Example of Hydraulic Design Calculation


( applying HDPE DWCP at gradient 1 : 225 )

d Pipe Computation Manhole and Level Computation


MH No of PE PE Cumulative Average Peak Peak Cumulative Diameter Length Gradient Full Full Fall Ground Invert Depth MH
To Units per PE Flow Flow Flow Peak 1:n Pipe Pipe Level Level Type
MH unit Factor Flow n= Velocity Flow of Pipe Drop
(1) (2a) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) MH=1
MH No. (PE) (PE) (l/s) (l/s) (l/s) (mm) (m) (m/s) (m3/s) (m) (m) (m)
1 21.000 19.500 1.500
6 5 30 30 0.08 6.91 0.54 0.54 225 77 225 0.892 0.035 0.34
2 20.700 19.158 1.542
0 5 0 30 0.08 6.91 0.54 0.54 225 64 225 0.892 0.035 0.28
3 20.500 18.873 1.627
11 5 55 85 0.22 6.16 1.36 1.36 225 94 225 0.892 0.035 0.42
4 20.100 18.456 1.644

29 20.000 18.500 1.500


4 5 20 20 0.05 7.23 0.38 0.38 225 56 225 0.892 0.035 0.25
30 20.000 18.251 1.749
0 5 0 20 0.05 7.23 0.38 0.38 225 53 225 0.892 0.035 0.24
32 20.000 18.016 1.984

31 20.000 18.500 1.500


11 5 55 55 0.14 6.47 0.93 0.93 225 55 225 0.892 0.035 0.24
32 20.000 18.256 1.744
0 55 0.14 6.47 0.93 0.93 225 225 0.892 0.035 0.00
35 20.000 18.256 1.744
4 5 20 75 0.20 6.25 1.22 1.22 225 30 225 0.892 0.035 0.13
36 20.000 18.122 1.878

32 20.000 18.042 1.958


0 5 0 180 0.47 5.68 2.66 2.66 225 45 250 0.845 0.034 0.18
34 20.000 17.862 2.138
3 5 15 195 0.51 5.63 2.86 2.86 225 30 250 0.845 0.034 0.12
36 20.000 17.742 2.258
17 5 85 280 0.73 5.41 3.94 3.94 225 250 0.845 0.034 0.00
34
to 0 5 195 504
SUMP
12 5 60 60 6.40 #VALUE! #VALUE! 225 78 250 0.845 0.034 0.31
29 4.740 -0.312 5.052
0 5 0 60 0.16 6.40 1.00 1.00 225 33 250 0.845 0.034 0.13
28 4.752 -0.444 5.196
0 5 0 60 0.16 6.40 1.00 1.00 225 49.5 250 0.845 0.034 0.20
27 4.500 -0.642 5.142
0 5 0 60 0.16 6.40 1.00 1.00 225 50 250 0.845 0.034 0.20
26 4.500 -0.842 5.342
11 5 55 115 0.30 5.96 1.79 1.79 225 80 250 0.845 0.034 0.32
25 4.000 -1.162 5.162
0 5 0 115 0.30 5.96 1.79 1.79 225 20 250 0.845 0.034 0.08
24 4.000 -1.242 5.242
6 5 30 145 0.38 5.81 2.19 2.19 225 53 250 0.845 0.034 0.21
23 4.000 -1.454 5.454
0 5 0 145 0.38 5.81 2.19 2.19 225 24.5 250 0.845 0.034 0.10
21 3.512 -1.552 5.064
0 5 0 145 0.38 5.81 2.19 2.19 225 33 91 1.411 0.056 0.36
20 3.500 -1.915 5.415
2
Example of Hydraulic Design Calculation
( applying HDPE DWCP at gradient 1 : 225 )

d Pipe Computation Manhole and Level Computation


MH No of PE PE Cumulative Average Peak Peak Cumulative Diameter Length Gradient Full Full Fall Ground Invert Depth MH
To Units per PE Flow Flow Flow Peak 1:n Pipe Pipe Level Level Type
MH unit Factor Flow n= Velocity Flow of Pipe Drop
(1) (2a) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (14) (15) (16) (17) MH=1
MH No. (PE) (PE) (l/s) (l/s) (l/s) (mm) (m) (m/s) (m3/s) (m) (m) (m)
20 3.500 1.635 1.865
0 5 0 425 1.11 5.16 5.72 5.72 225 49 84 1.469 0.058 0.58
17 3.000 1.052 1.948
0 5 0 425 1.11 5.16 5.72 5.72 225 57.5 250 0.845 0.034 0.23
18 3.000 0.822 2.178
0 5 0 425 1.11 5.16 5.72 5.72 225 61 250 0.845 0.034 0.24
19 3.000 0.578 2.422

11 4.000 2.650 1.350


20 5 100 100 0.26 6.05 1.58 1.58 225 57 250 0.845 0.034 0.23
12 4.000 2.422 1.578
20 5 100 200 0.52 5.61 2.92 2.92 225 72 250 0.845 0.034 0.29
13 4.000 2.134 1.866
0 5 0 200 0.52 5.61 2.92 2.92 225 50 51 1.890 0.075 0.98
14 3.000 1.154 1.846

16a 3.000 1.650 1.350


20 5 100 100 0.26 6.05 1.58 1.58 225 58 250 0.845 0.034 0.23
15 3.000 1.418 1.582
18 5 90 190 0.49 5.64 2.79 2.79 225 65 250 0.845 0.034 0.26
14 3.000 1.158 1.842

14 3.000 1.158 1.842


0 5 0 390 1.02 5.21 5.29 5.29 225 29 50 1.909 0.076 0.58
19 3.000 0.578 2.422

19
to 0 5 0 815
stp

total 1010 1927.5 0

Note :
For MH 9 to MH 10 and MH 28 to MH 27 are 225 diameter Ductile Iron Pipe.
3
Ref : 0053/01

Ref : 0081/01

comparison of sewer excavation comparison of sewer depth

remarks MH vcp depth extra depth extra E/W DROP MH MH depth extra depth
type A unless To of (m) =
otherwise MH sewer pipe 1
specified (1)
MH No. (m) (m) (m) (m) (m) (m)
Area A 1 1.200 -0.300 1.200 -0.300
-13.449
2 1.260 -0.282 1.260 -0.282
-12.267
3 1.270 -0.357 1.270 -0.357
-15.823
4 1.440 -0.204 1.440 -0.204

Area B 4A 1.200 -0.300 1.200 -0.300


-11.405
4B 1.370 -0.379 1.370 -0.379
-14.681
4 1.440 -0.544 1.440 -0.544

4 1.440 -0.060 1.440 -0.060


-5.518
5 1.470 -0.274 1.470 -0.274
0.000
6 1.880 0.136 1.880 0.136

6A 1.200 -0.678 1.200 -0.678

6 1.880 -0.078 1.880 -0.078

6 1.880 -0.258 1.880 -0.258


-1.944
7 2.300 0.042 2.300 0.042
0.000

446.040
9 2.950 2.950 2.950 2.950

D 9A 1.200 -3.852 1.200 -3.852


-77.497
D 9B 1.220 -3.976 1.220 -3.976
-116.988
D 9C 1.240 -3.902 1.240 -3.902
-117.360
D 9F 1.420 -3.922 1.420 -3.922

D 9D 1.200 -3.962 1.200 -3.962


-47.544
D 9E 1.280 -3.962 1.280 -3.962
-127.136
C 9F 1.420 -4.034 1.420 -4.034

D 9F 1.42 -3.644 1.42 -3.644


-60.476
E 9 2.950 -2.465 2.950 -2.465
4
Ref : 0053/01

Ref : 0081/01

comparison of sewer excavation comparison of sewer depth

remarks MH vcp depth extra depth extra E/W DROP MH MH depth extra depth
type A unless To of (m) =
otherwise MH sewer pipe 1
specified (1)
MH No. (m) (m) (m) (m) (m) (m)
E 10A 1.200 -0.665 1.200 -0.665
-16.072
D 10B 1.520 -0.428 1.520 -0.428
-16.503
B 10C 1.650 -0.528 1.650 -0.528
-12.090
E 10D 2.290 -0.132 2.290 -0.132

10 3.000 1.650 3.000 1.650

E 12 1.200 -0.646 1.200 -0.646


0.000
13 2.360 1.010 2.360 1.010
38.593
B 14 2.790 1.208 2.790 1.208
45.162
E 15 2.950 1.108 2.950 1.108
0.000
E 16 3.190 1.348 3.190 1.348
30.589
E 17 4.590 2.168 4.590 2.168

17A 1.200 1.200 1.200 1.200


0.000
17B 2.410 2.410 2.410 2.410

total 68 -106.370 0 #REF!

saving per manhole #REF!