
1806
CAD File Name
BALMOND-DWG-AP-A-00121_A.dwg
c

www.balmondstudio.com
Registered in England & Wales No. 7225351
L20 ~ L21
L22
L23

Hotel Operator
Hotel Operator
Food studio Blackbox
Japanese Blackbox
30.04.2022
30.04.2022
L24

Hotel Operator
Hotel Operator
Executive Office Black box
Executive Office Black box
Access Date 30.04.2022
Access Date 30.04.2022

Hotel Operator
Chinese Restaurant Black
box

Access Date 30.04.2022


L25
K
A-03009

6.1 6.2 6.3 6.4 6.5 6.6 6.7

3.75 8.60 4.30 4.30 8.60 3.75

6.A

10.95
Lobby
+114.000

6.B

8.00
L26 ~ L30
6.C

L
H
A-03009
A-03007

8.00
6.D

Offices
+114.000

8.00
4.1

4.2
4.2
5
J
A-03008
4.A 8.4 4.3 6.E
5
0
4.2

7.9 4.4
5

8.00
4.B

7.9 4.5
5
0

8.4 4.6 6.F


7.9

5
G

4.00
4.7
A-03007 4.2
5 4.8
4.10
4.C
7.7 6.G
9.0 0
0 4.9

5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11
5

4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 4.75 3.45 4.25 7.80 6.50 5.30

9.15
1.00 4.75 4.75 4.75 4.75 4.75 4.75 4.75 7.80 4.25 5.50 7.95 7.95 5.50 4.25
9.1

1.15

4.D
5.A
6.H

4.25
3.70

5.00
0
7.9

5.B
6.J

Lo
4.E bby

6.95
+9
2.6

8.00
67
0
4.2

4.F
5.C
I
A-03008

4.98
6.60
5.D

4.98
Lobby
+95.000
3.00

3.00
5.E

6.95
5.30

5.30
5.F

4.25
8.30

8.30
5.G
3.00

3.00
5.45

5.45
LANDSCAPE PACKAGE
9.15

9.15
REFER TO L-123001 +124.985

INTERIOR DESIGN - REFER TO SPECIALIST INTERIORS PACKAGE

FA˙ADE INFORMATION - REFER TO FA˙ADE PACKAGE

Smoke Curtain
Smoke Curtain
Hotel Rooms
+124.500 LANDSCAPE INFORMATION - REFER TO LANDSCAPE PACKAGE
8.10

8.10
Core 2.12 Core 2.13

SPECIALIST INTERIORS PACKAGE REFER TO I-265101


LANDSCAPE PACKAGE

Smoke Curtain
REFER TO L-125002

Core 2.2 Core 2.3 LANDSCAPE PACKAGE


+124.500 +124.500 SPECIALIST INTERIORS +124.500
PACKAGE REFER TO I-265101
REFER TO L-125102
11.15

11.15
F
A-03006
0.63
3.20

3.20
8.60

8.60
8.00

8.00
8.00

8.00
8.00

8.00
E
A-03005

F 1412.2018 CONSTRUCTION ISSUE MC OH


8.00

8.00
E 18.10.2016 GENERAL UPDATE MC OH

D 07.12.2014 CONSTRUCTION ISSUE MC OH

C 07.09.2014 CONSTRUCTION ISSUE MC OH

B 19.04.2013 CONTRACT ISSUE B


8.00

8.00
N A 22.02.2013 CONTRACT ISSUE A
A-33105

FOR CONSTRUCTION
8.00

8.00
M
A-33104
8.00

8.00
8.00

8.00
ARCHITECTURAL WORKS
4.70

4.70
GENERAL ARRANGEMENT
LEVEL 30 PLAN
92.67, 95.17, 114.00, 124.50 M
3.60 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 7.50 0.50 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.60 7.40 8.00 3.75

22.02.2013

1:500 @ A1
A-01032 F
O A B C D
A-33106 A-03001 A-03002 A-03003 A-03004
1090

A-01032_F.dwg

GENERAL ARRANGEMENT LEVEL 30 PLAN ( 92.67, 95.17, 114.00, 124.50 M )